ROW e-Review Tracker
Every project on Denver DOTI's public right-of-way e-Review index — encroachments, vacations, easement relinquishments, utility work, and capital projects — cross-referenced against each project's agency Comment Report for denials, flagged conditions, and bike lane elements.
Type
| Project | Type | Agencies | Outcome | |
|---|---|---|---|---|
2026-VACA-0000011 KSE Arena Redevelopment 1000 Chopper Cir Vacation VACADenial · 326 agencies | VACA | 26 | Denial · 3 | |
CenturyLink ReferralDenied PWPRS Project Number: 2026-VACA-0000011 KSE Arena Redevelopment 1000 Chopper Cir Vacation Reviewing Agency/Company: Centurylink/Lumen Reviewers Name: Briana Salles Reviewers Phone: 361-652-8608 Reviewers Email: briana.salles@lumen.com Approval Status: Denied C… DES Transportation ReviewDenied No Transportation exception to alley ROW vacation for private street. Awaiting City (storm sewer/drainage), Denver Water, and other utility service provider comment regarding utility service extensions and easements that may be required in and adjacent to this… Survey ReviewDenied Uploaded survey redline comments in E-Review. Review Status: Approved - No Response All documents in this project (11) ★ 2026-VACA-0000011 Comment Report 5-29-2026.pdfBall Arena_Alley Legal and Exhibit_S1.pdfKDC Alley Vacation Site Plan.pdfKDC Arena_Alley Legal Exhibit_vacation-checklist-application_S1.pdfKroenke Arena Company - Title Commtment 70861584 - Revision_4.pdfKroenke Parking CURRENT TITLE Commitment_revision_3.pdfREDLINES- CenturyLink- Salles - No Objection.pdfREDLINES- CenturyLink- Salles- Objection Letter.docxREDLINES- Survey- Breitnauer.pdfTitle Commitment -LTGC 1450 5th Street 74179.1.pdfTitle Commitment- LTGC Arena and Surrounding Parcels (74180.1).pdf | ||||
2026-VACA-0000009 AHRT 3707 Walnut St Vacation VACADenial · 124 agencies | VACA | 24 | Denial · 1 | |
Survey ReviewDenied See red lines for further comments. Review Status: Approved - No Response | ||||
2026-VACA-0000008 Womens Soccer Stadium Parcel 1B Vacation VACAClear28 agencies | VACA | 28 | Clear | |
All documents in this project (9) 2025-SDP-0000222 BWS Filing 5 SDP.pdf2026-04-13_Title Commitment_Parcel 1B.pdf★ 2026-VACA-0000008 Comment Report 4-29-2026.pdfApplication and checklist.pdfBWS F5-PARCEL 1B-ADJ-20251120 SURV-APP.pdfBWS-FILING 5-ALTA-DRAFT-20260324 sheet 5_Parcel 1B.pdfParcel 1B Legal Description.docxQCD from CDOT to City.pdfSDP Plans_Denver Summit FC-2025-PROJMSTER-0000120 - 2nd Review Submittal.pdf | ||||
2026-VACA-0000006 555 N Josephine St Vacation VACADenial · 226 agencies | VACA | 26 | Denial · 2 | |
Construction Engineering ReviewDenied See checklist and application. Vacations, dedications and easements need to be hatched. Survey ReviewDenied Survey redline comments were uploaded in E-Review. All documents in this project (7) ★ 2026-VACA-0000006 - Comment Report - 04.21.2026.pdfChecklist and Application.pdfLegal Description.pdfREDLINES - Survey- TBreitnaauer - 20260407-2026-VACA-006-1stSubmittal-Survey RedlineComments.pdfREDLINES- CenturyLink- Salles- No Reservations.pdfREDLINES-CenturyLink-BSales REDLINES.pdfSite Plan.pdf | ||||
2026-VACA-0000005 2465 S Downing St - Porter Hospital Alley Vacation VACADenial · 326 agencies | VACA | 26 | Denial · 3 | |
CenturyLink ReferralDenied PWPRS Project Number: 2026-VACA-0000005 - 2465 S Downing St - Porter Hospital Alley Vacation Reviewing Agency/Company: Centurylink/Lumen Reviewers Name: Briana Salles Reviewers Phone: 361-652-8608 Reviewers Email: briana.salles@selectrow.com Approval Status: D… DES Transportation ReviewDenied 1. Partial alley vacation cannot be approved since it is creating dead-end alley. An L-out has to be constructed 2. If alley vacation would be approved, it should be called out as 18' alley to include 2' dedication completed in 2024 3. Utility easement should… DES Wastewater ReviewDenied Easement reservation is needed to cover the existing public sanitary sewer or the re-location of the sewer needed to be done prior to vacation approval. | ||||
2026-VACA-0000003 1430 14th St Vacation VACANo report yet— agencies | VACA | — | No report yet | |
2026-VACA-0000001 1871 S University Blvd DU Alley Vacation VACADenial · 326 agencies | VACA | 26 | Denial · 3 | |
DES Transportation ReviewDenied PWPRS Project Number: 2026-VACA-0000001 1871 S University Blvd DU Alley Vacation Reviewing Agency/Company: DOTI DES Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.christensen@denvergov.org Approval Status:… DES Wastewater ReviewDenied Denver GIS indicates that the existing alley ROW between Asbury and Jewell is aproximately 22 to 24 feet, not 15'. Survey ReviewDenied Comments and redlines in project folder Review Status: Approved - No Response All documents in this project (7) ★ 2026-VACA-0000001 Comment Report 2-23-2026.pdfDU Alley Vacation Request_Application.pdfDU Alley Vacation Segment 1_Legal Description.pdfDU Alley Vacation Segment 2_Legal Description.pdfDU Alley Vacatoin Request_Site Plan.pdfREDLINES- CenturyLink- Salles - Objection Letter.pdfREDLINES- Survey- Pfohl.pdf | ||||
2026-UTIL-0000179 Denver Water - N Osage St between W 41st Ave and W 44th Ave UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000178 CenturyLink - Pauley Construction - 21530 Stoll Pl UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000177 Denver Water - W 32nd Ave and W 37th Ave UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000176 Xcel - Q3 Contracting - 7549 E Dartmouth Ave - WO no.115522325 UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000175 Xcel - HKS Utility Services - 2777 Zuni St UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000174 Xcel - Centerline Energy Construction - 995 S Zuni St UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000173 Xcel - HKS Utility Services - 525 S. Corona St UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000172 Xcel - HKS Utility Services - 1456 N. Corona St UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000171 CenturyLink - Pauley Construction - 917 Auraria Pkwy UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000170 Xcel - HKS Utility Services - 3701 W. 16th Ave UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000169 Xcel - HKS Utility Services -1310 N Jackson St UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000168 CenturyLink - PAULEY CONSTRUCTION - 18715 53rd Ave UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000167 Comcast - ITG Communications - 5353 E Yale Ave UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000166 Xcel - HKS Utility Services - E 14th Ave and N Pennsylvania St UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000165 Comcast - ITG Communications - 1100 Federal Blvd UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000164 Xcel - HKS Utility Services - W 38th Ave and Huron St UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000163 Xcel - HKS Utility Services - E 60th Ave and Tower Rd UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000162 CenturyLink - E.1600.0029596 - 10203 E. 56th Ave (N. Galena St and E. 56th Ave) UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000160 Xcel - NACC Construction - St Paul and E 41st Ave UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000159 Verizon - ADB Companies - Maxwell Pl from Picadilly Rd to N O UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000158 Xcel - NACC Construction - W 42nd Ave and Fox St UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (5) | ||||
2026-UTIL-0000157 Denver Water - W Jewell Ave between S Stuart St and S Patton Ct UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000154 Xcel - HKS Utility Services - 9111 E 40th Ave UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000151 Xcel - HKS Utility Services - Central Park Blvd. and E. 40th Ave UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (5) | ||||
2026-UTIL-0000150 Xcel - HKS Utility Services - E 46th Ave and SPR Trail-Bridge UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. Add EOP-EOP dimension on each sheet on each street where work is being performed. 2. Sheet 6: Proposed transformer is located in South Platte Levee NO DIG area. Work in this area must be reviewed | ||||
2026-UTIL-0000149 Xcel - HKS Utility Services LLC - W 38th Ave and Huron UTILDenial · 38 agencies | UTIL | 8 | Denial · 3 | |
City Forester ReviewDenied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. 1. ATTN: Per development no 2020PM0000591, gas line route on Galapago must be adjusted t… Comments:Denied 1. Add ROW-ROW dimension on each sheet on each street where work is being proposed. 2. Sheet 8: Dimension running line to storm manhole. Must comply with 5' minimum distance requirement. Denver Water ReferralDenied PWPRS Project Number: 2026-UTIL-0000149 - Xcel - HKS Utility Services LLC - W 38th Ave and Huron Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied C… | ||||
2026-UTIL-0000148 Xcel - HKS Utility Services - 1674 Albion St UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (4) | ||||
2026-UTIL-0000146 CenturyLink - Pauley Construction - 212480 E 48th Ave UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000145 CenturyLink - Pauley Construction - 21530 Stoll Pl UTILDenial · 38 agencies | UTIL | 8 | Denial · 3 | |
City Forester ReviewDenied Plan file is not available on e-review ERA Transportation ReviewDenied 1. Please provide dimensions from bore line to sidewalk, BOC, EOP 2. Sheet 11, 12 and 15 - Bore lines can by no means go thorough signal clear zones 3. Sheet 13 - Adjust street name labels, should be 51st Ave (not PL) 4. Sheet 13 - Show clear zone per CCD Std… PW Construction Engineering ReviewDenied RESTUBMIT. RE-READ the UPR Submittal checklist. On the next submittal, don't check items that are not show on the plans. | ||||
2026-UTIL-0000144 Xcel - HKS Utility Services - 1055 Clermont St UTILDenial · 26 agencies | UTIL | 6 | Denial · 2 | |
City Forester ReviewDenied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Comments:Denied 1. Reference specific record/project number for project showing future conditions of area to verify future conditions. All documents in this project (6) 1055 Clermont St. - Electric Installation (2026-07-08).pdf1055 Clermont St. - UPR Application (2026-07-08).pdf1055 Clermont St. - UPR Checklist (2026-07-08).pdf★ 2026-UTIL-0000144 - Comment Report - 07.27.26.pdf2026-UTIL-0000144 - Revised Comment Report - 07.30.26.pdfREDLINES - OCF - EHuetig Comments 7-22-26__2026-UTIL-0000144.pdf | ||||
2026-UTIL-0000143 Xcel - Sitewise LLC - 1570 S VALLEJO UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (9) 1570 S Vallejo St_QLA_REDUCED_JK SIGNED.pdf2026-UTIL-0000143 Comment Report 7-23-2026.pdf2026-UTIL-0000143 Revised Comment Report 7-28-2026.pdf2026-UTIL-0000143 Revised Comment Report 8-3-2026.pdfREDLINES- ER Transportation- Leyva- Approved.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig.pdfUtility Plan Review Application 1570 S Vallejo St..pdfUtility Plan Review checklist 1570 S VALLEJO.pdf | ||||
2026-UTIL-0000142 Zayo Fiber Solutions - 800 18th St UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
Comments:Denied 1. The use of aerial photography is not a sufficient representation of the existing conditions , especially where shadows obscure roadway features?or the resolution of the photo is low and features are not easily discernible.? | ||||
2026-UTIL-0000140 Xcel - HKS Utility Services - 4819 Irving St UTILClear5 agencies | UTIL | 5 | Clear | |
2026-UTIL-0000139 Xcel - HKS Utility Services - 20th St. and Lawrence St UTILClear6 agencies | UTIL | 6 | Clear | |
2026-UTIL-0000137 Xcel - HKS Utility Services - UNIV1924 Feeder UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
City Forester ReviewDenied Denied OCF Comments 7-15-26 1. Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. A. Sheet 5: Move switch cabinet 8' west of proposed site… ERA Transportation ReviewDenied 1. Sheet 5: Dimension proposed pole to BOC. Distance must comply with 5.5' minimum for future sidewalk expansion. All documents in this project (6) | ||||
2026-UTIL-0000136 Denver Water - 17th Ave and Detroit Street - West Elk Place and Tejon Street UTILClear6 agencies | UTIL | 6 | Clear | |
2026-UTIL-0000135 Xcel - HKS Utility Services - MONR1081 Feeder UTILDenial · 27 agencies | UTIL | 7 | Denial · 2 | |
City Forester ReviewDenied Comments:Denied All documents in this project (10) ★ 2026-UTIL-0000135 - Comment Report - 07.15.2026.pdf2026-UTIL-0000135 - Revised Comment Report - 07.29.2026.pdf2026-UTIL-0000135 - Revised Comment Report - 07.30.2026.pdf2026-UTIL-0000135 Final Approved Plan Set.pdfMONR1081 Feeder - Electric Installation.pdfMONR1081 Feeder - UPR Application.pdfMONR1081 Feeder - UPR Checklist.pdfREDLINES - OCF - Ehuetig - Comments 7-9-26 - MONR1081 Feeder - Electric.pdfREDLINES - OCF - EHuetig - Approved 7-27-26__MONR1081 Feeder - Electric (2026-07-23).pdfREDLINES -EPR Transportation- VCuellar - MONR1081 Feeder - Electric Installation (2026-07-23).pdf | ||||
2026-UTIL-0000134 Denver Water - Denver Water - W 50th Ave and W Dixie Pl UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000132 Xcel - HKS Utility Services - 3721 Globeville Rd UTILDenial · 210 agencies | UTIL | 10 | Denial · 2 | |
City Forester ReviewDenied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. 1. Sheet 6: Locate bore & trench on south side of Globeville at midpoint b/w ROW trees.… Comments:Denied 1. Dimension proposed SC to BOC. Must comply with 5.5' minimum distance requirement for future expansion of 5' attached sidewalk. All documents in this project (11) ★ 2026-UTIL-0000132 - Comment Report - 7.6.26.pdf2026-UTIL-0000132 - Comment Report - 7.7.26.pdf2026-UTIL-0000132 - Revised Comment Report - 7.21.26.pdf2026-UTIL-0000132 Final Approved Plan Set.pdf3721 Globeville Rd. - Electric Installation.pdf3721 Globeville Rd. - UPR Application.pdf3721 Globeville Rd. - UPR Checklist.pdfREDLINES - CDOT - MWhite - NW_028_C.pdfREDLINES - EPR Transportation - VCuellar - 3721 Globeville Rd. - Electric Installation.pdfREDLINES - OCF - EHuetig - Comments 6-30-26__2026-UTIL-0000132.pdfREDLINES - OCF - EHuetig - Approved 7-15-26__3721 Globeville Rd. - Electric 2026-07-13.pdf | ||||
2026-UTIL-0000131 Hyperfiber - ITG - Picadilly Rd and Green Valley Ranch Blvd UTILDenial · 48 agencies | UTIL | 8 | Denial · 4 | |
Parks and Recreation ReviewDenied PWPRS Project Number: 2026-UTIL-0000131 - Hyperfiber - ITG - Picadilly Rd and Green Valley Ranch Blvd Reviewing Agency/Company: Parks Planning Design and Construction Reviewers Name: Greg Neitzke Reviewers Phone: 3039162689 Reviewers Email: greg.neitzke@denver… ERA Transportation ReviewDenied 1. Include trench footage in bill of materials. 2. If trench footage exceeds 1,750 LF: Due to the project's limit of disturbance (Open trench equal to or exceeding PW Construction Engineering ReviewDenied Please Send PWPR-019 Denver Water ReferralDenied | ||||
2026-UTIL-0000130 Hyperfiber - ITG - Orleans St and E 55th Ave UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000129 Hyperfiber - ITG - Malaya St And E 55th Pl UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (3) | ||||
2026-UTIL-0000128 HyperFiber - ITG - Maxwell Pl and Kirk St UTILDenial · 37 agencies | UTIL | 7 | Denial · 3 | |
City Forester ReviewDenied Denied: 1) No trenching in the amenity zone Comments:Denied Previous approval was an error. The following comments must be addressed. PW Construction Engineering ReviewDenied This plan set references PWPR-019. Please send a copy to kim.blair@denvergov.org | ||||
2026-UTIL-0000127 CenturyLink - Pauley Construction - 4765 Green Valley Ranch Blvd UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000126 CenturyLink - Pauley Construction - 4872 Cathay St UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
Comments:Denied 1. Sheet 10: Add and dimension missing sanitary lateral that runs to 5152 N Espana Way. Must comply with minimum distance requirements. All documents in this project (8) | ||||
2026-UTIL-0000125 Xcel - HKS Utility Services, LLC - Leetsdale Dr and Dahlia St Denver, CO UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000124 Xcel - HKS Utility Services - E 59th Ave and Tower Rd UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000123 Comcast - ITG Communications - 11440 E 56th Ave UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. Include UPR number on top front center of cover sheet. 2. Please use aerial images for plans that clearly show the existing conditions for the area, including the adjacent All documents in this project (7) | ||||
2026-UTIL-0000122 Xcel - HKS Utility Services - 3515 Garfield St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. Application mentions proposed installation of 2 poles, but only one is being shown on plans. Please indicate where second pole is being proposed. If it is not in public ROW, show on plans but indicate that it is not being All documents in this project (7) ★ 2026-UTIL-0000122 - Comment Report - 06-29-2026.pdf2026-UTIL-0000122 Final Approved Plan Set.pdf2026-UTIL-0000122 Revised Comment Report 7-15-2026.pdf3515 Garfield St. - UPR Application.pdf3515 Garfield St. - UPR Checklist.pdf3515 Garfield St. - Utility Pole Installation.pdfREDLINES- ER Transportation- Leyva- Approved.pdf | ||||
2026-UTIL-0000121 Segura Fiber - AZ Field Services -18381 Green Valley Ranch Blvd UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (7) 2026-UTIL-0000121 - Comment Report - 7-9 - 26.pdf2026-UTIL-0000121 - Revised Comment Report - 7-30-26.pdf2026-UTIL-0000121 - Revised Comment Report -08.03.2026.pdf26859002-Denver Permit Checklist.pdfdotipt-121.2 utility plan review application.pdfS0024476 Peter Defries Corporation dba Dion's 18381 Green Valley Ranch BLVD.Pothole Permit Drawings.Rev 0.260417.pdfTCP- 26859002 18381 Green Valley Ranch blvd.pdf | ||||
2026-UTIL-0000120 Xcel - HKS Utility Services, LLC - 3494 W Alameda Ave UTILClear7 agencies | UTIL | 7 | Clear | |
All documents in this project (8) 2026-UTIL-0000020 Comment Report 7-8-2026.pdf2026-UTIL-0000120 - Final Approval Plan Set.pdf★ 2026-UTIL-0000120 Revised Comment Report 7-24-2026.pdf3494 W. Alameda Ave. - Electric Installation (2026-06-05).pdf3494 W. Alameda Ave. - UPR Application 6.9.26.pdf3494 W. Alameda Ave. - UPR Checklist (2026-06-05).pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES Forestry Huetig.pdf | ||||
2026-UTIL-0000119 Comcast - Mastec - 4698 Peoria St UTILDenial · 214 agencies | UTIL | 14 | Denial · 2 | |
City Forester ReviewDenied Denied: 1) Sheet 10 - show TPZ fencing as perimeter around ROW tree canopy adjacent to HH install. Add note to reference OCF Tree Protection Standard Notes. ERA Transportation ReviewDenied 1. Sheet 8: ROW line is not being shown accurately on plans. ROW line is closer to west edge of sidewalk. Consider moving running line to roadway to move out of private property. Add callout pointing to where work exists public | ||||
2026-UTIL-0000118 CenturyLink - Pauley Construction - 5292 Argonne St UTILClear15 agencies | UTIL | 15 | Clear | |
2026-UTIL-0000117 Xcel - HKS Utility Services - 4000 Lipan St UTILClear15 agencies | UTIL | 15 | Clear | |
2026-UTIL-0000116 Comcast - ITG Communications - 6923 E Montview Blvd UTILClear7 agencies | UTIL | 7 | Clear | |
All documents in this project (8) 2026-UTIL-0000116 Comment Report 6-25-2026.pdf2026-UTIL-0000116 Final Approved Plan Set.pdf★ 2026-UTIL-0000116 Revised Comment Report 7-15-2026.pdfApplication.pdfChecklist.pdfJB2405622-Montview Blvd and Olive St.pdfREDLINES- Construction Engineering- Blair.pdfTCP-JB0002405622 Montview Blvd and Olive St.pdf | ||||
2026-UTIL-0000114 Comcast - ITG Communications - 1490 S Shoshone St UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Please show existing conditions using aerial photography. Add line work for all fences, gates, walks buildings and driveways to demonstrate that the proposed location does not adversely affect the adjacent property.? 2. Sheet 7: Add existing sanitary latera… | ||||
2026-UTIL-0000113 CenturyLink - Pauley Construction - 4898 Halifax St UTILDenial · 27 agencies | UTIL | 7 | Denial · 2 | |
Comments:Denied 1. Add not stating that work exiting public ROW is not approved nor permitted under this UPR . 2. Please protect all green infrastructure, sanitary sewer, storm drain pipes and appurtenances during construction. PW Construction Engineering ReviewDenied REDLINES uploaded to Ereview page | ||||
2026-UTIL-0000112 CenturyLink - Pauley Construction - 4770 N Forest St UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
Comments:Denied 1. Show missing sanitary lateral located near proposed work. Closest edge of proposed work must be at least 5' from sanitary lateral. All documents in this project (9) 2026-UTIL-0000112 - Comment Report - 06.23.2026.pdf★ 2026-UTIL-0000112 - Revised Comment Report - 06.29.2026.pdf2026-UTIL-0000112 - Revised Comment Report - 07.07.26.pdf2026-UTIL-0000112 Final Approved Plan Set.pdfDenver UPR Checklist.pdfP.395801 Denver Utility Plan Application.pdfP.395801-26036.00-FOREST ST 20260605.pdfREDLINES - EPR Transportation - VCuellarLeyva - P.395801-26036.00-FOREST ST 20260629.pdfREDLINES - kdb P.395801-26036.00-FOREST ST 20260605.pdf | ||||
2026-UTIL-0000110 Denver Water - S Locust St and S Leyden St between E Virginia Ave and E Alameda Ave UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000109 Xcel - HKS Utility Services - 1565 Colorado Blvd UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (9) 1565 Colorado Blvd. - Electric Installation.pdf1565 Colorado Blvd. - UPR Application.pdf1565 Colorado Blvd. - UPR Checklist.pdf2026-UTIL-0000109 - Final Approval Plan Set.pdf2026-UTIL-0000109 Comment Report 6-17-2026.pdf2026-UTIL-0000109 Revised Comment Report 6-23-2026.pdf★ 2026-UTIL-0000109 Revised Comment Report 6-24-2026.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- ER Transportation- Leyva- Approved.pdf | ||||
2026-UTIL-0000108 Xcel - NACC Construction - Atchison Way UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (9) 2026-UTIL-0000108 - Comment Report 06.15.2026.pdf2026-UTIL-0000108 Final Approval Plan Set.pdf2026-UTIL-0000108 Revised Comment Report 6-16-2026.pdf2026-UTIL-0000108 Revised Comment Report 6-23-2026.pdf★ 2026-UTIL-0000108 Revised Comment Report 7-28-2026.pdfAtchison Phase 1 UPR application.pdfAtchison phase one-utility-plan-review-checklist.pdfAtchison-PH1_Denver_114946964_27May26.pdfREDLINES - Construction Engineering - KBlair - Atchison - PH1Denver 114946964 27May26 kdb.pdf | ||||
2026-UTIL-0000105 Xcel - HKS Utility Services - E. 56th Ave. and Valentia St UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000104 Denver Water - PT 23308 - Santa Fe Streetscape Improvement UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (4) | ||||
2026-UTIL-0000103 Xcel - HKS Utility Services LLC - E Yale Ave and S Holly St UTILNo report yet— agencies | UTIL | — | No report yet | |
2026-UTIL-0000102 Comcast - Mastec - 9313 W Saratoga Pl UTILDenial · 27 agencies | UTIL | 7 | Denial · 2 | |
City Forester ReviewDenied OCF Comments 6-2-26 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, ERA Transportation ReviewDenied 1. Work shown is going outside public right-of-way. This work shall not be permitted under this UPR. Please remove this work from the UPR plans and/or clearly note and provide callout for EACH location that it is not part of the UPR | ||||
2026-UTIL-0000101 Xcel - HKS Utility Services LLC - E 56th Ave and Picadilly Rd UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000100 Xcel - HKS Utility Services LLC - Tower Rd and Green Valley Ranch Blvd UTILDenial · 27 agencies | UTIL | 7 | Denial · 2 | |
Parks and Recreation ReviewDenied PWPRS Project Number: 2026-UTIL-0000100 - Xcel - HKS Utility Services LLC - Tower Rd and Green Valley Ranch Blvd ERA Transportation ReviewDenied 1. Sheet 14: Proposed location of work is in a park and will also require approved status from Parks reviewers. Please provide proof of approval/no objection when obtained. | ||||
2026-UTIL-0000099 Xcel - HKS Utility Services LLC - 1460 W. 38th Ave UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000098 Xcel - Sitewise LLC - Clarkson from 14th to 18th crossing Colfax UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
Comments:Denied 1. Due to the project's limit of disturbance (Open trench equal to or exceeding 1,750 LF) a Construction Activities | ||||
2026-UTIL-0000097 Xcel - HKS Utility Services - 1055 Auraria Pkwy UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000096 HyperFiber - ITG Communications - 1101 Auraria PKWY- Ball Arena Property Redevelopment - Phase 1 UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Dimension all proposed work (handholes, transformers, bore pits, running line, etc.) to BOC, ROW, and edge of walk. 2. Show all utility mains and services, including but not limited to; water, sanitary sewer, manholes, and storm sewer. Dimension to proposed… All documents in this project (9) 2026-UTIL-0000096 Comment Report 5-29-2026.pdf★ 2026-UTIL-0000096 Revised Comment Report 07.29.2026.pdfBA-PH1-UTIL-UPR-0001-APPLICATIONS.pdfBA-PH1-UTIL-UPR-0001-PLANS.pdfBA-PH1-UTIL-UPR-0001-SUBMITTAL CHECKLIST.pdfREDLINES - EPR TRANS- VCuellar - Updated 2026-UTIL-0000096 BA-PH1-UTIL-UPR-0001-PLANS (060826).pdfREDLINES - EPRTrans - VCuellar - 2026-UTIL-0000096 BA-PH1-UTIL-UPR-0001-PLANS (REV3 072126).pdfREDLINES - OFC - EHuetig - Approved - 2026-UTIL-0000096 BA-PH1-UTIL-UPR-0001-PLANS (060826).pdfREDLINES- Forestry- Huetig.pdf | ||||
2026-UTIL-0000095 Comcast - Mastec - 3512 S Hillcrest Dr UTILDenial · 38 agencies | UTIL | 8 | Denial · 3 | |
City Forester ReviewDenied ERA Transportation ReviewDenied Denver Water ReferralDenied PWPRS Project Number: 2026-UTIL-0000095 - Comcast - Mastec - 3512 S Hillcrest Dr Reviewing Agency/Company: Denver Water | ||||
2026-UTIL-0000094 Xcel - HKS Utility Services LLC - 3988 Galapago St UTILDenial · 26 agencies | UTIL | 6 | Denial · 2 | |
City Forester ReviewDenied 05/27/2026 Denied ERA Transportation ReviewDenied 1. Sheet 7: Add and dimension storm manhole at the intersection of W 39th Ave and N Galapago St. Ensure open trench and running line are at least 5' from manhole. | ||||
2026-UTIL-0000092 Sturgeon - 1000 Chopper Circle - N Speer Blvd Chopper Circle and Auraria Pkwy UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000091 Xcel - HKS Utility Services - Central Park Blvd and E 40th Ave UTILClear6 agencies | UTIL | 6 | Clear | |
All documents in this project (5) | ||||
2026-UTIL-0000090 Xcel - HKS Utility Services - 1001 N. Lincoln St UTILClear7 agencies | UTIL | 7 | Clear | |
All documents in this project (7) 1001 N. Lincoln St. - Electric Installation.pdf1001 N. Lincoln St. - UPR Application.pdf1001 N. Lincoln St. - UPR Checklist.pdf2026-UTIL-0000090 - Comment Report - 05.07.2026.pdf2026-UTIL-0000090 Final Approval Plan Set.pdf★ 2026-UTIL-0000090 Revised Comment Report 5-12-2026.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2026-UTIL-0000087 Xcel - HKS Utility Services - 1001 N. Alcott St UTILDenial · 16 agencies | UTIL | 6 | Denial · 1 | |
Comments:Denied PWPRS Project Number: 2026-UTIL-0000087 -Xcel - HKS Utility Services - 1001 N. Alcott St Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments:… All documents in this project (7) | ||||
2026-UTIL-0000086 Xcel - HKS Utility Services - S Monaco St Pkwy and E Center Ave UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000084 Xcel - HKS Utility Services - 6298 N. Argonne St UTILDenial · 27 agencies | UTIL | 7 | Denial · 2 | |
Comments:Denied 1. Sheet 6: Dimension proposed bore pit to storm main. Must comply with minimum distance requirements. 2. Running line/work crosses over a bridge. Contact?DOTI Bridge Group at?DOTI.Bridges@Denvergov.org?. UPR PW Construction Engineering ReviewDenied see kdb red lines. Review Status: Approved | ||||
2026-UTIL-0000082 Denver Water - Denver Water - Virginia Village - S Fairfax St from E Mexico Ave to E Florida Ave and in S Eudora St from E Florida Ave to E Louisiana Ave UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
City Forester ReviewDenied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No ERA Transportation ReviewDenied All documents in this project (8) ★ 2026-UTIL-0000082 - Comment Report - 04.24.26.pdf2026-UTIL-0000082 - Revised Comment Report -06.08.2026.pdf22979 - Site Plans.pdf22979 - UPRAPP.pdf22979 - URPCHECKLIST.pdfEPR TRANS-VCuellar-Leyva- REDLINES - 2026-UTIL-0000082.pdfOCF - REDLINES - 2026-UTIL-0000082 - OCF Comments 06.05.2026.pdfOCF - REDLINES - 2026-UTIL-0000082 - OCF Comments 4-21-26.pdf | ||||
2026-UTIL-0000080 Xcel - HKS Utility Services - UNIV1024 Feeder UTILDenial · 37 agencies | UTIL | 7 | Denial · 3 | |
City Forester ReviewDenied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No Comments:Denied Denver Water ReferralDenied PWPRS Project Number: 2026-UTIL-0000080 - Xcel - HKS Utility Services - UNIV1024 Feeder Reviewing Agency/Company: Denver Water All documents in this project (9) ★ 2026-UTIL-0000080 Comment Report 4-22-2026.pdf2026-UTIL-0000080 Revised Comment Report 4-23-2026.pdfREDLINES- CDOT- White.pdfREDLINES- Denver Water- Naso- Easement 421-365.pdfREDLINES- Denver Water- Naso.pdfREDLINES- Forestry- Huetig.pdfUNIV1024 Feeder - Electric Installation.pdfUNIV1024 Feeder - UPR Application.pdfUNIV1024 Feeder - UPR Checklist.pdf | ||||
2026-UTIL-0000079 Xcel - HKS Utility Services, LLC - 250 Clayton St Denver, CO UTILClear9 agencies | UTIL | 9 | Clear | |
2026-UTIL-0000078 Xcel - HKS Utility Services - 900 W. Ellsworth Ave UTILClear10 agencies | UTIL | 10 | Clear | |
All documents in this project (12) 2026-UTIL-0000078 - Comment Report - 04.16.2026.pdf2026-UTIL-0000078 - Final Approval Plan Set.pdf2026-UTIL-0000078 - Revised Comment Report 4-21-2026.pdf2026-UTIL-0000078 - Revised Comment Report 6-11-2026.pdf★ 2026-UTIL-0000078 - Revised Comment Report 6-24-2026.pdf900 S. Ellsworth Ave. - UPR Application.pdf900 S. Ellsworth Ave. - UPR Checklist.pdf900 S. Ellsworth Ave. - Utility Pole Installation.pdfREDLINES - OCF- E Huetig 2020PM0000419 - Approved Utility Plan.pdfREDLINES - OCF- EHuetig - 2026-UTIL-0000078 - OCF Comments 4-15-26.pdfREDLINES- ER Transportation- Leyva- Approved.pdfREDLINES- Forestry- Approved.pdf | ||||
2026-UTIL-0000077 Xcel - HKS Utility Services - 49th Ave and Yampa St UTILClear6 agencies | UTIL | 6 | Clear | |
2026-UTIL-0000076 3225 and 3227 W 21st Ave UTILClear5 agencies | UTIL | 5 | Clear | |
All documents in this project (5) | ||||
2026-UTIL-0000075 Xcel - HKS - 1001 N Lincoln St UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (6) | ||||
2026-UTIL-0000073 Xcel - HKS Utility Services - 1000 S Logan St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
City Forester ReviewDenied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No All documents in this project (8) 1000 S. Logan St. - Electric Installation.pdf1000 S. Logan St. - UPR Application.pdf1000 S. Logan St. - UPR Checklist.pdf★ 2026-UTIL-0000073 Comment Report 4-21-2026.pdf2026-UTIL-0000073 Final Approved Plan Set.pdf2026-UTIL-0000073 Revised Comment Report 5-12-2026.pdfREDLINES - OCF - EHuetig Comments 4-6-25__2026-UTIL-0000073.pdfREDLINES- Forestry- Huetig- Approved.pdf | ||||
2026-UTIL-0000071 Xcel - HKS Utility Services, LLC - 953 Decatur St Denver, CO UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000070 Xcel - HKS Utility Services - 1055 S Fox St UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000069 Zayo Fiber Solutions - TBD - 1400 Market St UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000068 Denver Water - PT 22980 - South Park Hill Main Replacement - N Glencoe St UTILClear7 agencies | UTIL | 7 | Clear | |
All documents in this project (5) | ||||
2026-UTIL-0000067 Denver Water - PT 23044 - Cory-Merrill Project 1 - S Filmore St and S Clayton St UTILClear6 agencies | UTIL | 6 | Clear | |
All documents in this project (4) | ||||
2026-UTIL-0000066 Xcel - HKS Utility Services - 8892 E. Lowry Blvd UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000064 Xcel - HKS Utility Services - 95 N. Lincoln St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
City Forester ReviewDenied Denied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No All documents in this project (10) 2026-UTIL-0000064 Comment Report 4-7-2026.pdf2026-UTIL-0000064 Final Approved Plan Set.pdf★ 2026-UTIL-0000064 Revised Comment Report 4-16-2026.pdf2026-UTIL-0000064 Revised Comment Report 4-21-2026.pdf95 N. Lincoln St. - Electric Installation.pdf95 N. Lincoln St. - UPR Application.pdf95 N. Lincoln St. - UPR Checklist.pdfREDLINES- ER Transportation- Leyva- Approved.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig.pdf | ||||
2026-UTIL-0000063 Hyper Fiber - ITG - E 45TH AVE AND ARGONNE ST UTILClear7 agencies | UTIL | 7 | Clear | |
All documents in this project (7) 2026-UTIL-0000063 Comment Report 4-6-2026.pdf2026-UTIL-0000063 Final Approved Plan Set.pdf★ 2026-UTIL-0000063 Revised Comment Report 4-23-2026.pdfOLT2 FDA00 - CCD Application - 031226.pdfOLT2 FDA00 - UPR Checklist 2.00 - 031226.pdfREDLINES- Construction Engineering- Blair.pdfRFUSA CO GREEN VALLEY RANCH OLT-02-ECA-031826-R3-OLT PERMIT.pdf | ||||
2026-UTIL-0000062 Comcast - ITG Communications LLC - 2700 S Holly St UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
ERA Transportation ReviewDenied 1. Running line goes over bridge at beginning of project. Refer to the Bridge Group @ DOTI.Bridges@denvergov.org. Bridge group must provide approval or denial of the proposed work (if they deem Comments:Denied PWPRS Project Number: 2026-UTIL-0000062 - Comcast - ITG Communications LLC - 2700 S Holly St Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comme… All documents in this project (4) | ||||
2026-UTIL-0000061 HyperFiber - ITG - DUNKIRK ST AND E 59TH AVE UTILNo report yet— agencies | UTIL | — | No report yet | |
All documents in this project (5) | ||||
2026-UTIL-0000060 Hyperfiber - ITG - MAXWELL PL and IRELAND ST UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (9) 2026-UTIL-0000060 Comment Report 3-31-2026.pdf2026-UTIL-0000060 Final Approved Plan Set.pdf★ 2026-UTIL-0000060 Revised Comment Report 6-16-2026.pdf2026-UTIL-0000060 Revised Comment Report 6-9-2026.pdfOLT2 FDA9 - CCD Application - 031226.pdfOLT2 FDA9 - UPR Checklist 2.9 - 031226.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- ER Transportation -Leyva- Approved.pdfRFUSA CO GREEN VALLEY RANCH A2-09 ECA 031026 R2.pdf | ||||
2026-UTIL-0000059 Hyper Fiber - ITG - Dunkirk St and E 56th Ave UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
Comments:Denied 1. For future plans, reserve spot for City UPR project number centered on top of the cover (e.g. 2026-UTIL-00000XX) if City UPR project number is not yet issued. Add specific UPR number to cover sheet now that it has been issued. PW Construction Engineering ReviewDenied See kdb red lines. All documents in this project (8) ★ 2026-UTIL-0000059 Comment Report 3-31-2026.pdf2026-UTIL-0000059 Revised Comment Report 06-23-2026.pdf2026-UTIL-0000059 Revised Comment Report 6-23-2026.pdfOLT2 FDA7 - CCD Application - 031226.pdfOLT2 FDA7 - UPR Checklist 2.7 - 031226.pdfREDLINES- Contruction Engineering- Blair.pdfREDLINES- ER Transportation- Leyva- Approved.pdfRFUSA CO GREEN VALLEY RANCH A2-07 ECA 031026 R2.pdf | ||||
2026-UTIL-0000058 Hyperfiber - ITG - N Dunkirk St and Maxwell Place UTILDenial · 38 agencies | UTIL | 8 | Denial · 3 | |
Comments:Denied 1. For future plans, reserve spot for City UPR project number centered on top of the cover (e.g. 2026-UTIL-00000XX) if City UPR project number is not yet issued. Add specific UPR number to cover sheet now that it has been issued. PW Construction Engineering ReviewDenied see kdb red lines. Denver Water ReferralDenied PWPRS Project Number: 2026-UTIL-0000058 - Hyperfiber - ITG - N Dunkirk St and Maxwell Place Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Commen… All documents in this project (8) ★ 2026-UTIL-0000058 Comment Report 3-27-2026.pdf2026-UTIL-0000058 Revised Comment Report 6-23-2026.pdf2026-UTIL-0000058 Revised Comment Report 6-29-2026.pdfOLT2 FDA6 - CCD Application - 031126.pdfOLT2 FDA6 - UPR Checklist 2.6 - 031126.pdfREDLINES - EPR Transportation - VCuellar - RFUSA_COGV0206_ECA_061926_R6.pdfREDLINES- Construction Engineering- Blair.pdfRFUSA CO GREEN VALLEY RANCH A2-06 ECA 031026 R2.pdf | ||||
2026-UTIL-0000057 HyperFiber - ITG - E 54th Pl and Dunkirk St UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (10) 2026-UTIL-0000057 Comment Report 3-27-2026.pdf2026-UTIL-0000057 Revised Comment Report 6-10-2026.pdf2026-UTIL-0000057 Revised Comment Report 6-16-2026.pdf★ 2026-UTIL-0000057 Revised Comment Report 6-23-2026.pdf2026-UTIL-0000057 Revised Comment Report 6-5-2026.pdfOLT2 FDA5 - CCD Application - 031126.pdfOLT2 FDA5 - UPR Checklist 2.5 - 031126.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- ER Transportation- Leyva- Approved.pdfRFUSA CO GREEN VALLEY RANCH A2-05 ECA 031026 R2.pdf | ||||
2026-UTIL-0000056 Zayo Fiber Solutions - 10700 E 45th Ave UTILDenial · 27 agencies | UTIL | 7 | Denial · 2 | |
ERA Transportation ReviewDenied 1. Show and dimension all Signal Equipment Clear Zones along the alignment.? No facilities including bored conduits or handholes are allowed in the Equipment Clear Zone as shown on?City and County of Denver Transportation PW Construction Engineering ReviewDenied see kdb red lines. Review Status: Approved - No Response All documents in this project (11) 2026-UTIL-0000056 - Final Approval Plan Set.pdf★ 2026-UTIL-0000056 Comment Report 3-27-2026.pdf2026-UTIL-0000056 Revised Comment Report 4-1-2026.pdf2026-UTIL-0000056 Revised Comment Report 4-15-2026.pdf2026-UTIL-0000056 Revised Comment Report 4-21-2026.pdfApplication Updated E 45th Ave.pdfChecklistE 45th Ave.pdfPlans -10700 E 45th Ave.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- ER Transportation- Leyva- Approved.pdfREDLINES- ER Transportation- Leyva- Bridge No Objection Email.pdf | ||||
2026-UTIL-0000054 Hyperfiber - ITG - N Dunkirk St and N Dunkirk Way UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
ERA Transportation ReviewDenied 1. Sheet C1: Dimension running line to inlet. 2. Add and dimension ALL service lines/laterals that come close to the running line. Link for plat maps: Denver Water ReferralDenied PWPRS Project Number: 2026-UTIL-0000054 - Hyperfiber - ITG - N Dunkirk St and N Dunkirk Way Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Commen… All documents in this project (9) ★ 2026-UTIL-0000054 Comment Report 3-26-2026.pdf2026-UTIL-0000054 Revised Comment Report 3-26-2026.pdf2026-UTIL-0000054 Revised Comment Report 6-16-2026.pdf2026-UTIL-0000054 Revised Comment Report 6-5-2026.pdf2026-UTIL-0000054 Revised Comment Report 6-9-2026.pdfOLT2 FDA4 - CCD Application - 031026.pdfOLT2 FDA4 - UPR Checklist 2.4 - 031026.pdfREDLINES- ER Transportation- Leyva- Approved.pdfRFUSA_ CO GREEN VALLEY RANCH A2-04_ECA_031026_R2 (1).pdf | ||||
2026-UTIL-0000053 Hyperfiber - ITG - Green Valley Ranch Blvd and Argonne St UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
Comments:Denied 1. Running line goes through signal clear zone across from N Ceylon St. Show and dimension all Signal Equipment Clear Zones along the alignment.? No facilities including bored conduits or handholes are allowed in the Equipment Denver Water ReferralDenied PWPRS Project Number: 2026-UTIL-0000053 - Hyperfiber - ITG - Green Valley Ranch Blvd and Argonne St Reviewing Agency/Company: Denver Water All documents in this project (6) | ||||
2026-UTIL-0000052 Hyperfiber - ITG - Tower Rd and E 45th Ave UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. Please reference correct restoration notes. On sheet C1, TSD 12.1 for landscape is being referenced for a bore pit that is on concrete and not on landscape. TSD 12.3 for trench patch (concrete) is more appropriate for this All documents in this project (7) ★ 2026-UTIL-0000052 Comment Report 3-26-2026.pdf2026-UTIL-0000052 Final Approved Plan Set.pdf2026-UTIL-0000052 Revised Comment Report 5-29-2026.pdfOLT2 FDA2 - CCD Application - 031026.pdfOLT2 FDA2 - UPR Checklist 2.2 - 031026.pdfREDLINES- ER Transportation- Leyva.pdfRFUSA CO GREEN VALLEY RANCH A2 02 ECA 031026 R4.pdf | ||||
2026-UTIL-0000051 2nd - Zayo Fiber Solutions- 910 E 15th UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
ERA Transportation ReviewDenied 05/04/2026 Denied | ||||
2026-UTIL-0000051 Zayo Fiber Solutions- 910 E 15th UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
Comments:Denied 1. Disturbance of the pedestrian way?(curb ramp, sidewalk and crosswalk) within 10 ft of an existing curb ramp will require the reconstruction of the curb ramp in compliance with current CCD and ADA standards, if not already fully Denver Water ReferralDenied PWPRS Project Number: 2026-UTIL-0000051 - Zayo Fiber Solutions- 910 E 15th Reviewing Agency/Company: Denver Water All documents in this project (5) | ||||
2026-UTIL-0000050 CenturyLink - PAULEY CONSTRUCTION - 6400 E 6th Ave Pkwy UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000049 Xcel - HKS Utility Services, LLC - E 20th Ave and N Grant St UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000048 Comcast - ITG Communications - 4665 N Beeler Ct UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000047 HyperFiber - ITG- Tower Rd and E 43rd Ave UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. For future plans, reserve spot for City UPR project number centered on top of the cover (e.g. 2026-UTIL-00000XX) if City UPR project number is not yet issued. Add specific UPR number to cover sheet now that it has been issued. All documents in this project (10) 2026-UTIL-0000047 Comment Report 3-18-2026.pdf2026-UTIL-0000047 Final Approved Plan Set.pdf2026-UTIL-0000047 Revised Comment Report 4-21-2026.pdf★ 2026-UTIL-0000047 Revised Comment Report 4-23-2026.pdf2026-UTIL-0000047 Revised Comment Report 5-29-2026.pdfApplication.pdfChecklist.pdfGREEN VALLEY RANCH Plans.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2026-UTIL-0000045 Comcast - Mastec - 4494 WALDEN ST DENVER CO 80249 UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
Comments:Denied 1. Add City UPR project number centered on top of the cover 2. Disturbance of the pedestrian way?(curb ramp, sidewalk and crosswalk) within 10 ft of an existing curb ramp will PW Construction Engineering ReviewDenied See your sheet 5 CCD Std Dwg 7.9 - Show and avoid Signal Eqpt Clear Zones. | ||||
2026-UTIL-0000043 Vero Fiber Networks - Redline Design - E Alameda A UTILDenial · 27 agencies | UTIL | 7 | Denial · 2 | |
ERA Transportation ReviewDenied 1. Add better vicinity map. Location of project is hard to tell from provided vicinity map. 2. Dimension EOP to EOP, ROW to ROW on all sheets on streets where work is being proposed. Denver Water ReferralDenied PWPRS Project Number: 2026-UTIL-0000043 - Vero Fiber Networks - Redline Design - E Alameda A Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comme… | ||||
2026-UTIL-0000042 Xcel - HKS Utility Services - 855 N Broadway UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (7) 2026-UTIL-0000042 Comment Report 03.04.2026..pdf2026-UTIL-0000042 Final Approved Plan Set.pdf★ 2026-UTIL-0000042 Revised Comment Report 4-8-2026.pdf855 N. Broadway - Electric Installation.pdf855 N. Broadway - UPR Application.pdf855 N. Broadway - UPR Checklist.pdfREDLINES- ER Transportation- Leyva- Approved.pdf | ||||
2026-UTIL-0000040 Xcel - HKS Utility Services - 4201 E Arkansas Ave UTILDenial · 19 agencies | UTIL | 9 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Show and dimension all Signal Equipment Clear Zones along the alignment.? No facilities including bored conduits or handholes are allowed in the Equipment Clear Zone as shown on?City and County of Denver Transportation All documents in this project (10) 2026-UTIL-0000040 Comment Report 03.04.2026.pdf2026-UTIL-0000040 Final Approved Plan Set.pdf★ 2026-UTIL-0000040 Revised Comment Report 4-7-2026.pdf2026-UTIL-0000040 Revised Comment Report 5-20-2026.pdf4201 E. Arkansas Ave. - Electric Installation.pdf4201 E. Arkansas Ave. - UPR Application.pdf4201 E. Arkansas Ave. - UPR Checklist.pdfREDLINES - EHuetig - 2026-UTIL-0000040 - OCF Comments 3-3-26.pdfREDLINES- ER Transportation- Leyva.pdfREDLINES- Forestry- Huetig- Approved.pdf | ||||
2026-UTIL-0000039 Comcast - Mastec - 3503 CENTRAL PARK BLVD UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (11) 2026-UTIL-0000039 Comment Report 3-3-2026.pdf2026-UTIL-0000039 Final Approval Plan Set.pdf2026-UTIL-0000039 Revised Comment Report 3-26-2026.pdf2026-UTIL-0000039 Revised Comment Report 3-9-2026.pdf★ 2026-UTIL-0000039 Revised Comment Report 5-5-2026.pdfApplication.pdfChecklist 1.pdfJB 2244285.pdfJB#2244285_FINAL_051326.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- Forestry- Evers.pdf | ||||
2026-UTIL-0000037 Xcel - HKS Utility Services - 1625 N Marion St UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (7) 1625 N. Marion St. - UPR Application.pdf1625 N. Marion St. - UPR Checklist.pdf1625 N. Marion St. - Utility Pole Installation.pdf2026-UTIL-00000037 Comment Report 02.27.26.pdf★ 2026-UTIL-00000037 Revised Comment Report 3-10-2026.pdf2026-UTIL-0000037 Final Approved Plan Set.pdfREDLINES- ER Transportation- Approved.pdf | ||||
2026-UTIL-0000036 Comcast - Mastec - 9100 E Lowry Blvd UTILDenial · 39 agencies | UTIL | 9 | Denial · 3 | |
City Forester ReviewDenied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No PW Construction Engineering ReviewDenied See kdb red lines. Denver Water ReferralDenied PWPRS Project Number: 2026-UTIL-0000036 - Comcast - Mastec - 9100 E Lowry Blvd Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments: Need to m… All documents in this project (12) ★ 2026-UTIL-0000036 Comment Report 2-26-2026.pdf2026-UTIL-0000036 Final Approved Plan Set.pdf2026-UTIL-0000036 Revised Comment Report 3-12-2026.pdf2026-UTIL-0000036 Revised Comment Report 3-3-2026.pdf2026-UTIL-0000036 Revised Comment Report 3-5-2026.pdf2026-UTIL-0000036 Revised Comment Report 4-22-2026.pdf2026-UTIL-0000036 Revised Comment Report 4-23-2026.pdfApplication.pdfChecklist.pdfPlans.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- Forestry- Huetig.pdf | ||||
2026-UTIL-0000035 Xcel - HKS Utility Services - 18th and Humboldt-Franklin UTILClear8 agencies | UTIL | 8 | Clear | |
2026-UTIL-0000034 Denver Water - PT 23030 - Berkley Project N Stuart St N Raleigh St N Quitman St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
City Forester ReviewDenied 2026-UTIL-0000034 OCF Comments 2-18-26 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Projec… All documents in this project (9) 2026-UTIL-0000034 - Final Approval Plan Set.pdf★ 2026-UTIL-0000034 Comment Report 2-23-2026.pdf2026-UTIL-0000034 Revised Comment Report 2-24-2026.pdf2026-UTIL-0000034 Revised Comment Report 5.15.26.pdf23030 CCD 1ST SUBMITTAL PE Signed.pdf23030 UPRAPP 1ST SUB.pdf23030 UPRCHECKLIST 1ST SUB.pdfREDLINES - EPR - VCuellar- 23030_FOR REVIEW.pdfREDLINES- Forestry- Huetig.pdf | ||||
2026-UTIL-0000033 Denver Water - PT 22977 - Harvey Park Project 4 - S Quitman St and S Perry St UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (9) 2026-UTIL-00000033 Final Approval Plan Set.pdf★ 2026-UTIL-0000033 Comment Report 2-23-2026.pdf2026-UTIL-0000033 Revised Comment Report 2-23-2026.pdf2026-UTIL-0000033 Revised Comment Report 4-14-2026.pdf22977 CCD 1ST SUBMITTAL PE Signed.pdf22977 UPRAPP 1ST SUB.pdf22977 UPRCHECKLIST 1ST SUB.pdfREDLINES- ER Transportation- Denied.pdfREDLINES- ER Transportation- Leyva- Approved.pdf | ||||
2026-UTIL-0000032 Xcel - HKS Utility Services - 995 S Clarkson St UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000030 Denver Water - PT 22844 - Acoma St Improvements - 5280 Trail UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. Disturbance of the pedestrian way?(curb ramp, sidewalk and crosswalk) within 10 ft of an existing curb ramp will require the reconstruction of the curb ramp in compliance with current CCD and ADA standards, if not already fully All documents in this project (8) ★ 2026-UTIL-0000030 Comment Report 2-19-2026.pdf2026-UTIL-0000030 Final Approval Plan Set.pdf2026-UTIL-0000030 Revised Comment Report 02.27.2026.pdf2026-UTIL-0000030 Revised Comment Report 2-19-2026.pdf22844 CCD 1ST SUBMITTAL PE Signed.pdf22844 UPRAPP 1ST SUB.pdf22844 UPRCHECKLIST 1ST SUB.pdfREDLINES - ER Transportation - VCL 22844_CCD_3RD SUBMITTAL Copy.pdf | ||||
2026-UTIL-0000027 Xcel - HKS Utility Services - 8892 E Lowry Blvd UTILClear6 agencies | UTIL | 6 | Clear | |
2026-UTIL-0000026 Vero Fiber Networks - 600 S Clinton St UTILDenial · 39 agencies | UTIL | 9 | Denial · 3 | |
City Forester ReviewDenied OCF Comments 2-12-26 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No ERA Transportation ReviewDenied 1. Required plan notes, Forestry Notes & Details Denver Water ReferralDenied PWPRS Project Number: 2026-UTIL-0000026 - Vero Fiber Networks - 600 S Clinton St Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments: Call ou… All documents in this project (11) ★ 2026-UTIL-0000026 Comment Report 2-17-2026.pdf2026-UTIL-0000026 Final Approved Plan Set.pdf2026-UTIL-0000026 Revised Comment Report 03-06-2026.pdf2026-UTIL-0000026 Revised Comment Report 3-11-2026.pdf2026-UTIL-0000026 Revised Comment Report 3-6-2026.pdfREDLINES- ER Transportation- Leyva- Approved.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig.pdfSIGNED Windsor Gardens utility-plan-review-checklist.pdfUPR application.pdfWSG Combined Permits.pdf | ||||
2026-UTIL-0000025 Xcel - HKS Utility Services - 650 W. Colfax Ave UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000024 Xcel - HKS Utility Services - 2483 S. Broadway UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (7) 2026-UTIL-0000024 Comment Report 02.10.2026.pdf2026-UTIL-0000024 Final Approved Plan Set.pdf★ 2026-UTIL-0000024 Revised Comment Report 3-2-2026.pdf2483 S. Broadway - UPR Application.pdf2483 S. Broadway - UPR Checklist.pdf2483 S. Broadway - Utility Pole Installation.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2026-UTIL-0000022 Xcel - HKS Utility Services - 1255 Vrain St UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
Comments:Denied All documents in this project (7) 1255 Vrain St. - UPR Application.pdf1255 Vrain St. - UPR Checklist.pdf1255 Vrain St. - Utility Pole Installation.pdf★ 2026-UTIL-0000022 Comment Report 2-6-2026.pdf2026-UTIL-0000022 Final Approved Plan Set.pdf2026-UTIL-0000022 Revised Comment Report 2-19-2026.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2026-UTIL-0000021 Xcel - HKS Utility Services - 2315 S. Monroe St UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000019 Xcel - HKS Utility Services - E. 46th Ave. and N. Yampa St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. Lots of work shown is going outside public right-of-way. This work shall not be permitted under this UPR. Clearly note and provide callout for EACH location where work goes outside of public ROW. Separate agreements shall be All documents in this project (6) ★ 2026-UTIL-0000019 Comment Report 2-5-2026.pdf2026-UTIL-0000019 Final Approved Plan Set.pdf2026-UTIL-0000019 Revised Comment Report 2-12-2026.pdfE. 46th Ave. and N. Yampa St. - Electric Installation.pdfE. 46th Ave. and N. Yampa St. - UPR Application.pdfE. 46th Ave. and N. Yampa St. - UPR Checklist.pdf | ||||
2026-UTIL-0000017 Xcel - HKS Utility Services - 1338 Forest St UTILClear6 agencies | UTIL | 6 | Clear | |
2026-UTIL-0000016 Xcel - HKS Utility Services - Florida and Raritan UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Disturbance of the pedestrian way?(curb ramp, sidewalk and crosswalk) within 10 ft of an existing curb ramp will require the reconstruction of the curb ramp in compliance with current CCD and ADA standards, if not already fully compliant per DOTI Rules and… | ||||
2026-UTIL-0000015 Xcel - HKS Utility Services - 2950 W 10th Ave UTILClear8 agencies | UTIL | 8 | Clear | |
2026-UTIL-0000014 Xcel - HKS Utility Services - 1700 S Julian St UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (9) 1700 S. Julian St. - Electric Installation.pdf1700 S. Julian St. - UPR Application.pdf1700 S. Julian St. - UPR Checklist.pdf2026-UTIL-0000014 Comment Report 02.03.2026 - Copy (2).pdf2026-UTIL-0000014 Final Approval Plan Set.pdf★ 2026-UTIL-0000014 Revised Comment Report 2-18-2026.pdf2026-UTIL-0000014 Revised Comment Report 2-19-2026.pdfREDLINES- ER Transportation- Leyva.pdfREDLINES- Forestry- Huetig- Approved.pdf | ||||
2026-UTIL-0000013 Xcel - HKS Utility Services - 1373 Dexter St UTILClear9 agencies | UTIL | 9 | Clear | |
2026-UTIL-0000012 Xcel - HKS Utility Services - Colfax and Oneida UTILClear9 agencies | UTIL | 9 | Clear | |
2026-UTIL-0000011 2nd - Xcel - HKS Utility Services - E 56th Ave UTILDenial · 38 agencies | UTIL | 8 | Denial · 3 | |
ERA Transportation ReviewDenied 1. Due to the project's limit of disturbance (Open trench equal to or exceeding 1,750 LF) a Construction Activities Stormwater Discharge Permit (CASDP) is required. Please prepare CASDP package in accordance with the City PW Construction Engineering ReviewDenied RECONSIDER open trench in E 56th (Joliet to Chambers). Denver Water ReferralDenied Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments: Pending license agreement for crossing 02/03/2026 Denied PWPRS Project Number: 2026-UTIL-0000011 - Xcel - HKS Utility Services… | ||||
2026-UTIL-0000011 Xcel - HKS Utility Services - E 56th Ave UTILDenial · 37 agencies | UTIL | 7 | Denial · 3 | |
ERA Transportation ReviewDenied 1. Add and dimension sanitary service line on SE corner of Joliet St. and 56th Ave. 2. Sheet 5 to Sheet 10: Work along E 56th Ave. is not within Denver and therefore will not be approved nor permitted PW Construction Engineering ReviewDenied See kdb red lines. Review Status: Approved - No Response Denver Water ReferralDenied PWPRS Project Number: 2026-UTIL-0000011 - Xcel - HKS Utility Services - E 56th Ave Reviewing Agency/Company: Denver Water | ||||
2026-UTIL-0000010 Comcast - ITG Communications - 4600 Leetsdale Dr UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
City Forester ReviewDenied 2026-UTIL-0000010 OCF Comments 1-26-26 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Projec… Comments:Denied 1. What's the "POTHOLE ONLY PLAN SET" note on cover page? Please remove. 2. Add UPR project number on the plan set. | ||||
2026-UTIL-0000009 Xcel - HKS Utility Services - TOWER1412 Feeder UTILClear7 agencies | UTIL | 7 | Clear | |
2026-UTIL-0000007 Xcel - HKS Utility Services - E. 6th Ave. and N. Washington St UTILClear10 agencies | UTIL | 10 | Clear | |
All documents in this project (5) | ||||
2026-UTIL-0000006 2nd - Xcel - HKS Utility Services - E. 2nd Ave. and Fillmore St UTILClear9 agencies | UTIL | 9 | Clear | |
2026-UTIL-0000006 Xcel - HKS Utility Services - E. 2nd Ave. and Fillmore St UTILDenial · 37 agencies | UTIL | 7 | Denial · 3 | |
City Forester ReviewDenied Comments:Denied 1. Show and dimension all Signal Equipment Clear Zones along the alignment.? No facilities including bored conduits or handholes are allowed in the Equipment Clear Zone as shown on?City and County of Denver Transportation PW Construction Engineering ReviewDenied See kdb red lines. All documents in this project (7) ★ 2026-UTIL-0000006 Comment Report 1-26-2026.pdfE. 2nd Ave. and Fillmore St. - Electric Installation.pdfE. 2nd Ave. and Fillmore St. - UPR Application.pdfE. 2nd Ave. and Fillmore St. - UPR Checklist.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- Forestry- Huetig- Fillmore approved development plans.pdfREDLINES- Forestry- Huetig- OCF Comments.pdf | ||||
2026-UTIL-0000005 Xcel - Q3 - 1000 S Logan St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. Proposed poles and guy wires were not included within UPR application. Send a updated application. 2. All proposed work must be 5' from sanitary sewer main and manholes. All documents in this project (11) 112063101 1000 S Logan St IFA 2025-12-30 PE STAMP FLAT.pdf2026-UTIL-0000005 Comment Report 1-26-2026.pdf2026-UTIL-0000005 Final Approved Plan Set.pdf★ 2026-UTIL-0000005 Revised Comment Report 2-11-2026.pdf2026-UTIL-0000005 Revised Comment Report 4-2-2026.pdfREDLINES- ER Transportation- Leyva- Approved.pdfREDLINES- Forestry- Huetig- 1000 S Logan SDP.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig- OCF Comments.pdfUPR Checklist DENVER.pdfUPR Submittal Application DENVER.pdf | ||||
2026-UTIL-0000003 Xcel - HKS Utility Services - 1928 W. 41st Ave UTILClear8 agencies | UTIL | 8 | Clear | |
2026-RELINQ-0000014 Broadway Station Soccer Stadium 708 S. Delaware St RELINQNo report yet— agencies | RELINQ | — | No report yet | |
2026-RELINQ-0000013 Broadway Station Soccer Stadium I25 and W. Kentucky Ave RELINQNo report yet— agencies | RELINQ | — | No report yet | |
2026-RELINQ-0000012 Broadway Station Soccer Stadium 809 S Delaware Way Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (2) | ||||
2026-RELINQ-0000011 AHRT 1086 N Meade St Relinquishment RELINQDenial · 118 agencies | RELINQ | 18 | Denial · 1 | |
DES Transportation ReviewDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. | ||||
2026-RELINQ-0000010 Access Easement 4991 N Telluride St Partial Relinquishment RELINQDenial · 121 agencies | RELINQ | 21 | Denial · 1 | |
Survey ReviewDenied Denied REDLINES ARE UPLOADED TO THE E-REVIEW WEB- Survey redlines uploaded in Accela and E-Review. PAGE All documents in this project (9) 18-026 Partial Easement Vacation Legal Description 20260310.docx18-026 Partial Easement Vacation Legal Description_signed 20260310.pdf★ 2026-RELINQ-0000010 - Comment Report 5.27.2026.pdfEasement Relinquishment Submittal Checklist.pdfOriginating Document.pdfREDLINES CenturyLink Lumen - P870086- NO RESERVATION LETTER. PDF.pdfREDLINES- CenturyLink- NO RESERVATION LETTER.pdfREDLINES- Survey- Lee.pdfSite Plan.pdf | ||||
2026-RELINQ-0000008 Storm Sewer Elmendorf and Telluride Entirety Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
2026-RELINQ-0000007 PNEE WW Elmendorf Dr and Telluride St Partial Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (3) | ||||
2026-RELINQ-0000006 3800 Blake St Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (7) | ||||
2026-RELINQ-0000005 655 Curtis St Auraria Campus Relinquishment RELINQDenial · 217 agencies | RELINQ | 17 | Denial · 2 | |
CenturyLink ReferralDenied PWPRS Project Number: 2026-RELINQ-0000005 655 Curtis St Auraria Campus Relinquishment Xcel ReferralDenied PWPRS Project Number: 2026-RELINQ-0000005 655 Curtis St Auraria Campus Relinquishment Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewers Phone: 3035713306 Reviewers Email: Don… | ||||
2026-RELINQ-0000001 3875 Walnut St Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
2026-ENCROACHMENT-0000134 Tier II 1437 Bannock St City and County Building Landscaping ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
2026-ENCROACHMENT-0000126 Tier II - 215 Detroit Soil Cells ENCROACHMENTClear20 agencies | ENCROACHMENT | 20 | Clear | |
All documents in this project (11) ★ 2026-ENCROACHMENT-0000126 Comment Report 7-30-2026.pdf215 Detroit_Encroachment_Application JH Sig.pdf215 Detroit_Encroachment_Checklist JH Sig.pdf215 Detroit_Encroachment_Detail SilvaCell-tech-sheet-3D-US.pdf215 Detroit_Encroachment_Landscape For Reference.pdf215 Detroit_Encroachment_Legal and Exhibit.pdf215 Detroit_Encroachment_Soil Cell Exhibit.pdfREDLINES- Centurylink- Letter of No Objection.pdfREDLINES- Survey- Breitnauer- Requirements.docxREDLINES- Survey- Breitnauer- SitePlan.pdfREDLINES- Survey- Breitnauer.pdf | ||||
2026-ENCROACHMENT-0000125 Tier II - 44th Ave and Broadway - Mural Project ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (8) 100_ Design Plans (44th and Broadway).pdf44th and Broadway Site Plan.pdfdoti.pt.2026.105-encroachment-application_ff.pdfEncroachment_Application_44th_Broadway.pdfencroachment-permit-submittal-checklist.pdfMural Rendering - Wall 1, 2, 3.pdfMural Rendering - Wall 5, 11, 12.pdfMural Rendering - Wall 7, 12.pdf | ||||
2026-ENCROACHMENT-0000123 Tier II - 1110 17th St Skynet🚲 bike lane ENCROACHMENTClear24 agencies | ENCROACHMENT | 24 | Clear | |
🚲 Bike lane mentioned [comment report text] "tus Date: Comments: Status: Maintain minimum 9'8" vertical clearance from bike lane surface to cable. No permanent infrastructure may be Comments: installed in the" [comment report text] "surface to cable. No permanent infrastructure may be Comments: installed in the bike lane. 07/09/2026 Denied PWPRS Proje" All documents in this project (10) 2026-ENCROACHMENT-0000123 Comment Report 7-9-2026.pdf★ 2026-ENCROACHMENT-0000123 Revised Comment Report 7-9-2026.pdf260609 Skynet - Skyline Preliminary Art Engineering.pdfDDS SKY 2_ SKYLINE_ Art Plan View.pdfDDS SKY 2_ SKYLINE_ Elevation View.pdfREDLINES- Survey- Savich- Approved.pdfREDLINES- Survey- Savich.pdfSKYLINE ENGINEERING PACKET Plan w ROW lines.pdfSkyline Park Encroachment Application DOTI v2.pdfSKYLINE Preliminary Truss Engineering.pdf | ||||
2026-ENCROACHMENT-0000121 Tier III - 723 E 6th Ave - Patio ENCROACHMENTDenial · 326 agencies | ENCROACHMENT | 26 | Denial · 3 | |
DS Transportation ReviewDenied 1. For reference: 2026 Transportation Standard Drawings (TSD) January 2026 may be found at https://www.denvergov.org/files/assets/public/v/1/doti/documents/standards/doti.es.2026.001.06-transportation_standard_drawings.pdf and Outdoor Places Program (OPP) fou… Survey ReviewDenied Construction Engineering ReviewDenied 1. Prior to the solicitation of bids or proposals from general contractors, the developer of this project is strongly encouraged to schedule an office meeting with the Right-of-Way Services Construction Inspections team (303) 446-3469 to discuss the project's… All documents in this project (8) 2026-01-13_Don's_Encroachment Exhibit.pdf2026-01-13_Don's_Legal Description.docx2026-01-13_Don's_Tier III Application - Signed.pdf2026-01-13_Don's_Tier III Checklist.pdf★ 2026-ENCROACHMENT-0000121 - Comment Report - 7-13-26.pdfDon's OP Plan_723 E 6th Ave_06-25-2026.pdfREDLINES - Accessibility Redlines - JPasillas2026-ENCROACHMENT-0000121-Accessibility Redlines.pdfREDLINES -CenturyLink- PMedrano - Letter of No Objection P870526.pdf | ||||
2026-ENCROACHMENT-0000118 Tier II - 500 16th St Mall - Skynet Art Series ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (11) 2026 Glenarm Plaza Special Event Agreement Skynets.pdf260608 Glenarm Structural PC00.pdf260608 Skynet - Glenarm Final Engineering Report.pdfCCD Special Event Permit Application Glenarm.pdfDDS SKY GLENARM artwork overlay 260602.pdfDDS SKY GLENARM breakaway and quick release detail 260601.pdfDDS SKY Glenarm Elevation 260601.pdfDOTI Encroachment Application Glenarm.pdfGlenarm Skynets - Community Notification.pdfSkynet Example.pngSkyNet Glenarm Art Installation - Observation Letter.pdf | ||||
2026-ENCROACHMENT-0000113 Tier II 225 N Clayton Street Soil Cells ENCROACHMENTDenial · 121 agencies | ENCROACHMENT | 21 | Denial · 1 | |
Denver Water ReferralDenied PWPRS Project Number: 2026-ENCROACHMENT-0000113 - Tier II 225 N Clayton Street Soil Cells Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments… All documents in this project (15) 2023PM0000357_Timber 225 ENCROACHMENT EXHIBITS_REV.1-05-18-2026.pdf2023PM0000357_Timber 225 Tier II Encroachemnt Checklist_Signed.pdf2023PM0000357_Timber 225 Tier II Encroachment Application_Signed.pdf2023PM0000357_Timber 225 TIER II ENCROACHMENT DESCRIPTIONS-05-18-2026.docx2023PM0000357_Timber 225 Tier II Encroachment Details.pdf2023PM0000357_Timber 225 Tier II Encroachment Site Plan.pdf2023PM0000357_Timber 225 TIER II PROPOSED PARCEL DESCRIPTION-05-07-2026.docx2023PM0000357_Timber 225 Title Info.pdf★ 2026-ENCROACHMENT-0000113 Comment Report 7-7-2026.pdfCitygreen_Stratavault_Structural Soil_Cell_Details.pdfcitygreen_Stratavault-Brochure_US_Jul2024-WEB-Letter.pdfCitygreen-Stratavault-TechSheet-July-2024.pdfREDLINES- CenturyLink- Letter of No Objection.pdfREDLINES- Survey- Breitnauer- Encroachment Requirements.docxREDLINES- Survey- Breitnauer.pdf | ||||
2026-ENCROACHMENT-0000105 Tier II 1645 E Evans Ave Monitoring Well ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
2026-ENCROACHMENT-0000100 Tier III 2400 S Monroe St. Fence ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (8) 2400 S Monroe Fencing Site Plan REV3 Trans 05.26.26 dig sign.pdf2400 S Monroe St. ILC 2-4-26.pdfencroachment application 2400 S Monroe St 5-20-26- signed.pdfEncroachment Checklist 2400 S Monroe St. 5-22-26.pdfLand Description 2400 S Monroe 5-22-26.docxProof of Ownership Recorded Warranty Deed 2400 S Monroe St 5-20-26.PDFSGA Response to Denver Transportation Review 2400 S Monroe St 05.26.26 dig sign.pdfTier determination checklist 2400 S Monroe St 5-20-26.pdf | ||||
2026-ENCROACHMENT-0000098 2nd - 1550 Wewatta St Bike Hub ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (10) 2026-ENCROACHMENT-0000098 Resolution Fee Invoice.pdf2nd Sub - 20260609_Architecture Bike Building Encroachment.pdf2nd Sub - 20260609_Bike Building Exhibit.pdf2nd Sub - 20260610_Bike Building Plaza ROW Encroachment_signed.pdf2nd Sub - 20260610_Electrical.pdf2nd Sub - 20260610_Structural Construction Set.pdf2nd Sub - 2026-PROJMSTR-0000171_arch response.pdf2nd Sub - Arch plans_1550 Wewatta St_5-28-2026_Arch Response 1.pdf2nd Sub - RC_GFRC_product info sheet.pdfREDLINES- CenturyLink- Letter of No Objection.pdf | ||||
2026-ENCROACHMENT-0000098 1550 Wewatta St Bike Hub ENCROACHMENTDenial · 326 agencies | ENCROACHMENT | 26 | Denial · 3 | |
Survey ReviewDenied Survey redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf). REDLINES ARE UPLOADED TO THE E-REVIEW WEBPAGE DES Wastewater ReviewDenied 1) Submit site plan signed and sealed by licensed engineer as required in Encroachment Permit Submittal Checklist. Plan should specifically address existing utilities and proposed grading. Plan should include the demolition or relocation of utilities as requir… Building Department ReviewDenied CPD Building Department is concerned that the Fire Separation Distance between the proposed bicycle storage building and the existing Triangle Building can bring the Triangle Building exterior wall construction out of compliance with 2025 Denver Building Code… All documents in this project (10) 20260520 Existing Utilities Floodplain and Asbuilts.pdf20260520_Bike Building Encroachment Application.pdf20260520_Bike Building Encroachment Submittal Checklist.pdf20260520_Bike Building Encroachment Submittal.pdf20260520_Land Description 2.pdf20260520_Land Description.docx20260520_Land Description.pdf★ 2026-ENCROACHMENT-0000098 Comment Report 6.8.26.pdf2026-ENCROACHMENT-0000098 Lumen no objection letter.pdfREDLINES- Survey- Savich.pdf | ||||
2026-ENCROACHMENT-0000094 Tier II - 1650 N Hooker Street - Non Removal Planters ENCROACHMENTDenial · 323 agencies | ENCROACHMENT | 23 | Denial · 3 | |
Survey ReviewDenied Survey comments/redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) Denver Water ReferralDenied PWPRS Project Number: 2026-ENCROACHMENT-0000094 - Townview Apartments - 1650 N Hooker Street - Non Removal Planters Reviewing Agency/Company: Denver Water Comment Report Page 4 of 6 Tier II - Townview Apartments - 1650 N Hooker Street - Non Removal Planters 06… ERA ReviewDenied We need an encroachment submittal checklist All documents in this project (9) 1600 N Hooker St Denver - SDP-2 - Survey (2).pdf1600 N Hooker St Denver - SDP-2 - Survey.pdf★ 2026-ENCROACHMENT-0000094 - Comment Report - 06.25.26.pdf2026-ENCROACHMENT-0000094 -RevisedComment Report - 07.07.26.pdfREDLINES- CentuyrLink- Letter of No Objection P870431.pdfREDLINES- Survey- Savich.pdfTownview_Encroachment Application.pdfTownview_Encroachment Site Plans.pdfTownview_Encroachment Tier Determination.pdf | ||||
2026-ENCROACHMENT-0000087 Tier II - 1633 S Alcott St Retaining Wall ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (12) CeuryLink Letter of No Objection P870523.pdfEncroachment Tier Determination Application.pdfEncroachment tier determination site plan.pdfExample Plans.jpgProperty Photo - Post Retaining Wall.jpgProperty Photo Pre-Retaining Wall.JPGREDLINES- Survey- Pfohl.pdfRetaining Wall - Distance from flowline-curb to wall 2.jpgRetaining Wall - Distance from flowline-curb to wall.jpgRetaining Wall Photo.jpgRetaining Wall Section Detail.pdfTier Determination Submittal Checklist.pdf | ||||
2026-ENCROACHMENT-0000052 Tier II - 1250 N Knox Ct - Lakewood Gulch Bridge Mural ENCROACHMENTDenial · 123 agencies | ENCROACHMENT | 23 | Denial · 1 | |
Survey ReviewDenied requires a site plan, the deed of the property that benefits the encroachment and the deed description in a Word document All documents in this project (11) ★ 2026-ENCROACHMENT-0000052 Comment Report 5-21-2026.pdfApplication - signed.pdfLakewood Dry Gulch Trail Safety Project-DRAFT.pdfMock up at Location.jpgMural Mockup.jpgProject Site 1.jpegProject Site 2.jpegProject Site 3.jpegProperty Record.pngREDLINES- CenturyLink- Letter of No Objection.pdfREDLINES- Survey- Sperling.docx | ||||
2026-ENCROACHMENT-0000047 Tier III - 60 S Eudora Fence and Columns ENCROACHMENTDenial · 325 agencies | ENCROACHMENT | 25 | Denial · 3 | |
Survey ReviewDenied Uploaded survey and redline comments in E-Review. City Council ReferralDenied PWPRS Project Number: 2026-ENCROACHMENT-0000047 Tier III - 60 S Eudora Fence and Columns Reviewing Agency/Company: Denver City Council District 5 Reviewers Name: Councilwoman Amanda Sawyer Reviewers Phone: 7203375555 Reviewers Email: denvercouncil5@denvergov.o… ROW - Supplemental ReviewDenied 05/19/2026 Denied PWPRS Project Number: 2026-ENCROACHMENT-0000047 Tier III - 60 S Eudora Fence and Columns Reviewing Agency/Company: Hilltop Heritage Association RNA Reviewers Name: Matthew DuPree Reviewers Phone: 3033557777 Reviewers Email: comm34@comcast.net… All documents in this project (9) 23130-24X36L SIGNED 1.pdf60 S Eudora-Right of Way Encroachment Letter 1.docx60 S Eudora-Site Plan for Encroachment Permit 1.pdf★ Comment Report 2026-ENCROACHMENT-0000047 5.19.2026.pdfencroachment-permit-submittal-checklist-signed.pdfLONO-Encroachment P870043_5.12.26.pdfREDLINES Hilltop RNA 2026-Encroachment-0000047 - 60 S Eudora St - Hilltop Neighborhood Association.pdfREDLINES Hilltop RNA DOTI 2026-ENCROACHMENT-0000047 60 S Eudora.pdfREDLINES SURVEY 20260513-2026ENCROACH047-Survey RedlineComments.pdf | ||||
2026-ENCROACHMENT-0000045 Tier II - Urban Forest Initiative - 1900 Block Chestnut Pl Tree Beds ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (6) | ||||
2026-ENCROACHMENT-0000042 Tier II - AHEC - 1201 5th Street Underground Conduit ENCROACHMENTDenial · 125 agencies | ENCROACHMENT | 25 | Denial · 1 | |
Survey ReviewDenied Survey comments / redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) REDLINES uploaded to E-review webpage All documents in this project (11) 2026ENCROACHMENT0000042 - AHEC MV Admin and 5th Street - 5th Street Hub Building - CCD Mapping Property Record Search Documentation.pdf★ 2026-ENCROACHMENT-0000042 Comment Report 6-16-2026.pdfAHEC Admin Building - CCD Property Record Search Documentation.pdfApplication.pdfEncroachment Checklist.pdfEncroachment LandE-Signed.pdfEncroachment Legal.docxProperties Legal Descriptions.docxREDLINES- CenturyLink- Letter of No Objection.pdfREDLINES- Survey- Savich.pdfSite Plan Exhibit.pdf | ||||
2026-ENCROACHMENT-0000040 Tier III - 1380 16th St - Patio - Benihana Express ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
2026-ENCROACHMENT-0000037 Tier II - 201 and 203 Garfield St Steps and Walkways ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (9) 201 and 203 Garfield Application.pdfBenefitting Property Parcel Land Description.docxencroachment-permit-submittal-checklist.pdfREDLINES - CenturyLink - Letter of No Objection P869803.pdfROW Encroachment Plans - 201 and 203 Garfield - 2026-04-09.pdfSite Image 1.jpgSite Image 2.jpgTitle for 201 Garfield.pdfTitle for 203 Garfield.pdf | ||||
2026-ENCROACHMENT-0000032 4975 W 44th Avenue - Yates Theater Awning ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (7) | ||||
2026-ENCROACHMENT-0000031 Tier III - 2500 S Milwaukee Fence ENCROACHMENTDenial · 324 agencies | ENCROACHMENT | 24 | Denial · 3 | |
Survey ReviewDenied Comments in project folder City Forester ReviewDenied ROW - Supplemental ReviewDenied PWPRS Project Number: 2026-ENCROACHMENT-0000031 - Tier III - 2500 S Milwaukee Fence Reviewing Agency/Company: University Park Community Council (a registered RNO) Reviewers Name: Mike Cox Reviewers Phone: 303-638-4689 Reviewers Email: MikeCox333@gmail.com | ||||
2026-ENCROACHMENT-0000029 Tier III - 1630 S Acoma Street - Art Work ENCROACHMENTDenial · 125 agencies | ENCROACHMENT | 25 | Denial · 1 | |
Survey ReviewDenied Comments in project folder All documents in this project (6) 2026-03-09 Urban Peak Cloud Art - Architectural Drawings_rev 1.pdf2026-03-11 Urban Peak Cloud Art - ROW Encroachment Application.pdf★ 2026-ENCROACHMENT-0000029 Comment Report 4-21-2026.pdfencroachment-permit-submittal-checklist.pdfREDLINES- CenturyLink- Medrano - No Objection.pdfREDLINES- Survey- Pfohl.docx | ||||
2026-ENCROACHMENT-0000027 Tier III - 1066 N Grant St- Bollards.Chains.Wall ENCROACHMENTClear21 agencies | ENCROACHMENT | 21 | Clear | |
All documents in this project (8) ★ 2026-ENCROACHMENT-0000027 Comment Report 4-10-2026.pdf260316 1066 Grant Property Description.docx260316 1066 Grant QC Deed.pdf260316 1066 Grant Tier III Encroachment Application.pdf260316 1066 Grant Tier III Encroachment Checklist.pdf260316 1066 Grant Tier III Encroachment Drawing Exhibit.pdfREDLINES- CenturyLink- Medrano- No Objection.pdfREDLINES- Survey- Sperling.docx | ||||
2026-ENCROACHMENT-0000026 Tier III - 3303 East Asbury Ave - Pavers - Fence ENCROACHMENTDenial · 321 agencies | ENCROACHMENT | 21 | Denial · 3 | |
Survey ReviewDenied Comments and redlines in project folder Denver Water ReferralDenied PWPRS Project Number: 2026-ENCROACHMENT-0000026 - Tier III - 3303 East Asbury Ave - Pavers - Fence Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied… ROW - Supplemental ReviewDenied PWPRS Project Number: 2026-ENCROACHMENT-0000026 - Tier III 3303 East Asbury Ave - Pavers - Fence Improvements Reviewing Agency/Company: University Park Community Council Reviewers Name: John Hesse Reviewers Phone: 720-454-8300 Reviewers Email: zoning@uparkcc.o… All documents in this project (7) 2026 0302 ASBURY HOUSE - ENCROACHMENT SUBMITTAL.pdf★ 2026-ENCROACHMENT-0000026 Comment Report 4-10-2026.pdfdotipt 105 encroachment application 2025 0211.pdfdotipt 105.3.2 encroachment checklist 2026 0318.pdfdotipt 105.3.2 encroachment checklist.pdfREDLINES- CenturyLink- Medrano- No Objection.pdfREDLINES- Survey- Pfohl.pdf | ||||
2026-ENCROACHMENT-0000025 Tier II 2718 Walnut St ENCROACHMENTDenial · 326 agencies | ENCROACHMENT | 26 | Denial · 3 | |
DS Transportation ReviewDenied PWPRS Project Number: 2026-ENCROACHMENT-0000025 Tier II 2718 Walnut St Reviewing Agency/Company: DOTI EPR Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.christensen@denvergov.org Approval Status: Denied Co… Survey ReviewDenied See Survey comments/checklist. DES Wastewater ReviewDenied This encroachment is in an area of known localized flooding, based on City stormwater modeling. The proposed encroachment must be analyzed for its effect on this flooding, and must be demonstrated to cause no more harm than previous to other properties as a re… All documents in this project (12) ★ 2026-ENCROACHMENT-0000025 Comment Report 4-8-2026.pdf2718 Walnut - Architectural Elevation.pdf2718 Walnut - Civil Site Plan.pdf2718 Walnut - Encroachment Application.pdf2718 Walnut - Encroachment Checklist.pdf2718 Walnut - Property Legal Description.docx2718 Walnut - Special Warranty Deed - Rec #2026009299.pdf2718 Walnut - Structural Plans.pdfREDLINES- CenturyLink- Medrano- No Objection.pdfREDLINES- DS WW- Martel.pdfREDLINES- Survey- Castaneda.docxREDLINES WW Martel_2026-ENCROACHMENT-0000025_WASTEWATER_Statement of No Impact.pdf | ||||
2026-ENCROACHMENT-0000021 Tier III 1096 S Gaylord Wash Park Social Existing Awning ENCROACHMENTDenial · 324 agencies | ENCROACHMENT | 24 | Denial · 3 | |
Survey ReviewDenied Survey comments copied to Project REDLINES folder. Building Department ReviewDenied I'm unable to find a record of a building construction permit for the canopies in question and they might present an increase in the A-2 fire-area beyond the allowable 5,000sf (including the second floor). Please submit a code analy- sis and design drawings of… Denver Office of Disability Rights ReferralDenied All outdoor patio areas in the ROW must comply with all ADA requirements and provide outdoor Accessible Dining Sur- faces/Tables with accessible furniture that complies with all applicable 2010 ADA/A117.1 requirements (specifically all heights and under table… All documents in this project (17) 1096_S_Gaylord_Plan_FINAL_PROJECTION_VERIFIED.pdf★ 2026-ENCROACHMENT-0000021 Comment Report 4-3-2026.pdfBuilding Elevation REVISED 2026.v2 1.pdfCorrection order issued to Wash Park Grill at 1096 S Gaylord St.pdfdotipt-105-encroachment_application.pdfLand description of the benefiting property .pdfParcel Description.pngPERMIT SUBMITIAL CHECKLIST 1.pdfRecorded Special Warranty Deed.pdfREDLINES- ADA- Pasillas.pdfREDLINES- CenturyLink- Letter of No Objection.pdfREDLINES- Survey- Pfohl.pdfsite plan_1096 S Gaylord st.pdfWash_Park_Social_Encroachment_Permit_Set_COMPRESSED.pdfWash_Park_Social_Signage_Proposal.pdfWPS_DOTI_Awning_Projections_Pic.pdfWPS_DOTI_Awning_Projections_WITH_RECOMMENDATIONS.pdf | ||||
2026-ENCROACHMENT-0000020 2nd - Tier II - 2345 E Evans Ave Ramp Railing and Step ENCROACHMENTDenial · 123 agencies | ENCROACHMENT | 23 | Denial · 1 | |
Survey ReviewDenied redlines in project folder Review Status: Approved All documents in this project (8) ★ 2026-ENCROACHMENT-0000020 Comment Report 5-29-2026.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Survey- Pfohl.docxSub 2 - 2026-ENCROACHMENT-0000020 - SITE PLAN.pdfSub 2 - 2026-ENCROACHMENT-0000020 1st Submittal Comment Report 4-21-2026.pdfSub 2 - B1 - ENCROACHMENT APPLICATION - SIGNED.pdfSub 2 - B2 - ENCROACHMENT CHECKLIST - SIGNED.pdfSub 2 - B4 - BENEFITING PROPERTY LAND DESCRIPTION.pdf | ||||
2026-ENCROACHMENT-0000020 Tier II - 2345 E Evans Ave Ramp Railing and Step ENCROACHMENTDenial · 222 agencies | ENCROACHMENT | 22 | Denial · 2 | |
DS Transportation ReviewDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. Survey ReviewDenied Comments and redlines in project folder All documents in this project (10) ★ 2026-ENCROACHMENT-0000020 Comment Report 4-17-2026.pdfA2 - TEP PLAN SET.pdfB1 - ENCROACHMENT APPLICATION - SIGNED.pdfB2 - ENCROACHMENT CHECKLIST - SIGNED.pdfB3 - ENCROACHMENT SITE PLAN.pdfB4 - BENEFITING PROPERTY LAND DESCRIPTION.pdfREDLINES- CenturyLink- Medrano- Letter of No Objection.pdfREDLINES- DODR- Pasillas.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Survey- Pfohl.pdf | ||||
2026-ENCROACHMENT-0000018 Tier II - 3330 W 24th Ave - Private Sewer System ENCROACHMENTDenial · 224 agencies | ENCROACHMENT | 24 | Denial · 2 | |
Survey ReviewDenied Survey comments and Site Plan redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) Denver Water ReferralDenied PWPRS Project Number: 2026-ENCROACHMENT-0000018 - Tier II - 3330 W 24th Ave - Private Sewer System Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied… All documents in this project (6) | ||||
2026-ENCROACHMENT-0000013 Tier III 1520 Trenton St Fence ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (8) | ||||
2026-ENCROACHMENT-0000011 Tier III- 419 S Broadway - Multiple Items ENCROACHMENTClear20 agencies | ENCROACHMENT | 20 | Clear | |
All documents in this project (9) ★ 2026-ENCROACHMENT-0000011 Comment Report 2-19-2026.pdfBP AMLI Arthaus Encroachment Submittal Checklist.pdfBP AMLI Arthaus Encroachment_Application.pdfBP AMLI Arthaus Encroachment_Supporting Documents.pdfBP AMLI Arthaus Encroachment_Title Committment.pdfParcel 0515205048000 - Legal Description.docxParcel 0515205049000 - Legal Description.docxParcel 0515205050000 - Legal Description.docxREDLINES- Survey- Sperling.docx | ||||
2026-ENCROACHMENT-0000003 Tier III - 200 Colorado Blvd - Retaining Wall - Fence - Stairs - ETC ENCROACHMENTDenial · 726 agencies | ENCROACHMENT | 26 | Denial · 7 | |
DS Transportation ReviewDenied PWPRS Project Number: 2026-ENCROACHMENT-0000003 - Tier III - 200 Colorado Blvd - Retaining Wall - Fence - Stairs - ETC Reviewing Agency/Company: DOTI DES Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.chri… Survey ReviewDenied Added survey and redline comments in the document folder. DES Wastewater Review REDLINES uploaded to E-review webpageDenied Show storm infrastructure on the plan, all fence structures will need to be 10' minimum away from any public infrastructure. ERA Transportation ReviewDenied 1. There is only 8 feet of right-of-way (ROW) along Colorado Blvd, which does not meet city standards. Encroachments will not be permitted along Colorado Blvd. and must be removed, including existing timber landscape walls. All private facilities along Colorad… ERA Wastewater ReviewDenied Show existing storm inlet on 2nd Ave. near stop sign. Is the inlet being reconstructed with the new 5' sidewalk along 2nd Ave? Xcel ReferralDenied PWPRS Project Number: 2026-ENCROACHMENT-0000003 - Tier III - 200 Colorado Blvd - Retaining Wall - Fence - Stairs - ETC Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewers Phone… Denver Fire Department ReviewDenied Please address the following comment(s): 1. There is an existing fire hydrant located at the northeast corner of Colorado Blvd. and 2nd Ave adjacent to the proposed scope of work. Provide dimensions around fire hydrant and demonstrate the proposed retaining wa… All documents in this project (10) 200 Colorado DOTI Encroachment Application.pdf200 Colorado DOTI Encroachment Permit Drawing R1.pdf200 Colorado Legal.pdf200 Colorado Warranty Deed.pdf★ 2026-ENCROACHMENT-0000003 Comment Report 2-2-2026.pdfREDLINES- ER Transportation- Kijowski.pdfREDLINES- ER WW- Sasarak.pdfREDLINES- Fire Prevention- Grier.pdfREDLINES- Survey- Breitnauer- ENCROACHReqmts.docxREDLINES- Survey- Breitnauer.pdf | ||||
2026-ENCROACHMENT-0000001 Tier III 2904 S Ingalls Wy - Fence Driveway and Shed ENCROACHMENTDenial · 124 agencies | ENCROACHMENT | 24 | Denial · 1 | |
ERA Transportation ReviewDenied PWPRS Project Number: 2026-ENCROACHMENT-0000001 Tier III 2904 S Ingalls Wy - Fence Driveway and Shed Reviewing Agency/Company: ER Transportation Reviewers Name: Kelsey Kijowski Reviewers Phone: 7209138834 Reviewers Email: kelsey.kijowski@denvergov.org Approval… All documents in this project (12) 2025 09 01_23-47 34.PNG2025 09 01_23-47 47.PNG2026-ENCROACHMENT-0000001 Comment Report 1-29-2026.pdf★ 2026-ENCROACHMENT-0000001 Revised Comment Report 7-28-2026.pdf2904 s ingalls way DAS zoning study 23.12.25 E-SIGN.pdfEncroachment Checklist Berry 12.23.25.pdfEncroachmentt Application Berry 12.23.25.pdfParcel Land Description_2904 S Ingalls Wy..docxProof of Ownership.pdfREDLINES- ER Transportation- Kijowksi.pdfREDLINES- Survey- Pfohl.docxZoningRelief_2904SIngalls_05-19-2025.pdf | ||||
2026-CIP-0000094 Sloans Lake Water Quality CIPNo report yet— agencies | CIP | — | No report yet | |
2026-CIP-0000093 Rapid Diverter Deployment - Quick Build CIPNo report yet— agencies | CIP | — | No report yet | |
2026-CIP-0000092 City Park Living Land CIPNo report yet— agencies | CIP | — | No report yet | |
2026-CIP-0000091 City Park (21st and York St Bus Stop) Accessibility Improvement CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (4) | ||||
2026-CIP-0000090 Bear Creek Ped Bridge - Submittal 1 CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (2) | ||||
2026-CIP-0000089 Xcel Energy - Leetsdale to Elati Substations - underground transmission line relocation CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (4) Att. 0 - Xcel Energy_5283 Phase 2_Sgmt 1_ 60% Engineering_Cover Memo_2026-06-15.pdfAtt. 1 - 5283 ELAT-MONR 230 kV UG Rplc Phase 2 - Section 1 - Drawing Package.pdfAtt. 2 - 2025-CIP-0000010 Comment Report 02-05-2025_Comment Response - Section 1, 2, 3 & 4 (1).xlsAtt. 3 - 5283 PHASE 2 PORTION 1 SURVEY CONTROL PLAN.pdf | ||||
2026-CIP-0000088 Santa Fe Streetscape 100pcnt CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (3) | ||||
2026-CIP-0000087 Rapid Diverter Deployment - Permanent CIPNo report yet— agencies | CIP | — | No report yet | |
2026-CIP-0000086 17th and 18th Ave Bus Priority CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (9) 17th and 18th Specs 2026-06-09.pdf17th_18th_Recommendations Report_March 2025R1.pdf17th-18th 100pcnt - CRF.pdf2026-06-09 17th and 18th Avenue Estimate.pdf2026-06-09 17th and 18th Avenue Plans.pdf2026-06-09 17th and 18th Avenue Turning Movement (1).pdfAppendix A. 17th_18th and Pearl Alternatives.pdfAppendix B. 18th Avenue Chicanes.pdfAppendix C. Uptown Care Center Alternatives.pdf | ||||
2026-CIP-0000085 Denver Resilient Landscape DRL - Rules and Regulations CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (1) | ||||
2026-CIP-0000083 GES Safer Streets - Non-Federal 90pct Package CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (10) 2026-CIP-0000083 - Comment Reports - 08.04.2026.pdf2026-CIP-0000083 GES Safer Streets - Non-Federal Package Survey Comments 2026.08.03.docxGES SS-P2NonFed-90PRCT Specs-2026-07-16.pdfGES SS-P2NonFed-90PRCT-Plans-2026-07-16.pdfGES SS-P2NonFed-CRF-60PRCTComments.xlsxGES SS-P2NonFed-DrainageReport.pdfGES SS-P2NonFed-Estimate.pdfREDLINES - DPR - JCervera - Comments GES SS-P2NonFed-90prct -Plans-2026-07-16.pdfREDLINES - OCF - EHuetig Comments 90 pct - 7-28-26.pdfREDLINES - WWConstruction - MGehrke - GES SS-P2NonFed-90PRCT-Plans-2026-07-16-mwg.pdf | ||||
2026-CIP-0000082 Parks Maintenance Facility - Green Valley Ranch CIPFlagged · 18 agencies | CIP | 8 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection See Survey comments inf Project Redlines folder. All documents in this project (3) | ||||
2026-CIP-0000081 Mestizo-Curtis Park Pool renovation redesign CIPClear31 agencies | CIP | 31 | Clear | |
All documents in this project (16) 015713 Erosion and Sedimentation Control.pdf10405062-Mestizo-Electrical Site Plan.pdf2026.07.13 CCD-Mestizo Irrigation-CPEP-60.pdf2026.07.13 CCD-Mestizo Landscape-CPEP-60.pdf2026.07.13 Mestizo Civil Plans.pdf2026.07.13 Mestizo Drainage Report.pdf2026.07.13 Mestizo Rain Garden O and M.pdf★ 2026-CIP-0000081 - Comment Report - 07.29.26.pdf311100 Clearing and Grubbing.pdf312000 Earth Moving.pdf312316 Excavating and Backfilling of Trenches.pdf321216 Asphalt Pavement.pdf321313 Concrete Walks Curbs and Miscellaneous Flatwork.pdf331100 Water Utility Distribution Piping.pdf333100 Sanitary Utility Sewerage Piping.pdf334400 Storm Sewerage.pdf | ||||
2026-CIP-0000080 Irving Street Traffic Calming CIPFlagged · 428 agencies | CIP | 28 | Flagged · 4 | |
ERA Wastewater ReviewReview Complete - Objection We have recently updated our Urban Flood Risk modeling to include 1 foot contours, basin boundaries, and flow depth information. It is suggested speed cushions be placed outside of areas where stormwater flows are already spilling, or may spill, into private p… ERA Erosion Control ReviewReview Complete - Objection 1. Please add CASDP not required notes to plans. DS Wastewater ReviewReview Complete - Objection Please see Brendan's comment. ERA Floodplain ReviewReview Complete - Objection PLANS: Show and label the floodplain boundaries and Flood Zone(s). Add the following Floodplain Note to identify the effective FIRM information: FLOODPLAIN NOTE: THIS PROJECT PROPOSES WORK IN THE ZONE AE FLOODPLAIN AND FLOODWAY OF SANDERSON GULCH AS SHOWN ON F… | ||||
2026-CIP-0000079 DPR Pre-Fabricated Restrooms CIPClear32 agencies | CIP | 32 | Clear | |
All documents in this project (8) ★ 2026-CIP-0000079. Comment Report. 07.27.2026.pdf95PRNCT COMMENT RESPONSES TO 2026-CIP-0000006 Comment Report 2-11-2026.pdfARGO PARK - DOTI-DPR RR IMPROVEMENTS - 95PRNCT ER Resubmittal.pdfCOMMONS PARK - DOTI-DPR RR IMPROVEMENTS - 95PRNCT ER Resubmittal.pdfHUSTON LAKE PARK - DOTI-DPR RR IMPROVEMENTS - 95PRNCT ER Resubmittal.pdfMONTBELLO CENTRAL PARK - DOTI-DPR RR IMPROVEMENTS - 95PRNCT ER Resubmittal.pdfPROJECT MANUAL - DOTI-DPR RR IMPROVEMENTS 95PRNCT ER Resubmittal.pdfRUDE PARK - DOTI-DPR RR IMPROVEMENTS - 95PRNCT ER Resubmittal.pdf | ||||
2026-CIP-0000076 Encroachment Rules and Regulations CIPFlagged · 249 agencies | CIP | 49 | Flagged · 2 | |
ERA Floodplain ReviewReview Complete - Objection See comments in shared document. External Referral 12Review Complete - Objection PWPRS Project Number: 2026-CIP-0000076 - Encroachment Rules and Regulations Reviewing Agency/Company: Denver Office of Climate Action, Sustainability and Resiliency Reviewers Name: Khai Hoan Nguyen Reviewers Phone: (720) 384 4855 Reviewers Email: khaihoan.nguy… | ||||
2026-CIP-0000075 CDOT - Proj. 26358 - SH35 R1 RESURFACING-BRIDGE CIPFlagged · 321 agencies | CIP | 21 | Flagged · 3 | |
ERA Erosion Control ReviewReview Complete - Objection DS Transportation ReviewReview Complete - Objection See redlines. Review Status: Review Complete - No Objec 2026 07 01 cm transportation redlines CIP CDOT ERA Floodplain ReviewReview Complete - Objection A floodplain permit is required for this project and review comments have been sent via the General Floodplain Permit review, 2026-FLOOD-0000081. This objection will be cleared once there are no outstanding floodplain comments that | ||||
2026-CIP-0000074 S. Platte River Trail - Mississippi to Dartmouth CIPFlagged · 334 agencies | CIP | 34 | Flagged · 3 | |
ERA Erosion Control ReviewReview Complete - Objection 1. Due to the project's limit of disturbance (greater than one acre) a Construction Activities Stormwater Discharge Permit (CASDP) is required. 2. Please prepare CASDP package in accordance with the City guidelines found here: https://denvergov.org/Government/… DS Wastewater ReviewReview Complete - Objection EC is needed since the site disturbing area more than 1 acre and adjacent to floodplain. Floodplain permit is required for working within floodplain. Reviewers Name: PW Survey ReviewReview Complete - Objection Redlines in project folder All documents in this project (17) 20260715_2026-CIP-0000074_SurveyComments.docx20260715_2026-CIP-0000074_SurveyRedlines.pdf★ 2026-CIP-0000074 - Comment Report - 07.16.26.pdf25420 SPRT ProjectSpecificationsList 30.pdf25420_SPRT_ConstructionPlans-Part1of2_30 MH.pdf25420_SPRT_ConstructionPlans-Part1of2_30.pdf25420_SPRT_ConstructionPlans-Part2of2_30 MH.pdf25420_SPRT_ConstructionPlans-Part2of2_30.pdf25420_SPRT_DraftWallStructureSelectionReport_30.pdf25420_SPRT_PreliminaryDrainageMemo_30.pdf25420_SPRT_PreliminaryFloodplainMemo_30.pdf25420_SPRT_PreliminaryGeotechnicalReport_30.pdf25420_SPRT_ProjectSpecificationsList_30 MH.pdfcpep-suggested-notes MH.pdfREDLINES - WW Construction - MGehrke 25420_SPRT_ConstructionPlans-Part1of2_30-mwg.pdfREDLINES- Survey- Pfohl.pdfREDLINES_Floodplain.pdf | ||||
2026-CIP-0000073 CDOT HSIP FY25 11TH AVE and QUEBEC ST CIPFlagged · 224 agencies | CIP | 24 | Flagged · 2 | |
ERA Wastewater ReviewReview Complete - Objection 1) Plans identify a disturbance area less than 1 acre. Therefore, it is understood that regulatory WQ treatment per the terms of the City's MS4 permit will not apply. Please confirm this understanding with a statement in the drainage memo. 2)See attached storm… Reviewers Name: PW Survey ReviewReview Complete - Objection Uploaded survey redline comments in E-Review. Review Status: Review Complete - Objection All documents in this project (12) ★ 2026-CIP-0000073 - Comment Report -07.16.2026.pdf25530 11 Quebec 30p Drng Memo.pdf25530 11th and Quebec - FIR SUE Report.pdf25530 11th-Quebec FIR Submittal Memo.pdf25530 11th-quebec-plans-260619.pdfREDLINES - EPR - DHarris - 25530 11th-quebec-plans-260619 EPR WW redlines.pdfREDLINES - Forestry - NEvers - Comments 7-15-26.pdfREDLINES - SURVEY - 20260702-26CIP073-30PRNCT Plans-Survey RedlineComments - FULL SET.pdfREDLINES - SURVEY - 20260702-26CIP073-3030PRNCTPlans-Survey RedlineComments.pdfREDLINES - SURVEY - 20260702-26CIP073-30PRCT Plans-Survey RedlineComments.pdfREDLINES - TME - ERodgriguez - Pages from 25530 11th-quebec-plans-260619 - TME Reviewed.pdfREDLINES - WWConstruction MGehke - 25530 11th-quebec-plans-260619-mwg.pdf | ||||
2026-CIP-0000072 Rapid Diverter Deployment CIPFlagged · 129 agencies | CIP | 29 | Flagged · 1 | |
PW Trans Safety ReviewReview Complete - Objection PWPRS Project Number: 2026-CIP-0000072 - Rapid Diverter Deployment Reviewing Agency/Company: DOTI Transportation & Mobility Engineering Reviewers Name: Allison Thienpont Reviewers Phone: 720-865-3197 Reviewers Email: allison.thienpont@denvergov.org Approval St… All documents in this project (10) ★ 2026-CIP-0000072 - Comment Report - 7.15.26.pdf90PRCT Rapid-Deployment Comment-Response.xlsx90PRCT Rapid-Deployment Construction-Plans.pdf90PRCT Rapid-Deployment Cost-Estimate.pdf90PRCT Rapid-Deployment Truck-Turns.pdfREDLINES - DOTIIMPLE - JCanada - 90PRCT Rapid-Deployment Construction-Plans - JEC Review.pdfREDLINES - DOTIIMPLE - JCanada - 90PRCT - Rapid-Deployment Cost-Estimate - JEC.pdfREDLINES - DOTIIMPLEM - JCandana 90PRCT Rapid-Deployment Truck-Turns - JEC Review.pdfREDLINES - TOPS - Arredondo.pdfREDLINES-DPR Cmnts PRNCT Rapid-Deployment_Construction-Plans.pdf | ||||
2026-CIP-0000071 Montbello Channel Improvements - Phase 3 CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (24) 00_GENERAL SHEETS 1-8.pdf01_SURVEY SHEETS 9-12.pdf02_LIMITS OF CONSTRUCTION SHEETS 17-19.pdf03_STORMWATER MANAGEMENT SHEETS 20-34.pdf04_EXISTING CONDITIONS SHEETS 35-37.pdf05_DEMOLITION AND REMOVALS SHEETS 38-40.pdf06_CIVIL SHEETS 41-43.pdf07_TRAFFIC CONTROL SHEETS 44-48.pdf08_DRAINAGEWAY IMPROVEMENTS SHEETS 49-57.pdf09_ENGINEERING GEOLOGY SHEETS 58-60.pdf10_BOX CULVERT IMPROVEMENT SHEETS 61-72.pdf11_WALL IMPROVEMENT SHEETS 73-78.pdf12_STORM SEWER IMPROVEMENT SHEETS 79-86.pdf13_ROADWAY IMPROVEMENT SHEETS 87-130.pdf14_LANDSCAPE SHEETS 131-142.pdfREDLINES - -DPR Cmnts_Montbello Channel Improvements P3 60PRCNT.pdfREDLINES - DS Transportation - CMueller - 2026 06 26 cm transportation redlines CIVIL SHEETS.pdfREDLINES - DS Wasterwater- DHarris CIP WW Standard Notes (1).pdfREDLINES - TME _ATheinpont Pages from 13_ROADWAY IMPROVEMENT SHEETS 87-130_AT Comments.pdfREDLINES - WWConstruction-MGehrke - Attachment 3 12_STORM SEWER IMPROVEMENT SHEETS 79-86 mwg.pdfREDLINES - WWConstruction-MGehrke - Attachment 1 GENERAL SHEETS.pdfREDLINES - WWConstruction-MGehrke - Attachment 2 - 05_DEMOLITION AND REMOVALS SHEETS 38-40 mwg.pdfREDLINES - WWConstruction-MGehrke - Attachment 4 - 13_ROADWAY IMPROVEMENT SHEETS 87-130 mwg.pdfREDLINES- Survey- Lee.pdf | ||||
2026-CIP-0000070 GES Safer Streets CIPFlagged · 126 agencies | CIP | 26 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection Review Complete - Objection All documents in this project (8) ★ 2026-CIP-0000070 - Comment Report - 07-13-2026.pdf2026-CIP-0000070 GES Safer Streets Survey Comments 2026.07.10.docx26087-GES SS-FOR-Cost Estimate-2026-05-18.pdf26087-GES SS-FOR-Drainage Memo-2026-05-15-Consor.pdf26087-GES SS-FOR-Specs-2026-05-15.pdf26087-North Central Community Improvements - FIR CRF.xlsxGES SS-FOR-Plans-2026-06-24.pdfREDLINES - WWConstruction - Mgehrke - GES SS-FOR-Plans-2026-06-24 mwg.pdf | ||||
2026-CIP-0000069 GO Bond Sidewalk Project - RISE - Vanderbilt Park and 6th and Federal Connections CIPFlagged · 525 agencies | CIP | 25 | Flagged · 5 | |
ERA Wastewater ReviewReview Complete - Objection 1)Water quality is required at 1 acre of land disturbance and required treatment of 95% of the disturbed area. The proposed work around Vanderbilt Park adjacent ROW's is understood to exceed 1 acre of disturbance. Please submit a drainage letter and design dem… ERA Erosion Control ReviewReview Complete - Objection Review Complete - Objection 1. Due to the project's limit of disturbance (greater than one acre) a Construction Activities Stormwater Discharge Permit (CASDP) is required for the construction areas by Vanderbilt Park and Tower Road. You may choose to submit a… DS Transportation ReviewReview Complete - Objection 1. Recommend detached sidewalks to comply with CCD Std Dwg 2.1 2. All concrete driveway should be constructed per CCD Std Dwg 6.1 with 5' approach widenings and 6' flares Forestry ReviewReview Complete - Objection PWPRS Project Number: 2026-CIP-0000069 - GO Bond Sidewalk Project - RISE - Vanderbilt Park and 6th and Federal Connections ERA Floodplain ReviewReview Complete - Objection PLANS: Please see attached floodplain redlines and address accordingly for your next CIP submittal. | ||||
2026-CIP-0000068 Parks Maintenance Facility - Green Valley Ranch CIPFlagged · 123 agencies | CIP | 23 | Flagged · 1 | |
DPR Parks QAReview Complete - Objection All DPR comments have not been addressed at this time. | ||||
2026-CIP-0000067 2023 Intersection Improvement Design🚲 bike lane CIPFlagged · 330 agencies | CIP | 30 | Flagged · 3 | |
🚲 Bike lane mentioned [file name] "53rd Ave Bikeway Plans 2026.5.29 reduced.pdf" ERA Wastewater ReviewReview Complete - Objection ERA Floodplain ReviewReview Complete - Objection All floodplain comments made on previous CIP review still apply. Below are general comments from the previous review that did not appear to be addressed with this submittal. FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplai… PW WW Maintenance ReviewReview Complete - Objection PWPRS Project Number: 2026-CIP-0000067 - 2023 Intersection Improvement Design Reviewing Agency/Company: WW Construction Reviewers Name: Mark Gehrke Reviewers Phone: 303-446-3427 Reviewers Email: mark.gehrke@denvergov.org Approval Status: Approved with conditio… All documents in this project (8) 100PRNT 2023 Intersection Improvements Specs.pdf2023 Group 1 100pct 2026-06-10.pdf2023 Intersection Improvements Final Drainage Report 20260604.pdf★ 2026-CIP-0000067 Comment Report 06.26.2026.pdf23080 2023 Intersections Group 1 Comments Matrix 2026-06-10.pdf53rd Ave Bikeway Plans 2026.5.29 reduced.pdfPerry and Lakewood Gulch - No Impact Letter_20260605.pdfREDLINES WW CONST Gehrke.pdf | ||||
2026-CIP-0000066 GO Bond Sidewalks - CD 237 - Group 2 CIPFlagged · 224 agencies | CIP | 24 | Flagged · 2 | |
ERA Erosion Control ReviewReview Complete - Objection Please add the required erosion control notes for projects not requiring a CASDP. Required notes are uploaded as redlines. REDLINES uploaded to E-review webpage Forestry ReviewReview Complete - Objection Forestry Comments: Review Status: No Response 1) Include OCF Tree Protection Detail - see OCF website. All documents in this project (10) ★ 2026-CIP-0000066 Comment Report 6-24-2026.pdfCCD 2 3 7 - Sidewalks Initial Drainage Memo.pdfFOR 30 ER Comment Matrix-Package 2 and 3.pdfFOR ConstPlans-Package 2 and 3.pdfFOR-Specs Package 2 and 3.pdfREDLINES - ER Erosion Control- Sasarak.pdfREDLINES- Forestry- Evers- Mitigation Form.pdfREDLINES- Forestry- Evers- OCF Tree Protection Notes.docxREDLINES- Trans Safety- De Vos Tidd.pdfREDLINES- WW Maintenance- Gehrke.pdf | ||||
2026-CIP-0000065 Bear Creek Trail (Bear Creek Park) CIPFlagged · 428 agencies | CIP | 28 | Flagged · 4 | |
ERA Wastewater ReviewReview Complete - Objection Provide documentation Metro Wastewater has reviewed and accepted the improvements within their easements. ERA Transportation ReviewReview Complete - Objection The City of Denver Engineering and Regulatory Office has completed its Strategic review of the submitted ERA Erosion Control ReviewReview Complete - Objection 1). Due to the project's limit of disturbance (greater than one acre) a Construction Activities Stormwater Discharge Permit (CASDP) is required. PW Survey ReviewReview Complete - Objection Review Complete - Objection sheets. Can you provide clarification on the "Revisions of Sections 625 and 629" comment, additional context would be helpful. Survey Redlines uploaded in Accela and copied into the Project Redlines folder REDLINES are uploaded to t… All documents in this project (15) ★ 2024-CIP-0000150 Comment Report 10-17-2024-RESPONSES.pdf2026-06-05 23-007 Bear Creek 90PRNT-compiled.pdf2026-06-05 Bear Creek Trail 0PRNTCost Estimate.pdf2026-CIP-0000065 - Comment Report - 06-29-2026.pdfBear Creek Trail - 90PRNT Spec book.pdfBear Creek Trail - Bear Creek Crossing SSR - PBB Review with responses.pdfBear Creek Trail - Bear Creek Crossing Structure Selection Report90PRNCT.pdfBear Creek Trail - Marston Crossing SSR - PBB Review with responses.pdfBear Creek Trail - Marston Crossing Structure Selection Report 90PRNCT.pdfBear Creek Trail CASDP 90 Percent 06.05.2026.pdfBear Creek Trail CASDP Narrative Report 90PRNT Submittal 2023-PROJMSTR-0000251.pdfDPR comment doc BCT - 60pct Review Doc-RESPONSES.pdfREDLINE Floodplain Review Comments.docxREDLINES - Floodplain 60pcntPlans.pdfREDLINES- Survey- Pfohl.pdf | ||||
2026-CIP-0000063 Encroachment Rules and Regulations CIPFlagged · 335 agencies | CIP | 35 | Flagged · 3 | |
DS Transportation ReviewReview Complete - Objection Forestry ReviewReview Complete - Objection ERA WastewaterReview Complete - Objection All documents in this project (6) ★ 2026-CIP-0000063 - Comment Report - 06-16-2026.pdfEPR Transportation_Chris Mueller - workshop photo 1.jpegEPR Transportation_Chris Mueller - workshop photo 2.jpegEPR Transportation_Chris Mueller - workshop photo 3.jpegEPR Transportation_Chris Mueller - workshop photo 4.jpegReviewer Instructions - Encroachment RR.pdf | ||||
2026-CIP-0000062 Evergreen Golf Course - Cart Path Replacement CIPClear28 agencies | CIP | 28 | Clear | |
All documents in this project (2) | ||||
2026-CIP-0000061 2023 New Traffic Signals - Central Denver 100Pcnt CIPFlagged · 223 agencies | CIP | 23 | Flagged · 2 | |
Forestry ReviewReview Complete - Objection PWPRS Project Number: 2026-CIP-0000061 - 2023 New Traffic Signals - Central Denver 100Pcnt Reviewing Agency/Company: Office of the City Forester Reviewers Name: Eric Huetig Reviewers Phone: 7209130752 Reviewers Email: eric.huetig@denvergov.org Approval Status:… REDLINES ARE UPLOADED TO THE E-REVIEW WEBPAGEReview Complete - Objection I am behind on reviews and will need to submit comments on 6/12 All documents in this project (13) 2026-04-30 Central Signals 100Pcnt Drainage Report.pdf2026-04-30 Central Signals 100Pcnt Estimate.pdf2026-04-30 Central Signals 100Pcnt Plans.pdf2026-04-30 Central Signals 100Pcnt Specs.pdf2026-04-30 Central Signals 90Pcnt Comment Resolution Matrix.pdf★ 2026-CIP-0000061 Comment Report 6.10.2026.pdf4015CENT- SUE Report_Stamped_REDUCED.pdf4015CENT_SUE_Stamped.pdfEXTERNAL Central Signals - Geotech Requirements.msgGeotechnical Investigation Report_RockSol.pdfREDLINES Forestry_Huetig - OCF Comments 6-8-26__ 2025PM0000173_2026-CIP-61 - 100pct.pdfREDLINES Trans Mobility_Stein - 2026-5-29_Central Signals 100Pcnt Plans_EES.pdfREDLINES_Jessica Stevens_Turf Alternatives.png | ||||
2026-CIP-0000060 CDOT Sheridan Blvd 17th Ave to 26th Ave - FOR 100PCNT REVIEW CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (13) 2026-CIP-0000060 - DPR Comments - JCevera - 25506-Sheridan-Design-FOR-COMBINED.pdf25506 SH-95 - 100PCNT FOR Drainage Report.pdf25506 SH-95 Edgewater Conditional Use Floodplain Permit.pdf25506 Sheridan Blvd ISA Rev1 01092025.pdf25506ROW AuthPkg REVISION.pdf25506-Sheridan CDOT Form 463.pdf25506-Sheridan-Design-FOR 2-SPECS.pdf25506-Sheridan-Design-FOR-COMBINED.pdfREDLINES - TME - EStein2026-5-29_25506-Sheridan-Design-FOR-COMBINED_EES.docxREDLINES - TME - EStein2026-5-29_25506-Sheridan-Design-FOR-COMBINED_EES.pdfREDLINES - WWConstruction - MGehrke - 25506-Sheridan-Design-FOR-COMBINED-mwg 6-8-26.pdfREDLINES- Survey- Savich.docxSheridan Dewatering Memo 20251017.pdf | ||||
2026-CIP-0000059 RRA - SW Trail CIPFlagged · 126 agencies | CIP | 26 | Flagged · 1 | |
ERA Wastewater ReviewReview Complete - Objection Please remove the 2nd to last paragraph from the Drainage Memo. This project is not within the City's MS4 jurisdictional limits. Project should be reviewed by Jefferson County for applicable MS4 requirements such as | ||||
2026-CIP-0000057 GVR Activation Zones CIPFlagged · 125 agencies | CIP | 25 | Flagged · 1 | |
Obtain a CASDP from ERReview Complete - Objection Survey comments copied to Project REDLINES folder. Review Status: No Response | ||||
2026-CIP-0000056 Montbello Landscape Transformation CIPFlagged · 328 agencies | CIP | 28 | Flagged · 3 | |
ERA Erosion Control ReviewReview Complete - Objection 1. Due to the project's limit of disturbance (greater than one acre) a Construction Activities Stormwater Discharge Permit (CASDP) is required. Please prepare CASDP package in accordance with the City guidelines found here: https://www.denvergov.org/content/de… Follow the prompts to enter application data and upload filesReview Complete - Objection PDF IS 90 MB. THIS CITY LAPTOP LOCKS UP. PLEASE RESEND AS 20MB MAX. PDF. PW Construction Engineering ReviewReview Complete - Objection The traffic control spec needs to reference dotipt 116.1 Traffic Control Procedures and dotirr 022.3 Issuance of Permits by the CTE so the contractor understands that E 56th is an arterial - Permit applications need to be submitted All documents in this project (2) | ||||
2026-CIP-0000055 Downtown Bus Priority🚲 bike lane CIPFlagged · 223 agencies | CIP | 23 | Flagged · 2 | |
🚲 Bike lane mentioned [comment report text] "ys park, they park. See the "loading zone" on market between 15th and 16th located in the bike lane. It says it is a loading zone 5pm to 2am. Cars are parked in it 24/7 making it unusable." [comment report text] "The lane still needs to function. Allowing cars to park in the bike lane so that bikes/scooters zip in and out of the bus lane is UNSAFE for everyone." [comment report text] "-16th and blake needs to install the physical armadillos to protect the bike lanes all the way up to the crosswalk at blake and 16th. Constantly" [comment report text] "the crosswalk at blake and 16th. Constantly cars parked in the bike lane before and after the intersection. There are no turning moveme" [comment report text] "s on or off 16th, design does not need to accommodate this and could instead provide more bike lane protection. 18th and blake and 17th and blake are protected al" Forestry ReviewReview Complete - Objection Forestry Comments: 1) Sheet 18 - Show TPZ fencing perimeter. External Referral 1Review Complete - Objection PWPRS Project Number: 2026-CIP-0000055 - Downtown Bus Priority Reviewing Agency/Company: RTD | ||||
2026-CIP-0000054 Santa Fe Streetscape and Multimodal Improvements CIPFlagged · 328 agencies | CIP | 28 | Flagged · 3 | |
ERA Materials ReviewReview Complete - Objection See uploaded Specs with kdb comments. Review Status: Review Complete - No Objec Forestry ReviewReview Complete - Objection Please refer to attached OCF Comment PDF: 1) Show accurate TPZ fencing (as would be installed during construction - perimeter around canopy/rooting area) Additional Internal Review 4Review Complete - Objection Review Complete - Objection All documents in this project (16) 20241016 Santa Fe Streetscape Design Intersection Analysis Turn Ln Removal.pdf20260508 Santa Fe Street scape Design Final Drainage Report 90pct Bid.pdf20260508 Santa Fe Streetscape Design 30pct Comment Response Form.pdf20260508 Santa Fe Streetscape Design Cost Estimate 90pct Bid.pdf20260508 Santa Fe Streetscape Design Final Geotech Report 03-24-25.pdf20260508 Santa Fe Streetscape Design Memo 90pct Bid.pdf20260508 SANTA FE STREETSCAPE DESIGN PLANS 90pct Bid.pdf20260508 Santa Fe Streetscape Design Technical Specifications 90pct Bid.pdf★ 2026-CIP-0000054 Comment Report 5-28-2026.pdfErosionControlPlans SantaFe PRJ10004604.pdfREDLINES- DPR- Cervera.pdfREDLINES- ERA Materials- Blair.pdfREDLINES- Forestry- Evers.pdfREDLINES- Trans Safety- Stein.pdfREDLINES- WW Maintenance- Gehrke.pdfSanta Fe CASDP Narrative ReportSantaFe PRJ10004604.pdf | ||||
2026-CIP-0000053 Clearance and Release - Ball Arena Bridge Landing CIPClear20 agencies | CIP | 20 | Clear | |
2026-CIP-0000052 5280 Trail - Acoma Shared Street CIPFlagged · 133 agencies | CIP | 33 | Flagged · 1 | |
DS Transportation ReviewReview Complete - Objection This project reviewed by ROWS-DES Transportation only for coordination with other nearby private developments. Please contact DES transportation review engineer Matt Steder (matt.steder@denvergov.org) if you have any All documents in this project (11) ★ 2026-CIP-0000052 - Comment Report - 05-26-26.pdf5280 Trail - Acoma Segment 90PCNT - CASDP Narrative.pdf5280 Trail - Acoma Segment 90PCNT - Final Drainage Report.pdf5280 Trail - Acoma Segment 90PCNT- Construction Plans.pdf5280 Trail - Acoma Segment 90PCNT- OandM Plan.pdf5280 Trail - Acoma Segment 90PCNT- Updated Irrigation Plan.pdfCCD 5280 Trail – Acoma Street 12th to 10th Avenue Memorandum.pdfREDLINES - EPR Transportation - MSteder - Approved_Signed - TEP Plan Set REV. 5_4-SITE_TRANSPORTATION_2022PM0000109.pdfREDLINES - WWConstruction - MGehrke 5280 Trail - Acoma Segment 90PCNT- Construction Plans-mwg_Optimized.pdfREDLINES - WWConstruction - MGehrke 5280 Trail - Acoma Segment 90PCNT- OandM Plan-mwg.pdfREDLINES -OFC- NEvers ER 90 prcnt Forestry - comments 5-26-26.docx-26-05-26-13-44.docx | ||||
2026-CIP-0000051 City Park - 21st and York St Bus Stop - Accessibility Improvement CIPFlagged · 529 agencies | CIP | 29 | Flagged · 5 | |
ERA Transportation ReviewReview Complete - Objection The City of Denver Engineering and Regulatory Office has completed its Strategic review of the submitted PW Survey ReviewReview Complete - Objection Control Diagram is not required for this project. REDLINES are uploaded to the E-Review webpage. PW Construction Engineering ReviewReview Complete - Objection See kdb red lines. Review Status: No Response Additional Internal Review 4Review Complete - Objection PWPRS Project Number: 2025-CIP-0000061 - City Park 21st and York St Bus Stop Accessibility Improvement Reviewing Agency/Company: Transportation & Mobility Engineering External Referral 1Review Complete - Objection PWPRS Project Number: 2025-CIP-0000061 - City Park 21st and York St Bus Stop Accessibility Improvement Reviewing Agency/Company: RTD Reviewers Name: clayton s woodruff Reviewers Phone: 303-299-2943 Reviewers Email: Clayton.woodruff@rtd-denver.com Approval Stat… All documents in this project (6) 2026-CIP-0000051 Comment Report 05-26-2026.pdfCityPark 21st York 95PRCTFLAT.pdfREDLINES- TME-ERodriguez- Pages from CityPark 21st York 95PRCTFLAT - TME Reviewed.pdf★ Response 2025-CIP-0000061 Comment Report 04-15-25.pdfResponse kdb red lines PB Fund CityPark 21st York 60PRNCT.pdfResponse REDLINES - Transportation and Mobility Engineering - Krook.pdf | ||||
2026-CIP-0000050 Southmoor Park Tributary CIPFlagged · 332 agencies | CIP | 32 | Flagged · 3 | |
ERA Erosion Control ReviewReview Complete - Objection 1. Due to the project's proximity to a drainageway or water body (enter name of drainageway/water body), a Construction Activities Stormwater Discharge Permit (CASDP) is required. Please prepare CASDP package in accordance with the City guidelines found here:… Reviewers Name: PW Survey ReviewReview Complete - Objection Comments and redlines in project folder ERA Floodplain ReviewReview Complete - Objection The no-rise analysis for the floodplain permit is currently under review. Additional floodplain comments will be provided with the no-rise analysis review. The object for the CIP will be cleared once the no-rise analysis has been reviewed and there are no outs… All documents in this project (7) ★ 2026-CIP-0000050 - Comment Report - 05 - 26 - 26.pdfREDLINES - WW Constuction- MGehkre Southmoor Park Tributary Improvements - 60pct Plans-mwg.pdfREDLINES- DPR - JCervera - Comments Southmoor Park Tributary Improvements - 60pct Plans.pdfREDLINES- Flood District- Clark.pdfREDLINES- Survey- Pfohl.pdfSouthmoor Park Trib Existing Assessment and Concept Memo.pdfSouthmoor Park Tributary Improvements - 60pct Plans.pdf | ||||
2026-CIP-0000049 Willis Case - Cart Path Replacement - 90Pcnt CIPClear23 agencies | CIP | 23 | Clear | |
All documents in this project (2) | ||||
2026-CIP-0000048 Lincoln Street Bridge and 6th Avenue Bridge over Cherry Creek CIPFlagged · 439 agencies | CIP | 39 | Flagged · 4 | |
ERA Wastewater ReviewReview Complete - Objection Verify the pipe sizes shown are correct. Sheet 19 shows an 24-inch elliptical pipe with new FES outfall to cherry creek but the pipe upstream of the inlet at 306+51.50 is a 60-inch RCP. MapIT shows the existing main in 6th Ave as ERA Erosion Control ReviewReview Complete - Objection 1. Due to the project's proximity to a waterway, a Construction Activities Stormwater Discharge Permit (CASDP) is required. 2. Please prepare CASDP package in accordance with the City guidelines found here: https://denvergov.org/Government/Agencies-Departments… Forestry ReviewReview Complete - Objection PWPRS Project Number: 2026-CIP-0000048 - Lincoln Street Bridge and 6th Avenue Bridge over Cherry Creek Reviewing Agency/Company: Forestry RTDReview Complete - Objection PWPRS Project Number: 2026-CIP-0000048 - Lincoln Street Bridge and 6th Avenue Bridge over Cherry Creek Reviewing Agency/Company: RTD Reviewers Name: clayton woodruff Reviewers Phone: 3032992943 Reviewers Email: Clayton.Woodruff@RTD-Denver.com Approval Status:… All documents in this project (13) ★ 2026-CIP-0000048 Comment Report 05.15.2026.pdf2026-CIP-0000048 Revised Comment Report 05.22.26.pdfL6CC 30PRNT FIR Submittal 04-24-26.pdfL6CC 30PRNT FIR Cost Estimate 4-24-26.pdfL6CC Draft Drainage Design Report FIR 4-24-26.pdfL6CC Draft Geotech Report FIR 4-24-26.pdfL6CC Draft Pavement Design Report FIR 4-24-26.pdfL6CC Draft Structure Selection Report FIR 4-24-26.pdfL6CC Draft Utility Report FIR.pdfREDLINES - DPR Comments L6CC 30PRNT FIR Submittal 04-24-26.pdfREDLINES - Floodpain - DBoyles 2026-CIP-0000048_Floodplain-review.pdfREDLINES - SURVEY - DSperling COMMENTS SPERLING L6CC 30PRNT FIR Submittal 04-24-26.pdfREDLINES - TME- ETidd - L6CC 30PRNT FIR Submittal 04-24-26_EDT.pdf | ||||
2026-CIP-0000046 Clearance and Release - 1241 W Bayaud Ave CIPFlagged · 321 agencies | CIP | 21 | Flagged · 3 | |
DS Transportation ReviewReview Complete - Objection Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. DS Wastewater ReviewReview Complete - Objection Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. PW Survey ReviewReview Complete - Objection stamp date and sign the exhibit Review Status: Review Complete - No Objection description approved All documents in this project (6) 2026-04-24 Clearance and Release Intake Form-Appx 1241 W Bayaud-CASR EV Charger.xlsm2026-04-24 Clearance and Release Memo-All Agencies-1271 W Bayaud Xcel Permit.pdf2026-04-24 Legal Description-1271 Bayaud.pdf★ 2026-CIP-0000046 - Comment Report - 05.11.2026.pdf2026-CIP-0000046 Comment Report 05.21.2026.pdfREDLINES - SURVEY COMMENTS Legal Description-1271 Bayaud.pdf | ||||
2026-CIP-0000045 Smith Rd Bridge and Sandown Rd Bridge over Quebec CIPClear42 agencies | CIP | 42 | Clear | |
All documents in this project (18) 1_SSQ Plans 100PRT 2026-04-20.pdf10A SSQ CASDP Narrative 2026-04-17.pdf10B SSQ CASDP Plans 2026-04-17.pdf11 SSQ Comment Resolution Form_90PNCT 2026-04-20.pdf12 SSQ Construction Phasing Memo Final 2026-04-21.pdf2 SSQ Special Provisions 100PRCT 2026-04-20.pdf★ 2026-CIP-0000045 - Comment Report - 05.15.2026.pdf2026-CIP-0000045_Comments Compiled_Smith Rd Bridge and Sandown Rd Bridge over Quebec.msg3_SSQ Cost Estimate 100 PRCT 2026-04-20.pdf4SSQConstructionSchedule1002026-04-20.pdf5SSQgeotechnicalReportFinal2026-03-30.pdf6SSQDrainage ReportFinal2026-04-20.pdf7ASSQSmithD-04-BOST-30A RATING Package2026-04-17.pdf7BSSQD-04-BOST-40A RATING Package2026-04-17.pdf8A SSQ Smith_Bridge Calculation Package 2026-04-17.pdf8B SSQ_Smith Bridge IDC Calc Package Stamped 2026-04-17.pdf9A SSQ Sandown CalculationPackage 2026-04-17.pdf9B SSQ Sandown Bridge IDC Calc Package Stamped 2026-04-17.pdf | ||||
2026-CIP-0000044 Mill 18 - 15th and Umatilla CIPFlagged · 429 agencies | CIP | 29 | Flagged · 4 | |
ERA Wastewater ReviewReview Complete - Objection Sheet 25: Consider adding a slope to the ADA crossing in the proposed minimum. Shown as zero percent on plans. Sheet 38: verify the existing and propose storm manhole rims will not be located in the proposed curb and gutter section. Especially the existing man… ERA Materials ReviewReview Complete - Objection See kdb 630 spec. . Please verify that the HMA spec meets the MGPEC Item 20 and make the note in the specification. PW Survey ReviewReview Complete - Objection Minor survey comments are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) External Referral 1Review Complete - Objection PWPRS Project Number: 2026-CIP-0000044 - Mill 18 - 15th and Umatilla Reviewing Agency/Company: RTD All documents in this project (13) 10859-AT-003.pdf10859-Mill18 SAQ.xlsx2026.04.17-Mill 18 15th and Umatilla Street-Plans-90PRNCT TML.pdf★ 2026-CIP-0000044- Comment Report - 05.11.2026.pdf60pMill18-Comment Resolution Matrix.xlsxB202090 01-Mill 18-SS-3-6-2026.pdfMill Levy 18 Specs 90p.pdfREDLINES - OFC-EHuetig- 5-5-26 2018PM0000539 - 2026-CIP-0000044.pdfREDLINES- Materials- KDB-630 Mill Levy18 Specs 90p.pdfREDLINES- Survey- Savich.pdfREDLINES-Implementation-JCanada -2026.04.17-Mill_18 15th and Umatilla Street-Plans-90PRCT Canada Stein Thienpont.pdfREDLINES-WaterServices-JStevens- Turf Alternatives.pngREDLINES-WWConstruction-MGehrke-2026.04.17-Mill 18 15th and Umatilla Street-Plans-90PRNCT TML-mwg.pdf | ||||
2026-CIP-0000043 High Line Canal Trail Quebec to Parker CIPFlagged · 126 agencies | CIP | 26 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection Comments in project folder Review Status: No Response | ||||
2026-CIP-0000042 Sun Valley Riverfront Park 125pcnt CD Submittal CIPClear21 agencies | CIP | 21 | Clear | |
2026-CIP-0000041 5283 underground projectPhase 2, Segment 2, 95PRCT CIPClear25 agencies | CIP | 25 | Clear | |
All documents in this project (6) 0. Xcel Energy5283 Phase 2Sgmt 2 95PRCT Engineering Cover Memo 2026-04-14.pdf1. 5283 ELAT-MONR 230 kV UG Rplc Phase 2 - Section 2 - Drawing Package.pdf2. 2025-CIP-0000010 Comment Report 02-05-2025 Comment Response - Section 2, 3 & 4.xls★ 2026-CIP-0000041 - Comment Report - 05.01.2026.pdf3. 6531943791 5283 Control Diagram Monroe to Elati CCD SIGNED.pdf4. Monroe to Elati Control DiagramCO83-CF MOD.dwg | ||||
2026-CIP-0000040 5283 Underground Relocation Project Phase 2, Segment 3, 95 PRCT Engineering Submittal CIPFlagged · 330 agencies | CIP | 30 | Flagged · 3 | |
PW Survey ReviewReview Complete - Objection Comments and redlines in project folder PW Trans Safety ReviewReview Complete - Objection PWPRS Project Number: 2026-CIP-0000040 - 5283 Underground Relocation Project Phase 2, Segment 3, 95 PRCT Engineering Submittal Reviewing Agency/Company: Transportation Mobility Engineering Reviewers Name: Eric Stein Reviewers Phone: (720) 865-3270 Reviewers Em… Additional Internal ReviewReview Complete - Objection The Survey Control Diagram has been completed but not included with the plan set. The Survey Control Diagram should incorporate CCD Local Projection Coordinate System with the following parameters: All documents in this project (6) ★ 2026-CIP-0000040 - Comment Report - 05-01-2026.pdfAtt. 0 - Xcel Energy 5283 Phase 2 Sgmt 3 95PRCT Engineering Cover Memo 2026-04-07.pdfAtt. 1 - 5283 ELAT-MONR 230 kV UG Rplc Phase 2 - Section 3 - Drawing Package.pdfAtt. 2 - 2025-CIP-0000010 Comment Report 02-05-2025 Comment Response - Section 3 and 4.xlsAtt. 3 - Monroe to Elati Control Diagram CO83-CF MOD .dwgREDLINES- Survey- Pfohl.pdf | ||||
2026-CIP-0000039 RISE New Signals Project - South Package CIPFlagged · 129 agencies | CIP | 29 | Flagged · 1 | |
Forestry ReviewReview Complete - Objection Add current tree protection detail from forestry website. Forestry has received mitigation funds. Need removal permit prior to construction. Tree protection must be approved prior to mobilization for remaining trees to protect. All documents in this project (8) 2026-04-13 RISE South Plans-Last Call Review - RV Comments.pdf2026-04-13 RISE South Plans-Last Call Review.pdf2026-04-13 RISE South Specs-Last Call Review.pdf2026-04-14 RISE South Estimate-Last Call Review.pdf2026-04-15 RISE Signals South 90 ER Comment Resolution Response.pdf★ 2026-CIP-0000039 - Comment Report - 04-30-2026.pdfREDLINES - DPR Comments 2026-04-13 RISE South Plans-Last Call Review.pdfREDLINES - DPR Comments 2026-04-13 RISE South Specs-Last Call Review.pdf | ||||
2026-CIP-0000038 GOGO Bond Sidewalks - RISE - East Colfax Gaps CIPFlagged · 423 agencies | CIP | 23 | Flagged · 4 | |
DS Transportation ReviewReview Complete - Objection SEE REDLINES: Review Status: Review Complete - No Objection 2026 04 16 CM TRANSPORTATION REDLINES SIDEWALKS PW Survey ReviewReview Complete - Objection Forestry ReviewReview Complete - Objection Review Complete - Objection PW Construction Engineering ReviewReview Complete - Objection See kdb red lines. All documents in this project (13) 2025-CIP-0000134 30 Comment Matrix Responses.pdf★ 2026-CIP-0000038 - Comment Report - 04-30-2026..pdfREDLINES - DPR - Comments RISE East Colfax Sidewalk Gaps Plan Set 90.pdfREDLINES - Forestry - NEvers - East Colfax Grouping Sidewalk Improvments; Mitigation Form.pdfREDLINES - MATERIAL REVIEW - KDB RISE E Colfax SW - PSPs 90.pdfREDLINES - MATERIAL REVIEW - KDB RISE E Colfax SW Gap 90.pdfREDLINES - Survey- TB - CIP 90%_Comments.docREDLINES - TME -ERodriguez Pages from RISE East Colfax Sidewalk Gaps Plan Set 90 - TME Reviewed.pdfREDLINES - WW Construction- MGehrke - RISE East Colfax Sidewalk Gaps Plan Set 90-mwg.pdfREDLINES - WWConstruction - MGehkre 20250507_103130.jpgRISE East Colfax Sidewalk Gaps Drainage Letter 90.pdfRISE East Colfax Sidewalk Gaps Plan Set 90.pdfRISE East Colfax Sidewalks - Project Special Provisions 90.pdf | ||||
2026-CIP-0000037 Sanderson Gulch Upstream of Clay Street CIPFlagged · 126 agencies | CIP | 26 | Flagged · 1 | |
ERA Floodplain ReviewReview Complete - Objection REDLINES uploaded to E-review webpage All documents in this project (6) | ||||
2026-CIP-0000036 Denver Resilient Landscape DRL - Rules and Regulations CIPClear53 agencies | CIP | 53 | Clear | |
All documents in this project (2) | ||||
2026-CIP-0000035 Ogden Bikeway Extension🚲 bike lane CIPFlagged · 128 agencies | CIP | 28 | Flagged · 1 | |
🚲 Bike lane mentioned [project title] "2026-CIP-0000035 - Ogden Bikeway Extension" [comment report text] "www.denvergov.org/pwera Ogden Bikeway Extension 04/28/2026" [comment report text] "Comment Report Ogden Bikeway Extension 04/28/2026" [comment report text] "Comment Report Ogden Bikeway Extension 04/28/2026" [comment report text] "Comment Report Ogden Bikeway Extension 04/28/2026" [comment report text] "omplete - No Objection Comments: PWPRS Project Number: 2026-CIP-0000035 - Ogden Bikeway Extension Reviewing Agency/Company: Transportation Mobility Engineeri" ERA Erosion Control ReviewReview Complete - Objection 1. Add missing note 5I to CIP Erosion Control Notes - CASDP Not Required "THE DIRECT OR INDIRECT DISCHARGE OF WATER CONTAINING WASTE CEMENT TO THE STORM SEWER SYSTEM IS PROHIBITED All documents in this project (7) ★ 2026-CIP-0000035- Comment Report - 04.28.2026.pdfOBE 60Pct Cost Estimate 20260410.pdfOBE 60Pct DesignPlans 20260410.pdfREDLINE- DOTI - CLONG - 2026-CIP-035 CLREDLINES - DOTI - CLONG - 2026-CIP-035 CL.pdfREDLINES- TME- EStein-2026-4-23_OBE 60Pct DesignPlans 20260410_EES_AT.pdfREDLINES- WW Constructions - OBE 60Pct DesignPlans 20260410-mwg.pdf | ||||
2026-CIP-0000034 Metro Water Recovery - Cherry Creek Interceptor Rehabilitation CIPFlagged · 239 agencies | CIP | 39 | Flagged · 2 | |
ERA Materials ReviewReview Complete - Objection See kdb red lines - the Transportation Notes need to be updated. Review Status: Review Complete - Objection ERA Floodplain ReviewReview Complete - Objection FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplain are required to obtain a Floodplain Permit. As currently proposed this project can permitted under a General Floodplain Permit, https://denvergov.org/files/assets/public/v/… All documents in this project (6) ★ 2026-CIP-0000034 - Comment Reports - 04.27.2026.pdfPAR 1478 - CHERRY CREEK INTERCEPTOR REHABILITATION 2026 - 30 EDITS.pdfREDLINES - WW Construction - Gehrke - PAR 1478 - CHERRY CREEK INTERCEPTOR REHABILITATION 2026 - 30 EDITS-mwg.pdf-26-04-23-15-34.pdfREDLINES -Material Reivew kdbPAR 1478 - CHERRY CK INTERCEPTOR REHAb 2026.pdfREDLINES- Survey- Lee.docxREDLINES_Floodplain.pdf | ||||
2026-CIP-0000033 RTD Downtown Rail Replacement - Areas B and C 80pct Design CIPFlagged · 329 agencies | CIP | 29 | Flagged · 3 | |
ERA Wastewater ReviewReview Complete - Objection Add the 7 Drainage Notes for outside agency projects to the plan set. Drainage Notes can be found on Page 8 of the attached Suggested CPEP Notes Combined PDF. PW Survey ReviewReview Complete - Objection Review Complete - Objection Additional Internal Review 1Review Complete - Objection refer to survey comments and redlines per Thomas Savich All documents in this project (8) ★ 2026-CIP-0000033 Comment Report 4.27.26.pdfDOTI Comment Resolution Form - Area BandC 30pct.pdfEPR WR REDLINES_Suggested_CPEP_Notes_Combined_6-28-23.pdfREDLINES - Transportation Mobility Engineering - 2026-4-14_RTD DRRP Area BandC 80pct Plans_EES.pdfREDLINES - WW CONSTRUCTION - RTD DRRP Area BandC 80pct Plans-mwg.pdf-26-04-23-15-00.pdfREDLINES- Survey- Savich.docxRTD DRRP Area BandC 80pct Drainage Report.pdfRTD DRRP Area BandC 80pct Plans.pdf | ||||
2026-CIP-0000032 RTD Downtown Rail Replacement - Area A 30pct Design CIPFlagged · 333 agencies | CIP | 33 | Flagged · 3 | |
ERA Wastewater ReviewReview Complete - Objection ERA Erosion Control ReviewReview Complete - Objection PW Survey ReviewReview Complete - Objection All documents in this project (7) ★ 2026-CIP-0000032 - Comment Report - 04.24.2026.pdfEPR WR REDLINES_Suggested_CPEP_Notes_Combined_6-28-23.pdfREDLINES - TransportationMobilityEngineering - Approved wconditions.pdfREDLINES - WWConstruction- RTD DRRP Area A 30pct Plans-mwg.pdfREDLINES- Survey- Savich.docxRTD DRRP Area A 30pct Drainage Report.pdfRTD DRRP Area A 30pct Plans.pdf | ||||
2026-CIP-0000031 GES Safer Streets - Non-Federal Package CIPFlagged · 520 agencies | CIP | 20 | Flagged · 5 | |
ERA Materials ReviewReview Complete - Objection When the Specification are submitted: ERA Erosion Control ReviewReview Complete - Objection Please prepare CASDP package in accordance with the City guidelines found here: https://denvergov.org/Government/Agencies-Departments-Offices/Agencies-Departments-Offices-Directory/Depart ment-of-Transportation-and-Infrastructure/Programs-Services/Wastewater-M… PW Survey ReviewReview Complete - Objection ERA Floodplain ReviewReview Complete - Objection FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplain are required to obtain a Floodplain Permit. Portions of this project are in the regulatory floodplain. Additional Internal Review 1Review Complete - Objection PWPRS Project Number: 2026-CIP-0000031 - GES Safer Streets - Non-Federal Package Reviewing Agency/Company: RTD Reviewers Name: clayton woodruff Reviewers Phone: 3032992943 Reviewers Email: Clayton.Woodruff@RTD-Denver.com Approval Status: Denied Comments: Proje… All documents in this project (11) ★ 2026-CIP-0000031 Comment Report 4-22-2026.pdfGES SS - Non-Federal Package - Design Critieria Memorandum.pdfGES SS-P2NonFed-60-Plans-2026-04-03.pdfGES SS-P2NonFed-60PRCT-DrainageReport-2026-04-03.pdfGES SS-P2NonFed-60PRCT-Turning Movements-2026-04-03.pdfREDLINES- Craig Long.pdfREDLINES- DPR- Cervera.pdfREDLINES- ER WW- Sasarak.pdfREDLINES- Forestry- Huetig.pdfREDLINES- RTD- Woodruff.pdfREDLINES- Survey- Castaneda.docx | ||||
2026-CIP-0000030 Willis Case - Cart Path Replacement CIPFlagged · 125 agencies | CIP | 25 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection Date: 2026.04.21 Project Name: 2026-PROJMSTR-0000133 Willis Case - Cart Path Replacement All documents in this project (3) | ||||
2026-CIP-0000029 60pct - First Creek Trail and Stream Improvements - 42nd to 38th CIPFlagged · 630 agencies | CIP | 30 | Flagged · 6 | |
ERA Wastewater ReviewReview Complete - Objection REPEAT COMMENT: Prepare a Water Quality Memo stating compliance with the City's MS4 permit for construction and post-construction water quality regulations. The City's MS4 permit is available online at: https://www.denvergov.org/Government/Agencies-Departments… ERA Materials ReviewReview Complete - Objection For traffic control specifications, Add dotipt 116.1 dotirr 22.3 to the list of Stds. FOR ASPHALT AND CC USED IN THE ROW: Please Verify and state in the HMA Spec that it meets MGPEC Item 20Review Complete - Objection 1. SWMP plans and CASDP narrative were both received with this CIP submittal. However, CASDP reviews require a separate application. 2. Please prepare CASDP package in accordance with the City guidelines found here: https://denvergov.org/Government/Agencies-De… 4. This objection will be removed once a CASDP application has been received.Review Complete - Objection 04/01/2026 Review Complete - Objection SEE REDLINES. 2026 04 01 CM TRANSPORTATION REDLINES TRAIL PLEASE REQUEST A TEAMS CALL MEETING SHOULD THERE BE QUESTIONS. REDLINES uploaded to E-review webpage Reviewers Name: PW Survey ReviewReview Complete - Objection Survey redlines uploaded to Accela. Review Status: No Response PW Construction Engineering ReviewReview Complete - Objection If there are new cub cuts and curb ramps in the ROW - corresponding details need to be provided. All documents in this project (10) 20260330 - First Creek Trail - CASDP Report.pdf20260331 - First Creek Trail 38th to 42nd 60pct CDs.pdf★ 2026-CIP-0000029 Comment Report 4-16-2026.pdf25035 Tree Survey.pdfAppendix G2 - First Creek Trail 38th to 42nd - SWMP Plans.pdfDPR CDSubmittalChecklist 2025.xlsxREDLINES- DS Transportation- Mueller.pdfREDLINES- Floodplain- Boles.docxREDLINES- Survey- Lee.docxREDLINES- WW Maintenance- Gehrke.pdf | ||||
2026-CIP-0000028 Jackson Street Storm System Phase 3🚲 bike lane CIPClear27 agencies | CIP | 27 | Clear | |
🚲 Bike lane mentioned [comment report text] "r future projects. This would help to account for opportunities such as the Albion Street bike path improvement. Alternative 1 seems" All documents in this project (3) | ||||
2026-CIP-0000027 S University Blvd Sidewalk CD10-G1 CIPFlagged · 230 agencies | CIP | 30 | Flagged · 2 | |
ERA Materials ReviewReview Complete - Objection It is better to reference standards instead of include them in the plans. Please ensure that the concrete specs meet MGPEC Item 30. Then state in the spec that MGPEC Item 30 requirements are met. PW Survey ReviewReview Complete - Objection redlines in project folder All documents in this project (6) ★ 2026-CIP-0000027 Comment Report 04.15.2026.pdfREDLINES - Impementation Design - LEdington - SouthUniversityBoulevard 100 Construction Plans March26 - LME comments.pdfREDLINES- Survey- Pfohl.pdfSouth University Boulevard 100 Specifications March26.pdfSouth University Boulevard 60 Comment Resolution Matrix March26.pdfSouthUniversityBoulevard 100 Construction Plans March26.pdf | ||||
2026-CIP-0000026 2025 - Wastewater Facility Improvements CIPFlagged · 125 agencies | CIP | 25 | Flagged · 1 | |
ERA Wastewater ReviewReview Complete - Objection The Existing Condition and Demo plan does not distinguish between full depth removal of asphalt and mill and overlay. The overall grading plan correctly shows full-depth removal vs. mill and overlay. Note: the variation on the plan sheets may cause a critical… All documents in this project (3) | ||||
2026-CIP-0000025 Welton Streetscape - 24th ST to 30th ST CIPFlagged · 528 agencies | CIP | 28 | Flagged · 5 | |
ERA Wastewater ReviewReview Complete - Objection Welton Street is in an Urban Flood Risk Area (UFRA) identified with significant street flows during major storm events. The project should perform an analysis and identify potential adverse impacts to adjacent properties resulting from increased flow depths in… ERA Materials ReviewReview Complete - Objection Please reference dotipt 116.1 Traffic Control Procedures and 630 sepc and ensure there aren't conflicts. ERA Erosion Control ReviewReview Complete - Objection Project will require a CASDP. Project manager to determine the appropriate time to submit for a a CASDP. This objection can be removed once a CASDP application has been received. To submit a new application online, - Go to the E-permits website and sign into y… Comments:Review Complete - Objection 04/08/2026 Review Complete - Objection CIP has been reviewed for coordination with private development. There are several approved and ongoing site developments adjacent to the area of work. EPR-Wastewater will notify adjacent proposed developments that may be… PW Survey ReviewReview Complete - Objection See Survey comments. Review Status: Review Complete - Objection All documents in this project (5) ★ 2026-CIP-0000025 - Comment Report 04.09.2026.pdfREDLINES Construction - KBrekke - Welton Streetscapes 3PRCT Roll Plot - redlines.pdfREDLINES- Forestry- Evers.pdfSURVEY - SURVEY - 2026-CIP-0000025 Welton Streetscape - 24th ST to 30th ST Survey Comments 2026.04.08.docxWelton Streetscapes 3PRCT Roll Plot.pdf | ||||
2026-CIP-0000024 Morrison Road Project CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (13) 2025-12-01 Morrison Road 60pct NORTH Comment Response.pdf2026-03-20 Morrison Rd 90pct NORTH Drainage Report.pdf2026-03-20 Morrison Rd NORTH 90pct Plans SUBMITTED.pdf2026-03-20 Morrison Rd NORTH 90pct Specs.pdf2026-03-20 SAQ 90pct North-Plazas.pdf2026-03-20 SAQ 90pct North.pdf4070MORR - Utility Report 2025 DRAFT.pdf4070MORR SUE Plan PH2-3 - 2023 STAMPED.pdfER Review Request Memo 20260326.docxREDLINES - GInfrastructure - CBell - 2026-03-20 Morrison Rd 90pct NORTH Drainage Report.pdf-26-04-08-16-51.pdfREDLINES - Materials - KBlai - dotipt-116.1_traffic_control_procedures (1).pdfREDLINES - Materials - KBlair dotirr-022.3_issuance_of_permits_by_the_city_traffic_engineer (1).pdfREDLINES - WWConstruction - MGehrke - 2026-03-20 Morrison Rd NORTH 90pct Plans SUBMITTED-mwg_Optimized.pdf | ||||
2026-CIP-0000023 Parks Maintenance Facility - GVR 60pct Submittal CIPFlagged · 426 agencies | CIP | 26 | Flagged · 4 | |
ERA Erosion Control ReviewReview Complete - Objection Objection will be removed once CASDP application has been received. DS Transportation ReviewReview Complete - Objection Review Complete - Objection REDLINES uploaded to E-review webpage SEE REDLINES: PW Survey ReviewReview Complete - Objection survey comments uploaded to e review add survey diagram and general survey notes PW Construction Engineering ReviewReview Complete - Objection Review Complete - Objection All documents in this project (7) 2026.03.13 Comment Response Document.pdf2026.03.15 GVR Parks Maintenance Facility - ER Set.pdf★ 2026-CIP-0000023 Comment Report 4-2-2026.pdfCCD NE Maintenance Facility Drainage Memo FULL.pdfREDLINES- Construction Engineer- Blair.pdfREDLINES- DS Transportation- Mueller.pdfREDLINES- Survey- Sperling.docx | ||||
2026-CIP-0000022 Clearance and Release -1800 W 39th Ave CIPClear15 agencies | CIP | 15 | Clear | |
All documents in this project (7) 1965-02-23 Vesting deed-1800 W 39th Ave.PDF2025-11-13 Assessor Info-1800 W 39th Ave.pdf2025-11-20 OE Report-1800 W 39th Ave.pdf2026-03-12 Clearance and Release Intake Form-1800 W 39th Ave.xlsm2026-03-12 Clearance and Release Memo-All Agencies-1800 W 39th Ave.docx★ 2026-CIP-0000022 Comment Report 3-31-2026.pdfLegal Description-1800 W 39th Ave-SurvApp.docx | ||||
2026-CIP-0000020 2026 WMD Pipe and Manhole Rehabilitation - Phase 2 CIPFlagged · 136 agencies | CIP | 36 | Flagged · 1 | |
ERA Floodplain ReviewReview Complete - Objection FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplain are required to obtain a Floodplain Permit. The following locations are in the floodplain and will require a floodplain permit: - Base Area 5 - Base Area 6 - Add Alt 4 - Ar… All documents in this project (3) | ||||
2026-CIP-0000019 Bannock St. and 8th Ave. Bridges over Cherry Creek Rehabilitation CIPFlagged · 327 agencies | CIP | 27 | Flagged · 3 | |
ERA Erosion Control ReviewReview Complete - Objection Erosion control review will be completed with CASDP, 2025-EC-0000142, currently under review. Once there are no significant erosion control comment with the CASDP review the objection will be cleared on the CIP. ERA Floodplain ReviewReview Complete - Objection Erosion control review will be completed with floodplain permit, 2025-FLOOD-0000179, currently under review. Once there are no significant floodplain comments with the floodplain permit review the objection will be cleared on the Additional Internal Review 1Review Complete - Objection PWPRS Project Number: 2026-CIP-0000019 - Bannock St. and 8th Ave. Bridges over Cherry Creek Rehabilitation Reviewing Agency/Company: DOTI IPM - Bridge Reviewers Name: Lisa Hilt Reviewers Phone: 303-446-3579 Reviewers Email: lisa.hilt@denvergov.org Approval Sta… All documents in this project (13) 2026-02-13 8th and BannockSpecs.docx2026-02-13 8th BannockSpecs.pdf2026-02-13 HPBSpecs (2).docx2026-02-13 HPBSpecs.docx2026-02-13 HPBSpecs.pdf2026-02-13_HPBSpecs.pdf★ 2026-CIP-0000019 Comment Report 3-18-2026.pdf8th and Bannock 100 PRNCT Plans.pdfCCD MaterialsManagementPlan 20191113.pdfCCOD RACS SOP 20190502 Final.pdfHighlandsPedBridge 100 PRNCT Plans.pdfREDLINES- DPR- Cervera.pdfREDLINES- Trans Safety- Stein.pdf | ||||
2026-CIP-0000018 Quebec over Airlawn CIPFlagged · 223 agencies | CIP | 23 | Flagged · 2 | |
Reviewers Name: PW Survey ReviewReview Complete - Objection 1. Previous comment unaddressed: Add Survey Control Points, with both symbols and point numbers, to Roadway Removal & Reset Plans, Roadway Plans, Sidewalk Plan and Profile sheets. PW Construction Engineering ReviewReview Complete - Objection See kdb red lines. Review Status: Review Complete - No Objec All documents in this project (14) 2023-CIP-0000225 60 Comment Matrix Responses.pdf★ 2026-CIP-0000018 Comment Report 3-18-2026.pdfQuebec over Airlawn - Project Special Provisions95.pdfQuebec over Airlawn CASDP Narrative 95.pdfQuebec over Airlawn Drainage Report 95.pdfQuebec over Airlawn Environmental LSI Final.pdfQuebec over Airlawn Geotetch Pavement Report Final.pdfQuebec over Airlawn Plans 95.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- Materials- Blair- CC Specs.pdfREDLINES- Materials- Blair- Project Special Provisions.pdfREDLINES- Survey- Castaneda.docxREDLINES- Trans Safety- Rodriguez.pdfREDLINES- WW Maintenance- Gehrke.pdf | ||||
2026-CIP-0000017 S Sheridan Blvd and W Louisiana Ave Intersection Improvements CIPFlagged · 331 agencies | CIP | 31 | Flagged · 3 | |
ERA Materials ReviewReview Complete - Objection See kdb red lines. Review Status: Review Complete - Objection Forestry ReviewReview Complete - Objection Review Complete - Objection Comments:Review Complete - Objection PWPRS Project Number: 2026-CIP-0000017 - S Sheridan Blvd and W Louisiana Ave Intersection Improvements Reviewing Agency/Company: Denver Department of Transportation and Infrastructure - Construction Engineering Reviewers Name: KIM BLAIR, P.E. Reviewers Phone:… All documents in this project (9) 2026-0218 Sheridan and Louisiana 90 PRNCT -OPCC.pdf2026-0218 Sheridan and Louisiana 90 PRNCT Drainage Memo.pdf2026-0218 Sheridan and Louisiana 90PRNCT Specs.pdf2026-0218 Sheridan and Louisiana 90PRNCT-CommentResolution.pdf2026-0218 SheridanandLouisiana 90PRNCT-ConstPlans.pdf★ 2026-CIP-0000017 Comment Report 3-12-2026.pdfREDLINES- ERA Materials- Blair.pdfREDLINES- Erosion Control - CASDP Not Required.pdfREDLINES- Forestry- Huetig.pdf | ||||
2026-CIP-0000016 5280 Trail - Acoma Shared Street CIPFlagged · 132 agencies | CIP | 32 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection survey comments are uploaded Review Status: Review Complete - No Objec All documents in this project (3) | ||||
2026-CIP-0000015 RTD Downtown Rail Replacement Project DRRP CIPFlagged · 425 agencies | CIP | 25 | Flagged · 4 | |
Reviewers Name: ERA Wastewater ReviewReview Complete - Objection New storm infrastructure requires inspection and as-builts. Please indicated in the Drainage Report if this project is re-developing under RTD's MS4 permit. Reviewers Name: ERA Erosion Control ReviewReview Complete - Objection Please indicate if this project is redeveloping under RTD's MS4 permit for construction stormwater management or if the project intends to obtain an erosion control (CASDP) from the City and County of Denver. PW Survey ReviewReview Complete - Objection survey comments have been uploaded Review Status: Review Complete - Objection ERA Floodplain ReviewReview Complete - Objection Show FEMA 100-year floodplain/floodway boundary for Cherry Creek on the plans. the 100-year floodplain and floodway coincide at this location. The project proposed work in the regulatory floodplain and floodway of Cherry Creek. As such, a Floodplain Permit is… | ||||
2026-CIP-0000014 GES Safer Streets🚲 bike lane CIPFlagged · 429 agencies | CIP | 29 | Flagged · 4 | |
🚲 Bike lane mentioned [comment report text] "he project is now designating Clayton Street as a designated (shared) bikeway with passenger vehicles which deviates from the original Colorado Public Utilities Commis" ERA Wastewater ReviewReview Complete - Objection Sheet 157: The low point at 20+40.84 needs an inlet. PW Survey ReviewReview Complete - Objection Plan set indicates survey sheets will be added with next submittal. DOTI Survey comments are in the project folder. REDLINES uploaded to E-review webpage Forestry ReviewReview Complete - Objection Forestry Comments: 1) What is protocol for new signage installs adjacent to ROW trees (within canopy dripline)? Recommend including Additional Internal Review 8Review Complete - Objection PWPRS Project Number: 2026-CIP-0000014 - GES Safer Streets Reviewing Agency/Company: Forestry Reviewers Name: Darren Potucek Reviewers Phone: 3163042366 Reviewers Email: darren.potucek@denvergov.org Approval Status: Denied Comments: Need to discuss work being… All documents in this project (8) ★ 2026-CIP-0000014 Comment Report 3-6-2026.pdf26087-GES SS-FIR-Cost Estimate-2026-02-06.pdf26087-GES SS-FIR-Plans-2026-02-06.pdf26087-GES SS-FIR-Preliminary Drainage Memo-2026-02-06-Consor.pdf26087-GES SS-FIR-Preliminary Drainage Memo-2026-02-06-KH.pdf26087-GES SS-FIR-Turning Movements-2026-02-06.pdfREDLINES- Survey- Castaneda.docxREDLINES- WW Maintenance- Gehrek.pdf | ||||
2026-CIP-0000013 2025 - Wastewater Facility Improvements CIPFlagged · 325 agencies | CIP | 25 | Flagged · 3 | |
ERA Wastewater ReviewReview Complete - Objection The decorative paving on the north and east side of building is also full-depth pavement replacement. The total full-depth pavement replacement is 1.11 AC, see EPR-Wastewater Redlines. Please reduce the full-depth pavement to be below 1.00 AC or provide water… Forestry ReviewReview Complete - Objection No existing trees shown on the demo plans. Need to show trees called out for protection due to equipment, materials stored in parking lot and access routes to the facility. Trees get damaged in the parking lot medians due to this ERA Floodplain ReviewReview Complete - Objection Floodplain review will be completed through floodplain permit, currently in for review, 2026-FLOOD-0000008. Floodplain objection will be cleared from CIP once review is complete and there are no outstanding floodplain All documents in this project (6) ★ 2026-CIP-0000013 Comment Report 3.5.26.pdf90 PRCT SurveyRedlineResponses 2000W3rdAve 02-17-2026.pdf90 PRCT DesignDrawings 2000W3rdAve 02-17-2026.pdf90 PRCT ERResponseLetter 2000W3rdAve 02-17-2026.pdf90 PRCT WWRedlineResponses 2000W3rdAve 02-17-2026.pdfREDLINES - WASTERWATER- MSasarak - EPR - WASTEWATER REDLINES.pdf | ||||
2026-CIP-0000012 2023 Intersection Improvement Design - Early Package🚲 bike lane CIPFlagged · 225 agencies | CIP | 25 | Flagged · 2 | |
🚲 Bike lane mentioned [file name] "53rd Ave Bikeway Plans 2026.02.04 reduced.pdf" [file name] "REDLINES- Project Manager- 53rd Ave Bikeway Plans.pdf" PW Survey ReviewReview Complete - Objection Comments and redlines in project folder Review Status: Review Complete - Objection ERA Floodplain ReviewReview Complete - Objection Review Complete - Objection All documents in this project (14) 2023 90PCT COMBINED.pdf★ 2026-CIP-0000012 Comment Report 2-24-2026.pdf23080 2023 Intersections Group 1 60pct Comments Matrix.xlsx53rd Ave Bikeway Plans 2026.02.04 reduced.pdf90_ 2023 Intersection Improvements Estimate G1.xlsx90pct 2023 Intersection Improvements Final Drainage Report.pdf90pct 2023 Intersection Improvements Specs.pdfREDLINES- Craig Long.pdfREDLINES- Floodplain- Silva.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Project Manager- 2023 90PCT COMBINED.pdfREDLINES- Project Manager- 53rd Ave Bikeway Plans.pdfREDLINES- Survey- Pfohl.pdfREDLINES- WW Maintenance- Gehrke.pdf | ||||
2026-CIP-0000011 Participatory Budget Athmar Park Sidewalks CIPFlagged · 122 agencies | CIP | 22 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection Comments and redlines in project folder. Review Status: Review Complete - No Objec | ||||
2026-CIP-0000010 LIPAN POND IMPROVEMENTS - W. ALAMEDA AVE. TO BAYAUD AVE CIPFlagged · 126 agencies | CIP | 26 | Flagged · 1 | |
ERA Floodplain ReviewReview Complete - Objection Repeat Comment: This project was permitted under a No-Rise for the floodplain permit (2023-SUDP-0003121). Please submit a signed and sealed letter from the hydraulic engineer verifying that the final grading and design of the Lipan All documents in this project (8) ★ 2026-CIP-0000010 Comment Report 2-19-2026.pdf21-029.01 SPR O and M.pdf21-029.1 SPR Lipan Pond - Drainage Memo 100PRNT.pdfNarrative Report Information Worksheet Lipan Pond.pdfREDLINES- WW Maintenance- Gehrke- SPR Corridor Improvements.pdfREDLINES- WW Maintenance- Gehrke.pdfSPR Corridor Improvements - Lipan Pond 100 PRNTCASDP Plans.pdfSPR Corridor Improvements - Lipan Pond 100PRNT Plans.pdf | ||||
2026-CIP-0000009 Alma-Lincoln Park Improvements CIPClear27 agencies | CIP | 27 | Clear | |
2026-CIP-0000008 Denver Resilient Landscape DRL Rules and Regulations CIPClear54 agencies | CIP | 54 | Clear | |
All documents in this project (2) | ||||
2026-CIP-0000007 1240 W Bayaud Renovation CIPClear26 agencies | CIP | 26 | Clear | |
2026-CIP-0000006 DPR Pre-Fabricated Restrooms CIPFlagged · 129 agencies | CIP | 29 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection Missing survey control diagram for each City Park projects in this submittal. Refer to PDF for Survey Control Guidelines. REDLINES uploaded to E-review webpage All documents in this project (11) 2026 0116 DOTI - DPR Restroom Improvements 60PRNCT ER Comment Report RESPONSES.pdf20260116 DOTI-DPR RR Improvements 95 PRNCT ER Civil MONTBELLO.pdf20260116 DOTI-DPR RR Improvements 95PRNCT ER Civil COMMONS.pdf20260116 DOTI-DPR RR Improvements 95PRNCT ER Civil HUSTON.pdf20260116 DOTI-DPR RR Improvements 95PRNCT ER Civil KENNEDY.pdf20260116 DOTI-DPR RR Improvements 95PRNCT ER Elec.pdf20260116 DOTI-DPR RR Improvements 95PRNCT ER Plbg.pdf20260116 DOTI-DPR RR Improvements 95PRNCTER Civil RGO.pdf20260116 DOTI-DPR RR Improvements95PRNCT ER Civil RUDE.pdf★ 2026-CIP-0000006 Comment Report 2-11-2026.pdfREDLINES- Survey- Breitnauer.pdf | ||||
2026-CIP-0000005 South Central CTN - 12th Ave🚲 bike lane CIPFlagged · 326 agencies | CIP | 26 | Flagged · 3 | |
🚲 Bike lane mentioned [file name] "REDLINES -2026-CIP-0005 South Centrial CTN Bikeway - CL.pdf" [comment report text] "comm Reviewing Agency: Attachment: 2026-CIP-0005 South Centrial CTN Bikeway CL.pdf REDLINES uploaded to Ereview page Reviewers Name: Additional Internal Review" PW Trans and Mobility ReviewReview Complete - Objection PWPRS Project Number: 2026-CIP-0000005 - South Central CTN - 12th Ave Reviewing Agency/Company: DOTI Transportation & Mobility Engineering Reviewers Name: Allison Thienpont Reviewers Phone: 720-865-3197 Reviewers Email: almithienpont@gmail.com Approval Status:… Fire Prevention ReviewReview Complete - Objection The drawings for this project are approved, however, the DFD does not endorse nor approve any traffic circles at this time. RTDReview Complete - Objection PWPRS Project Number: 2026-CIP-0000005 - South Central CTN - 12th Ave Reviewing Agency/Company: RTD Reviewers Name: clayton woodruff Reviewers Phone: 3032992943 Reviewers Email: Clayton.Woodruff@RTD-Denver.com Approval Status: Denied Comments: Project Name: 20… | ||||
2026-CIP-0000004 Parks Maintenance Facility - Green Valley Ranch CIPFlagged · 324 agencies | CIP | 24 | Flagged · 3 | |
ERA Wastewater ReviewReview Complete - Objection The project is tributary to a regional offsite detention and water quality pond, Silverado Pond I. I have uploaded the Master Drainage Report for the project area to Accela, please contact me directly if you can not access the document. ERA Erosion Control ReviewReview Complete - Objection Project requires a CASDP. This objection will be removed once the CASDP application has been received. To submit a new application online, - Go to the E-permits website and sign into your account: denvergov.org/epermits - Click Apply for a Permit under the Dev… PW Construction Engineering ReviewReview Complete - Objection See kdb red lines. I have included a plan sheet from the project that constructed the sidewalk. It appears that there's a descrepancy. All documents in this project (8) 2025.12.18 CCD DPR Parks Maintenance Facility Construction GVR Drawings.pdf★ 2026-CIP-0000004 Comment Report 2-5-2026.pdfREDLINES - ER Wastewater- Sasarak.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- DS Transportation- Mueller- Gateway overall south.pdfREDLINES- DS Transportation- Mueller.pngREDLINES- ER Wastewater- Sasarak- Master Drainage Report.pdfREDLINES- Survey- Pfohl.pdf | ||||
2026-CIP-0000003 2026 WMD Pipe Rehabilitation Phase 1 CIPClear27 agencies | CIP | 27 | Clear | |
All documents in this project (2) | ||||
2026-CIP-0000002 Sun Valley Riverfront Park CIPFlagged · 129 agencies | CIP | 29 | Flagged · 1 | |
ERA Floodplain ReviewReview Complete - Objection Floodplain Design Requirement 1 - FLOODPLAIN PERMIT: Floodplain permit 2023-SUDP-0003998 is currently under All documents in this project (6) | ||||
2026-CIP-0000001 Sloans Lake North Tennis and Basketball Court Replacement and ADA Access CIPFlagged · 126 agencies | CIP | 26 | Flagged · 1 | |
ERA Erosion Control ReviewReview Complete - Objection This objection will be removed once a CASDP has been submitted. | ||||
2025-VACA-0000017 3333 N Colorado Blvd Vacation VACADenial · 327 agencies | VACA | 27 | Denial · 3 | |
DES Transportation ReviewDenied PWPRS Project Number: 2025-VACA-0000017 3333 N Colorado Blvd Vacation Reviewing Agency/Company: DOTI DES Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.christensen@denvergov.org Approval Status: Denied Com… ERA Transportation ReviewDenied 1. Call out and hatch the location of area to be vacated on the Site Plan. 2. A ROW dedication will be required, per Transportation Standard drawing 10.5 "L" Type Alley Configurations. This dedication will need to occur prior to the proposed ROW vacation. Plea… Survey ReviewDenied See Survey red lines for Exhibit and for Site Plan. Review Status: Approved - No Response All documents in this project (11) ★ 2025-VACA-0000017 Comment Report 12.31.25.pdf2025-VACA-0000017 Site Plan Survey Red Lines 2025.12.23.pdf2025-VACA-0000017 Survey Red Lines 2025.12.23.pdfapplication signature.pdfhatch area of ROW vacation request.pdfrow vacation checklist application.pdfsubject alley requesting vacation DigTix.jpgsubmital signature.pdfSURVEY 3333 COLORADO BLVD.pdfsurvey ALLEY VACATION DESCRIPTION 11-11-2025.docxsurvey exhibit a 240903_VAC-ALLEY-V0-BINDER.pdf | ||||
2025-VACA-0000014 2535 W 35th Ave Vacation VACANo report yet— agencies | VACA | — | No report yet | |
2025-VACA-0000013 510 E 51st Avenue Vacation VACANo report yet— agencies | VACA | — | No report yet | |
2025-VACA-0000012 Ball Arena Redevelopment 12th and Service Drive VACADenial · 324 agencies | VACA | 24 | Denial · 3 | |
DES Transportation ReviewDenied 1. Coordinate shared boundary12th/Service Drive Vacation meets up with the Vacation being reviewed as Denver Fire Department ReviewDenied This would not allow DFD to have access to the north and west side of the building. Provide further information to substantiate that access will not be impeded in order to gain approval for this vacation. Survey ReviewDenied Survey redline comments were uploaded in E-Review. Review Status: Approved - No Response All documents in this project (9) ★ 2025-VACA-0000012 Comment Report 10-17-2025.pdfKroenke Arena Company - Title Commtment 70861584 - Revision_4.pdfKroenke Parking CURRENT TITLE Commitment_revision_3.pdfKSE Ball Arena_Site Investigation Work Plan_12-1-2023.pdfREDLINES- Survey- Breitnauer.pdfROW Vacation 3 2025-09-03_Legal and Exhibit.pdfSPLevel Cub Application.pdfTitle Commitment -LTGC 1450 5th Street 74179.1.pdfTitle Commitment- LTGC Arena and Surrounding Parcels 74180.1.pdf | ||||
2025-VACA-0000011 2860 N Speer Blvd VACANo report yet— agencies | VACA | — | No report yet | |
All documents in this project (6) | ||||
2025-VACA-0000010 Ball Arena Redevelopment 1000 Chopper Cir VACANo report yet— agencies | VACA | — | No report yet | |
All documents in this project (11) Application and Checklist - Updated and Signed.pdfArea 2 Site Plan.pdfKroenke Arena Company - Title Commtment 70861584 - Revision_4.pdfKroenke Parking CURRENT TITLE Commitment_revision_3.pdfKSE Ball Arena_Site Investigation Work Plan_12-1-2023.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Survey- Breitnauer.docROW Vacation 2 2025-09-04_Legal and Exhibit.pdfROW Vacation 2 Parcel 2 - APPROVED.pdfTitle Commitment -LTGC 1450 5th Street 74179.1.pdfTitle Commitment- LTGC Arena and Surrounding Parcels 74180.1.pdf | ||||
2025-VACA-0000009 3600 Park Ave West VACADenial · 121 agencies | VACA | 21 | Denial · 1 | |
Survey ReviewDenied Please see attached redline comments Review Status: Approved - No Response All documents in this project (4) | ||||
2025-VACA-0000008 3800 W Colfax Ave Alley Vacation VACANo report yet— agencies | VACA | — | No report yet | |
All documents in this project (7) 12 Alley Vacation Lot 45 Block 7 Colfax Ave Sub. 1464 Sq Ft.pdf1473 Newton Street Agreement - Signed and Notarized.pdf1473 Newton Street Alley Vacation - Signed and Notarized.pdf3800 W. Colfax_2024PM0000409 - Alley ROW Vacation Site Plan.pdf3800 W. Colfax_2024PM0000409 - ROW Vacation App.pdfOsceola Easement - all signed.pdfREDLINES- CenturyLink- Hoopes.pdf | ||||
2025-VACA-0000003 Broadway Station Soccer Stadium VACANo report yet— agencies | VACA | — | No report yet | |
2025-VACA-0000002 3424 W 25th Ave Lot Vacation VACADenial · 229 agencies | VACA | 29 | Denial · 2 | |
City Councilperson and Aides ReferralDenied PWPRS Project Number: 2025-VACA-0000002 3424 W 25th Ave Lot Vacation Reviewing Agency/Company: Denver City Council Reviewers Name: Councilwoman Amanda P. Sandoval Reviewers Phone: 720-337-7701 Reviewers Email: amanda.sandoval@denvergov.org Approval Status: Den… DES Transportation ReviewDenied | ||||
2025-VACA-0000001 910 Galapago St Alley Vacation VACANo report yet— agencies | VACA | — | No report yet | |
2025-UTIL-0000286 Xcel - HKS Utility Services - 529 Cherokee St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. Pole must be at least 3' from the BOC when there is on-street parking. 2. Pole is within pedestrian sight triangle. Remove or relocate pole. | ||||
2025-UTIL-0000285 Xcel - HKS Utility Services - E. 52nd Ave. Washington to Emerson UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (9) 2025-UTIL-0000285 Comment Report 1-9-2026.pdf2025-UTIL-0000285 Final Approved Plan Set.pdf2025-UTIL-0000285 Revised Comment Report 1-9-2026.pdf★ 2025-UTIL-0000285 Revised Comment Report 2-19-2026.pdfE 52nd Ave - Washington to Emerson Streetlight.pdfE. 52nd Ave. - Washington to Emerson Streetlight - UPR Application.pdfE. 52nd Ave. - Washington to Emerson Streetlight - UPR Checklist.pdfREDLINES- ER Transportation- Leyva - Clear Zone Request.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2025-UTIL-0000284 Xcel - HKS Utility Services - 1625 N. Marion St UTILClear7 agencies | UTIL | 7 | Clear | |
2025-UTIL-0000283 Denver Water - S Park Hill Neighborhood - N Jasmine St UTILDenial · 19 agencies | UTIL | 9 | Denial · 1 | |
PW Construction Engineering ReviewDenied See kdb red lines. All documents in this project (7) ★ 2025-UTIL-0000283 Comment Report 01.07.2026.pdf2025-UTIL-0000283 Final Approved Plan Set.pdf2025-UTIL-0000283 Revised Comment Report 1-8-2026.pdf22749 CCD 1ST SUBMITTAL PE Signed.pdf22749 UPRAPP 1ST SUB.pdf22749 UPRCHECKLIST 1ST SUB.pdfREDLINES- kdb- Construction Engineering red lines 22749_CCD_1ST SUB.pdf | ||||
2025-UTIL-0000282 Denver Water - W Ohio Ave - S Raleigh St - S Perry St - S Meade St UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (7) | ||||
2025-UTIL-0000281 Xcel - HKS Utility Services - 3575 Chestnut Pl UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. Disturbance of the pedestrian way?(curb ramp, sidewalk and crosswalk) within 10 ft of an existing curb ramp will require the reconstruction of the curb ramp in compliance with current CCD and ADA standards, if not already fully All documents in this project (8) ★ 2025-UTIL-0000281 Comment Report 1-7-2026.pdf2025-UTIL-0000281 Final Approved Plan Set.pdf2025-UTIL-0000281 Revised Comment Report 2-10-2026.pdf3575 Chestnut Pl. - Electric Installation.pdf3575 Chestnut Pl. - UPR Application.pdf3575 Chestnut Pl. - UPR Checklist.pdfREDLINES- ER Transportation- Leyva- Clear Zone Request.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2025-UTIL-0000280 Xcel - HKS Utility Services - DTERTR08 Feeder UTILDenial · 29 agencies | UTIL | 9 | Denial · 2 | |
ERA Transportation ReviewDenied 1. Project goes over a bridge. Please contact?DOTI Bridge Group at?DOTI.Bridges@Denvergov.org?. Plans will not be approved until approval is obtained from the Bridge Group. PW Construction Engineering ReviewDenied 1. Prior to the solicitation of bids or proposals from general contractors, the developer of this project is strongly encouraged to schedule an office meeting with the Right-of-Way Services Construction Inspections team (303) 446-3469 to discuss the project's… All documents in this project (8) ★ 2025-UTIL-0000280 Comment Report 1-5-2026.pdf2025-UTIL-0000280 Final Approved Plan Set.pdf2025-UTIL-0000280 Revised Comment Report 04-21-2026.pdf2025-UTIL-0000280 Revised Comment Report 4-21-2026.pdfDTERTR08 Feeder - Electric Installation.pdfDTERTR08 Feeder - UPR Application.pdfDTERTR08 Feeder - UPR Checklist.pdfREDLINES- ER Transportation- Leyva- Approved.pdf | ||||
2025-UTIL-0000279 Xcel - HKS Utility Services - 1850 S. Irving St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Denver Water ReferralDenied PWPRS Project Number: 2025-UTIL-0000279 - Xcel - HKS Utility Services - 1850 S. Irving St Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments… All documents in this project (6) | ||||
2025-UTIL-0000278 Xcel - HKS Utility Services - 325 King St UTILClear6 agencies | UTIL | 6 | Clear | |
2025-UTIL-0000277 Xcel - HKS Utility Services - 2029 Lawrence St UTILClear9 agencies | UTIL | 9 | Clear | |
2025-UTIL-0000276 Xcel - HKS Utility Services - 4681 W. 46th Ave UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Pole is located within the pedestrian sight triangle. Please remove or relocate proposed pole. All documents in this project (7) ★ 2025-UTIL-0000276 Comment Report 12.31.2025.pdf2025-UTIL-0000276 Final Approved Plan Set.pdf2025-UTIL-0000276 Revised Comment Report 1-5-2026.pdf4681 W 46th Ave. - UPR Application.pdf4681 W 46th Ave. - UPR Checklist.pdf4681 W. 46th Ave. - Electric Installation.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2025-UTIL-0000275 Xcel - HKS Utility Services - DTERTR08 Feeder UTILDenial · 29 agencies | UTIL | 9 | Denial · 2 | |
ERA Transportation ReviewDenied 1. Note: W 17th Ave. is a Moratorium St. between project boundaries. Asphalt patches shall conform to City and County of Denver Transportation Standards and Details standard drawing no.12.2?Trench Vertical patch (Asphalt) in PW Construction Engineering ReviewDenied 1. Prior to the solicitation of bids or proposals from general contractors, the developer of this project is strongly encouraged to schedule an office meeting with the Right-of-Way Services Construction Inspections team (303) 446-3469 to discuss the project's… All documents in this project (8) ★ 2025-UTIL-0000275 Comment Report 12.30.25.pdf2025-UTIL-0000275 Final Approved Plan Set.pdf2025-UTIL-0000275 Revised Comment Report 04-21-2026.pdf2025-UTIL-0000280 Revised Comment Report 4-21-2026.pdfDTERTR08 Feeder - Electric Installation.pdfDTERTR08 Feeder - UPR Application.pdfDTERTR08 Feeder - UPR Checklist.pdfREDLINES- ER Transportation- Leyva- Approved.pdf | ||||
2025-UTIL-0000274 CenturyLink - Pauley Construction - 978 32nd St UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (6) | ||||
2025-UTIL-0000273 Xcel - HKS Utility Services - 3060 Leyden St UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (8) 2025-UTIL-0000273 Comment Report 12.24.2025.pdf2025-UTIL-0000273 Final Approval Plan Set.pdf2025-UTIL-0000273 Revised Comment Report 12-29-2025.pdf★ 2025-UTIL-0000273 Revised Comment Report 1-5-2026.pdf3060 Leyden St. - Electric Installation.pdf3060 Leyden St. - UPR Application.pdf3060 Leyden St. - UPR Checklist.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2025-UTIL-0000272 Xcel - HKS Utility Services - Founders Green UTILClear7 agencies | UTIL | 7 | Clear | |
All documents in this project (5) 2025-UTIL-0000272 - Final Approval Plan Set.pdf★ 2025-UTIL-0000272 Comment Report 12-29-2025.pdfFounders Green - Electric Installation Martin Luther King and Trenton.pdfFounders Green - UPR Application Martin Luther King and Trenton.pdfFounders Green - UPR Checklist Martin Luther King and Trenton.pdf | ||||
2025-UTIL-0000271 Xcel - HKS Utility Services - 6th Ave. and Corona St UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (7) ★ 2025-UTIL-0000271 Comment Report 12.24.2025.pdf2025-UTIL-0000271- Final Approval Plan Set.pdf2025-UTIL-0000271 Revised Comment Report 12-29-2025.pdf2025-UTIL-0000271 Revised Comment Report 12-30-2025.pdf6th and Corona - Electric Installation.pdf6th and Corona - UPR Application.pdf6th and Corona - UPR Checklist.pdf | ||||
2025-UTIL-0000270 Xcel - Q3 - 3333 Mariposa St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. Dimension pole to sidewalk. Must be at least 6" from existing sidewalk. All documents in this project (7) | ||||
2025-UTIL-0000269 Comcast - ITG Communications - 2500 E 1ST AVE UTILDenial · 19 agencies | UTIL | 9 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Add UPR number to plans, front and center of cover page. 2. Work located on private property. The City and County of Denver does not review/approve nor inspect work All documents in this project (9) 2025-UTIL-0000269 Comment Report 12.18.2025.pdf2025-UTIL-0000269 Final Approved Plan Set.pdf★ 2025-UTIL-0000269 Revised Comment Report 12-15-2026.pdf2025-UTIL-0000269 Revised Comment Report 2-24-2026.pdfApplication 2500 E 1st Ave.pdfChecklist 2500 E 1st Ave.pdfJB2345117 - 2500 E 1st Ave Denver.pdfREDLINES- ER Transportation- Leyva.pdfREDLINES- Forestry- Huetig- Approved.pdf | ||||
2025-UTIL-0000268 2nd - Comcast - ITG Communications 4101 BRIGHTON BLVD UTILDenial · 110 agencies | UTIL | 10 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Sheet 10: Add missing storm line that runs between STA 14+50 SW and 15+30 SW and dimension to running line. 2. Sheet 11: Proposed handhole is located on the sidewalk. Please remove or relocate to where it's not disturbing the All documents in this project (6) ★ 2025-UTIL-0000268 Comment Report 1-23-2026.pdf2025-UTIL-0000268 Revised Comment Report 2-25-2026.pdfdotipt-121.2-utility plan review application 4101 Brighton Blvd -2.pdfJB2192079 - 4101 Brighton Blvd Denver addressed.pdfpwpt-121.2-utility-plan-review-checklist 4101 Brighton Blvd-2.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2025-UTIL-0000268 Comcast - ITG Communications - 4101 BRIGHTON BLVD UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Add UTIL number on cover page. 2. Dimension running line to all inlets. Must comply with 2' minimum distance requirement. | ||||
2025-UTIL-0000267 Xcel - HKS Utility Services - 2280 S. Albion St UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (7) | ||||
2025-UTIL-0000266 Xcel - HKS Utility Services - Telluride St and 45th Ave UTILClear7 agencies | UTIL | 7 | Clear | |
2025-UTIL-0000265 Xcel - HKS Utility Services - E. 56th Ave. and Dunkirk St UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (7) 2025-UTIL-0000265 Comment Report 12-16-2025.pdf2025-UTIL-0000265 Final Approval Plans.pdf★ 2025-UTIL-0000265 New Revised Comment Report 12-17-2025.pdf2025-UTIL-0000265 Revised Comment Report 12-17-2025.pdfE. 59th Ave. and Dunkirk St. - Electric Installation.pdfE. 59th Ave. and Dunkirk St. - UPR Application.pdfE. 59th Ave. and Dunkirk St. - UPR Checklist.pdf | ||||
2025-UTIL-0000264 Xcel - HKS Utility Services - 2160 S. Clermont St UTILDenial · 19 agencies | UTIL | 9 | Denial · 1 | |
City Forester ReviewDenied OCF Comments 12-4-25 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No All documents in this project (10) ★ 2025-UTIL-0000264 Comment Report 12-16-2025.pdf2025-UTIL-0000264 Final Approved Plan Set.pdf2025-UTIL-0000264 Revised Comment Report 1-15-2026.pdf2025-UTIL-0000264 Revised Comment Report 1-21-2026.pdf2160 S. Clermont St. - Electric Installation.pdf2160 S. Clermont St. - UPR Application.pdf2160 S. Clermont St. - UPR Checklist.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig- OCF Comments.pdfREDLINES- Forestry- Huetig- Site Development Plan.pdf | ||||
2025-UTIL-0000263 Xcel - HKS Utility Services - 2828 W. 44th Ave UTILClear8 agencies | UTIL | 8 | Clear | |
2025-UTIL-0000262 Xcel - HKS Utility Services - 3800 W. Colfax Ave UTILClear8 agencies | UTIL | 8 | Clear | |
2025-UTIL-0000261 Xcel - Q3 - 949 Bryant St - WO no.111630804 UTILDenial · 29 agencies | UTIL | 9 | Denial · 2 | |
ERA Transportation ReviewDenied 1. Sheet 9: Dimension running line to sanitary sewer manhole. 2. Sheet 9: Dimension running line to storm manhole and inlet. Denver Water ReferralDenied PWPRS Project Number: 2025-UTIL-0000261 - Xcel - Q3 - 949 Bryant St - WO no.111630804 Reviewing Agency/Company: Denver Water All documents in this project (13) 111630804_949 BRYANT ST_IFA_2025-11-17_PE STAMP FLAT.pdf2025-UTIL-0000261 Comment Report 12-12-2025.pdf2025-UTIL-0000261 Final Approved Plan Set.pdf2025-UTIL-0000261 Revised Comment Report 3-10-2026.pdf★ 2025-UTIL-0000261 Revised Comment Report 3-16-2026.pdf2025-UTIL-0000261 Revised Comment Report 3-17-2026.pdf2025-UTIL-0000261 Revised Comment Report 4-8-2026.pdfApplication_949 Bryant St_111630804.pdfREDLINES- ER Transportation- Leyva- Approved.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig- OCF Comments.pdfREDLINES- Forestry- Huetig- SDP for 9th.pdfUPR Checklist_949 Bryant St_111630804.pdf | ||||
2025-UTIL-0000260 2nd - Xcel - HKS Utility Services - 3850 Blake St UTILClear10 agencies | UTIL | 10 | Clear | |
2025-UTIL-0000260 Xcel - HKS Utility Services - 3850 Blake St UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
PW Construction Engineering ReviewDenied 1. Prior to the solicitation of bids or proposals from general contractors, the developer of this project is strongly encouraged to schedule an office meeting with the Right-of-Way Services Construction Inspections team (303) 446-3469 to discuss the project's… | ||||
2025-UTIL-0000259 Xcel - HKS Utility Services - 1660 Federal Blvd., UTILClear8 agencies | UTIL | 8 | Clear | |
2025-UTIL-0000258 Comcast - Mastec - 100 S MONROE ST UTILDenial · 19 agencies | UTIL | 9 | Denial · 1 | |
City Forester ReviewDenied 2025-UTIL-0000258 - Monroe: Bayaud to Cedar OCF Comments 11-24-25 1. Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the followi… All documents in this project (12) 2025-UTIL-0000258 Comment Report 12-3-2025.pdf2025-UTIL-0000258 Final Approved Plan Set.pdf★ 2025-UTIL-0000258 Revised Comment Report 12-5-2025.pdf2025-UTIL-0000258 Revised Comment Report 12-8-2025.pdf2025-UTIL-0000258 Revised Comment Report 12-9-2025.pdfPLANS JB 2175452 100 S MONROE ST Rev1.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- ER Transportation- Leyva.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig.pdfUPR Application.pdfUPR Checklist.pdf | ||||
2025-UTIL-0000257 Xcel - HKS Utility Services - E Evans Ave and Pearl St UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (6) 2025-UTIL-0000257 - Comment Report - 12.02.2025.pdf2025-UTIL-0000257 Final Approved Plan Set.pdf★ 2025-UTIL-0000257 Revised Comment Report 12-15-2025.pdf2509009 E. Evans and Pearl St. - Electric Installation.pdf2509009 E. Evans and Pearl St. - UPR Application.pdf2509009 E. Evans and Pearl St. - UPR Checklist.pdf | ||||
2025-UTIL-0000256 Verizon - ADB Companies - 4905 E Yale Ave UTILDenial · 39 agencies | UTIL | 9 | Denial · 3 | |
City Forester ReviewDenied ERA Transportation ReviewDenied 1. E Yale Ave is a Moratorium Street between project boundaries. Asphalt patches shall conform to City and County of Denver Transportation Standards and Details standard drawing no.12.2?Trench Vertical patch (Asphalt) in Comments:Denied PWPRS Project Number: 2025-UTIL-0000256 - Verizon - ADB Companies - 4905 E Yale Ave Reviewing Agency/Company: Denver Water All documents in this project (7) 2025-UTIL-0000256 - REDLINES - CityOfForester-EHuetig.pdf★ 2025-UTIL-0000256 Comment Report 12.2.2025.pdf2025-UTIL-0000256 Revised Comment Report 12-19-2025.pdfADB_DEN_2509BEPU_FAILURE_DOMAIN_SHERIDAN_TO_CLINTON_CLIRING_0003_PERMITPRINT (1).pdfFD SHERIDAN TO CLINTIN RING 003 -utility-plan-review-application.pdfFD SHERIDAN TO CLINTIN RING 003 -utility-plan-review-checklist.pdfREDLINES- Forestry- Huetig- Approved.pdf | ||||
2025-UTIL-0000255 Crown Castle - UCI2 Construction Services - Gateway Ave East of Enid Way UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (7) 2025-UTIL-0000255 Comment Report 12.01.2025.pdf2025-UTIL-0000255 Final Approved Plan Set.pdf★ 2025-UTIL-0000255 Revised Comment Report 12-11-2025.pdfApplication 14922 E Gateway Ave 11072025.pdfChecklist 14922 E Gateway Ave 11072025.pdfConstruction Drawings 14922 E Gateway Ave 11072025.pdfREDLINES-DPR Forestry-NEvers 11-26-25.pdf | ||||
2025-UTIL-0000254 Denver Water - North Washington Street and E 48th Avenue UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
Comments:Denied 1. Refer to the Bridge Group @ DOTI.Bridges@denvergov.org. Plans will not be approved until they are reviewed and approved by the DOTI bridges group. All documents in this project (7) | ||||
2025-UTIL-0000253 Xcel - HKS Utility Services - 4503 Tennyson St UTILClear9 agencies | UTIL | 9 | Clear | |
2025-UTIL-0000252 Denver Water - PT 22750 - Park Hill - Montclair Neighborhood UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Dimension running line to nearby inlets. Must comply with 2' minimum distance requirement. 2. Dimension running line to nearby storm and sanitary mains and manholes. All documents in this project (7) | ||||
2025-UTIL-0000251 Centurylink - Pauley Construction - 1445 Market St UTILClear10 agencies | UTIL | 10 | Clear | |
All documents in this project (7) 2025-UTIL-0000251 - Comment Report - 11.12.2025.pdf2025-UTIL-0000251 Final Approved Plan Set.pdf2025-UTIL-0000251 Revised Comment Report 11-14-2025.pdf★ 2025-UTIL-0000251 Revised Comment Report 11-17-2025.pdfP.340473 Denver Utility Plan Application.pdfP.340473- Site Plans.pdfP.340473 UPR Checklist.pdf | ||||
2025-UTIL-0000250 Xcel - HKS Utility Services - 3210 N. Franklin St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Please relocate pole, as it seems to be directly in front of a driveway. Ensure the pole is not blocking any entrance or access points such as gates, garage doors, parking spots etc. All documents in this project (7) ★ 2025-UTIL-0000250 - Comment Report - 11.13.25.pdf2025-UTIL-0000250 Final Approved Plan Set.pdf2025-UTIL-0000250 Revised Comment Report 12-2-2025.pdf3210 N. Franklin St. - UPR Application (2025-10-22).pdf3210 N. Franklin St. - UPR Checklist (2025-10-22).pdf3210 N. Franklin St. - Utility Pole Installation (2025-10-22).pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2025-UTIL-0000249 Denver Water - PT 22745 - Speer Neighborhood - N Pearl St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Sheet 3: Dimension running line to storm main and manhole on N Pearl St. and E 4th Ave. Must comply with 5' minimum distance requirement. All documents in this project (7) | ||||
2025-UTIL-0000248 Xcel - HKS Utility Services - E. 56th Ave. and Boston Ct UTILClear7 agencies | UTIL | 7 | Clear | |
2025-UTIL-0000247 Crown Castle - Wavelink - 4650 N Columbine St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Dimension running line to sanitary sewer manhole. Must comply with 5' minimum distance requirement. | ||||
2025-UTIL-0000246 Xcel - HKS Utility Services - 471 S. Vine St UTILClear6 agencies | UTIL | 6 | Clear | |
2025-UTIL-0000244 Comcast - Mastec - 2135 WESLEY DR DENVER CO UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
City Forester ReviewDenied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No ERA Transportation ReviewDenied 1. Add city UPR project number centered on top of the cover page. 2. Show and dimension all Signal Equipment Clear Zones along the alignment.? No facilities including bored conduits All documents in this project (11) ★ 2025-UTIL-0000244 Comment Report 11-3-2025.pdf2025-UTIL-0000244 Final Approved Plan Set.pdf2025-UTIL-0000244 Revised Comment Report 11-18-2025.pdf2025-UTIL-0000244 Revised Comment Report 11-7-2025.pdfJB 1952557 - 2135 E Wesley Ave - QLB Plan Set.pdfJB1952557 SR1660028 2135 E Wesley Ave - TCP.pdfREDLINES- ER Transportation- Leyva.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig.pdfUPR Application (1).pdfUPR Checklist (1).pdf | ||||
2025-UTIL-0000242 Xcel - HKS Utility Services - 399 N High St UTILClear5 agencies | UTIL | 5 | Clear | |
2025-UTIL-0000241 Xcel - HKS Utility Svcs - Bark 17th Feeder Market St to Lawrence S UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (7) 2025-UTIL-0000241 Comment Report 10.30.25.pdf2025-UTIL-0000241 Final Approved Plan Set.pdf★ 2025-UTIL-0000241 Revised Comment Report 12-2-2025.pdfBark 17th Feeder - Electric Installation.pdfBark 17th Feeder - UPR Application.pdfBark 17th Feeder - UPR Checklist.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2025-UTIL-0000239 Denver Water - PT 22747 - Cheesman Country Club Neighborhood - Marion and Lafayette UTILDenial · 19 agencies | UTIL | 9 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Due to the project's limit of disturbance (greater than one acre and/or greater than 1,750 linear feet) a Construction All documents in this project (8) ★ 2025-UTIL-0000239 Comment Report 10-30-2025.pdf2025-UTIL-0000239 Final Approved Plan Set.pdf2025-UTIL-0000239 Revised Comment Report 11-12-2025.pdf22747 CCD 1ST SUBMITTAL SIGNED.pdf22747 UPRAPP 1ST SUB.pdf22747 UPRCHECKLIST 1ST SUB.pdfREDLINES- ER Transportation- Leyva- Approved.pdfREDLINES- Forestry- Huetig.pdf | ||||
2025-UTIL-0000238 Xcel - HKS Utility Services - 2798 S. Federal Blvd UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (6) | ||||
2025-UTIL-0000237 Xcel - HKS Utility Services - E. 56th Ave. and Tower Rd UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (7) 2025-UTIL-0000237 Comment Report 10-28-2025.pdf2025-UTIL-0000237 Final Approved Plan Set.pdf2025-UTIL-0000237 Revised Comment Report 12-1-2025.pdf★ 2025-UTIL-0000237 Revised Comment Report 12-4-2025.pdfE. 56th Ave. and Tower Rd. - Electric Installation.pdfE. 56th Ave. and Tower Rd. - UPR Application.pdfE. 56th Ave. and Tower Rd. - UPR Checklist.pdf | ||||
2025-UTIL-0000236 Xcel - HKS Utility Services - Bark 17th Feeder UTILDenial · 410 agencies | UTIL | 10 | Denial · 4 | |
City Forester ReviewDenied Denied - please refer to attached Forestry Comments: 1) Sheet 5 - Show TPZ fencing and reference OCF Tree Protection Notes 2) Sheet 11 - Relocate OT outside of amenity zone and tree protection zone REDLINES uploaded to E-review webpage ERA Transportation ReviewDenied 1. Due to the project's limit of disturbance (open trench equal to or exceeding 1,500 linear feet) a Construction Activities Stormwater Discharge Permit (CASDP) is required. Please prepare CASDP package in accordance with the ERA Erosion Control ReviewDenied CASDP required. Apply for coverage under XCEL Linear Umbrella CASDP 2024-EC-0000189. This UPR record status will be revised to approved upon receipt of CASDP application. Denver Water ReferralDenied PWPRS Project Number: 2025-UTIL-0000236 - Xcel - HKS Utility Services - Bark 17th Feeder Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 0000000000 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments: M… All documents in this project (12) ★ 2025-UTIL-0000236 Comment Report 10-28-2025.pdf2025-UTIL-0000236 Final Approved Plan Set.pdf2025-UTIL-0000236 Revised Comment Report 11-13-2025.pdf2025-UTIL-0000236 Revised Comment Report 11-20-2025 2.pdf2025-UTIL-0000236 Revised Comment Report 11-20-2025.pdf2025-UTIL-0000236 Revised Comment Report 3-12-2026.pdfBark 17th Feeder Market St. to 15th St. - Electric Installation.pdfBark 17th Feeder Market St. to 15th St. - UPR Application.pdfBark 17th Feeder Market St. to 15th St. - UPR Checklist.pdfREDLINES- Denver Water- Naso.pdfREDLINES- ER Transportation-Leyva.pdfREDLINES- Forestry- Evers.pdf | ||||
2025-UTIL-0000235 Xcel - HKS Utility Services - 4305 W. 46th Ave UTILClear9 agencies | UTIL | 9 | Clear | |
All documents in this project (10) 2025-UTIL-0000235 Comment Report 10-27-2025.pdf2025-UTIL-0000235 Final Approved Plan Set.pdf2025-UTIL-0000235 Revised Comment Report 12-4-2025.pdf★ 2025-UTIL-0000235 Revised Comment Report 12-8-2025.pdf4305 W. 46th Ave. - UPR Application.pdf4305 W. 46th Ave. - UPR Checklist.pdf4305 W. 46th Ave. - Utility Pole Installation.pdfREDLINES- ER Transportation- Leyva.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig.pdf | ||||
2025-UTIL-0000230 Xcel - HKS Utility Services - 3061 S. Bryant St UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Dimension sidewalk. 2. Dimension pole to edge of sidewalk. Pole must allow enough space for a 5' sidewalk and must be at least 6" from | ||||
2025-UTIL-0000229 Xcel - Mears Group - 5503-5539 Dearborn St UTILClear7 agencies | UTIL | 7 | Clear | |
All documents in this project (9) 2025-UTIL-0000229 Comment Report 10-22-2025.pdf2025-UTIL-0000229 Final Approval Plan Set.pdf2025-UTIL-0000229 Revised Comment Report 12-15-2025.pdf★ 2025-UTIL-0000229 Revised Comment Report 12-22-2025.pdf5503-5539 Dearborn St QLB Seal.pdfChecklist.pdfDenver UPR Application.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2025-UTIL-0000227 Xcel - Q3 Contracting - 3250 E 2nd Ave UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Dimension SC to BOC , EOP, and edge of walk. Must comply with minimum distance requirements (3', 2' and 6", respectively). All documents in this project (7) 111487889_3250 E 2ND AVE_IFA2_2025-10-22_PE STAMP FLAT.pdf★ 2025-UTIL-0000227 - Comment Reports - 11.12.2025.pdf2025-UTIL-0000227 Final Approved Plan Set.pdf2025-UTIL-0000227 Revised Commnet Report 1-15-2026.pdfREDLINES- ER Transportation- Leyva.pdfUPR Checklist DENVER_3250 E 2nd Ave_111487889 (2).pdfUPR Submittal Application DENVER_3250 E 2nd Ave_111487889 (2).pdf | ||||
2025-UTIL-0000218 Xcel - HKS Utility Services - 17th and Grant Vault RELO UTILDenial · 19 agencies | UTIL | 9 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Sheet 5: Dimension running line to inlet. Must comply with 2' minimum requirement. 2. Sheet 5: Dimension switch cabinet to EOP, edge of walk, and ROW. All documents in this project (6) 17th and Grant Vault RELO - Electric Installation (2025-09-25).pdf17th and Grant Vault RELO - UPR Checklist (2025-09-24).pdf17th and Grant Vault RELO - UPR Application (2025-09-24).pdf★ 2025-UTIL-0000218 - Comment Report - 10.16.25.pdf2025-UTIL-0000218 Final Approved Plan Set.pdf2025-UTIL-0000218 Revised Comment Report 10-28-2025.pdf | ||||
2025-UTIL-0000216 2nd - Xcel - HKS Utility Services - 2650 Larimer St UTILDenial · 19 agencies | UTIL | 9 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Large utility vaults should be in the roadway or parking lane where access requirements allow it. There is sufficient space on Lawrence St. for the proposed vault. Is there a reason why installation under the sidewalk is preferred? All documents in this project (8) ★ 2025-UTIL-0000216 Comment Report 3-3-2026.pdf2025-UTIL-0000216 Revised Comment Report 3-5-2026.pdf2nd Submittal 2650 Larimer St. - Electric Installation.pdf2nd Submittal 2650 Larimer St. - UPR Application.pdf2nd Submittal 2650 Larimer St. - UPR Checklist.pdfREDLINES- ER Transportation- Leyva- Approved Plans.pdfREDLINES- ER Transportation- Leyva- Request for Clear Zone Access.pdfREDLINES- ER Transportation- Leyva- Request for Updates on 2 Clear Zone Requests.pdf | ||||
2025-UTIL-0000216 Xcel - HKS Utility Services - 2650 Larimer St UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Remove all work in signal clear zones. No facilities including bored conduits or handholes are allowed in the Equipment Clear Zone as shown on?City and County of Denver Transportation Standards and Details?standard All documents in this project (8) ★ 2025-UTIL-0000216 Comment Report 10-14-2025.pdf2650 Larimer St. - Electric Installation (2025-09-23).pdf2650 Larimer St. - UPR Application (2025-09-25).pdf2650 Larimer St. - UPR Checklist (2025-09-25).pdfREDLINES- ER Transportation- Leyva- Approved Plans.pdfREDLINES- ER Transportation- Leyva- Request for Clear Zone Access.pdfREDLINES- ER Transportation- Leyva- Request for Updates on 2 Clear Zone Requests.pdfREDLINES- Forestry- Evers.pdf | ||||
2025-UTIL-0000212 Xcel - Q3 Contracting - North 1434 Feeder 107792143- Race St. and E 37th Ave UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
City Forester ReviewDenied Denied: 1) Include OCF Tree Protection Standard Notes and Detail. ERA Transportation ReviewDenied 1. Ensure all streets are labeled. All documents in this project (11) 107792143_NORTH 1434 FEEDER_RACE ALT ROUTE_IFA2_2025-09-19.pdf2025-UTIL-0000212 Comment Report 10-6-2025.pdf2025-UTIL-0000212 Final Approval Plans.pdf★ 2025-UTIL-0000212 Revised Comment Report 11-24-2025.pdf2025-UTIL-0000212 Revised Comment Report 11-26-2025.pdf2025-UTIL-0000212 Revised Comment Report 11-3-2025.pdf2025-UTIL-0000212 Revised Comment Report 12-19-2025.pdfREDLINES- DPR- Cervera.pdfREDLINES- ER Transportation- Leyva.pdfUPR Checklist DENVER North 1434 Feeder.pdfUPR Submittal Application DENVER_North 1434 Feeder_09.19.25.pdf | ||||
2025-UTIL-0000209 Xcel - Q3 Contracting - 242 Milwaukee St WO110019473 UTILDenial · 16 agencies | UTIL | 6 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Dimension all poles to EOP. 2. Dimension all poles to ROW. All documents in this project (7) 110019473_242 Milwaukee St_IFA2_2025-09-12_PE STAMP FLAT.pdf2025-UTIL-0000209 - Final Approval Plan Set.pdf★ 2025-UTIL-0000209 Comment Report 10-14-2025.pdf2025-UTIL-0000209 Revised Comment Report 12-9-2025.pdfREDLINES- ER Transportation- Leyva.pdfUPR Checklist DENVER 242 Milwaukee St_110019473.pdfUPR Submittal Application DENVER_242 Milwaukee St_110019473.pdf | ||||
2025-UTIL-0000207 Xcel - HKS Utility Services - UNIV1024 Feeder UTILDenial · 29 agencies | UTIL | 9 | Denial · 2 | |
Parks and Recreation ReviewDenied PWPRS Project Number: 2025-UTIL-0000207 - Xcel - HKS Utility Services - UNIV1024 Feeder Reviewing Agency/Company: Parks and Recreation Reviewers Name: Jennifer Cervera Reviewers Phone: 7209135862 Reviewers Email: Jennifer.Cervera@denvergov.org Approval Status:… ERA Transportation ReviewDenied 1. Sheet 6: Dimension all bore pits to nearby water, storm, and sanitary sewer lines. Must comply with 5' minimum requirement. All documents in this project (12) 2025-UTIL-0000207 Comment Report 09.29.2025.pdf2025-UTIL-0000207 Final Approval Plan Set.pdf2025-UTIL-0000207 Revised Comment Report 10-1-2025.pdf★ 2025-UTIL-0000207 Revised Comment Report 10-27-2025.pdf2025-UTIL-0000207 Revised Comment Report 11-18-2025.pdf2025-UTIL-0000207 Revised Comment Report 3-5-2026.pdfREDLINES - Forestry - Huetig.pdfREDLINES- ER Transportation- Leyva.pdfREDLINES- Forestry- Huetig- Approved.pdfUNIV1024 - UPR Application.pdfUNIV1024 - UPR Checklist.pdfUNIV1024 Feeder - Electric Installation.pdf | ||||
2025-UTIL-0000203 Xcel - HKS Utility Services - 1725 Marion St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
ERA Transportation ReviewDenied 1.Please confirm that the pole is not blocking any entrance or access points. It appears as if the pole would block access to the existing dumpsters. All documents in this project (7) 1725 Marion St. - Uitility Pole Installation (2025-09-09).pdf1725 Marion St. - UPR Application (2025-09-09).pdf1725 Marion St. - UPR Checklist (2025-09-09).pdf★ 2025-UTIL-0000203 Comment Report 09.25.25.pdf2025-UTIL-0000203 Final Approved Plan Set.pdf2025-UTIL-0000203 Revised Comment Report 9-30-2025.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2025-UTIL-0000191 Comcast - ITG Communications LLC - 3140 S Dahlia St UTILDenial · 18 agencies | UTIL | 8 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Note: Please reserve spot centered on top of the cover sheet for utility project number (e.g. 2025-UTIL-XXXXXXX). All documents in this project (9) ★ 2025-UTIL-0000191 Comment Report 9-15-2025.pdf2025-UTIL-0000191 Final Approval Plan Set.pdf2025-UTIL-0000191 Revised Comment Report 10-3-2025.pdf2025-UTIL-0000191 Revised Comment Report 1-23-2026.pdf2025-UTIL-0000191 Revised Comment Report 9-16-2025.pdfdotipt-121.2-utility_plan_review_applicatioJB0002238347.pdfJB2238347 - 3140 Dahlia St.pdfpwpt-121.2-utility-plan-review-checklist- JB0002238347.pdfREDLINES- ER Transportation- Leyva.pdf | ||||
2025-UTIL-0000174 Xcel - HKS Utility Services - 47th to 52nd on Washington - Phase 2 Electric UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (14) 2025-UTIL-0000174 Comment Report 8-22-2025.pdf2025-UTIL-0000174 Final Approved Plans.pdf2025-UTIL-0000174 Revised Comment Report 10-10-2025.pdf2025-UTIL-0000174 Revised Comment Report 12-29-2025.pdf★ 2025-UTIL-0000174 Revised Comment Report 1-5-2026.pdf47th to 52nd on Washington (Phase 2 Electric) - Electric Install (2025-08-06).pdf47th to 52nd on Washington (Phase 2 Electric) - UPR Application (2025-08-06).pdf47th to 52nd on Washington (Phase 2 Electric) - UPR Checklist (2025-08-06).pdfREDLINES- ER Transportation- Leyva- Approved Plans.pdfREDLINES- ER Transportation- Leyva.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig- OCF Comments.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Traffic Signals- Barela.pdf | ||||
2025-UTIL-0000171 HyperFiber - ITG - Towe Rd and E 45th Ave. COGV-A2-02 UTILDenial · 38 agencies | UTIL | 8 | Denial · 3 | |
Parks and Recreation ReviewDenied DPR Comments provided in documents ERA Transportation ReviewDenied 1. Please remove all work not located on CCD ROW (Aurora City Road) form UPR plan. We do not review or approve this work. Denver Water ReferralDenied PWPRS Project Number: 2025-UTIL-0000171 - HyperFiber - ITG - Towe Rd and E 45th Ave. COGV-A2-02 Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 0000000000 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comm… All documents in this project (8) 10005_HF_CO GREEN VALLEY RANCH A2-01_ECA_08012025_R6.pdf2025-UTIL-0000171 Comment Reports 08.20.25.pdf★ 2025-UTIL-0000171 Comment Reports 08.26.25.pdf2025-UTIL-0000171 Revised Comment Reports 11-3-2025.pdf2025-UTIL-0000171 Revised Comment Reports 12-29-2025.pdfApplication.pdfREDLINES- DPR- Cervera- Approved.pdfREDLINES- DPR Comments 10005_HF_CO GREEN VALLEY RANCH A2-01_ECA_08012025_R6.pdf | ||||
2025-UTIL-0000170 2nd - Xcel - HKS Utility Services - 901 N. Navajo St UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
City Forester ReviewDenied OCF Comments 12-9-25 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No ERA Transportation ReviewDenied 1. Dimension switch cabinet to edge of walk, EOP, and BOC. SC must be at least 3' from the BOC and 6" from the edge of walk. All documents in this project (11) ★ 2025-UTIL-0000170 Comment Report 12-23-2025.pdf2025-UTIL-0000170 Final Approved Plan Set.pdf2025-UTIL-0000170 Revised Comment Report 1-16-2026.pdf2025-UTIL-0000170 Revised Comment Report 1-7-2026.pdf2nd Submittal Application 901 N. Navajo St..pdf2nd Submittal Checklist 901 N. Navajo St..pdf2nd Submittal Plans 901 N. Navajo St. - Electric Installation.pdfREDLINES- ER Transportation- Leyva- Approved.pdfREDLINES- ER Transportation- Leyva- Clear Zone Approval.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig.pdf | ||||
2025-UTIL-0000170 Xcel - HKS Utility Services - 901 N. Navajo St UTILDenial · 27 agencies | UTIL | 7 | Denial · 2 | |
City Forester ReviewDenied 2025-UTIL-0000170 - 901 Navajo Xcel OCF Comments 8-18-25 ERA Transportation ReviewDenied 1. Note: W. 11th Ave. is a Moratorium Street between project boundaries. Asphalt patches shall conform to City and All documents in this project (9) ★ 2025 -UTIL- 0000170 Comment Reports 08.19. 2025.pdf2025-UTIL-0000170 Revised Comment Reports 9-11-2025.pdf2025-UTIL-0000170 Revised Comment Reports 9-4-2025.pdf901 N. Navajo St. - Electric Installation.pdf901 N. Navajo St. - UPR Application.pdf901 N. Navajo St. - UPR Checklist.pdfREDLINES - Office of the City Forester - EHuetig.pdfREDLINES- ER Transportation- Leyva.pdfREDLINES- Forestry- Huetig- Approved.pdf | ||||
2025-UTIL-0000152 Xcel - HKS Utility Services - 805 W. 38th Ave UTILClear8 agencies | UTIL | 8 | Clear | |
All documents in this project (8) ★ 2025-UTIL-0000152 Comment Report 07.28.2025.pdf2025-UTIL-0000152 Final Approval Plan Set.pdf2025-UTIL-0000152 Revised Comment Report 9-12-2025.pdf805 W. 38th Ave. - Electric Installation.pdf805 W. 38th Ave. - UPR Application.pdf805 W. 38th Ave. - UPR Checklist.pdfREDLINES- DPR- Cervera- Approved.pdfREDLINES-DPR.pdf | ||||
2025-UTIL-0000146 Denver Water-Intersection of 49th Avenue and Washington Street UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Dimension the running line to the 8" sanitary main and manholes to the West of the running line. | ||||
2025-UTIL-0000139 Crown Castle - Wavelink - 5586 N Elkhart St UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
ERA Transportation ReviewDenied 1. Replace standard notes with current Required Plan Notes (revised 5/18/20), available for download under Utility Plan Review at PW Construction Engineering ReviewDenied See kdb red lines. | ||||
2025-UTIL-0000136 – Xcel - HKS Utility Services - 4305 W. 46th Ave UTILDenial · 115 agencies | UTIL | 15 | Denial · 1 | |
ERA Transportation ReviewDenied 1. We can only approve work that is within current right-of-way. If it's only proposed, we cannot review or approve. 2. Street Cut Pavement Repair Markers will be required. 3. Please protect all green infrastructure, sanitary sewer, storm drainpipes and appurt… | ||||
2025-UTIL-0000089 Xcel - HKS Utility Services - S. Dahlia St. and Highline Canal UTILDenial · 28 agencies | UTIL | 8 | Denial · 2 | |
ERA Transportation ReviewDenied 1. Street lights must be placed to allow a minimum of 0.5 ft clearance to a 5 ft attached walk. 2. Show Signal Equipment Clear Zones on the east side of Dahlia St at Highline Pl. Bore line must be constructed to minimize encroachment into clear zone. Denver Water ReferralDenied PWPRS Project Number: 2025-UTIL-0000089 - Xcel - HKS Utility Services - S. Dahlia St. and Highline Canal Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 0000000000 Reviewers Email: kela.naso@denverwater.org Approval Status: De… All documents in this project (6) | ||||
2025-UTIL-0000080 Crown Castle - Wavelink - East 8th Ave and Lincoln Street UTILDenial · 115 agencies | UTIL | 15 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Relocation of small cell node is not approved with this Utility Plan Review. Submit a revised SONO per Small Cell Co-Location process at https://www.denvergov.org/Government/Agencies-Departments-Offices/Agencies-Departments-Offices-Directory/D epartment-of-… | ||||
2025-UTIL-0000058 Sturgeon Electric Company - E Yale Ave between Dahlia St and Holly St UTILDenial · 215 agencies | UTIL | 15 | Denial · 2 | |
City Forester ReviewDenied 2025-UTIL-0000058 - Yale: Dahlia to Holly OCF Comments 4-1-25 1. Address OCF comments on attached redlined plans (uploaded to ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in… Denver Water ReferralDenied PWPRS Project Number: 2025-UTIL-0000058 - Sturgeon Electric Company - E Yale Ave between Dahlia St and Holly St Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso | ||||
2025-RELINQ-0000020 3698 N Xanthia St Relinquishment RELINQDenial · 219 agencies | RELINQ | 19 | Denial · 2 | |
Survey ReviewDenied Redlines in project folder Review Status: Comments Compiled DES Wastewater ReviewDenied The requested relinquishment is the easement access to the existing public storm and sanitary mains traversing the RK Mechanical site. After reviewing the current site configuration, this route is the only access to the public main and manholes. Please provide… All documents in this project (8) ★ 2025-RELINQ-0000020 Comment Report 1-14-2026.pdfREDLINES- Survey- Pfohl.pdfXanthia Multi-Family_Access Esmt Relinq - Application_SIGNED.pdfXanthia Multi-Family_Access Esmt Relinq - Checklist_SIGNED.pdfXanthia Multi-Family_Access Esmt Relinq - Legal and Exhibit.pdfXanthia Multi-Family_Access Esmt Relinq - Map Check.DOCXanthia Multi-Family_Access Esmt Relinq - Original Document.pdfXanthia Multi-Family_Access Esmt Relinq - Site Plan.pdf | ||||
2025-RELINQ-0000019 Cherry Lane Sidewalk Easement Along 1st Avenue RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (6) | ||||
2025-RELINQ-0000018 2625 E Cedar Ave Relinquishment RELINQDenial · 124 agencies | RELINQ | 24 | Denial · 1 | |
DES Wastewater ReviewDenied The new PNEE needs to be in place and recorded prior to approval of this relinquishment. | ||||
2025-RELINQ-0000017 Broadway Station Soccer Stadium 748 S Cherokee St RELINQDenial · 120 agencies | RELINQ | 20 | Denial · 1 | |
Xcel ReferralDenied PWPRS Project Number: 2025-RELINQ-0000017 Broadway Station Soccer Stadium 748 S Cherokee St Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy | ||||
2025-RELINQ-0000016 Broadway Station Filing No. 4 - 748 S Cherokee St RELINQDenial · 120 agencies | RELINQ | 20 | Denial · 1 | |
Xcel ReferralDenied PWPRS Project Number: 2025-RELINQ-0000016 Broadway Station Filing No. 4 - 748 S Cherokee St Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy | ||||
2025-RELINQ-0000015 2860 N Bryant St Relinquishment RELINQDenial · 219 agencies | RELINQ | 19 | Denial · 2 | |
Survey ReviewDenied Comments and redlines in project folder Review Status: Comments Compiled Xcel ReferralDenied PWPRS Project Number: 2025-RELINQ-0000015 2860 N Bryant St Relinquishment Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Donna.L.George@xcelenergy.co… All documents in this project (8) ★ 2025-RELINQ-0000015 Comment Report 9-15-2025.pdf29th and Speer_Relinquishment Application.pdf29th and Speer_Relinquishment Checklist.pdf29th and Speer_Relinquishment Legal and Exhibit.pdf29th and Speer_Relinquishment Legal Description.docx29th and Speer_Relinquishment Site Plan.pdf29th and Speer_Reserved Utility Easement Ordinance.pdfREDLINES- Survey- Pfohl.pdf | ||||
2025-RELINQ-0000014 Morning Star Observatory Park 2100 S Josephine St RELINQNo report yet— agencies | RELINQ | — | No report yet | |
2025-RELINQ-0000013 Westside Clinic 1100 Federal Blvd Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
2025-RELINQ-0000012 Broadway Station Soccer Stadium S Cherokee and W Ohio RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (4) | ||||
2025-RELINQ-0000009 KS105 4201 E Arkansas Ave Relinquishment RELINQDenial · 120 agencies | RELINQ | 20 | Denial · 1 | |
Survey ReviewDenied Comments and redlines in project folder All documents in this project (9) 01_KS150_Easement Relinquishment Application_SIGNED.pdf02_KS150_Recorded Subdivision Plat.pdf03_KSS150_6ft Util Esmt Relinquishment Closure Sheet.pdf03_KSS150_L&E_Utility Easement Relinquishment.pdf05_KSS150_SITE PLAN_Utility Easement Relinquishment.pdf★ 2025-RELINQ-0000009 Comment Report 07-25-2025.pdfKSS150_L&E_Proposed Utility Easement.pdfKSS150_Proposed Utility Easement Closure Sheet.pdfREDLINES- Survey- Pfohl.pdf | ||||
2025-RELINQ-0000008 26th and Larimer Block A Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
2025-RELINQ-0000007 Colfax and Elm 4905 E Colfax Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (5) | ||||
2025-RELINQ-0000003 Augustana Lutheran Church RELINQDenial · 323 agencies | RELINQ | 23 | Denial · 3 | |
Construction Engineering ReviewDenied Which document shows and labels the new easement? DES Wastewater ReviewDenied ERA Transportation ReviewDenied 1. Update Checklist - No. 3 is not completed: is this a partial or whole easement relinquishment (Application form says "entirety")? If partial relinquishment, legal description is required. 2. Update Application form: a. Project Information not completed - Is… All documents in this project (13) 2023-DED-0060-FINAL RECORDED EASEMENT 2023078184.pdf★ 2025-RELINQ-0000003 Comment Report 06-18-2025.pdf5088 E Dakota Site Plan with Easement Shown.pdfEasement top Be Relinquished Recordation No 2002033206 2002-02-19.pdfExhibit A DRAINAGE.pdfHabitat Metro Denver - Application for Easement Relinquishmewnt 250428.pdfREDLINES- CenturyLink- Hill - Letter.pdfREDLINES- CenturyLink- Hill.pdfREDLINES- ER Trans- 01_Habitat Metro Denver - Application for Easement Relinquishment 250428_11072025.pdfREDLINES- ER Trans- 02_Habitat Metro Denver Easement Relinquishment Response to Comments 11072025.pdfREDLINES- ER Trans- 03_2023-DED-0060-FINAL RECORDED EASEMENT 2023078184.pdfREDLINES- ER Trans- 04_Easement Relinquishment Exhibit for Illustrative Purposes Only.pdfREDLINES- ER Trans- LOAfin Leetsdale.pdf | ||||
2025-RELINQ-0000002 Denver Rock Drill Garage 3955 High Street RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (2) | ||||
2025-RELINQ-0000001 Stok 2833 Welton Street Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
2025-ENCROACHMENT-0000164 Tier III - 2535 W 35th Ave Garage ENCROACHMENTDenial · 121 agencies | ENCROACHMENT | 21 | Denial · 1 | |
Survey ReviewDenied Survey comments/redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) All documents in this project (14) ★ 2025-ENCROACHMENT-0000164 Comment Report 1-21-2026.pdf2529-2535 W 35TH ZONE LOT AMENDMENT 9-25-25 for ROW app - Copy.pdfa_2025Encroach164_SitePlan-001.pdfb_2025Encroach164_VestingDeed-001.pdfc_2025Encroach164_TitleCommitment-001.pdfd_2025Encroach164_DeedDesc-001.docxDEED OF TRUST.pdfdotipt-105.3.2-encroachment_checklistV3.pdfdotipt-105-encroachment application 2535 W 35TH AVE.pdfe_2025Encroach164_Desc and Illus-002.pdfEXHIBIT A LEGAL DESCRIPTION 2535 W 35TH AVE.pdff_2025Encroach164_Desc-002.docxREDLINES- Survey- Savich.pdfw 35th EXHIBIT B garge easement 2025-09-26.pdf | ||||
2025-ENCROACHMENT-0000163 Tier II - 3575 Chestnut Pl Weather Monitoring Box ENCROACHMENTDenial · 227 agencies | ENCROACHMENT | 27 | Denial · 2 | |
Survey ReviewDenied Survey checklist with needed items is in project Red Lines folder. Xcel ReferralDenied PWPRS Project Number: 2025-ENCROACHMENT-0000163 - Tier II - 3575 Chestnut Pl Weather Monitoring Box Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewers Phone: 3035713306 Review… | ||||
2025-ENCROACHMENT-0000162 Tier III - 1900 16th Street Plaza Sculpture ENCROACHMENTDenial · 426 agencies | ENCROACHMENT | 26 | Denial · 4 | |
Survey ReviewDenied Survey redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) REDLINES uploaded to E-review webpage DES Wastewater ReviewDenied As noted by other reviewers, two large Metro Water Recovery sanitary mains appear to exist under the work area. These should be shown on the design plans, and MWRD approval must be obtained for this work. In addition, CCD GIS data indicates an active sanitary… ERA Transportation ReviewDenied 1. Add dimension(s) from proposed Encroachment(s) to the adjacent flowline. 2. Dimension and label the pedestrian access route (PAR). 3. There are two large MWRD sanitary mains through this location. Show the outer limits of both pipes on the Site Plan. Approv… ERA Wastewater ReviewDenied Show existing 60-inch and 58-inch Metro Water Recover mains and existing sanitary service. Verify application has been reviewed and approved by Metro. All documents in this project (9) ★ 2025-ENCROACHMENT-0000162 Comment Report 1-15-2026.pdf251218 Dreamscape MEP Teir III Application.pdf251218 Dreamscape MEP Teir III Legal.docx251219 Dreamscape MEP Teir III Checklist.pdf251219 Dreamscape MEP Teir III Letter.pdf251219 Dreamscape MEP Teir III Plans.pdfREDLINES- DS WW- Martel.pngREDLINES- ER Transportation- Kijowski.pdfREDLINES- Survey- Savich.pdf | ||||
2025-ENCROACHMENT-0000161 Tier II - 2501 Blake St Ramp Canopy Platform ENCROACHMENTDenial · 323 agencies | ENCROACHMENT | 23 | Denial · 3 | |
Survey ReviewDenied Survey comments & redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) ERA Transportation ReviewDenied 1. Note: this existing encroachment is Tier III since it does not meet the requirements for a Tier II. To qualify this as a Tier II, you will need to modify the ramp/stairs such that: 1) they do not project into the ROW more than 5 feet, and 2) do not change d… ERA Wastewater ReviewDenied The proposed canopy should be have a gutter with downspouts. Revise plans to show downspout discharge locations in compliance with city criteria. All documents in this project (10) 202527 LSP R2 DSsigned.pdf★ 2025-ENCROACHMENT-0000161 Comment Report 1-16-2026.pdf2501 Blake st Land Description.docx2501 Blake st Title.pdf25075 - ELEMENTS.denver - architectural drawings.pdf25075 - ELEMENTS.denver - Tier II Application 2025-12-12 signed.pdf25075 - ELEMENTS.denver - Tier II Checklist 2025-12-12.pdfREDLINES- ER Transportation- Kijowski.pdfREDLINES- Forestry- Evers.pdfREDLINES- Survey- Savich.pdf | ||||
2025-ENCROACHMENT-0000160 Tier III - 2595 S Vine St - Fence ENCROACHMENTDenial · 223 agencies | ENCROACHMENT | 23 | Denial · 2 | |
Survey ReviewDenied Comments in project folder Review Status: Approved w/Conditions ERA Transportation ReviewDenied 1. Show the existing alley. 2. Show the property line. 3. Show and label Vine Street. 4. Add the 10x10 pedestrian sight triangle at the alley. Ensure it is placed at the location of the compliant sidewalk and not the existing condition. 5. Add dimensions betwe… | ||||
2025-ENCROACHMENT-0000159 Tier III - 661 N Williams - Retaining Wall - Foundational Wall ENCROACHMENTDenial · 224 agencies | ENCROACHMENT | 24 | Denial · 2 | |
Survey ReviewDenied survey comments are in the project folder need documents: deed, deed in Word, title commitment, Exhibit A and description in Word REDLINES uploaded to E-review webpage ERA Transportation ReviewDenied 1. Per 2025-LOG-0003255 review in July 2025, the stairs encroaching 4 feet into the 16-foot alley must be removed, and permit (2011-Encroachment-0057601) revoked as this is a significant impact to the public travel way. No action is needed for the revocation -… All documents in this project (8) | ||||
2025-ENCROACHMENT-0000157 Tier III - 1901 29th Street Crossroads Shelter Repair ENCROACHMENTDenial · 325 agencies | ENCROACHMENT | 25 | Denial · 3 | |
DS Transportation ReviewDenied PWPRS Project Number: 2025-ENCROACHMENT-0000157 - Tier III - 1901 29th Street Crossroads Shelter Repair Reviewing Agency/Company: DOTI DES Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.christensen@denverg… Survey ReviewDenied Survey comments are in the project REDLINES folder (REDLINES- Survey- Savich.docx). ERA Transportation ReviewDenied 1. Provide a Site Plan that includes all required items on the Permit Submittal Checklist. Specifically, we need to see distance from encroachments to the nearest flowline, distance from property line to back of curb, and distance the encroachments project int… All documents in this project (11) ★ 2025-ENCROACHMENT-0000157 Comment Report 12-30-2025.pdf2025-ENCROACHMENT-0000157 Revised Comment Report 3-2-2026.pdfDOTI_ENCROACHMENT_TIER 3_APP_1901 29TH ST_12.4.25.pdfDOTI_ENCROACHMENT_TIER 3_ARCH_DWGS_1901 29TH ST_12.4.25.pdfDOTI_ENCROACHMENT_TIER 3_CHKLST_1901 29TH ST_12.4.25.pdfDOTI_ENCROACHMENT_TIER 3_DWGS_1901 29TH ST_12.4.25.pdfDOTI_ENCROACHMENT_TIER 3_PARCEL LAND DESCRP_1901 29TH ST_12.4.25.docxDOTI_ENCROACHMENT_TIER 3_WARRANTY DEED_1901 29TH ST_12.4.25.pdfREDLINES- ER Transportation- Kjowski- Approval.pdfREDLINES- ER Transportation- Kjowski- ELEVATION DWGS- Approval.pdfREDLINES- Survey- Savich.docx | ||||
2025-ENCROACHMENT-0000155 Tier II - 3015 E Colfax Ave - Monument Sign ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (4) | ||||
2025-ENCROACHMENT-0000152 Tier II - 639 29th St Art Sculpture ENCROACHMENTDenial · 226 agencies | ENCROACHMENT | 26 | Denial · 2 | |
DS Transportation ReviewDenied PWPRS Project Number: 2025-ENCROACHMENT-0000152 - Tier II - 639 29th St Art Sculpture Reviewing Agency/Company: DOTI DES Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.christensen@denvergov.org Approval St… Survey ReviewDenied Survey comments and redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf). All documents in this project (14) ★ 2025-ENCROACHMENT-0000152 Comment Report 12-18-2025.pdf25.11.19_Welton_encroachment_application.pdf29th and Welton Existing Site Survey.pdf29th and Welton Tier II Encroachment Permit Set - 11.21.25.pdf29th and Welton Tier II Encroachment Permit Set - 12.23.25.pdfa_2025Encroach152-SitePlan-001.pdfArt Recommendation 639 29thSt MC 10.30.25.pdfb_2025Encroach152-VestingDeed-001.pdfc_2025Encroach152-TitleCommitment-001.pdfd_2025Encroach152-VestingDesc-001.docxdotipt-105.3.2-encroachment_checklist - 29th & Welton.pdfParcel Description of Property.pdfREDLINES- Survey- Savich.pdfTitle Commitment.pdf | ||||
2025-ENCROACHMENT-0000151 Tier II-600 N Galapagos - Ramp and Stairs ENCROACHMENTDenial · 222 agencies | ENCROACHMENT | 22 | Denial · 2 | |
Survey ReviewDenied missing deed, title commitment and description is incorrect comments in the Redlines folder ERA Wastewater ReviewDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. All documents in this project (9) ★ 2025-ENCROACHMENT-0000151 - Comment Report 12.17.25.pdfAppication for Encroachment signed 10-23-25.pdfDrwg A-1 Iss 4 12-18-24-sealed.pdfDrwg A-1a Ext Ramp 10-15-24-sealed.pdfDrwg X-5 10-22-2025-sealed 003.pdfENCROACHReqmts 2025ENCROACHMENT151.docxLEGAL DESCRIPTION.docxREDLINES-SURVEY-DSperling.docxSpec Sht EXT Ramp 9-20-23.pdf | ||||
2025-ENCROACHMENT-0000149 Tier III 225 E Bayaud Ave - Fence - Stairs - Landscaping ENCROACHMENTDenial · 725 agencies | ENCROACHMENT | 25 | Denial · 7 | |
DS Transportation ReviewDenied 1. Confirm 6-foot tall privacy fence detail and any zoning approval being pursued for wall/fence (if applicable), i.e. an encroachment permit does not replace a zoning approval for a front yard wall/fence. 2. Depict 30'x30' Corner Sight Triangle at E Bayaud Av… Survey ReviewDenied survey comments are in the redline folder missing many components needed for a Tier III encroachment ERA Transportation ReviewDenied 1. Fences shall be placed a minimum of 6 inches horizontal clearance behind the back of the sidewalk to allow for sidewalk maintenance. 2. Provide typical cross-section or elevation detail for the proposed fence. 3. Provide typical cross-section or elevation d… Xcel ReferralDenied PWPRS Project Number: 2025-ENCROACHMENT-0000149 Tier III 225 E Bayaud Ave - Fence - Stairs - Landscaping Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewers Phone: 3035713306 R… City Forester ReviewDenied OCF Comments 12-4-25 ROW - Supplemental ReviewDenied PWPRS Project Number: 2025-ENCROACHMENT-0000149 Tier III 225 E Bayaud Ave - Fence - Stairs - Landscaping Reviewing Agency/Company: West Washington Park Neighborhood Association Reviewers Name: Kathryn Fontaine for WWPNA Board Reviewers Phone: 3037758624 Review… ROW - Supplemental ReviewDenied PWPRS Project Number: 2025-ENCROACHMENT-0000149 Tier III 225 E Bayaud Ave - Fence - Stairs - Landscaping Reviewing Agency/Company: neighborhood resident Reviewers Name: Gertrude Grant Reviewers Phone: 3037443882 Reviewers Email: gertiegrant@estreet.net Approva… All documents in this project (10) ★ 2025-ENCROACHMENT-0000149 Comment Report 12-16-2025.pdf225 E Bayaud - Encroachment Application - 20251117.pdf225 E Bayaud - Encroachment Checklist - 20251117.pdf225 E Bayaud - Land Title.pdf225 E Bayaud - Parcel Land Description.docx225 E Bayaud - Tier III Encroachment Permit Plans - 20251117.pdfREDLINES- Forestry- Huetig.pdfREDLINES- RNO- Fontaine.pdfREDLINES- Survey- Sperling.docxREDLINES_ER TRANS KIJOWSKI 225 E Bayaud - Tier III Encroachment Permit Plans - 20260714.pdf | ||||
2025-ENCROACHMENT-0000147 ATT SL CoLocate Group 1 ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (9) ATT SL 2025 GROUP 1 SONO Address Card.pdfATT SL 2025 GROUP 1 SONO Application Form_R01.pdfATT SL 2025 GROUP 1 SONO Construction Plans.pdfATT SL 2025 GROUP 1 SONO Master Tracker.xlsxATT SL 2025 GROUP 1 SONO RF Certification Reports 40 Micro.pdfATT SL 2025 GROUP 1 SONO SS Structural Analysis.pdfATT SL 2025 GROUP 1 SONO Statement of Maintenance.pdfREDLINES - ER WASTEWATER - SASARAK.pdfREDLINES- Survey- Castaneda.doc | ||||
2025-ENCROACHMENT-0000147 2nd Submittal ATT SL CoLocate Group 1 ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (12) ATT SMARTLINK 2025 GROUP 1 CITY BARK Address Card.pdfATT SMARTLINK 2025 GROUP 1 CITY BARK Application.pdfATT SMARTLINK 2025 Group 1 CITY BARK CCD No Objection RF Letter.docxATT SMARTLINK 2025 GROUP 1 CITY BARK Construction Plans.pdfATT SMARTLINK 2025 GROUP 1 CITY BARK Master Tracker.xlsxATT SMARTLINK 2025 Group 1 CITY BARK Pole Location Description.docxATT SMARTLINK 2025 GROUP 1 CITY BARK Signed Checklist.pdfATT SMARTLINK 2025 GROUP 1 CITY BARK SS Structural Analysis.pdfATT SMARTLINK 2025 GROUP 1 CITY BARK Statement of Maintenance.pdfREDLINES - ER WASTEWATER - SASARAK.pdfREDLINES- CenturyLink- Letter of No Objection.pdfREDLINES- Survey- Castaneda.doc | ||||
2025-ENCROACHMENT-0000146 Tier II 85 N Lincoln St - Soil Cells - Canopy and Overhang - Paving - Lights ENCROACHMENTDenial · 228 agencies | ENCROACHMENT | 28 | Denial · 2 | |
Survey ReviewDenied redlines and comments are in the folder Xcel ReferralDenied PWPRS Project Number: 2025-ENCROACHMENT-0000146 - Tier II 85 N Lincoln St - Soil Cells - Canopy and Overhang - Paving - Lights Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewe… All documents in this project (12) 2025-1010 - 95 LINCOLN ROW ENCROACHMENT TITLE COMMITMENT II.pdf2025-1010 - 95 LINCOLN ROW ENCROACHMENT APP.pdf2025-1010 - 95 LINCOLN ROW ENCROACHMENT CHECKLIST.pdf2025-1010 - 95 LINCOLN ROW ENCROACHMENT CLOSURE REPORT.pdf2025-1010 - 95 LINCOLN ROW ENCROACHMENT LEGAL EXHIBIT.pdf2025-1010 - 95 LINCOLN ROW ENCROACHMENT PLANS.pdf2025-1010 - 95 LINCOLN ROW ENCROACHMENT TIER ENCROACHMENT EXHIBIT.pdf2025-1010 - 95 LINCOLN ROW ENCROACHMENT TITLE COMMITMENT I.pdf2025-1010 - 95 LINCOLN ROW ENCROACHMENT WARRANTY DEED.pdf★ 2025-ENCROACHMENT-0000146 Comment Report 12-5-2025.pdfREDLINES- Survey- Sperling- ENCROACHReqmts.docxREDLINES- Survey- Sperling- LEGAL EXHIBIT.pdf | ||||
2025-ENCROACHMENT-0000145 Tier III – 3420 Steele Street– Stairs ENCROACHMENTDenial · 121 agencies | ENCROACHMENT | 21 | Denial · 1 | |
Survey ReviewDenied See Survey ENCROACHReqmts doc for needed documents. All documents in this project (11) ★ 2025-ENCROACHMENT-0000145 Comment Report 11.17.25.pdf2025-ENCROACHMENT-0000145 Survey Comments ENCROACHReqmts 2025.11.14.docx3201 Bruce Randolph 251002.pdf3201 Bruce Randolph Side Elevation.pdf3201 Bruce Randolph Siet Plan.pdf3240 Encroachment App Completed.pdfApproved SUDP Site Plan 5.5.2023.pdfArchPlans 3420NSteeleSt 05-16-2025.pdfdoti.pt.2023.105 tier determination checklist SIGNED.pdfNarrativeLetter 3240NSteeleSt 05-16-2025.pdfREDLINES- CenturyLink- Medrano- No Objection.pdf | ||||
2025-ENCROACHMENT-0000144 Tier III - 4101 E Wesley Ave - Fence ENCROACHMENTDenial · 423 agencies | ENCROACHMENT | 23 | Denial · 4 | |
Survey ReviewDenied Comments and redlines in project folder Review Status: Denied ERA Transportation ReviewDenied 1. The Encroachment Section detail indicates that the Gabion Pilaster is located at back of walk. All facilities, including the pilasters, shall be placed minimum 6-inches behind sidewalk. Update detail to show required clearance and add dimension. Note: the c… Xcel ReferralDenied PWPRS Project Number: 2025-ENCROACHMENT-0000144 - Tier III - 4101 E Wesley Ave - Fence Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewers Phone: 3035713306 Reviewers Email: Do… Denver Water ReferralDenied PWPRS Project Number: 2025-ENCROACHMENT-0000144 - Tier III - 4101 E Wesley Ave - Fence Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 0000000000 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments: Una… All documents in this project (8) ★ 2025-ENCROACHMENT-0000144 Comment Report 11-13-2025.pdf4101 E. Wesley Ave_Pilaster Exhibit.pdfdot.pt.2023.105 tier determination checklist.pdfdotipt-105-encroachment_application.pdfREDLINES- Survey- Pfohl.pdfROW Encroachment Exhibit.pdfWZP03X-Landscape Plan SDP-Encroach Permit 10-10-25.pdfWZP03X-ROW Encroachment-Layout1.pdf | ||||
2025-ENCROACHMENT-0000139 Tier III-1395 S St Paul Street ENCROACHMENTDenial · 122 agencies | ENCROACHMENT | 22 | Denial · 1 | |
Survey ReviewDenied Comments and redlines in project folder | ||||
2025-ENCROACHMENT-0000132 Tier III - 600 16th St and Glenarm Place - Canopy Artwork ENCROACHMENTDenial · 326 agencies | ENCROACHMENT | 26 | Denial · 3 | |
Survey ReviewDenied Redlines regarding the Site Plan are in the project REDLINES folder (REDLINES- Survey- Savich.pdf). REDLINES uploaded to E-review webpage ERA Wastewater ReviewDenied The minimum clearance above storm and sanitary lines is 23'. Please clarify if the drawing on sheet 10 of 12 is an illustration of the artwork "retracted" to create a 31.67 foot clearance. Show where the storm drains are located on this drawings. Can a 23' min… Xcel ReferralDenied PWPRS Project Number: 2025-ENCROACHMENT-0000132-Tier III - 600 16th St and Glenarm Place - Canopy Artwork Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Ema… | ||||
2025-ENCROACHMENT-0000127 Tier III - 1640 N Logan - Planter Boxes ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (20) 1638 and 1640 Deed of Trust.pdf2025 09 05 STATUS OF ENCROACHMENT.pdf2025-09-29 - Encroachment Submittal Checklist.pdf2025-09-29 - Encrochment Applicaiton (Tier III).pdfdotipt-105-encroachment_application (Tier III Applicaiton) (1).pdfIMG_9398.jpegIMG_9399.jpegIMG_9400.jpegIMG_9401.jpegIMG_9402.jpegIMG_9403.jpegIMG_9404.jpegQuick Claim Deed.pdfREDLINES- CenturyLink- Medrano- Letter of No Objection.pdfREDLINES- ER Transportation- Kijowski 2-4-2026.pdfREDLINES- ER Transportation- Kijowski- Tier III Applicaiton.pdfREDLINES- ER Transportation- Kijowski.pdfSite Plan.pdfSite Plan.xlsxUpdated Site Plans 11-17-2025.pdf | ||||
2025-ENCROACHMENT-0000125 Tier III - 1730 Wynkoop Street - Machete - Patio ENCROACHMENTDenial · 529 agencies | ENCROACHMENT | 29 | Denial · 5 | |
Survey ReviewDenied Survey comments are in the project REDLINES folder (REDLINES- Survey- Savich.docx) ERA Transportation ReviewDenied 1. Since you are part of a multi-tenant property, you must get permission from the property/building owner. Please provide a letter of approval. 2. Flex posts and rubber curbs shall be placed at least 1 foot away from the gutter pan. Provide dimension/note on… ERA Wastewater ReviewDenied Label the size of the existing storm line running parallel to Wynkoop between the curb and building . Is this existing storm line and existing storm manhole privately maintained? City GIS records do not show these facilities. If the manhole and main are city f… Xcel ReferralDenied PWPRS Project Number: 2025-ENCROACHMENT-0000125-Tier III - 1730 Wynkoop Street - Machete - Patio Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Donna… City Forester ReviewDenied Please refer to attached Forestry Comments: 1) Ensure ROW tree trunks are protected from potential conflict. Maintain buffer of material min 10' from trunk of tree. Note on plan. 2) Show TPZ fencing as perimeter around tree grate on construction sheets. REDLIN… All documents in this project (15) 1730 Wynkoop Machete_LEGAL DESCRIPTION.docx2025-09-26_1730 Wynkoop Machete_Survey Plat.pdf2025-09-30_1730 Wynkoop Machete_Tier III Plan.pdf2025-10-01_1730 Wynkoop Machete_Tier III Application.pdf2025-10-01_1730 Wynkoop Machete_Tier III Checklist.pdf★ 2025-ENCROACHMENT-0000125 Comment Report 10-28-2025.pdfMachete OPP Plan_1730 Wynkoop_09-29-25.pdfModStreet Parklet Plans_1730 Wynkoop_09.23.25.pdfREDLINES- ER Transportation- Leyva- Approved.pdfREDLINES- ER Transportation- Leyva- Landlord approval letter.pdfREDLINES- Forestry- Evers.pdfREDLINES- Survey- Savich.docxREDLINES- Xcel- George- OPP Plan.pdfREDLINES- Xcel- George- WY17.1 MAP.pdfREDLINES-CenturyLink- McLean.pdf | ||||
2025-ENCROACHMENT-0000123 Tier II - 3737 Blake - EV Chargers - CCD ENCROACHMENTDenial · 424 agencies | ENCROACHMENT | 24 | Denial · 4 | |
Survey ReviewDenied See ENCROACHReqmts Checklist for all documents needed. Review Status: Approved Construction Engineering ReviewDenied 1. Prior to the solicitation of bids or proposals from general contractors, the developer of this project is strongly encouraged to schedule an office meeting with the Right-of-Way Services Construction Inspections team (303) 446-3469 to discuss the project's… City Forester ReviewDenied Denied - Do not locate EV infrastructure within existing tree planters. ERA ReviewDenied Please provide the completed and signed submittal checklist. All documents in this project (15) 2020051465.pdf★ 2025-ENCROACHMENT-0000123 Comment Report 10-30-2025.pdf3600 Blake.pdfasmt_02271.pdfdotipt-105.3.2-encroachment_checklist_signed.pdfEncroachment Application_Blake Street.pdfOverview.pngPlans 3737 Blake St_9-24-25.pdfREDLINES- ER Transportation- Kijowski- Approved Plans.pdfREDLINES- ER Transportation- Kijowski- signage detail.pdfREDLINES- Forestry- Evers.pdfREDLINES- Survey- Castaneda.docxSideview.pngUPDATED 3737 BLAKE STREET_10-3-25 Signed and Sealed.pdfUPDATED 3737 BLAKE STREET_sidewalk width callout.pdf | ||||
2025-ENCROACHMENT-0000122 Tier III - 865 S Milwaukee ENCROACHMENTDenial · 324 agencies | ENCROACHMENT | 24 | Denial · 3 | |
Survey ReviewDenied Comments and redlines in project folder Review Status: Denied ERA Wastewater ReviewDenied Pursuant to Section 13.11.1 of the Storm Drainage Design and Technical Manual, provide specifications for the pipe thickness, cover, bedding, and backfill material validating the pipe can withstand HS-2O loading. Pursuant to Section 9.7 of the Storm Drainage D… City Forester ReviewDenied 2025-ENCROACHMENT-0000122 - 865 S Milwaukee OCF Comments 10-22-25 1. Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the followi… All documents in this project (8) ★ 2025-ENCROACHMENT-0000122 Comment Report 10-24-2025.pdf865 S Milwaukee dewatering 09-14-25 signed.pdfA dotipt-105.3.2-encroachment_checklist.pdfDeed Commitment.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Survey- Pfohl.pdfSIGNED 865 S_MILWAUKEE encroachment_application.pdf | ||||
2025-ENCROACHMENT-0000118 Tier II - 2099 Welton Street ENCROACHMENTDenial · 222 agencies | ENCROACHMENT | 22 | Denial · 2 | |
DS Transportation ReviewDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. Survey ReviewDenied Survey comments/site plan markup are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) All documents in this project (8) 2025-09-11_Five Points Encroachment_Drawings.pdf2025-09-18_encroachment_application_Signed.pdf★ 2025-ENCROACHMENT-0000118 Comment Report 10-14-2025.pdfdotipt-105.3.2-encroachment_checklist.pdfParcel Land Description.docxREDLINES- Survey- Savich- Approved.pdfREDLINES- Survey- Savich.pdfTransmittal.pdf | ||||
2025-ENCROACHMENT-0000117 Tier II - 4100 W Conejos EV Charger ENCROACHMENTDenial · 322 agencies | ENCROACHMENT | 22 | Denial · 3 | |
Survey ReviewDenied Minor survey comments regarding the site plan are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) REDLINES uploaded to E-review webpage ERA Transportation ReviewDenied 1. Show the existing public trees and provide dimensions between the proposed encroachments and the trees. 2. In general, more detail needs to be provided for each proposed facility to ensure they meet transportation standards. These facilities may not be "fie… City Forester ReviewDenied 2025-ENCROACHMENT-0000117 - 4100 W Conejos OCF Comments 10-7-25 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in… All documents in this project (13) ★ 2025-ENCROACHMENT-0000117 Comment Report 10-14-2025.pdfEncroachment Application Conejos and Quitman.pdfEncroachment overview.pngEncroachment street view.pngEncroachment Tier Determination Checklist Conejos and Quitman.pdfQUITMAN encroachment detail.pdfREDLINES- ER Transportation- Kijowski- Updated Signage.pdfREDLINES- ER Transportation- Kijowski- Updated Site Plan.pdfREDLINES- ER Transportation- Kijowski.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Survey- Savich- Approved.pdfREDLINES- Survey- Savich.pdfSidewalk width.png | ||||
2025-ENCROACHMENT-0000112 Tier II 3575 Chestnut Pl EV Chargers ENCROACHMENTDenial · 323 agencies | ENCROACHMENT | 23 | Denial · 3 | |
Survey ReviewDenied See Encroachment Survey Checklist Comments. Review Status: Approved w/Conditions ERA Transportation ReviewDenied 1. Please see uploaded `ER Transportation REDLINE.pdf'. This application shall not be approved until the described Land Use matters have been resolved. 2. The plan does not appear to reflect the public ROW correctly. You are showing what looks to be a 5-foot a… City Forester ReviewDenied Denied: 1) Show all existing ROW trees on plans. 2) Keep all excavation a min 10' from trunk of existing trees. 3) Show Tree Protection Fencing for work around existing ROW trees. 4) Charger not permitted inside tree planter - locate in-between planter and cur… All documents in this project (9) ★ 2025-ENCROACHMENT-0000112 Comment Report 10-1-2025.pdfCHESTNUT_encroachment detail.pdfEncroachment Application_Chestnut Pl.pdfEncroachment overview.pngEncroachment street view.pngEncroachment Tier Determination Checklist_Chestnut.pdfQUITMAN_encroachment detail.pdfREDLINES- CenturyLink- Medrano- Letter of No Objection.pdfREDLINES- Survey- Castaneda.docx | ||||
2025-ENCROACHMENT-0000110 Tier II - 621 Kalamath St Lighting Under Viaduct ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (14) 2025_5_12_Encroachment Application.pdf621 Kalamath St Denver CO 80204 - Owners, Taxes, Deeds, Records, Permits.pdf621 LLC dotipt-105-encroachment_application.pdf621 LLC_621 Kalamath St Property Record.pdfACORD Form 20231212-164148.pdfBattery 621 Certificate of Insurance.pdfBattery 621 Deed 2746289-57674-2010.pdfBattery621 LED Viaduct Parking Lighting Encroachment Application.pdfBattery621 LED Viaduct Parking Lighting Encroachment Eng Drawing.pdfDOTI Bridge Letter to The Public Works.pdfInvoice 2024-PARK-000003.pdfPDFsam_merge.pdfREDLINES- CenturyLink- Medrano- Letter of No Objection.pdfREDLINES Survey ENCROACHReqmts 2025ENCROACHMENT110.docx | ||||
2025-ENCROACHMENT-0000106 – Tier II - 4545 W 29th Ave EV Charger ENCROACHMENTDenial · 325 agencies | ENCROACHMENT | 25 | Denial · 3 | |
DS Transportation ReviewDenied Non-authorized use of encroachment permit. Please place charger inside property line. Survey ReviewDenied Survey comments are in the project REDLINES folder (REDLINES- Survey- Savich.docx) REDLINES uploaded to E-review webpage ERA Transportation ReviewDenied 1. The encroachment permit will not approve you to privatize the parking spot. However, you are allowed to put a placard on the encroachment to indicate it is for private use. Even with approval of an encroachment permit, you cannot prohibit people from parkin… All documents in this project (11) 2020127562 Warranty Deed.pdf★ 2025-ENCROACHMENT-0000106 Comment Report 9-9-2025.pdf4545 w 29th Engineer plans.pdfCO Denver Print Page.pdfEncroachment App checklist.pdfencroachment app signed.pdfFEMA Map 2.pdfFEMA Map.pdfREDLINES- CenturyLink- Canary.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Survey- Savich.docx | ||||
2025-ENCROACHMENT-0000096 Tier II Cherry Lane 2500 E 2nd Ave - Soil Cells ENCROACHMENTDenial · 327 agencies | ENCROACHMENT | 27 | Denial · 3 | |
Survey ReviewDenied Survey requirements, comments, and redline comments were uploaded in E-Review. DES Wastewater ReviewDenied Soil cells need to be a minimum of 10' from any public sanitary or storm infrastructure Denver Water ReferralDenied All documents in this project (10) ★ 2025-ENCROACHMENT-0000096 Comment Report 8-20-2025.pdfREDLINE- PW SURVEY 20250731.pdfREDLINES - PW Survey 20250730-ENCROACHReqmts.docxREDLINES- CenturyLink- Hoopes.pdfWCL_Parcel Land Description.docxWCL_Soil Cell Encroachment_Application - Signed.pdfWCL_Soil Cell Encroachment_Checklist.pdfWCL_Soil Cell Encroachment_Drawings 2.pdfWCL_Soil Cell Product Data_RootSpace.pdfWCL_Title Commitment - 2.15.2025.pdf | ||||
2025-ENCROACHMENT-0000092 Tier II Flock Safety Cameras - Multiple Locations ENCROACHMENTDenial · 325 agencies | ENCROACHMENT | 25 | Denial · 3 | |
DS Transportation ReviewDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. ROW - Supplemental ReviewDenied Denied PWPRS Project Number: 2025-ENCROACHMENT-0000092 - Tier II Flock Safety Cameras - Multiple Locations Reviewing Agency/Company: Villa Park Neighborhood Association Reviewers Name: Kathy Sandoval on behalf of the Villa Park Neighborhood Association board a… ROW - Supplemental ReviewDenied PWPRS Project Number: 2025-ENCROACHMENT-0000092 - Tier II Flock Safety Cameras - Multiple Locations Reviewing Agency/Company: Denver City Council District 3 Reviewers Name: Jamie Torres Reviewers Phone: 720-337-3333 Reviewers Email: Jamie.Torres@denvergov.org… All documents in this project (6) | ||||
2025-ENCROACHMENT-0000088 Tier III 3801 W 32nd Ave Raised Deck and Pergola ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (16) 25-ENCR-88_REDLINES- SURVEY- Gulaid - 11-03-2025.pdf25-ENCR-88_REDLINES- SURVEY- Gulaid - 7-30-2025.pdf98e80b1e-05c0-4756-9c65-d8879eef89c61.jpgArchPlans_3801 32ND AVE_06102025s.pdfCivilPlans_3801 32ND AVE_06102025s.pdfCO Denver Print Page.pdfCopy of 2007 survey.pdfImage 1.pngImage 2.pngImage 3.pngImage 4.pngREDLINES- ER Transportation- Kijowski- Approved.pdfREDLINES- SURVEY- Gulaid - 11-04 Denial.pdfStrucPlans_3801 32ND AVE_06102025s.pdfTier 3 encroachment submittal application.pdfWritten Narrative_3801 W 32nd Ave.docx | ||||
2025-ENCROACHMENT-0000085 Tier III 1601 Lowell Blvd Ambulance Drop-off Canopy ENCROACHMENTDenial · 125 agencies | ENCROACHMENT | 25 | Denial · 1 | |
Survey ReviewDenied PWPRS Project Number: 2025-ENCROACHMENT-0000085 - Tier III 1601 Lowell Blvd Ambulance Drop-off Canopy Reviewing Agency/Company: DOTI-ROWS Survey Reviewers Name: Brian Pfohl Reviewers Phone: 630.202.6564 Reviewers Email: brian.pfohl@denvergov.org Approval Statu… All documents in this project (14) 1011656_HCA SLOAN LAKE_S.pdf★ 2025-ENCROACHMENT-0000085 Comment Report 07-23-2025.pdfAE107.pdfEncroachment Application6-4-25.pdfEncroachment Description.docxEncroachment Plan.pdfExisting Conditions Plan.pdfHospital Parcels.docxPermit Submittal Checklist 6-25-25 Signed.pdfREDLINES- CenturyLink- Hoopes.pdfREDLINES- Survey- Pfohl.pdfS110 - CANOPY PLANS.pdfS200 - FOUNDATION SECTIONS AND DETAILS.pdfVesting Deeds for Parcel 1 and 2.pdf | ||||
2025-ENCROACHMENT-0000084 Tier II 1962 Market Street Projecting Signs ENCROACHMENTDenial · 124 agencies | ENCROACHMENT | 24 | Denial · 1 | |
DS Project Coordinator ReviewDenied All documents in this project (10) ★ 2025-ENCROACHMENT-0000084 Comment Report 07-23-2025.pdfEncroachment Application_Tier II Signage_1962 Market St_06 30 2025.pdfEncroachment Info_Tier II Signage_1962 Market St_06 30 2025.pdfEncroachment Submittal Cklist_Tier II Signage_1962 Market St_06 30 2025.pdfParcel Land Description_Tier II Signage_1962 Market St_06 30 2025.docxREDLINES - Survey - Pfohl.docxREDLINES- CenturyLink- Hoopes.pdfSite Plan_Tier II Signage_1962 Market St_06 30 2025.pdfSpecial Warranty Deed_Tier II Signage_1962 Market St_06 30 2025.pdfVicinity Map_Tier II Signage_1962 Market St_06 30 2025.pdf | ||||
2025-ENCROACHMENT-0000081 Tier II - 5575 E 33rd Ave EV Charger ENCROACHMENTDenial · 424 agencies | ENCROACHMENT | 24 | Denial · 4 | |
Survey ReviewDenied See Encroachment Reqmts document. Review Status: Approved ERA Transportation ReviewDenied 1. Additional survey/details needed showing placement of pedestal, dimension from pedestal to face of curb, dimension from pedestal to back of sidewalk, and distance from right-of-way. Dimensions also need to include locations/placement for bollards. Typical p… Construction Engineering ReviewDenied Demonstrate ADA compliance once the Charging Station is installed. See kdb red lines. REDLINES uploaded to E-review webpage City Forester ReviewDenied Denied - Please coordinate with Forestry Operations, Darren.Potucek@denvergov.org, for impact on internal site trees. All documents in this project (9) ★ 2025-ENCROACHMENT-0000081 Comment Report 7-21-2025.pdfCharger location.pngCharger location_overhead.pngEncroachment Application_Pauline Robinson_signed.pdfEncroachment Tier Determination Checklist_Pauline Robinson.pdfPAULINE ROBINSON LIBRARY_3-25-25.pdfREDLINES- CenturyLink- Canary - Letter of No Objection.pdfREDLINES- ER Transportation- Kijowski.pdfSidwalk width_9ft.png | ||||
2025-ENCROACHMENT-0000073 Tier III 2380 S Monroe St Fence and Retaining Wall ENCROACHMENTDenial · 125 agencies | ENCROACHMENT | 25 | Denial · 1 | |
Survey ReviewDenied Comments and redlines in project folder All documents in this project (7) | ||||
2025-ENCROACHMENT-0000061 Tier III - Colorado 150 Pedestrian Walkway ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (14) 1884 Capitol Grounds Plat Description.pdfApp Reason_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdfApp_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdfChecklist_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdfElevations Architectural_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdfElevations Structural_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdfProp Desc_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.docxREDLINES - Forestry - Evers.pdfREDLINES - Lumen - Bolden - Exhibit A.pdfREDLINES - Lumen - Bolden - P866360 Encroachment Response - No Objections.pdfREDLINES - Survey - Breitnauer.docxSHPO Assessment_ID86303 6-9-25 Colorado 150 Walkway.pdfSite Plan_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdfTree Protection Details_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdf | ||||
2025-ENCROACHMENT-0000054 Tier III 2400 S Jackson St Fence ENCROACHMENTDenial · 126 agencies | ENCROACHMENT | 26 | Denial · 1 | |
Survey ReviewDenied Comments and redlines in project folder All documents in this project (8) 2025-ENCROACHMENT-0000054 Comment Report 6-10-2025.pdf★ 2025-ENCROACHMENT-0000054 Revised Comment Report 06-11-2025.pdfDOTEncroachmentApp_2400SouthJacksonStreet_05-12-2025.pdfEncroachmentChecklist_2400SouthJackson_05-14-25.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Survey- Pfohl.pdfSitePlans_2400SouthJacksonStreet_04-25-25.pdf | ||||
2025-ENCROACHMENT-0000052 Tier II 3950 N Williams St Suspended Paver System ENCROACHMENTDenial · 224 agencies | ENCROACHMENT | 24 | Denial · 2 | |
Survey ReviewDenied See additional comments, checklist and red lines. CenturyLink ReferralDenied We received the following email with contact information for the reviewer assigned to this project. Please contact the reviewer to work towards their approval. Good morning. We have received your request for an encroachment and have set up a Lumen project acco… All documents in this project (11) 2025-0318_40thWilliams_Application.pdf2025-0318_40thWilliams_Checklist.pdf2025-0318_40thWilliams_Exhibits.pdf2025-0318_40thWilliams_Legal Description.docx2025-0318_40thWilliams_Legal Dsigned.pdf2025-0318_40thWilliams_Title Commitment.pdf★ 2025-ENCROACHMENT-0000052 Comment Report 06-03-2025.pdfREDLINES - Survey - Castaneda - Land Description.pdfREDLINES - Survey - Castaneda - Property Description Comments.docxREDLINES - Survey - Castaneda.docxREDLINES- Centurylink- Canary- Letter of No Objection.pdf | ||||
2025-ENCROACHMENT-0000049 Tier III 1550 Wewatta Plaza of the Americas Renovation ENCROACHMENTDenial · 327 agencies | ENCROACHMENT | 27 | Denial · 3 | |
Survey ReviewDenied Survey comments are in the project REDLINES folder (REDLINES- Survey- Savich.docx) REDLINES are uploaded to the E-Review webpage. City Forester ReviewDenied Please refer to attached Forestry Comments: ERA ReviewDenied Denied until we can confirm the ownership of this encroachment. All documents in this project (9) 20250418_Encroachment Application.pdf20250418_Encroachment Resubmittal.pdf20250418_Encroachment Submittal Checklist.pdf20250418_Existing Utilities, Floodplain, and Asbuilts.pdf20250418_Land Description.docx20250418_Land Description.pdf★ 2025-ENCROACHMENT-0000049 Comment Report 05-23-2025.pdfREDLINES- CenturyLink- Approval Letter.pdfREDLINES- Survey- Savich.docx | ||||
2025-ENCROACHMENT-0000044 Tier III - 395 N Clermont Street - Existing Fence ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (8) 395 N CLERMONT - dotipt-105.3.2-encroachment_checklist SIGNED.pdf395_CLERMONT_ST - A0.1 SITE PLAN 4-11-25-DSIGN.pdf395-N-CLERMONT-N-SIDE-FENCE-PIC.jpgDADIOMOV A0.1 2-20-25.pdfENCROACHMENT_APPLICATION_395_N_CLERMONT_ST_4-11-25_dotipt-105-encroachment...cation_SIGNED.pdfIMG_7517.jpgIMG_7836.jpgISP_SURVEY_395_Clermont_St_Pkwy_12-6-24.pdf | ||||
2025-ENCROACHMENT-0000043 Tier II 10390 Havana St Monument Signs ENCROACHMENTDenial · 322 agencies | ENCROACHMENT | 22 | Denial · 3 | |
Survey ReviewDenied See survey redlines ERA Wastewater ReviewDenied S1 and S2 at Havana St and 47th Ave require more detailed drawings to show where the sign foundations are located in relations to the existing box culvert at crossing under 47th ave. It appears the new "tower" portion of the signs are located directly above th… Xcel ReferralDenied PWPRS Project Number: 2025-ENCROACHMENT-0000043 Tier II 10390 Havana St Monument Signs Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Donna.L.George@… All documents in this project (13) ★ 2025-ENCROACHMENT-0000043 Comment Report 05-15-2025.pdfAGI Prologis - Denver - Monument 1-02 - PERMIT.pdfAGI Prologis - Denver - Monument 2-02 - PERMIT.pdfAGI Prologis - Denver - Monument 3-02 - PERMIT.pdfEncroachment Checklist.pdfREDLINES - LUMEN - Canary - P865820 Rev 6-2-25.pdfREDLINES - Svechovsky - Denied.pdfREDLINES- ER WW- Sasarak- S1.pdfREDLINES- ER WW- Sasarak- S2.pdfSign Application - 2.0.pdfStamped - E01 Site Plan Scaled.pdfStamped - E02 Site Plan Scaled.pdfStamped - E03 Site Plan Scaled.pdf | ||||
2025-ENCROACHMENT-0000042 2ND SUBMITTAL - Tier III - Ball Arena Pedestrian Bridge ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (20) 1507 11th St_Adjacent Property Land Description.docx2025-ENCROACHMENT-0000042 REDLINES - DPR - Cervera_Comment Response.pdf2025-ENCROACHMENT-0000042 REDLINES - Floodplain - Boles.pdf_Comment Response.pdf2025-ENCROACHMENT-0000042 REDLINES - Survey-Savich_Comment Response.pdf2025-ENCROACHMENT-0000042 REDLINES - WW Construction - Gehrke_Comment Response.pdf2025-ENCROACHMENT-0000042_Ball Area Bridge Encroachment Legal Description.docxBall Arena - Title Commitment - Kroenke Parking (70860861) - REV 8 - Dtd 02.17.26, Eff 02.11.26.pdfCherry Creek Trail Detour Plans.pdfREDLINES - DPR - JCervera - RE_ Wynkoop Crossing Tier III Encroachment - DPR Denial.pdfREDLINES- Bridges- Bergman- Tier III Inspection Requirements.docxREDLINES- Bridges- Bergman.docxREDLINES ER TRANS BACA 2025-ENCROACHMENT-0000042.pdfREDLINES Floodplain_Boles - 2025-ENCROACHMENT-0000042_Floodplain-comments_2026-06-09_drb.pdfREDLINES Gehrke WW Const Wynkoop Crossing Tier III Encroachment_2025-ENCROACHMENT-0000042_2nd Submittal-mwg.pdfREDLINES- Survey- Savich.pdfWynkoop Crossing Tier III Encroachment Application_2025-ENCROACHMENT-0000042_2nd Submittal.pdfWynkoop Crossing Tier III Encroachment Checklist_2025-ENCROACHMENT-0000042_2nd Submittal.pdfWynkoop Crossing Tier III Encroachment_2025-ENCROACHMENT-0000042_1st Submittal Comment Response Letter.docxWynkoop Crossing Tier III Encroachment_2025-ENCROACHMENT-0000042_1st Submittal Comment Response Letter.pdfWynkoop Crossing Tier III Encroachment_2025-ENCROACHMENT-0000042_2nd Submittal.pdf | ||||
2025-ENCROACHMENT-0000042 Tier III - Ball Arena Pedestrian Bridge ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (16) 2025.04.28 Wynkoop Crossing - Conceptual Design Summary.pdfBall Area Bridge Encroachment 1 2025-03-21.docxBall Area Bridge Encroachment 2 2025-03-21.docxBall Arena - Title Commitment - Kroenke Parking Parcels 70860861.pdfBall Arena Adjacent Property Land Description.docxREDLINE - Floodplain - Boles.pdfREDLINES - Denver Land Preservation - Bryant.docxREDLINES - DPR - Cervera.pdfREDLINES - Wastewater - Marron.pdfREDLINES - WW Construction - Gehrke.pdfREDLINES- Bridges- Bergman- Tier III Inspection Requirements.docxREDLINES- Bridges- Bergman.docxREDLINES- Survey- Savich.pdfWynkoop Crossing Tier III Encroachment Application.pdfWynkoop Crossing Tier III Encroachment Checklist.pdfWynkoop Crossing Tier III Encroachment_1st Submittal.pdf | ||||
2025-ENCROACHMENT-0000041 Tier III Iowa Underpass - DOTI ENCROACHMENTDenial · 123 agencies | ENCROACHMENT | 23 | Denial · 1 | |
Survey ReviewDenied Comments and redlines in project folder Review Status: Approved All documents in this project (7) ★ 2025-ENCROACHMENT-0000041 Comment Report 5-14-2025.pdfdotipt-105.3.2-encroachment_checklist Iowa Underpass signed.pdfdotipt-105-encroachment_application Iowa Underpass signed.pdfPages from Iowa Underpass-ConstructionPlans Encroachment Submittal.pdfREDLINES- CDOT- White.pdfREDLINES- Survey- Pfohl.pdfREDLINES- Xcel- George.pdf | ||||
2025-ENCROACHMENT-0000036 Tier III 1555 Blake Street Raised Deck ENCROACHMENTDenial · 227 agencies | ENCROACHMENT | 27 | Denial · 2 | |
Survey ReviewDenied Survey comments/redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) Landmark ReviewDenied This will need review by the Lower Downtown Design Review Commission. Please submit the following to Landmark Preservation via email at landmark@denvergov.org: - A completed Landmark application form and checklist, which you can find here: https://denvergov.or… All documents in this project (9) 001_1555_SugarCube_Encroachment_Application.pdf002_SUGARCUBE BUILDING PERMIT PLAN_250328.pdf003_Encroachment_Checklist_Signed.pdf004_Title Policy.pdf005_Special_Warranty_Deed.pdf1547 Blake Street Parcel Description.docx★ 2025-ENCROACHMENT-0000036 Revised Comment Report 06-09-2025.pdfREDLINES- CenturyLink- Hoopes.pdfREDLINES- Survey- Savich.pdf | ||||
2025-ENCROACHMENT-0000035 Tier III 1530 16th Street Raised Deck ENCROACHMENTDenial · 427 agencies | ENCROACHMENT | 27 | Denial · 4 | |
Survey ReviewDenied Survey comments/redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) ERA Transportation ReviewDenied 1. While proposed placement may fall in line with mall reconstruction, additional detail required showing the route connection. Please show actual striping and lane widths for streets on opposite ends of intersection. Mall reconstruction starts/ends at Market… ERA Wastewater ReviewDenied On Sheet 2, show the existing inlet located in the southerly flowline of 16th Street. This inlet must remain accessible and cannot be covered by the proposed decking. The gutter pan bridge needs to be removable so the flowline can be accessed for debris remova… Landmark ReviewDenied This will need review by the Lower Downtown Design Review Commission. Please submit the following to Landmark Preservation via email at landmark@denvergov.org: - A completed Landmark application form and checklist, which you can find here: https://denvergov.or… All documents in this project (9) 001_1530_Historic_Sugar_Encroachment_Application_signed.pdf002_SUGAR BUILDING PERMIT PLAN_250328.pdf003_1530_Historic_encroachment_checklist_signed.pdf004_Title_Policy_04-08.pdf005_Special_Warranty_Deed.pdf1530 16th Street Parcel Description.docx★ 2025-ENCROACHMENT-0000035 Revised Comment Report 06-06-2025.pdfREDLINES - Forestry - Evers.pdfREDLINES- Survey- Savich.pdf | ||||
2025-ENCROACHMENT-0000034 Tier II - 250 Clayton Street Soil Cells ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (14) 2022PM0000693_250 Clayton TIER II ENCROACHMENT APPLICATION_signed.pdf2022PM0000693_250 Clayton TIER II ENCROACHMENT CLOSURE REPORT.pdf2022PM0000693_250 Clayton TIER II ENCROACHMENT DETAILS.pdf2022PM0000693_250 Clayton TIER II ENCROACHMENT Legal Description.pdf2022PM0000693_250 Clayton TIER II ENCROACHMENT LEGL_ENCR.docx2022PM0000693_250 Clayton TIER II ENCROACHMENT SITE PLAN.pdf2022PM0000693_250 Clayton TIER II ENCROACHMENT ZONE LOT.docx2022-PM0000693_252-CLayton_Title-Commitment.pdfCitygreen_Stratavault_Structural Soil_Cell_Details.pdfcitygreen_Stratavault-Brochure_US_Jul2024-WEB-Letter.pdfCitygreen-Stratavault-TechSheet-July-2024.pdfREDLINES - Survey - Breitnauer - 20250409-25ENCROCH034-Site Plan.pdfREDLINES - Survey - Breitnauer - 20250409-25ENCROCH034-Survey Reqmts.docxREDLINES- CenturyLink- Canary.pdf | ||||
2025-ENCROACHMENT-0000031 Tier III 3901 Wynkoop St Ramp and Stairs ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (9) 2025-03-18 Wynkoop Street Tier III Encroachment Exhibit.pdf3901 Wynkoop - Adjacent Parcel Land Description.docx3901 Wynkoop - dotipt-105.3.2-encroachment_checklist (CP Signed).pdf3901 Wynkoop - dotipt-105-encroachment_application - Tier III vFinal (CP Signed).pdf77237-ENCROACHMENT-EXHIBIT-3-17.pdfREDLINES - Survey - Castaneda Exibit A.pdfREDLINES - Survey - Castaneda.docxThe Forge-CO Linked Commitment.pdfWYNKOOP-FORGE-ENCROACHMENT-DESCRIPTION.docx | ||||
2025-ENCROACHMENT-0000026 Tier II Lowell Blvd and Evans Ave Green Infrastructure Improvements ENCROACHMENTDenial · 525 agencies | ENCROACHMENT | 25 | Denial · 5 | |
Survey ReviewDenied See Survey comments in Project REDLINES folder. Review Status: Denied ERA Transportation ReviewDenied The submitted plan does not include any revisions from the 2025-CIP-0000013 plan set. There were several comments made to the CIP that were not addressed that would affect this plan. Approval will be withheld until comments from 2025-CIP-0000013 are resolved. CenturyLink ReferralDenied Denied on behalf of CenturyLink. We received the following email with contact information for the reviewer assigned to this project. Please contact the reviewer to work towards their approval. "Good afternoon. We have received your request for an encroachment… City Forester ReviewDenied 1. Are the 51st and Steel improvements included in this? Alder is not an OCF approved ROW species. 2. For Lowell and Evans, still showing water lines conflicting with proposed trees. Still need information on when these will be relocated. Tree protection for e… ROW - Supplemental ReviewDenied PWPRS Project Number: 2025-ENCROACHMENT-0000026 Tier II Lowell Blvd and Evans Ave Green Infrastructure Improvements Reviewing Agency/Company: Forestry Reviewers Name: Darren Potucek Reviewers Phone: 3163042366 Reviewers Email: darren.potucek@denvergov.org Appr… | ||||
2025-ENCROACHMENT-0000020 Tier III 40th and Fox Pedestrian Bridges ENCROACHMENTDenial · 226 agencies | ENCROACHMENT | 26 | Denial · 2 | |
Survey ReviewDenied PWPRS Project Number: 2025-ENCROACHMENT-0000020 - Tier III 40th and Fox Pedestrian Bridges Reviewing Agency/Company: ROW/Survey Reviewers Name: Ali Gulaid Reviewers Phone: 720.865.3132 Reviewers Email: ali.gulaid@denvergov.org Approval Status: Denied Comments:… ERA Transportation ReviewDenied 1. As noted in the narrative, and per requirements of the Encroachment Rules and Regs, a min 24 ft clearance is required for these particular locations due to existing utilities in the roadway. While the bridges appear to provide that clearance, the drawings a… All documents in this project (8) 2025-0211_Tier III Encroachment Narrative.pdf★ 2025-ENCROACHMENT-0000020 Revised Comment Report 7-22-2025.pdf250721-REDLINES- SURVEY- Gulaid - 7-22-2025.pdf40TH and FOX - dotipt-105-encroachment_application - COMPLETED.pdf40TH and FOX_dotipt-105.3.2-encroachment_checklist - SIGNED.pdfREDLINES- SURVEY- Gulaid.pdfTitle Commitment.pdfUpdated_Tier III Encroachment Exhibits - 40th and Fox.pdf | ||||
2025-ENCROACHMENT-0000019 2nd Submittal Tier III AHRT 5375 W 10th Ave Private Storm Line ENCROACHMENTDenial · 324 agencies | ENCROACHMENT | 24 | Denial · 3 | |
Survey ReviewDenied Survey comments copied to Project REDLINES folder. ERA Transportation ReviewDenied 1. The 13-foot ROW dedication needs to be approved and recorded prior to approval of this encroachment permit . Encroachments may only be permitted within existing (already dedicated) public ROW. Add dedication number to site plan and survey exhibit(s). 2. Pro… Xcel ReferralDenied PWPRS Project Number: 2025-ENCROACHMENT-0000019_2nd Submittal Tier III AHRT 5375 W 10th Ave Private Storm Line Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewer… All documents in this project (14) 1st sub storm pipe plan 22038_Creekside_Encroachment Storm PandP (1).pdf1st sub storm pipe plan 22038_Creekside_Encroachment Storm PandP (2).pdf2025 NEW Encroachment Review Distribution List.xlsx2025-ENCROACHMENT-0000019 Comment Report 10-15-2025.pdf★ 2025-ENCROACHMENT-0000019 Revised Comment Report 10-23-2025.pdf22038_Creekside Flats_Wall Encroachment.pdfEncroachment Permit - Legal and Exhibit_Exhibit A_R2.pdfEncroachment Permit - Legal and Exhibit_Exhibit B.pdfEncroachment Permit - Legal Description_Exhibit A_R2.docxEncroachment Permit - Legal Description_Exhibit B.docxEncroachment Permit Exhibit A - Closure Report_R2.pdfEncroachment Permit Exhibit B - Closure Report.pdfREDLINES- Metro WW- Boch.pdfREDLINES- Survey- Lee.docx | ||||
2025-ENCROACHMENT-0000019 Tier III AHRT 5375 W 10th Ave Private Storm Line ENCROACHMENTDenial · 321 agencies | ENCROACHMENT | 21 | Denial · 3 | |
Survey ReviewDenied See Survey Comments in REDLINES folder. CenturyLink ReferralDenied Denied on behalf of this critical reviewer. We received the following email with contact information for the reviewer assigned to this project. Please contact the reviewer to work towards their approval. "Your project number is P865011 and it should be referen… Xcel ReferralDenied PWPRS Project Number: 2025-ENCROACHMENT-0000019 Tier III AHRT 5375 W 10th Ave Private Storm Line Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Donna… All documents in this project (10) ★ 2025-ENCROACHMENT-0000019 Comment Report 03-18-2025.pdf70815473_Commitment_revision_2 1.pdfCreekside 5375 W 10th Ave_encroachment_application.pdfCreekside_Storm Plan and Profile.pdfDenver - 5375 W 10th Avenue_ALTA.pdfdotipt-105.3.2-encroachment_checklist.pdfEncroachment Permit - Legal Description.docxEncroachment Permit - Legal Exhibit.pdfEncroachment Permit Parcel - Closure Report.pdfRevised 22038_Creekside_Encroachment Storm PP.pdf | ||||
2025-ENCROACHMENT-0000009 Tier III - 201 S. Milwaukee St Fence ENCROACHMENTDenial · 626 agencies | ENCROACHMENT | 26 | Denial · 6 | |
DS Transportation ReviewDenied 1. See DOTI ER/Paul Weller comments and accompanying markup 2. Depict adjacent 2900 E Cedar Ave neighbors driveway to the west. 3. Depict edge of pavement on south and north side along E Cedar Ave 4. Show AASHTO roadway sight triangles at neighbor's driveway t… DS Project Coordinator ReviewDenied PWPRS Project Number: 2025-ENCROACHMENT-0000009 - Tier III - 201 S. Milwaukee St Fence Reviewing Agency/Company: Project Coordination Reviewers Name: Tiffany Holcomb Reviewers Phone: 720-865-3018 Reviewers Email: Tiffany.Holcomb@denvergov.org Approval Status:… Survey ReviewDenied Uploaded survey comments in E-Review. Review Status: Approved CenturyLink ReferralDenied Denied on behalf of this critical reviewer. We received the following email with contact information for the reviewer assigned to this project. Please contact the reviewer to work towards their approval. "We have received your request for an encroachment and h… Construction Engineering ReviewDenied Submittal is incomplete see comments from other reviewers. City Forester ReviewDenied | ||||
2025-ENCROACHMENT-0000008 Tier III - 3720 Delgany St Retaining Wall ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
2025-CIP-0000227 Denver Water Cathodic Protection Conduits No. 76 and 154 CIPClear30 agencies | CIP | 30 | Clear | |
All documents in this project (2) | ||||
2025-CIP-0000226 Holden Place and Decatur Street Intersection Improvements CIPFlagged · 132 agencies | CIP | 32 | Flagged · 1 | |
External Referral 4Review Complete - Objection PWPRS Project Number: 2025-CIP-0000226 - Holden Place and Decatur Street Intersection Improvements Reviewing Agency/Company: RTD Reviewers Name: clayton woodruff Reviewers Phone: 3032992943 Reviewers Email: Clayton.Woodruff@RTD-Denver.com Approval Status: Deni… All documents in this project (3) | ||||
2025-CIP-0000224 2025 - Wastewater Facility Improvements CIPFlagged · 324 agencies | CIP | 24 | Flagged · 3 | |
ERA Wastewater ReviewReview Complete - Objection Per discussions with the project team, a decision needs to be make between full-depth pavement replacement and mill-overlay. Mill and overlay with portions of the project, not exceeding one acre, being full-depth can be performed PW Survey ReviewReview Complete - Objection survey comments are in the project folder Review Status: No Response add general survey notes ERA Floodplain ReviewReview Complete - Objection Comments to be addressed on plans submitted for CIP review prior to floodplain objection being cleared . Please note that if additional comments arise during the floodplain permit review that result in plan changes those must also be | ||||
2025-CIP-0000223 Evergreen Golf Course - Cart Path Replacement CIPClear24 agencies | CIP | 24 | Clear | |
All documents in this project (2) | ||||
2025-CIP-0000222 5283 Underground Relocation Project - Phase 2-Segment 4 CIPClear23 agencies | CIP | 23 | Clear | |
All documents in this project (6) 2025-CIP-0000010 Comment Report 02-05-2025.xls★ 2025-CIP-0000222 Comment Report 01.02.2026.pdf5283 ELAT-MONR 230 kV UG Rplc Phase 2 - Section 4 - Drawing Package.pdf6531943791 5283 Control Diagram Monroe to Elati CCD SIGNED.pdfMonroe to Elati Control Diagram CO83-CF.dwgXcel Energy 5283 Phase 2 Sgmt 4 95pct Engineering Cover Memo 2025-12-12.pdf | ||||
2025-CIP-0000221 E. Yale Ave Multimodal Improvements CIPFlagged · 128 agencies | CIP | 28 | Flagged · 1 | |
ERA Materials ReviewReview Complete - Objection There is confusion about the ROW lines. Please see my comments R1. Review Status: Review Complete - Objection All documents in this project (10) ★ 2025-CIP-0000221 Comment Reports 12.30.25.pdfC14-027-PSPs-Yale Improvements 2025-12-09.pdfREDLINES - DOTI- CLONG 2025-CIP-221 Yale Ave Improvr - CL.pdfREDLINES - ERA Materials - kdb Red Lines Yale Holly 95 Design 2025-12-09 (2).pdfREDLINES - ERA Materials - kdb Red Lines Yale Holly 95 Design 2025-12-09.pdfREDLINES- Design Plans- Kevan OConnell.pdfREDLINES- Yale Improvements- Kevan OConnell.pdfREDLINES-Transmobile-EDevosTidd.pdfYale Holly 95pct Design Plans Roadway Project.pdfYale Holly 95pct Drainage Report Roadway Project.pdf | ||||
2025-CIP-0000220 RTD Downtown Rail Replacement Project DRRP CIPFlagged · 322 agencies | CIP | 22 | Flagged · 3 | |
Reviewers Name: ERA Wastewater ReviewReview Complete - Objection Indicate the ownership responsibility of all the inlets labeled to be "reset". Label as either "private" or "City and County of Denver " - use "CCD" as an abbreviation if desired. Modifications to CCD inlets will require city ERA Erosion Control ReviewReview Complete - Objection Please indicate if this project is redeveloping under RTD's MS4 permit for construction stormwater management or if the project intends to obtain an erosion control (CASDP) from the City and County of Denver. ERA Floodplain ReviewReview Complete - Objection It is not clear whether there is work proposed on the bridge over Cherry Creek. Sheet CS-003 says no work between STA 219+70 & 247+70, and construction limits shown on other sheets contradict this statement, but sheets K-001 & K-007 seem to indicate there may… | ||||
2025-CIP-0000219 Ultra-Urban Green Infrastructure Guidelines 2nd Edition🚲 bike lane CIPFlagged · 131 agencies | CIP | 31 | Flagged · 1 | |
🚲 Bike lane mentioned [comment report text] "eir operations and vehicles. 3. For Green Gutter locations showing a bike lane or access between the planter and sidewalk, please revise images and" Reviewers Name: ERA Transportation ReviewReview Complete - Objection The City of Denver Engineering and Regulatory Office has completed its Strategic review of the submitted All documents in this project (16) ★ 2025-CIP-0000219 Comment Report 12.26.25.pdfAppendix A Typical Details.pdfAppendix B Supplemental Fact Sheet Details.pdfAppendix C Plant List.pdfAppendix D Critical Elevations Table.pdfAppendix E Plan Set Guidance.pdfAppendix F Construction Checkpoint List.docxAppendix G Drainage Report Checklist.docxAppendix H Green Infrastructure Monitoring.pdfAppendix I O and M Plan Template.docxAppendix I O and M Plan Templates MATRIX.xlsxCover Letter.pdfRECOMMENDATIONS - 2025-CIP-0000219 - One Water Stevens.pdfREDLINES- Forestry- Evers.pdfUUGIG 2ndEdition 95pct.pdfUUGIG 60Pct CommentResponses.pdf | ||||
2025-CIP-0000218 Participatory Budget Athmar Park Sidewalks CIPFlagged · 122 agencies | CIP | 22 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection Comments and redlines in project folder All documents in this project (7) | ||||
2025-CIP-0000217 Cheesman Playground Picnic and Walk Replacement CIPFlagged · 124 agencies | CIP | 24 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection survey comments in the project folder All documents in this project (6) | ||||
2025-CIP-0000216 Morrison Road Project CIPFlagged · 435 agencies | CIP | 35 | Flagged · 4 | |
ERA Materials ReviewReview Complete - Objection Please reference dotipt 116.1 Traffic Control Procedures and dotirr 022.3 Issuance of Permits by the CTE in the 630 sepc and ensure there aren'tconflicts. . Insure that the project 401 Spec meets MGPEC Item 20, and the project concrete spec meets MGPEC Item 30… ERA Erosion Control ReviewReview Complete - Objection This objection will be removed once a CASDP application has been submitted. Forestry ReviewReview Complete - Objection Review Complete - Objection External Referral 2Review Complete - Objection PWPRS Project Number: 2025-CIP-0000216 - Morrison Road Project Reviewing Agency/Company: RTD All documents in this project (22) 2025-1_1.PDF2025-1_2.PDF2025-1_3.PDF2025-12-01_Morrison Rd 60pct and 95pct BofD Memo.pdf2025-12-01_Morrison Rd NORTH 60pct Plans_SUBMITTED.pdf2025-12-01_Morrison Rd SOUTH 95pct Plans_SUBMITTED.pdf2025-12-01_Morrison Rd_SOUTH_95pct Specs.pdf★ 2025-CIP-0000216 Comment Report 12-22-2025.pdf4070MORR - Utility Report 2025 DRAFT.pdf60pct NORTH and 90pct SOUTH Submission Cover Letter.pdfER Review Request Memo 20251202.docxREDLINES- Craig Long.pdfREDLINES- ERA Materials- Blair - Traffic Control Procedures.pdfREDLINES- ERA Materials- Blair- Asphalt Pavement Materials.pdfREDLINES- ERA Materials- Blair- issuance of permits.pdfREDLINES- ERA Materials- Blair- Portland Cement Concrete.pdfREDLINES- Forestry- Evers.pdfREDLINES- Mobility- Thienpont- 60pct Plans.pdfREDLINES- Mobility- Thienpont- 95pct Plans- EES Comments.pdfREDLINES- Mobility- Thienpont- 95pct Plans.pdfREDLINES- Mobility- Thienpont- BDS 4-3 3ft gap.pdfREDLINES- WW Maintenance- Gehrke.pdf | ||||
2025-CIP-0000215 Clearance and Release CUP North Conveyance CIPClear16 agencies | CIP | 16 | Clear | |
All documents in this project (8) 2016-09-02_Vesting Deed_CUP North.pdf2017-01-27_Vesting Deed_CUP North.pdf2025-10-28_Title Commitment_CUP North.pdf2025-10-30_Legal Description_CUP North.pdf2025-11-06_Survey Exhibit_CUP North.pdf2025-12-03_Clearance and Release Memo_CUP North.pdf★ 2025-CIP-0000215 Comment Report 12-19-2025.pdfClearance and Release - CUP North.xlsm | ||||
2025-CIP-0000214 Denver Water 2026 ALSLR Program CIPClear29 agencies | CIP | 29 | Clear | |
All documents in this project (7) ★ 2025-CIP-0000214 Comment Report 12-19-2025.pdfLRP_2026_CCD_ALSLRPlan_CIPPermit_Letter of Intent.pdfLRP_D-4_CIP_Attachment 1_2026 Work Package Maps_1 of 2.pdfLRP_D-4_CIP_Attachment 1_2026 Work Package Maps_2 of 2.pdfLRP_D-4_CIP_Attachment 2_2026 Contract Documents.pdfLRP_D-4_CIP_Attachment 3_S1 2025 LSLR List.pdfLRP_D-4_CIP_Attachment 4_2026_Potential_Tree_Conflicts.pdf | ||||
2025-CIP-0000213 Sanderson Gulch Zuni to Clay Bid Set CIPFlagged · 127 agencies | CIP | 27 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection Comments in project folder Review Status: No Response All documents in this project (9) 2025-CIP-0000137 Comment Response.xlsx★ 2025-CIP-0000213 Comment Report 12-18-2025.pdfCASDP Plans Sanderson Gulch Trail 100PRCNT.pdfCASDP Report 100PRCNT.pdfCDs Sanderson Gulch Trail 100PRCNT.pdfFloodplain Impact Memo Sanderson Gulch Trail 100 PRCNT.pdfHEC RAS Model Sanderson Gulch Trail100PRCNTSubmittal.zipREDLINES- Floodplain- Boles.docxREDLINES- Survey- Pfohl.docx | ||||
2025-CIP-0000212 New Traffic Signals Northeast Denver - MLK and Kearney CIPFlagged · 423 agencies | CIP | 23 | Flagged · 4 | |
ERA Materials ReviewReview Complete - Objection see kdb red lines 630 spec Review Status: Review Complete - No Objec Reviewers Name: DS Transportation ReviewReview Complete - Objection SEE REDLINES: 2025 12 04 CM TRANSPORTATION REDLINES - MLK KEARNEY DPR Parks QAReview Complete - Objection See DPR Comments REDLINES. Review Status: No Response Fire Prevention ReviewReview Complete - Objection By approving this project it will take away the ability for DFD to have navigation from the west to the north and from the east to the south on Kearney. All documents in this project (9) ★ 2025-CIP-0000212 Comment Report 12-18-2025.pdfNTS NE - 100pct CASDP Narrative 2025-11-19.pdfNTS NE - 90pct Comment Resolution Form 2025-11-19.pdfNTS NE - CP2 - 100pct Plans 2025-11-19.pdfNTS NE - CP2 - 100pct Specifications 2025-11-19.pdfREDLINES- DPR- Cervera.pdfREDLINES- DS Transportation- Mueller.pdfREDLINES- Materials- Blair.pdfREDLINES- Trans Safety- Rodriguez.pdf | ||||
2025-CIP-0000211 New Traffic Signals Northeast Denver - Bond CIPFlagged · 326 agencies | CIP | 26 | Flagged · 3 | |
ERA Materials ReviewReview Complete - Objection Please cite and ensure that the HMA Spec meets MGPEC Item 20 and that the CC Spec meets MGPEC Item 30 (both uploaded here). RE: comment resolution, where is page 2, Standard construction details? REDLINES uploaded to E-review webpage . PW Survey ReviewReview Complete - Objection redlines in project folder Review Status: Review Complete - No Objec DPR Parks QAReview Complete - Objection See DPR Comments REDLINES_DPR_ pdf Review Status: Review Complete - No Objec All documents in this project (11) ★ 2025-CIP-0000211 Comment Report 12-17-2025.pdfNTS NE 100PRCNT CASDP Narrative.pdfNTS NE CP1 100PRCNT Plans.pdfNTS NE 90PRCNT Comment Resolution Form.pdfNTS NE CP1 100PRCNT Specifications.pdfREDLINES- DPR- Cervera- 100pct Plans.pdfREDLINES- DPR- Cervera- 100pct Specifications.pdfREDLINES- DPR- Cervera- Approved.pdfREDLINES- Materials- Blair 1.pdfREDLINES- Materials- Blair 2.pdfREDLINES- Survey- Pfohl.pdf | ||||
2025-CIP-0000210 SIGI Five Points Group D - Coordination CIPFlagged · 125 agencies | CIP | 25 | Flagged · 1 | |
Forestry ReviewReview Complete - Objection Please see attached pdf (in e-review) for comments: 1) See pdfs for species substitutions. All documents in this project (9) 2025.11.26 29th and Curtis Drainage Memo.pdf2025.11.26 31st and Cali Drainage Memo.pdf2025.11.26 SIGI 3091 CALIFORNIA ST BAWM60CD.pdf2025.11.26 SIGI CURTIS ST 2900 60CD.pdf★ 2025-CIP-0000210 Comment Report 12-16-2025.pdfCL SIGI5Points GrpD 60per.pdfREDLINES- Forestry- Evers- California.pdfREDLINES- Forestry- Evers- Curtis.pdfSPECS SIGI5POINTS GrpC D forER.pdf | ||||
2025-CIP-0000209 Evergreen Golf Course - Cart Path Replacement CIPClear25 agencies | CIP | 25 | Clear | |
All documents in this project (2) | ||||
2025-CIP-0000208 Skyline Park Block 2 CIPFlagged · 125 agencies | CIP | 25 | Flagged · 1 | |
PW Trans Safety ReviewReview Complete - Objection PWPRS Project Number: 2025-CIP-0000208 - Skyline Park Block 2 Reviewing Agency/Company: DOTI Transportation & Mobility Engineering Reviewers Name: Allison Thienpont Reviewers Phone: 720-865-3197 Reviewers Email: allison.thienpont@denvergov.org Approval Status:… All documents in this project (25) 01 Skyline-B2 PRCNT Design G General RIOS.pdf04 Skyline-B2 100PRCNT Design V Survey105 West.pdf06 Skyline-B2 100PRCNT Design C Civil Kimley Horn.pdf07 Skyline-B2 100PRCNT Design L Landscape RIOS.pdf08 Skyline-B2 100PRCNT Design HP HistoricPreservation ModernRuins.pdf10 Skyline-B2 100PRCNT Design A Architecture RIOS.pdf14 Skyline-B2 100PRCNT Design QF Food Service Ricca.pdf15 Skyline-B2 100PRCNT Design S Structure HCL.pdf16 Skyline-B2 100PRCNT Design M Mechanical RJA.pdf17 Skyline-B2 100PRCNT Design E Electrical RJA.pdf18 Skyline-B2 100PRCNT Design P Plumbing RJA.pdf19 Skyline-B2 100PRCNT Design EL Lighting Clanton.pdf★ 2025-CIP-0000208 Comment Report 12-5-2025.pdf21 Skyline-B2100PRCNT Design AV Audio-Visual King Systems.pdf22 Skyline-B2 100PRCNT Design SG Signage RIOS.pdf23 Skyline-B2 100PRCNT Design R Ice Rink Stantec.pdf24 Skyline-B2 100PRCNT Design W Water Features Fluidity Arch.pdf24 Skyline-B2 100PRCNT Design W Water Features Fluidity MEP.pdf250919 Skyline-B2 ER 90PRCNT Comment Responses ef.pdfMEMO - C - Skyline-B2 100PRCNT Design Civil Final Drainage Report.pdfMEMO - S - Skyline-B2 100PRCNT Design Structural Calculations.pdfREDLINES- CE- Brekke.pdfREDLINES- Trans Safety- Thienpont.pdfREDLINES- WW Maintenance- Gehrke.pdfSkyline Project Manual Permit Set 2025-09-19.pdf | ||||
2025-CIP-0000207 RSA Pkg 2 Projects - Park 20th and 22nd CIPFlagged · 130 agencies | CIP | 30 | Flagged · 1 | |
Forestry ReviewReview Complete - Objection Please refer to attached comments: 1) Sheet 24 - trees appear to be in fair condition. Coordinate with OCF before or at construction to determine plan of All documents in this project (13) ★ 2025-CIP-0000207 Comment Report 12-1-2025.pdfER Submittal Overview.dotxREDLINES- ERA Materials- Bair 1.pdfREDLINES- ERA Materials- Blair 2.pdfREDLINES- WW Maintenance- Gehrke.pdfRSA PKG 2 - 30pct Comment Resolution Form 2025-11-12.pdfRSA PKG 2 - 90pct Drainage Memo.pdfRSA PKG 2 - 90pct Plans 2025-11-12.pdfRSA PKG 2 - 90pct Specifications 2025-11-12.pdfRSA PKG 2 - Historic Tech Memo.pdfRSA PKG 2 90pct - X24-122.01 RD TRN - Fire Truck.dwgRSA PKG 2 90pct - X24-122.01 RD TRN - SU-30.dwgRSA PKG 2 90pct -X24-122.01 RD TRN - Fire Truck.bak | ||||
2025-CIP-0000206 Go Bond Sidewalks - CD 8 and 9 Colorado Blvd CIPFlagged · 231 agencies | CIP | 31 | Flagged · 2 | |
ERA Erosion Control ReviewReview Complete - Objection The limits of construction are 1.47 acres. Project requires a CASDP. Please remove the Erosion Control Notes from Sheet 64 and submit for a CASDP. CASDP/SWMP plans may remain in the CIP plan set, but should be extracted for PW Construction Engineering ReviewReview Complete - Objection Ensure that the curb ramps are detailed with 2' radii where possible per CCD Std Dwg 7.1. All documents in this project (6) | ||||
2025-CIP-0000205 High Line Canal Trail Activation Zones CIPFlagged · 123 agencies | CIP | 23 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection Resubmittal Required Review Status: No Response | ||||
2025-CIP-0000204 17th and 18th Ave Transit Improvements CIPFlagged · 328 agencies | CIP | 28 | Flagged · 3 | |
ERA Transportation ReviewReview Complete - Objection The City of Denver Department of Transportation & Infrastructure Engineering & Regulatory Office (ER) has completed its Transportation review of the submitted 2025-CIP-0000204 - 17th and 18th Ave Transit Improvements Forestry ReviewReview Complete - Objection Review Complete - Objection PW Trans Safety ReviewReview Complete - Objection PWPRS Project Number: 2025-CIP-0000204 - 17th and 18th Ave Transit Improvements Reviewing Agency/Company: DOTI Transportation & Mobility Engineering Reviewers Name: Allison Thienpont Reviewers Phone: 720-865-3197 Reviewers Email: allison.thienpont@denvergov.or… | ||||
2025-CIP-0000203 Mayfair Town Center Streetscape Improvements CIPFlagged · 126 agencies | CIP | 26 | Flagged · 1 | |
Forestry ReviewReview Complete - Objection OCF Comments 11-17-25 1. Address OCF comments on attached redlined plans, uploaded via ERA site. If redlined plans were not received, All documents in this project (7) | ||||
2025-CIP-0000202 RISE New Signals Project CIPClear24 agencies | CIP | 24 | Clear | |
All documents in this project (10) 2025-11-05 RISE Signals South 60pct ER Comment Response Form.pdf2025-11-05 RISE Signals South 90pct Estimate.pdf2025-11-05 RISE Signals South 90pct Plans.pdf2025-11-05 RISE Signals South 90pct Specs.pdf★ 2025-CIP-0000202 Comment Report 11-24-2025.pdfREDLINES- Craig Long.pdfREDLINES- Kim Blair 1.pdfREDLINES- Kim Blair 2.pdfREDLINES- Trans Safety- De Vos Tidd.pdfREDLINES- WW Maintenance- Gehrke.pdf | ||||
2025-CIP-0000201 DPR NW Maint. Facility CIPFlagged · 427 agencies | CIP | 27 | Flagged · 4 | |
ERA Wastewater ReviewReview Complete - Objection Please provide a drainage report with calculations for the bio-retention pond. Pond size should be sized to provide water quality for the ultimate build-out condition including the future building expansion and pavement of the gravel parking lot. Note: the sanitary sewer service and SOI require an SUDP permit.Review Complete - Objection See KDB Red Lines Review Status: Review Complete - Objection ERA Floodplain ReviewReview Complete - Objection FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplain are required to obtain a Floodplain Permit through the Sewer Use and Drainage Permit (SUDP) application process. Send a project location map to the Denver Floodplain Manage… Additional Internal Review 3Review Complete - Objection As identified during review of 2025-CIP-0000142, please refer to the Sloan's Lake Major Drainageway Plan January 2018. The recommended plan proposes a forebay in conflict with the gravel/future phase parking area. Please include All documents in this project (6) 2025-11-04 SLGC Equipment Building 60 PRNCT CD Drawings.pdf2025-11-04 SLGC Office and Equipment Bldg 60 PRNCT CD Project Manual.pdf2025-11-04 SLGC Office Building 60 PRNCT CD - Drawings.pdf★ 2025-CIP-0000201 Comment Report 11-24-2025.pdfREDLINES - ERWastewater - MSasarak - DENVF 180017_SloansLake_DRAINAGE REPORT_IFP Rev1_20260331.pdfREDLINES- Kim Blair.pdf | ||||
2025-CIP-0000200 48th Avenue Greenway CIPFlagged · 530 agencies | CIP | 30 | Flagged · 5 | |
ERA Transportation ReviewReview Complete - Objection The City of Denver Department of Transportation & Infrastructure Engineering & Regulatory Office (ER) has completed its Transportation review of the submitted 2025-CIP-0000200 - 48th Avenue Greenway Project documents, DS Wastewater ReviewReview Complete - Objection Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. DPR Parks QAReview Complete - Objection See DPR Comments in pdfs starting with 'DPR Cmnts_'. ERA Floodplain ReviewReview Complete - Objection PW Trans Safety ReviewReview Complete - Objection PWPRS Project Number: 2025-CIP-0000200 - 48th Avenue Greenway Reviewing Agency/Company: Transportation Mobility Engineering Reviewers Name: Eric Stein Reviewers Phone: 7208653270 Reviewers Email: eric.stein@denvergov.org Approval Status: Denied Comments: I'm s… All documents in this project (11) ★ 2025-CIP-0000200 Comment Report 11.21.25.pdf48th Greenway-100PRCNT Submittal-Comment Resolution.xlsx48th Greenway-100PRCNT Submittal-Plan Set.pdfDPR Cmnt 48th Greenway-100PRCNT Submittal Comment Resolution.pdfDPR Cmnt 48th Greenway-100PRCNT Submittal-Plan Set.pdfREDLINES - WWConstruction-MGehrke.pdfREDLINES- 2025-CIP-0000200 Floodplain-comments.docxREDLINES- DOTIDivGreen Infrastructure-CBell.pdfREDLINES- DPR- Kijowski.pdfREDLINES- ER Transportation- Kijowski.pdfREDLINES-TransMobility-EStein.pdf | ||||
2025-CIP-0000199 SIGI Five Points Group C CIPFlagged · 122 agencies | CIP | 22 | Flagged · 1 | |
Forestry ReviewReview Complete - Objection Forestry Comments - pdfs submitted via E-Review: 1) See Species recommendations - Tremont All documents in this project (11) 2025.10.31 N. Downing Drainage Memo.pdf2025.10.31 Park Ave and Tremont Drainage Memo.pdf2025-10-31 Group C - Tremont 60CD.pdf2025-10-31 Group C- Downing 60CD.pdf★ 2025-CIP-0000199 Comment Report 11-20-2025.pdfCL SIGI5Points GrpC 60per.pdfREDLINES- Forestry- Evers- Downing.pdfREDLINES- Forestry- Evers- Tremont.pdfREDLINES- WW Maintenance- Gehrek 1.pdfREDLINES- WW Maintenance- Gehrek 2.pdfSPECS SIGI5POINTS GrpC-D.pdf | ||||
2025-CIP-0000198 Skyline Block 3 Electrical Design CIPFlagged · 126 agencies | CIP | 26 | Flagged · 1 | |
ERA Transportation ReviewReview Complete - Objection Where is this work being done? There wasn't a Site Plan or Cover Sheet included with the submittal, so it's unclear whether this vault is on park property or in the ROW. All documents in this project (2) | ||||
2025-CIP-0000197 Lipan Pond Water Quality Facility🚲 bike lane CIPFlagged · 225 agencies | CIP | 25 | Flagged · 2 | |
🚲 Bike lane mentioned [comment report text] "to be the west ROW of Lipan, South ROW of Alameda, and east limits of existing bike path along SPR at/near river bank. Effective perimeter controls are essent" ERA Erosion Control ReviewReview Complete - Objection 11/18/2025 Review Complete - Objection This CIP objection will be removed once CASDP application has been submitted. Final technical review of CASDP elements will be performed during formal CASDP application process. ER-Erosion Control has reviewed the SWMP pl… ERA Floodplain ReviewReview Complete - Objection This project was permitted under a No-Rise for the floodplain permit (2023-SUDP-0003121). Please submit a signed and sealed letter from the hydraulic engineer verifying that the final grading and design of the Lipan Pond will not All documents in this project (9) 2025-10-20 SPR - Lipan Pond 90pct.pdf2025-10-20SPR - Lipan Pond90 pct SUDP.pdf★ 2025-CIP-0000197 Comment Report 11-19-2025.pdf21-029.01 SPR OandM.pdfNarrative Report Information Worksheet Lipan Pond.pdfREDLINES- WW Maintenance- Gehrke- Lipan Pond 90pct.pdfREDLINES- WW Maintenance- Gehrke- OandM.pdfSPR - Lipan Pond SWMP.pdfSPR Lipan Pond - Drainage Memo 90pct.pdf | ||||
2025-CIP-0000196 Evergreen Golf Course - Cart Path Replacement CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (1) | ||||
2025-CIP-0000195 2024 Pedestrian Intersection Improvement Project CIPFlagged · 125 agencies | CIP | 25 | Flagged · 1 | |
Reviewers Name: ERA Materials ReviewReview Complete - Objection Review Complete - Objection All documents in this project (22) ★ 2025-CIP-0000195 Comment Report 11-18-2025.pdf30 PRNT 2024 Intersections Drainge Report.pdf30 PRNT 2024 Intersections Turning Templates.pdf30 PRNT 2024 IntersectionsTechnicalSpecificationsList.pdf30PRNT 2024 Intersections Construction Plans.pdf30PRNT 2024 Intersections Cost Estimate.pdfREDLINES- Craig Long.pdfREDLINES- ER Materials- Blair 1.pdfREDLINES- ER Materials- Blair 2.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Mobility- Thienpont- Construction Plans.pdfREDLINES- Mobility- Thienpont- Turning Templates.pdfREDLINES- Survey- Sperling.pdfUPCG-Traffic Memo 23rd Ave and Decatur.pdfUPCG-Traffic Memo 50th and Julian.pdfUPCG-Traffic Memo 6th and Irving.pdfUPCG-Traffic Memo Evans and Hazel.pdfUPCG-Traffic Memo Florida and Hazel.pdfUPCG-Traffic Memo Iliff and Hazel.pdfUPCG-Traffic Memo Jewell and Yates.pdfUPCG-Traffic Memo Syracuse and 22nd.pdfUPCG-Traffic Memo Walden St.pdf | ||||
2025-CIP-0000194 Washington Park Improvements Project - Track 2 (Central Tennis Courts) CIPFlagged · 126 agencies | CIP | 26 | Flagged · 1 | |
PW Survey ReviewReview Complete - Objection Comments and redlines in project folder | ||||
2025-CIP-0000193 Clearance and Release - Cherry Creek Glendale CIPClear14 agencies | CIP | 14 | Clear | |
All documents in this project (7) 1935-08-21 Quitclaim Deed Cherry Creek Canal Property.pdf20250210 Agreement no2 SURVAPP approved.pdf2025-10-24 70835517 Property Information Binder.pdf2025-10-27 Clearance and Release - Cherry Creek Glendale water stub license.xlsm2025-10-27 Clearance and Release Memo Cherry Creek Glendale Parcel Water Line.docx★ 2025-CIP-0000193 Comment Report 11-13-2025.pdfCCD Parcel in Glendale - Water Line.pdf | ||||
2025-CIP-0000192 GO Bond Sidewalks - GES 2021 Project A CIPFlagged · 323 agencies | CIP | 23 | Flagged · 3 | |
ERA Wastewater ReviewReview Complete - Objection See ER-Wastewater Redlines Review Status: Review Complete - No Objec ERA Erosion Control ReviewReview Complete - Objection This objection will be removed once a CASDP application has been received. Note. the SWMP plans may remain in the complete CIP set, but the the SWMP plans and details sheets should be extracted and submittal along with the External Referral 1Review Complete - Objection PWPRS Project Number: 2025-CIP-0000192 - GO Bond Sidewalks - GES 2021 Project A Reviewing Agency/Company: RTD Reviewers Name: clayton woodruff Reviewers Phone: 3032992943 Reviewers Email: Clayton.Woodruff@RTD-Denver.com Approval Status: Denied All documents in this project (8) ★ 2025-CIP-0000192 Comment Report 11-13-2025.pdfCCD GES Sidewalks_ER Review Comments.xlsxCCD GES Sidewalks_Narrative Report Information Worksheet.pdfCCD GES Sidewalks_Plans.pdfCCD GES Sidewalks_TechnicalSpecifications.pdfREDLINES - ER WASTEWATER - SASARAK.pdfREDLINES- Craig Long.pdfREDLINES- RTD- Woodruff.pdf | ||||
2025-CIP-0000191 University Hills - Bethesda Park CIPFlagged · 227 agencies | CIP | 27 | Flagged · 2 | |
ERA Transportation ReviewReview Complete - Objection The City of Denver Department of Transportation & Infrastructure Engineering & Regulatory Office (ER) has completed its Strategic review of the submitted 2025-CIP-0000191 - University Hills - Bethesda Park 100% Project PW Survey ReviewReview Complete - Objection Comments and redlines in project folder Review Status: No Response | ||||
2025-CIP-0000190 2025 - Wastewater Facility Improvements CIPFlagged · 428 agencies | CIP | 28 | Flagged · 4 | |
ERA Wastewater ReviewReview Complete - Objection Please clarify if the asphalt repaving is "full depth" replacement or "mill and overlay". See the Materials drop-down at the bottom of the page.Review Complete - Objection Due to the land disturbance activity adjacent to South Platte River, the repaving improvements require a CASDP. This objection will be removed once a CASDP application has bee received. PW Survey ReviewReview Complete - Objection survey comments are in the project folder Review Status: No Response survey notes ERA Floodplain ReviewReview Complete - Objection FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplain are required to obtain a Floodplain Permit. As this project progresses if the improvements change that are in the regulatory floodplain the umbrella permit may not be an op… All documents in this project (7) | ||||
2025-CIP-0000189 5280 Trail - Acoma Shared Street CIPFlagged · 534 agencies | CIP | 34 | Flagged · 5 | |
ERA Wastewater ReviewReview Complete - Objection Please indicate which city department will be responsible for the long term maintenance of the soil cells and street side planters. The proposed trench drain is non-standard infrastructure. Please indicate which city department will be responsible for its main… ERA Erosion Control ReviewReview Complete - Objection PW Survey ReviewReview Complete - Objection comments in the folder Review Status: Review Complete - Objection Fire Prevention ReviewReview Complete - Objection Additional Internal Review 4Review Complete - Objection My concern is that where vehicle curb cuts remain, that there is no flare. I think the landscape area next to these will be damaged. All documents in this project (12) ★ 2025-CIP-0000189 Comment Report 11-5-2025.pdf5280 Trail - Acoma Segment Green Infrastructure Memo 251017.pdf5280 Trail - Acoma Segment Preliminary Design Plans - Submittal 251017.pdf5280 Trail - Acoma Segment Preliminary Drainage Report 251017.pdfCCD 5280 Trail – Acoma Street 12th to 10th Avenue Memorandum - 251017.pdfREDLINES- Craig Long.pdfREDLINES- Forestry- Evers 1.pdfREDLINES- Forestry- Evers 2.pdfREDLINES- Mobility- Stein- Preliminary Design Plans.pdfREDLINES- Mobility- Stein.pdfREDLINES- Survey- Sperling.pdfREDLINES- WW Maintenance- Gehrke.pdf | ||||
2025-CIP-0000185 Bannock St. and 8th Ave. Bridges over Cherry Creek Rehabilitation CIPFlagged · 126 agencies | CIP | 26 | Flagged · 1 | |
ERA Floodplain ReviewReview Complete - Objection All documents in this project (17) ★ 2025-CIP-0000185 Comment Report 10-28-2025.pdf208_specification_2020.pdf8th and Bannock 90PRCNT Plans.pdf8th and Bannock_613 Electrical Specifications.pdf8th and Bannock_ELEC_Cost Estimate.xlsx8th and Bannock_UTIL Cost Estimate.xlsx8th and Bannock_Utility Specifications.pdf8thandBannock_Structural_Spec.pdf8thAveOverCherryCreek_Rev_20250922.kmzBannock and 8th St Bridges BRTM Final 2025-10-06.pdfCASMP_90pct.pdfD-01-CC-168 Final Rehabilitation Report.pdfD-01-CC-170A Final Rehabilitation Report.pdfD-01-CC-172 Final Rehabilitation Report (1).pdfEL_StatementNoImpact_20250926.pdfREDLINES- Trans Safety- De Vos Tidd.pdfSUDP_Application_Signed.pdf | ||||
2025-CIP-0000182 Tower Road Sanitary Interceptor Phase 1 CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (11) 2025-0919 - Tower Road Interceptor PH1 Design Report 100pct FULL.pdf2025-0922 - Tower Road Interceptor - Project Special Provisions.pdf2025-0922 - Tower Road Interceptor PH1 CDs 100pct.pdfREDLINES- Mueller- 56-65.pngREDLINES- Mueller- 56th and Tower PMs repaired.pdfREDLINES- Mueller- 65-68.pngREDLINES- Mueller- Gateway.pdfREDLINES- Mueller- High Point projects.pdfREDLINES- Mueller- Pena Station.pdfREDLINES- Mueller- Tower Road Interceptor PH1 Design Report.pdfTower Road San 90prcnt Design MASTER COMMENT with RESPONSES.xlsx | ||||
2025-CIP-0000177 Bettie Cram Drive Bridge CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (10) 2019-0805-NWC 3.13 BCD Bridge-Report-Geotechnical BCD Pavement.pdf2020-0115-NWC 3.13 BCD Bridge-Report-Geotechnical BCD & 51st Bridges.pdf2020-1218-NWC 3.13 BCD Bridge-Plan-NWC_3.07B_SSPR_Plans (SUE Plans).pdf2024-0429-NWC 3.13 BCD Bridge-Report-Geotechnical 48th Ave over Levee Pavement Memo.pdf2024-1014-South Platte River Hydrology and Hydraulics Report_CLOMR Support (signed).pdf2025-0530-NWC 3.13 BCD Bridge-Memo_Drainage.pdf2025-0919 NWC_BCD Bridge Hydraulic Summary Memo.pdf2025-0919-NWC 3.13 BCD Bridge-Comment Response Matrix.xlsx2025-0919-NWC 3.13 BCD Bridge-Plan-CD.pdf2025-0919-NWC 3.13 BCD Bridge-Specs.pdf | ||||
2025-CIP-0000167 Federal and Amherst HAWK Signal CIPFlagged · 127 agencies | CIP | 27 | Flagged · 1 | |
Forestry ReviewReview Complete - Objection 2023PM0000031 - Federal & Amherst HAWK 100% OCF Comments 9-24-25 All documents in this project (8) | ||||
2025-CIP-0000166 NTSPI Intersection Bundle 100PRNT CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (15) 202500807_NTSPI Intersection Design_FINAL OPC.pdf20250807_NTSPI Intersection Design_Final Plans.pdf20250807_Turn Templates.pdf20250808 NTSPI Intersection Design and Data Collection Technical Specifications Final.pdfDOTI NTSIP 90pct Comment-Resolution-Form.pdfREDLINES- Craig Long.pdfREDLINES- DPR- Cervera.pdfREDLINES- DPR- Kijowski- Approved.pdfREDLINES- ER Transportation- Kijowski.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES- Forestry- Huetig.pdfREDLINES- PM- Canada- Intersection Design.pdfREDLINES- PM- Canada- Technical Specifications 25-09-23-12-36.pdfREDLINES- PM- Canada- Technical Specifications.pdfREDLINES- PM- Canada- Turn Templates.pdf | ||||
2025-CIP-0000160 Sanderson Gulch Florida to Arkansas CIPFlagged · 338 agencies | CIP | 38 | Flagged · 3 | |
ERA Wastewater ReviewReview Complete - Objection The storm outfalls passing through walls 4 and 16 conflict with the soldier pile footings. Provide a detail showing how the storm drain will pass through the wall - likely needs to be centered between pile footings. DS Transportation ReviewReview Complete - Objection Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. PW Survey ReviewReview Complete - Objection Comments in project folder Review Status: Review Complete - No Objection All documents in this project (24) ★ 2025-CIP-0000160 Comment Report 9-8-2025.pdf2025-CIP-0000160 Revised Comment Report 12-2-2025.pdfChecklist_DPR (2).pdfLetter_Transmittal.pdfPlans_Civil.pdfPlans_Reveg.pdfREDLINES- Floodplain- Hamer_Comments.pdfREDLINES- Floodplain- Hamer_Plans_Civil.pdfREDLINES- Floodplain- Hamer_Report_Design.pdfREDLINES- Floodplain- Hamer_Specifications_Civil.pdfREDLINES- Survey- Pfohl.docxREDLINES- Tran Safety- De Vos Tidd.pdfREDLINES- Wastewater- Gehrke.pdfReport_CASDP_Narrative.pdfReport_Design.pdfReport_ErosionControl.pdfReport_Geotech_Walls_Draft.pdfReport_StructureSelection (1).pdfReport_StructureSelection.pdfResponses_DPR.pdfResponses_MHFD.pdfResponses_Table.xlsmSpecifications_Civil.pdfSpecifications_Reveg.pdf | ||||
2025-CIP-0000141 2025 Green Infrastructure Improvements CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (9) 2025 GI IMP_100pct PLANS.pdf2025 GI IMP_SPECS.pdf51st-Steele_Lowell-Evans_ERA COMMENT-RESPONSE.pdfREDLINES - Office of the City of Forestry.pdfREDLINES - Survey Red Lines 2025.08.13.pdfREDLINES - Transportation Mobility Engineering - 2025-08-5_2025 GI_IMP100PCT Plans_EES.pdfREDLINES - WW Construction Pages from 2025 GI IMP_100pct-Plans-mvg.pdfREDLINES- DPR Comments 2025 GI IMP_100pct PLANS.pdfREDLINES- Survey- Approved.pdf | ||||
2025-CIP-0000112 Buchtel Complete Streets and Evans Intersection Improvements Project 100pcnt Plans CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (8) REDLINES - DPR - Cervera.pdfREDLINES - Forestry - Huetig.pdfREDLINES - Halpin - 25418_Buchtel_Project Specifications_100_DGI.pdfREDLINES - Halpin - Pages from 25418_Buchtel_Construction Plans_100_DGI_reduced.pdfREDLINES - TME - De Vos Tidd.pdfREDLINES - WW Construction - Gehrke.pdfREDLINES - WW-DES - Armfield.pdfREDLINES- Survey- Pfohl.pdf | ||||
2025-CIP-0000106 RISE New Signals Project CIPFlagged · 126 agencies | CIP | 26 | Flagged · 1 | |
DPR Parks QAReview Complete - Objection DPR Comments provided in documents Review Status: No Response All documents in this project (13) 2025-06-13_RISE Signals North 100pcnt Cost Estimate.pdf2025-06-13_RISE Signals North 100pcnt Plans.pdf2025-06-13_RISE Signals North 100pcnt Specs.pdf2025-06-13_RISE Signals North 90pcnt CRF.pdf2025-11-21_RISE Signals NORTH Estimate.pdf2025-11-21_RISE Signals NORTH Plans.pdf2025-11-21_RISE Signals NORTH Specs.pdf★ 2025-CIP-0000106 Updated Comment Report 1-7-2026.pdfREDLINES - CCD - Long.pdfREDLINES - CCD - Vigil - RV Comments.pdfREDLINES - CCD - Vigil.msgREDLINES - Parks - Cervera.pdfREDLINES- Craig Long.pdf | ||||
2025-CIP-0000101 Passenger Amenity Program - Bus Stop Package 2 CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (8) 2025.05.29_BSIP P2 SPECS - 100pcnt.pdf22029_Bus Stops 100pcnt_2025-05-30.pdfREDLINES - Blair - TC fm 2025.05.29_BSIP P2 SPECS - 100pcnt.pdfREDLINES - Blair - dotipt-116.1_traffic_control_procedures.pdfREDLINES - Blair - dotirr-022.3_issuance_of_permits_by_the_city_traffic_engineer.pdfREDLINES - Forestry - Huetig.pdfREDLINES - WW - Klosowski.pdfREDLINES- Forestry- Huetig- Approved.pdf | ||||
2025-CIP-0000093 Mestizo-Curtis Park Pool renovation CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (12) 015713_Erosion_and_Sedimentation_Control.docx2025.05.12 MESTIZO - CIVIL 60_ CPEP DRAINAGE REPORT.pdf2025.05.12 MESTIZO - CIVIL 60_ CPEP PLANS.pdf2025.05.12 MESTIZO - LANDSCAPE 60_ CPEP PLANS.pdf311100_Clearing_and_Grubbing.docx312000_Earth_Moving.docx312316_Excavating_and_Backfilling_of_Trenches.docx321216_Asphalt_Pavement.docx321313_Concrete_Walks_Curbs_and_Miscellaneous_Flatwork.docx331100_Water_Utility_Distribution_Piping.docx333100_Sanitary_Utility_Sewerage_Piping.docx334400_Storm_Sewerage.docx | ||||
2025-CIP-0000046 Overland Park Golf Course - No.10 and No.16 Cart Path Replacement CIPNo report yet— agencies | CIP | — | No report yet | |
2025-CIP-0000010 Xcel Energy 5283 Transmission Line-Phase 2 CIPFlagged · 325 agencies | CIP | 25 | Flagged · 3 | |
City Project Manager ReviewReview Complete - Objection This plan has been submitted as an External Agency Transportation or Utility review. The City and County of Denver does not formally approve these plans rather a Statement of No Objection (SONO) is issued. The SONO constitutes an authorization to proceed with… Reviewers Name: ERA Transportation ReviewReview Complete - Objection Review Complete - Objection The City of Denver Engineering and Regulatory Office has completed its Strategic review of the submitted PW Survey ReviewReview Complete - Objection Comments in project folder All documents in this project (8) 2024-CIP-0000048 Comment Report 04-04-2024_PEI Response.xls★ 2025-CIP-0000010 Comment Report 02-05-2025.pdf2025-CIP-0000010 Comment Report 02-05-2025.xls5283 ELAT-MONR 230 kV UG Rplc Phase 2 - Final Civil Bid Drawing Package.pdf5283 Leets Elati Cover Letter-Memo for Denver_Phase 1 and 2_60pcnt Resubmittal_1-17-25.pdfREDLINES - Forestry - Huetig.pdfREDLINES- Survey- Pfohl.docxXcel Energy - 5283 Underground - Phase 2, Section 3 - 95% CIP.zip | ||||
2025-CIP-0000004 Mill 20 Traffic Signal Upgrade - Monaco Pkwy CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (15) 250106_2024-CIP-0000035 Comment Response_ACL.pdf250106_Mill 20 Estimate_100pcnt.pdf250106_Mill 20 Specs_100pcnt.pdf250106_Mill 20_Drainage H and H Memo.pdf250106_Mill 20_Floodplain No Rise Letter.pdf250106_monaco-mill_20-100pcnt-plans.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- Craig Long.xlsxREDLINES- DPR- Cervera- Comment Resolution.pdfREDLINES- DPR- Cervera- Mill 20 spec.pdfREDLINES- DPR- Cervera- Plans.pdfREDLINES- DPR- Cervera.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Trans Safety- De Vos Tidd.pdfREDLINES- WW Maintenance- Gehrke.pdf | ||||
2024-VACA-0000010 Sharp Lane North Telluride Way VACANo report yet— agencies | VACA | — | No report yet | |
2024-VACA-0000009 2nd and Steele Alley Vacation VACANo report yet— agencies | VACA | — | No report yet | |
2024-VACA-0000007 830 Federal Blvd Alley Vacation VACADenial · 426 agencies | VACA | 26 | Denial · 4 | |
Asset Management ReviewDenied My understanding is a portion of the alley is needed for maintaining Weir Gulch. ERA Transportation ReviewDenied 1. There is an additional adjacent property owner with City and County of Denver owning parcels on either side of alley. This is not considered public right-of-way, and you will need to work with City Real Estate for approval to proceed. 2. Please also note, i… ERA Wastewater ReviewDenied See ER-Wastewater Redlines Survey ReviewDenied see survey redlines in folder and uploaded in e-review All documents in this project (8) 1005311-Federal Blvd Vacation Site Plan-VACATION EXHIBIT-FINAL.pdf★ 2024-VACA-0000007 Comment Report 09.20.2024.pdfAlleyway Vacation Legal Description.docxApplication and Checklist.pdfFEDERAL ALLEY VACATION DESCPT-FINAL.pdfREDLINES - ER WASTEWATER - SASARAK.pdfsurve redlines FEDERAL ALLEY VACATION DESCPT-FINAL.pdfsurvey redlines 1005311-Federal Blvd Vacation Site Plan-VACATION EXHIBIT-FINAL.pdf | ||||
2024-VACA-0000006 2625 W 24th Ave Vacation VACADenial · 229 agencies | VACA | 29 | Denial · 2 | |
ERA Transportation ReviewDenied 1. Please note that a vacation would be split between adjacent property owners. Does the owner to the North agree with this request? 2. Please show on survey that utility pole would not fall within the vacated area. It appears to be very close to the line and… Survey ReviewDenied | ||||
2024-VACA-0000005 DFD1 745 W Colfax - 1150 Welton VACANo report yet— agencies | VACA | — | No report yet | |
2024-VACA-0000004 901 Navajo Street - Mercy Housing VACADenial · 120 agencies | VACA | 20 | Denial · 1 | |
Survey ReviewDenied Resubmittal Required. Survey Redlines are in the project REDLINES folder. REDLINES are uploaded to the E-Review webpage. | ||||
2024-VACA-0000002 Niagara St and Union Ave Intersection VACANo report yet— agencies | VACA | — | No report yet | |
2024-UTIL-0000017 Xcel - SITEWISE - 1679 BELLAIRE ST UTILDenial · 16 agencies | UTIL | 6 | Denial · 1 | |
Parks and Recreation ReviewDenied DPR Comments provided in documents Review Status: Denied | ||||
2024-RELINQ-0000018 3800 N Xanthia St Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (7) REDLINES- Survey- Svechovsky.pdfXanthia_SSWR Esmt Relinq - Application_Signed.pdfXanthia_SSWR Esmt Relinq - Checklist_Signed.pdfXanthia_SSWR Esmt Relinq - Original Document.pdfXanthia_SSWR Esmt Relinq - Sanitary Plat Map.pdfXanthia_SSWR Esmt Relinq - Site Plan.pdfXanthia_SSWR Esmt Relinq - Stapleton Filing No. 18 Sanitary Plans.pdf | ||||
2024-RELINQ-0000017 Westside Clinic 1100 Federal Blvd Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (8) DH-WSC - Easement Relinquishment Application.pdfDH-WSC - Easement Relinquishment Legal and Exhibit.docxDH-WSC - Easement Relinquishment Legal and Exhibit_signed.pdfDH-WSC - Easement Relinquishment Site Plan.pdfO-1941-0031.pdfREDLINES- CenturyLink- NDS Conflict- Canary.pdfREDLINES- Centurylink- No Objection Letter- Canary.pdfREDLINES- CenturyLink- Vacation Denial Letter- Canary.pdf | ||||
2024-RELINQ-0000015 4498 and 4496 N Rifle St Turnaround Easement Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
2024-RELINQ-0000014 2777 Zuni St Covenant Relinquishment RELINQDenial · 116 agencies | RELINQ | 16 | Denial · 1 | |
DES Wastewater ReviewDenied Per the terms of the Covenant, this agreement will remain until demo permits are issued and the sanitary service lines are properly capped and inspected for the 21 units. When demo permits and cutoffs completed, contact Brenden Marron for removal of this denia… | ||||
2024-RELINQ-0000013 2777 Zuni St. Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (6) 2026-UTIL-0000139 - Final Approval Plan Set.pdf2777 N. Zuni St. - ALTA Survey.pdf2777 N. Zuni St. - Easement Document - Bk 2407 Pg 241.pdf2777 N. Zuni St. - Previously Relinquished - Bk 2621 Pg 329.pdf2777 N. Zuni St.- Easement Relinquishment Application_signed.pdf2777 N. Zuni St.- Easement Relinquishment Exhibit.pdf | ||||
2024-RELINQ-0000012 SOL at Sun Valley 2622 W 11th Ave RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (3) | ||||
2024-RELINQ-0000011 4602 S. Syracuse St Wastewater Easement RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (5) | ||||
2024-RELINQ-0000010 123 Speer Alley Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
2024-RELINQ-0000009 Evans and Bannock Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (3) | ||||
2024-RELINQ-0000008 1055 19th Street Relinquishment RELINQDenial · 215 agencies | RELINQ | 15 | Denial · 2 | |
CenturyLink ReferralDenied PWPRS Project Number: 2024-RELINQ-0000008 - 1055 19th Street Relinquishment Reviewing Agency/Company: Lumen/ CenturyLink Reviewers Name: VeShon Sheridan Reviewers Phone: 804-234-6825 Reviewers Email: veshon.sheridan@lumen.com Approval Status: Denied Comments:… Xcel ReferralDenied PWPRS Project Number: 2024-RELINQ-0000008 - 1055 19th Street Relinquishment Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy | ||||
2024-RELINQ-0000006 4600 S Syracuse St Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (7) Miller - 4600 S. Syracuse Legal Description and Illustration - Zone Lot 1.pdfMiller Global - Application - Easement Relinquishment App.pdfMiller Global - Easement and Indemnity Agreement - Easement Relinquishment App.pdfMiller Global - Legal Description - 4600 S Syracuse - Commercial - Zone Lot 1 - 27735719.1.docxMiller Global - Legal Description - Easement Relinquishment App.pdfMiller Global - PNEE - Easement Relinquishment App.pdfMiller Global - Site Plan - Easement Relinquishment App.pdf | ||||
2024-RELINQ-0000005 4201 E Arkansas Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (8) 2023-SDPSUB-0000005_5thPlatDoc.pdfKS150_EasementRelinquish1_LegalWest.docxKS150_EasementRelinquish1_LegalWestCombined.pdfKS150_EasementRelinquish2_LegalEast.docxKS150_EasementRelinquish2_LegalEastCombined.pdfKS150_EasementRelinquishmentChecklistApplication.pdfPlat - Kibler Addition Updated.pdfREDLINES- Survey- Pfohl.pdf | ||||
2024-RELINQ-0000004 Relinquishment 4602 South Syracuse Street RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (7) Application - Easement Relinquishment Application - Revised.pdfEasement and Indemnity Agreement - Easement Relinquishment Application - Revised.pdfLegal Description - 4602 S. Syracuse Zone Lot 2 - Easement Application - 26976953.1.docxLegal Description - Easement Relinquishment Application - Revised.pdfPNEE - Easement Relinquishment Application - Revised.pdfREDLINES- Survey- Pfohl.docxSite Plan - Easement Relinquishment Application - Revised.pdf | ||||
2024-RELINQ-0000003 SGI-USA Denver Buddhist Center - 1450 N. Speer Blvd RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (6) 1. Easement Relinquishment Application_2021PM0000378 - Signed.pdf2. Original Holding Document_2021PM0000378.pdf3. Legal Description and Exhibit_2021PM0000378.pdf3a. Legal Description in Word_2021PM0000378.docx4. Site Plan_2021PM0000378.pdfREDLINES- Survey- Sperling- Legal Description and Exhibit.pdf | ||||
2024-ENCROACHMENT-0000198 Tier III 3439 Lowell Blvd Retaining Wall and Fence ENCROACHMENTDenial · 126 agencies | ENCROACHMENT | 26 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Show 10 ft x 10 ft pedestrian sight triangle at alley. Fence must be moved out of the triangle. 2. Show dimension from toe of retaining to face of lower wall on structural section. | ||||
2024-ENCROACHMENT-0000179 Tier II 96 W Hoye Pl - Broadway Station Soil Cells ENCROACHMENTDenial · 121 agencies | ENCROACHMENT | 21 | Denial · 1 | |
Survey ReviewDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. All documents in this project (17) ★ 2024-ENCROACHMENT-0000179 Revised Comment Report 12-20-24.pdfBroadway Sta EF - Exhibit A.docxBroadway Sta EF - Exhibit A.pdfBroadway Sta EF - Exhibit B.docxBroadway Sta EF - Exhibit B.pdfBroadway Sta EF - Exhibit C.docxBroadway Sta EF - Exhibit C.pdfBroadway Sta EF - Exhibit D.docxBroadway Sta EF - Exhibit D.pdfBroadway Sta EF - Exhibit E.docxBroadway Sta EF - Exhibit E.pdfBroadway Sta EF - Lot Exhibit.docxBroadway Sta EF - Lot Exhibit.pdfBroadway Sta EF - Title Commitment.pdfBroadway Station - Encroachment Application.pdfBroadway Station - Permit Submittal Checklist.pdfBroadwayEF_EncroachmentApp_SitePlan.pdf | ||||
2024-ENCROACHMENT-0000167 Tier III 740 Lafayette St - Wall ENCROACHMENTDenial · 324 agencies | ENCROACHMENT | 24 | Denial · 3 | |
DS Project Coordinator ReviewDenied PWPRS Project Number: 2024-ENCROACHMENT-0000167 Tier III 740 Lafayette St - Wall Reviewing Agency/Company: Project Coordination Reviewers Name: Tiffany Holcomb Reviewers Phone: 720-865-3018 Reviewers Email: Tiffany.Holcomb@denvergov.org Approval Status: Denied… Survey ReviewDenied Survey comments are uploaded in E-Review. Review Status: Approved Xcel ReferralDenied PWPRS Project Number: 2024-ENCROACHMENT-0000167 Tier III 740 Lafayette St - Wall Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Donna.L.George@xcelen… All documents in this project (13) 07.16.2024_740NorthLafayetteStreet_StampedDrawings.pdf★ 2024-ENCROACHMENT-0000167 Revised Comment Report 12-20-2024.pdfdotipt-105.3.2-encroachment_checklist.pdfREDLINES - Forestry - Huetig - OCF Comments 11-15-24.pdfREDLINES - Forestry - Huetig - OCF Tree Protection Detail - 11x17 - 4-1-22.pdfREDLINES - Survey - Breitnauer.docxREDLINES- ER Transportation- Weller- WoolstonREVWallDetail.pdfREDLINES- ER Transportation- Weller.pdfREDLINES- Forestry- Huetig- Approved.pdfsigned dotipt-105-encroachment_application copy.pdfsigneddoti.pt.2023.105_tier_determination_checklist.pdfStampedSurvey_740Lafayette.pdfTier Review 740 N Lafayette.pdf | ||||
2024-ENCROACHMENT-0000158 Tier III 660 N Corona St Fence ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (8) Comment Resolution Sheet_660 N Corona St_10-29-24.pdfEncroachment Application_660 N Corona St_10-29-24.pdfEncroachment Area Land Description_660 N Corona St_10-29-24.docxEncroachment Submittal Checklist_660 N Corona St_10-29-24.pdfParcel Land Description_660 N Corona St_10-29-24.docxREDLINES- Survey- Breitnauer.docxTier III Encroachment SitePlan.CrossSection.Photos_660 N Corona St_10-29-24.pdfWarranty Deed_660 N Corona St_10-29-24.pdf | ||||
2024-ENCROACHMENT-0000152 Tier II 2883 Welton St Ramp ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (7) Address Assignment Card_2883 Welton St_.pdfColorado SOS Document Service - trade name fliling.pdfEncroachment Permit Submittal Application_2883 Welton 1017OwnerSignature.pdfEncroachment Permit Submittal Checklist _101724 Owner Signature.pdfREDLINES- CenturyLink- Canary- Letter of No Objection.pdfROW Set 2883 Welton St Cafe_Arch_CA_24_0805pdf-Signed82024.pdfWarranty Deed Document 2018088468.pdf | ||||
2024-ENCROACHMENT-0000133 Tier II - 1520 California St - Canopies and Planters ENCROACHMENTDenial · 421 agencies | ENCROACHMENT | 21 | Denial · 4 | |
DS Transportation ReviewDenied 1. Sheet EP-01. California St frontage. The 6'10" PAR is utilizing the amenity zone/pavers at the tree/tree grates. Demonstrate or the PAR will meet CCD and ADA cross-slope requirements and remove PAR from alternate material pavers/tree grate as may be require… Survey ReviewDenied Survey comments/reds are in the REDLINES folder (REDLINES- Survey- Savich.pdf) REDLINES are uploaded to the E-Review webpage. ERA Transportation ReviewDenied 1. Plans show right-of-way (ROW) width as greater than 21 ft. Per Transportation Standards and Details, encroachments shall maintain a PAR of 8 ft for ROW streetscape greater than 21 ft. Therefore, a min 8 ft PAR is required. 2. Plans showing PAR as measured f… Xcel ReferralDenied PWPRS Project Number: 2024-ENCROACHMENT-0000133 - Tier II - 1520 California St - Canopies and Planters Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email:… All documents in this project (14) ★ 2024-ENCROACHMENT-0000133 Comment Report 10-28-24.pdfa_2024Encroach133-SitePlan-001.pdfb_2024Encroach133-VestingDeed-001.pdfc_2024Encroach133-TitleCommitment-001.pdfd_2024Encroach133-DeedDesc-001.docxEncroachment Application.pdfEncroachment Checklist_1520California_10-3-2024.pdfFlowline Measurements.pdfLease - Leven Deli.pdfLOI.pdfParcel Land Description.docxPlans.pdfREDLINES- ER Transportation- Kijowski.pdfRevised Encroachment Application and Plans_1520California__10-10-25 Land Owner Executed.pdf | ||||
2024-ENCROACHMENT-0000128 Tier III 10 Galapago Stairs Landing and Railing ENCROACHMENTDenial · 123 agencies | ENCROACHMENT | 23 | Denial · 1 | |
CenturyLink ReferralDenied Denied on behalf of this critical reviewer. We received the following email with contact information for the reviewer assigned to this project. Please contact the reviewer to work towards their approval. "Your project number is P863578 and it should be referen… All documents in this project (11) 1613100LX-AE-2024-07-03.pdf2024.07.18_10 Galapago - 60pct Construction Documents.pdf2024_08_27 - 10 Galapago - A101.pdf2024_08_27 - 10 Galapago - S100.pdf20240827-10 Galapago-Encroachment Plan.pdf★ 2024-ENCROACHMENT-0000128 Comment Report 10-16-2024.pdfdoti.pt.2023.105_tier_determination_checklist - 10 Galapago_Signed.pdfdotipt-105.3.2-encroachment_checklist_10 Galapago_Signed.pdfdotipt-105-encroachment_application_10 Galapago_Signed.pdfREDLINES- CenturyLink- Canary.pdfWarranty Deed 2017028546.pdf | ||||
2024-ENCROACHMENT-0000120 Tier III 550 N Harrison St Fence ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (8) Encroachment Permit Checklist-2024-07-03.pdfHarrison_St_Encroachment and Encumberance In Right Of Way.pdfHarrisonEncroachmentApplication_Signed_08.01.24.pdfKDB Red Lines Harrison_St_Encroachment.pdfLegal Exhibit-Encroachment area signed.pdfREDLINES - Survey - Breitnauer - 20240925 - ISP.pdfREDLINES - Survey - Breitnauer - 20240927 - Description.pdfTitle Commitment for Harrison Street Development.pdf | ||||
2024-ENCROACHMENT-0000119 Tier III 3039 Walnut St Ramp and Stairs ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
2024-ENCROACHMENT-0000113 Tier II - E Colfax BRT Grant-Josephine – Steele-Colorado – Elm-Monaco ENCROACHMENTDenial · 127 agencies | ENCROACHMENT | 27 | Denial · 1 | |
DS Transportation ReviewDenied Denied on behalf of Critical Reviewer, This is still under review. Please contact the reviewer to resolve. All documents in this project (6) ★ 2024-ENCROACHMENT-0000113 Comment Report 09-11-2024.pdfdotipt-105.3.2-encroachment_checklist - E Colfax BRT - signed.pdfdotipt-105-encroachment_application - E Colfax BRT - signed.pdfE Colfax BRT - Landscape Layout Plans and Details - 8-15-24.pdfREDLINES - Special Projects - Pulkinen.pdfREDLINES - Survey - Breitnauer.docx | ||||
2024-ENCROACHMENT-0000091 2ND SUB_Tier III 1550 Market St STK Patio ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (16) 16M - Title Commitment 03.25.26.pdf2026.01.16_1550_Market_Street_LandmarkApprovedApplication.pdf2026.01.16_1550MarketStreet_AmendedCOA.pdf2026.07.21_1550_Market_St_Approved_Application.pdf2026.07.21_1550_Market_St_COA.pdf2ND SUB - APPROVED PLANS-8.pdf2ND SUB 260301-STK Denver Patio - ELEC.pdf2ND SUB APPLICATION.pdf2ND SUB CHECKLIST.pdf2ND SUB JVA STK Denver Patio Awning Canopy STRUC.pdf2ND SUB STK Denver Awning Support Frames - Calculations Updated 05142026.pdf2ND SUB STK Market Street Denver CO V20 ARCH.pdf2ND SUB STK Market Street Denver CO V20 PL Sheets.pdfDenver_ZONE1_CCDZoningPermit_v1_20260721_104202.pdfPARCEL DESCRIPTION 1550 market 5-17-24.docxSTK Denver ESMT Legal description.pdf | ||||
2024-ENCROACHMENT-0000091 Tier III 1550 Market St STK Patio ENCROACHMENTDenial · 524 agencies | ENCROACHMENT | 24 | Denial · 5 | |
DS Transportation ReviewDenied 1. Dimension PAR clearance at each of the two (2) light pole bases in front of property, nearest patio rail to nearest concrete pole base element. 2. Provide grades and cross-slope of PAR around patio at regular intervals to verify it meets CCD/ADA standards a… Survey ReviewDenied Survey comments are in the REDLINES folder (REDLINES- Survey- Savich) ERA Wastewater ReviewDenied See Denial Comments from 6/27/2024 Denver Office of Disability Rights ReferralDenied PWPRS Project Number: 2024-ENCROACHMENT-0000091 Tier III 1550 Market St STK Patio Reviewing Agency/Company: DODR Reviewers Name: Juan Pasillas Reviewers Phone: 720-913-3309 Reviewers Email: Juan.pasillas@denvergov.org Approval Status: Denied Comments: Please s… Landmark ReviewDenied This project will require Landmark design review by the Lower Downtown Design Review Commission. The project will need to comply with the Design Guidelines for Lower Downtown Historic District and the Design Guidelines for Lower Downtown Streetscape. As design… All documents in this project (14) 2024_05-17 - STK Market Street Denver CO_01 ARCH.pdf2024_05-17 - STK Market Street Denver CO_02 STRC.pdf2024_05-17 - STK Market Street Denver CO_03 STRC CALCS.pdf2024_05-17 - STK Market Street Denver CO_04 LAND SURVEY.pdf2024-ENCROACHMENT-0000091 Comment Report 7-2-2024.pdf★ 2024-ENCROACHMENT-0000091 Revised Comment Report 06-13-2025 .2.pdfDeed of Trust Security Agreement Fixture Filing and Assignment of Leases and Rents.pdfFINAL - doti.pt.2023.105_tier_determination_checklist.pdfFINAL - dotipt-105-encroachment_app-signed.pdfPARCEL DESCRIPTION 1550 market 5-17-24.docxREDLINES - CenturyLink - Hackler.pdfREDLINES - DODR - Pasillas.pdfREDLINES- Survey- Savich.docxTab 40 - Survey.pdf | ||||
2024-ENCROACHMENT-0000080 Tier III 2465 S. Downing Street Porter Ortho Specialty Center ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (6) Checklist_2460 S Corona St_05-09-2024_Tier Request.pdfExhibit_2460 S Corona St_05-09-2024_Tier Request.pdfPorterOrtho-dotipt-105-encroachment_application.pdfREDLINES- CenturyLink- Hackler- Letter Of No Objection.pdfREDLINES- Survey- Pfohl.pdfSitePlan_2490 S Corona St_03-27-2024_Zoning Permit Resubmit.pdf | ||||
2024-ENCROACHMENT-0000077 Tier II Washington St Improvement - Wayfinding Signs ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
2024-ENCROACHMENT-0000071 2nd Tier III 1501 S Pearl St. - Ototo Patio ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (1) | ||||
2024-ENCROACHMENT-0000071 Tier III 1501 S Pearl St. - Ototo Patio ENCROACHMENTDenial · 128 agencies | ENCROACHMENT | 28 | Denial · 1 | |
ERA Transportation ReviewDenied 1. It is unclear what has been revised since previous submittal. This submittal did not provide comment responses showing previous comments by reviewers as well as how the comment was addressed. Please include. 2. Encroachments shall be a max of 40 ft in lengt… | ||||
2024-ENCROACHMENT-0000069 Tier II 1010 Colfax Art District Sign ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (11) 230472-04 - Opus Group - Kalaco - Denver Arts District Pylon.pdfALTA Commit for Title Ins 7-1-21-CO.PDFdotipt-105-encroachment_application SIGNED.pdfPlans from 2019PM0000672 Colfax and Kalamath SDP 1_e.pdfPylon dotipt-105.3.2-encroachment_checklist.pdfPylon Permission.pdfREDLINES- Huetig- Forestry- Approved.pdfREDLINES- Huetig- Forestry.pdfREDLINES- Survey- Sperling.docxSpecial Warranty Deed 3.7.22.pdfTitle Committment - 2.2.24_e.pdf | ||||
2024-ENCROACHMENT-0000067 Tier III 16th St Mall Design Build Reconstruction Project ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (13) 16th St Mall dotipt-105.3.2-encroachment_checklist.pdf16th St Mall dotipt-105-encroachment_application.pdfExhibit 1 Trout and Pebbles.pdfExhibit 2 Hexagon Shade Structures.pdfExhibit 3 Hive Climber and Hexagon Platforms.pdfExhibit 4 Block 4 Square Shade Structures.pdfExhibit 5 Scattered Leaves.pdfExhibit 6 Grasslands.pdfExhibit 7 Block 12 Square Shade Structures.pdfLandscape Site Plans.pdfREDLINES- Parks- Cervera.pdfREDLINES- Survey- Savich- Approved.pdfREDLINES- Survey- Savich.docx | ||||
2024-ENCROACHMENT-0000037 Tier III 1509 17th St Canopies and Strata Vaults ENCROACHMENTDenial · 523 agencies | ENCROACHMENT | 23 | Denial · 5 | |
DS Transportation ReviewDenied There are no exceptions to the proposed encroachments from DES Transportation; however, limits need to match TEP/SDP submittals. 1. The Tier III Encroachments (i.e. Canopies and Strata Vaults) are to be identified on TEP/SDP and identified by name and type mat… Survey ReviewDenied Survey comments are in the REDLINES folder (REDLINES- Survey- Savich.docx) DES Wastewater Review REDLINES uploaded to E-review webpageDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. Xcel ReferralDenied PWPRS Project Number: 2024-ENCROACHMENT-0000037 - Tier III 1509 17th St Canopies and Strata Vaults Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Don… City Forester ReviewDenied 2024-ENCROACHMENT-0000037 - 17th & Blake Cells & Canopies OCF Comments 4-15-24 1. NOTE: Planting area configuration on Blake has changed from what was originally approved by OCF (see attachment, uploaded via ERA site). A. Our office needs to re-review the SDP… All documents in this project (8) 20240320_RH_EncrApplication.pdf20240320_RH_EncrChecklist.pdf20240320_RH_EncrExhibits.pdf★ 2024-ENCROACHMENT-0000037 Comment Report 4-18-2024.pdf2024-ENCROACHMENT-0000037 Revised Comment Report 2-26-2025.pdfREDLINES- CenturyLink- Letter of No Objection with Reservations.pdfREDLINES- Forestry- Huetig.pdfREDLINES- Survey- Savich.docx | ||||
2024-ENCROACHMENT-0000035 Tier III 7993 E 36th Ave. Storm Sewer ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
2024-ENCROACHMENT-0000011 Tier II 1140 N Bannock St Soil Cells ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (12) 1100 Bannock - Special Warranty Deed.pdf2024-01-30 ESW Soil Cell Encroachment Site Plan.pdf25 - LANDSCAPE PLAN.pdf34 - LANDSCAPE DETAILS.pdfApplication Evans School West_DOTI Encroachment.pdfChecklist dotipt-105.3.2-encroachment.pdfESMT_190212_ENCR_20240201.pdfGreenBlue Urban ArborSystem Tree Pit Package 600 24.pdfLegal Description_190212.docxLEGL_190212_ENCR.docxREDLINES- Survey- Pfohl.pdfSoil Cell Encroachment Letter 2024_01_30.pdf | ||||
2024-ENCROACHMENT-0000002 Tier III 1618 E 38th Ave Roof Overhang and Steps ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
2024-CIP-0000200 Upper Sanderson Gulch Storm Improvements CIPFlagged · 530 agencies | CIP | 30 | Flagged · 5 | |
ERA Transportation ReviewReview Complete - Objection See ER Transportation Redlines for comments Review Status: Review Complete - No Objection ERA Erosion Control ReviewReview Complete - Objection 1). Due to the project's proximity to a waterway, a Construction Activities Stormwater Discharge Permit (CASDP) is required. 2). Please prepare CASDP package in accordance with the City guidelines found here: https://www.denvergov.org/content/denvergov/en/wast… PW Survey ReviewReview Complete - Objection Survey redlines have been uploaded to Accela and copied to the Project REDLINES folder. DPR Parks QAReview Complete - Objection DPR Comments provided in documents Review Status: No Response ERA Floodplain ReviewReview Complete - Objection Please see comments provided with the review of 2024-SUDP-0004218. All documents in this project (16) 2024_11_20_MHFD MEP Design Approval Letter_Upper Sanderson.pdf★ 2024-CIP-0000200 Comment Report 12-26-2024.pdf2024-CIP-0000200 Upper Sanderson Gulch Storm Improvements - CASDP Plan.msgBID_UPPER SANDERSON GULCH_07272022.pdfGeocal - Upper Sanderson Gulch Storm Project Report rev. 5-11-2022.pdfREDLINES- DPR- Cervera- Approved.pdfREDLINES- DPR- Cervera- concrete_walks_curbs_and_miscellaneous_flatwork.docxREDLINES- DPR- Cervera- Executed DOTI Storm Sewer Utility Permit in Sanderson Gulch.pdfREDLINES- DPR- Cervera- native_seeding.docxREDLINES- DPR- Cervera.pdfREDLINES- ER Transportation- Weller.pdfREDLINES- Survey- Lee.docxSanderson Drainage Memo_Bid.pdfUpper Sanderson_Comment Response Log_Bid_ER.xlsxUpper Sanderson_MMP_Final.pdfUpper Sanderson_Statement Of No Impact_Bid.pdf | ||||
2024-CIP-0000102 Mill Levy 26 CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (12) CIP_Review_May2022.pdfML26 - Drainage Memo 100pct.pdfML26 - Estimate 100pct.pdfML26 - Plans 100pct.pdfML26 - Specs 90pct Comments.pdfML26 - SWMP Narrative.pdfML26_Comment Resolution Matrix 90pct Comments.pdfREDLINES - Forestry - Evers.pdfREDLINES - Parks - Cervera.pdfREDLINES - Survey - Castaneda.docxREDLINES - Transportation Mobility Engineering - Stein.pdfREDLINES - WW Construction - Gehrke.pdf | ||||
2024-CIP-0000076 CD9 Sidewalk Package 8 Group B CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (8) CIP_Review_May2022.pdfDenver Sidewalk Gap District 9 Package 8 Group B Final Plans.pdfDenver Sidewalk Gap District 9 Package 8 Group B Specs_REV041224.pdfREDLINES - Blair - 630 fm SW Gap D9 Pkg 8 Group B Specs_REV041224.pdfREDLINES - Blair - SW Gap D9 Pkg 8 Group B Final.pdfREDLINES - Transportation and Mobility - Stein.pdfREDLINES- ER Transportation- Kijowski- 100pct Plans.pdfREDLINES- ER Transportation- Kijowski- REV10312025.pdf | ||||
2024-CIP-0000021 HSIP 23 Peoria Improvements VisionZero CIPNo report yet— agencies | CIP | — | No report yet | |
All documents in this project (9) 2024-01-19_24322_Peoria HSIP_ER CRF_100pcnt.pdf2024-01-19_24322_Peoria HSIP_Estimate_100pcnt.pdf2024-01-19_24322_Peoria HSIP_Plans_100pcnt.pdf2024-01-19_24322_Peoria HSIP_Specifications_100pcnt.pdf2026 06 16 CM Transportation Redlines 47th.pdfREDLINES- Construction Engineering- Blair- Specs.pdfREDLINES- Construction Engineering- Blair.pdfREDLINES- DS Transportation- Mueller.pdfREDLINES- Survey- Svechovsky.pdf | ||||
2023-VACA-0000011 3330 W 24th Ave Vacation VACADenial · 428 agencies | VACA | 28 | Denial · 4 | |
City Councilperson and Aides ReferralDenied PWPRS Project Number: 2023-VACA-0000011 - 3330 W 24th Ave Vacation Reviewing Agency/Company: City Council Reviewers Name: Amanda Sandoval ERA Transportation ReviewDenied 1. Properties at 3324 W. 24th Ave. and 3326 W. 24th Ave. - have these owners accepted the vacation request, as they may receive a portion of this vacation? Please provide written acceptance from these owners. Survey ReviewDenied survey redlines can be found in REDLINES folder ROW - Supplemental ReviewDenied PWPRS Project Number: 2023-VACA-0000011 - 3330 W 24th Ave Vacation Reviewing Agency/Company: CPD - Zoning Administration Reviewers Name: Tina Axelrad Reviewers Phone: 7208652937 Reviewers Email: tina.axelrad@denvergov.org Approval Status: Denied Comments: Appr… | ||||
2023-VACA-0000010 Bonnie Brae Block 24 Alley VACANo report yet— agencies | VACA | — | No report yet | |
2023-VACA-0000003 Broadway Station, S Cherokee St Rename VACANo report yet— agencies | VACA | — | No report yet | |
All documents in this project (2) | ||||
2023-VACA-0000002 2nd Submittal 29th and Speer VACANo report yet— agencies | VACA | — | No report yet | |
All documents in this project (6) 2023-VACA-0000002_29th and Speer_Response Letter.pdf2nd Submittal 29th and Speer_Checklist and Application - Signed.pdf2nd Submittal 29th and Speer_Concept Plan - Loading.pdfREDLINES- Baca- 20250490res.pdfREDLINES- Survey- Gulaid- LAND DESCRIPTION - 11-25.docxREDLINES- Survey- Gulaid- LAND DESCRIPTION.docx | ||||
2023-UTIL-0000189 Xcel Energy - E Harvard Ave and S Downing St, Denver UTILDenial · 17 agencies | UTIL | 7 | Denial · 1 | |
ERA Transportation ReviewDenied 1. Provide dimensions perpendicular from the EOP to conduit, instead of from the ROW line. 2. Minimum depth of boring shall be 4' under structures and 5' under channel thalweg when located within a | ||||
2023-UTIL-0000184 Denver Water - TBD - Evans Avenue from Josephine to Milwaukee Street UTILDenial · 215 agencies | UTIL | 15 | Denial · 2 | |
City Forester ReviewDenied 2023-UTIL-0000184: Evans - Josephine to Milwaukee OCF Comments 8-21-23 1. Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines (reference proj… ERA Transportation ReviewDenied 1. Please protect all sanitary sewer and storm drain pipes and appurtenances during construction. 2. Provide legend for line types and symbols (define EOC as lip of pan or back of curb). All documents in this project (10) ★ 2023-UTIL-0000184 Comment Report 08-23-2023.pdf2023-UTIL-0000184 Revised Comment Report 12-4-2025.pdf2023-UTIL-0000184 Revised Comment Report 12-8-2025.pdf21941 dotipt-121.2- UPR - application.pdfDW Evans Ave UPR-checklist.pdfPlans - 21941 - DSGN - SSM - 60.pdfREDLINES- ER Transportation- Leyva.pdfREDLINES Forestry Huetig - OCF Tree Protection Detail - 2-14-20.pdfREDLINES- Forestry- Huetig- Approved.pdfREDLINES Forestry Huetig.pdf | ||||
2023-RELINQ-0000017 1975 S. Colorado Blvd RELINQDenial · 222 agencies | RELINQ | 22 | Denial · 2 | |
Survey ReviewDenied Survey RedLines in REDLINES folder DES Wastewater ReviewDenied Denver Wastewater will not relinquish this portion of the easement until design plans to re-route the existing public sanitary sewer main have been approved. Approval of the sewer main re-route design plans will also include bonding/surety to ensure that the e… All documents in this project (7) 1- 1975 S. Colorado Blvd - easement - relinquishment - application submit.pdf2- 1975 S. Colorado Blvd - Easement Relinquishment Letter.pdf★ 2023-RELINQ-0000017 Comment Report 07-14-2023.pdf3- 1975 S. Colorado Blvd Sewer Easement Relinquishment Site Plan.pdf4- 1975 S. Colorado Blvd - Proposed Relinquishment-Survey.pdf5- 1975 S. Colorado Blvd - Original Ordinance.pdfREDLINES Survey Clarke.pdf | ||||
2023-RELINQ-0000012 4050 N Brighton Blvd RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (2) | ||||
2023-RELINQ-0000005 263 Josephine St RELINQDenial · 320 agencies | RELINQ | 20 | Denial · 3 | |
CenturyLink ReferralDenied PWPRS Project Number: 2023-RELINQ-0000005 - 263 Josephine St Reviewing Agency/Company: CenturyLink/Lumen Reviewers Name: Rebekah Anthony Reviewers Phone: 307-717-0420 Reviewers Email: rebekah.anthony@lumen.com Approval Status: Denied Comments: CenturyLink has… DES Wastewater ReviewDenied PWPRS Project Number: 2023-RELINQ-0000005 - 263 Josephine St Reviewing Agency/Company: DOTI ERA Transportation ReviewDenied 1. Please work with the DES Wastewater reviewer for requirements relating to the private storm and public sanitary mains located within the easement reserved by ordinance 728, series 1978. The easement may not be relinquished until the public main has been aba… All documents in this project (13) 2023-RELINQ-0000005 Comment Report 3-21-2023.pdf2023-RELINQ-0000005 Comment Report.pdf★ 2023-RELINQ-0000005 Revised Comment Report 1-4-2024.pdf2023-RELINQ-0000005 Revised Comment Report 3-28-2023.pdf20240104_2023-RELINQ-0000005_SitePlan.pdf263 Josephine St Easement Relinquishment Letter.pdf302_easement_relinquishment_application ss.pdfPages from 302_easement_relinquishment_application page 2.pdfREDLINES- Centurylink- Anthony.pdfREDLINES- ER Transportation- Kijowski.pdfREDLINES- Survey- Pfohl.pdfResponse to REDLINES- Survey- Pfohl.pdfSite Plan-r1.pdf | ||||
2023-PROJMSTR-0000468 Santa Fe Streetscape Design PROJMSTRNo report yet— agencies | PROJMSTR | — | No report yet | |
2023-ENCROACHMENT-0000175 Tier II - 301 High St - Security Wall ENCROACHMENTDenial · 525 agencies | ENCROACHMENT | 25 | Denial · 5 | |
DS Transportation ReviewDenied comments emailed to applicant DS Project Coordinator ReviewDenied PWPRS Project Number: 2023-ENCROACHMENT-0000175 - Tier II - 301 High St - Security Wall Reviewing Agency/Company: Development Services / Project Coordination Reviewers Name: Tiffany Holcomb Reviewers Phone: 720-865-3018 Reviewers Email: Tiffany.Holcomb@denverg… Survey ReviewDenied Comments in project folder Review Status: Approved Building Department ReviewDenied No uploaded drawings for the wall were found under the documents tab for this project. Assuming the proposed wall height increase doubles the height of the wall, the flexural stress at the bottom of the wall due to wind load will increase by a factor of 4. App… Denver Fire Department ReviewDenied No drawings or information to review for this project | ||||
2023-ENCROACHMENT-0000172 Tier II - 3615 Delgany - Pedestrian Lights ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (8) 3615 Delgany - Tier II Encroachment - Application.pdf3615 Delgany - Tier II Encroachment - Checklist.pdf3615 Delgany - Tier II Encroachment - EG1 Fixture Specs.pdf3615 Delgany - Tier II Encroachment - Encroachment Area Land Description.docx3615 Delgany - Tier II Encroachment - Encroachment Area Site Plan -stamped.pdf3615 Delgany - Tier II Encroachment - Parcel Land Description.docx3615 Delgany - Tier II Encroachment - Survey Exhibit.pdf3615 Delgany - Tier II Encroachment - Title.pdf | ||||
2023-ENCROACHMENT-0000168 2nd -Tier II Crown Castle 2023 Group 16 ENCROACHMENTDenial · 326 agencies | ENCROACHMENT | 26 | Denial · 3 | |
Survey ReviewDenied ERA Transportation ReviewDenied 1. Site DN0540 - per Small Cell Design Guidelines Section 2.2 for General Placement, free standing poles are not to be placed within a designated park or parkway. This location falls within Hale Parkway. Co-locations may be options nearby - but also require Pa… Parks and Recreation ReviewDenied DPR Comments provided in documents Review Status: Approved - No Response All documents in this project (7) 2023 Group 16 ADDRESS_CARD_REV_1895_Wynkoop_St- DN0689.pdf2023 Group 16 DN0689 EME Report REV.pdf2023 Group 16 DN0689_1A_ACCURACY_CERTIFICATION_SIGNED REV.pdf2023 Group 16 DN0689_FCD_1.4.24_SIGNED.pdf★ 2023-ENCROACHMENT-0000168 Comment Report 10-18-2023 (2).pdfCrown Castle Fiber LLC - 2023 - Group #16 - SMALL GROUP TRACKER.xlsxREDLINES- ER Transportation- McMurtrie- Comment Letter.pdf | ||||
2023-ENCROACHMENT-0000159 Tier III - Regulator Station 54 - W 29th and Fox St ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
2023-ENCROACHMENT-0000158 3rd - Tier III - 50 S Bellaire Retaining Wall ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (20) 3rd Sub - ALTA Commitment_50 S Bellaire St_09-20-2024.pdf3rd Sub - Architectural Site Plan_50 S Bellarie_09-20-2024.pdf3rd Sub - Encroachment Application_50 S Bellaire_09-20-2024.pdf3rd Sub - Encroachment Checklist_50 S Bellaire_09-20-2024.pdf3rd Sub - Encroachment Land Description and Illustration_50 S Bellaire.pdf3rd Sub - Encroachment Narrative_50 S Bellaire_09-20-2024.pdf3rd Sub - ISP_5080 S Bellaire_11-02-2023.pdf3rd Sub - Legal Description-Exhibit A_50 S Bellaire St_09-20-2024.docxAPPROVAL- Survey- Pfohl.docxREDLINES- City Council- Sawyer- Approved.pdfREDLINES- ER Trans- Weller- Comments.pdfREDLINES- ER Trans- Weller- StrucRetWall.pdfREDLINES- ER Trans- Weller- Traffic Analysis Comments.pdfREDLINES- ER Trans- Weller- Traffic Engineering Memo report draft.pdfREDLINES- ER Trans- Weller.pdfREDLINES- ER Transportation- Weller- Architectural Site Plan.pdfREDLINES- ER Transportation- Weller- Comment Response Letter.pdfREDLINES- ER Transportation- Weller- Structural Detail.pdfREDLINES- Hilltop Neighborhood- Approved Plans.pdfREDLINES- Hilltop Neighborhood Letter.pdf | ||||
2023-ENCROACHMENT-0000158 2nd - Tier III 50-80 S Bellaire Retaining Wall ENCROACHMENTDenial · 827 agencies | ENCROACHMENT | 27 | Denial · 8 | |
DS Transportation ReviewDenied 1. Show and label the curb/gutter and sidewalk on the Site Plan. Include dimensions for sidewalk width and distance from curb flowline (face-of-curb) to closest edge of retaining wall (for example, column edge, columnar cap edge). 2. Walls, including their foo… Survey ReviewDenied PWPRS Project Number: 2023-ENCROACHMENT-0000158_2nd - Tier III 50-80 S Bellaire Retaining Wall Reviewing Agency/Company: DOTI-ROWS Survey Reviewers Name: Brian Pfohl Reviewers Phone: 630.202.6564 Reviewers Email: brian.pfohl@denvergov.org Approval Status: Deni… DES Wastewater Review REDLINES uploaded to E-review webpageDenied City Council ReferralDenied PWPRS Project Number: 2023-ENCROACHMENT-0000158_2nd - Tier III 50-80 S Bellaire Retaining Wall Reviewing Agency/Company: Denver City Council, District 5 Reviewers Name: Amanda Sawyer Reviewers Phone: 7203375555 Reviewers Email: DenverCouncil5@denvergov.org App… ERA Transportation ReviewDenied PWPRS Project Number: 2023-ENCROACHMENT-0000158_2nd - Tier III 50-80 S Bellaire Retaining Wall Reviewing Agency/Company: DOTI ROWS ER Transportation Reviewers Name: Paul Weller Reviewers Phone: 720-913-0514 Reviewers Email: Paul.Weller@Denvergov.org Approval S… TES Sign and Stripe ReviewDenied PWPRS Project Number: 2023-ENCROACHMENT-0000158 - Tier III - 50 S Bellaire - Retaining Wall Reviewing Agency/Company: DOTI Implementation Reviewers Name: Brittany Price Reviewers Phone: 7208653154 Reviewers Email: brittany.price@denvergov.org Approval Status:… ERA ReviewDenied Better dimensioned plans are needed showing height of wall and fence, property line, right-of-way line, sidewalk dimensions and how far into the right-of-way the wall is. Call outs must be on plans including flowline, face of curb, curb cuts fully dimensioned… ROW - Supplemental ReviewDenied PWPRS Project Number: 2023-ENCROACHMENT-0000158 - Tier III - 50 S Bellaire - Retaining Wall Reviewing Agency/Company: Hilltop Neighborhood Association Reviewers Name: Thomas Hart AIA - Zoning Committee Chair - Hilltop Neighborhood Association Reviewers Phone:… All documents in this project (7) ★ 2023-ENCROACHMENT-0000158 Comment Report 5-3-2024.pdf2nd Sub Encroachment Application_50 S Bellaire_04-05-2024.pdf2nd Sub Encroachment Application_80 S Bellaire_04-05-2024.pdf2nd Sub Site Plan_50-80 S Bellaire_04-05-2024.pdfREDLINES- ER Transportation- Weller.pdfREDLINES- Hilltop Neighborhood Letter.pdfREDLINES- Survey- Pfohl.pdf | ||||
2023-ENCROACHMENT-0000158 Tier III - 50 S Bellaire - Retaining Wall ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (14) Checklist_Signed_50 S Bellaire_09-06-2023.pdfEncroachment Application Complete Signed_50 S Bellaire_07-10-2023.pdfEncroachment Checklist_50 S Bellaire_08-29-2023.pdfEncroachment Narrative_50 S Bellaire_07-10-2023.pdfImage 1.jpegImage 2.jpegImage 3.jpegParcel Land Description_50 S Bellaire_09-06-2023.docxQuite Claim Deed Receipt Title Commitment_07-12-2023.pdfREDLINES- ER Transportation- Kijowski.pdfREDLINES- Hilltop Neighborhood Letter.pdfREDLINES- Survey- Pfohl.docxSITE PLAN_50 S BELLAIRE_09-06-2023.pdfSURVEY SIGNED_50 AND 80 S BELLAIRE_09-06-2023.pdf | ||||
2023-ENCROACHMENT-0000155 Tier II - CPV 17th St Gardens ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
2023-ENCROACHMENT-0000135 Tier II - 805 W 38th Ave - Planters ENCROACHMENTDenial · 225 agencies | ENCROACHMENT | 25 | Denial · 2 | |
DS Transportation ReviewDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. Survey ReviewDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. All documents in this project (9) 2020-PM-0000591_38th and Huron_Encroachment Checklist.pdf2020-PM-0000591_38th and Huron_Legal Description- Comments.pdf2020-PM-0000591_38th and Huron_Legal Description.docx2020-PM-0000591_38th and Huron_Legal Exhibit.pdf2020-PM-0000591_38th and Huron_Signed Encroachment Application.pdf2020-PM-0000591_38th and Huron_Tier II Encroachment Plans.pdf2020-PM-0000591_38th and Huron_Title Commitment.pdf★ 2023-ENCROACHMENT-0000135 Comment Report 8-25-2023.pdfREDLINES- SURVEY- Ali.pdf | ||||
2023-ENCROACHMENT-0000126 Tier II - 200 E Colfax - Bollards - Capitol Bldg ENCROACHMENTDenial · 121 agencies | ENCROACHMENT | 21 | Denial · 1 | |
City Forester ReviewDenied DENIED - please coordinate with OCF on Tree Protection Requirements. All trees to remain and be protected. Significant impact shown to historic, large stature, shade trees. Nick.Evers@denvergov.org. All documents in this project (14) 01-CB Encroachment Permit Transmittal.pdf02-CB COD Encroachment Permit App. 2023.07.18.pdf03-CB Encroachment Narrative.pdf04-CB Encroachment SITE PLAN.pdf05-CB Bollard Cover and Rated BollardEUA reviewed.pdf06-CB Encroachment Location.docx07-CB Additional Materials - Property Ownership.pdf08-CB Site Survey - signed.pdf09-CB encroachment_checklist.pdf10-CB ID78915 2-14-23 State Capitol Bollards.pdf★ 2023-ENCROACHMENT-0000126 Comment Report 8-11-2023.pdfREDLINES- Survey- Pfohl 8-11-2023.docxREDLINES- Survey- Pfohl-Approved.pdfREDLINES- Survey -Prohl.docx | ||||
2023-ENCROACHMENT-0000124 Tier II Crown Castle 2023 Group 15 ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (11) Crown Castle 2023 Group 15 SUBMITTAL CHECKLIST.pdfCrown Castle 2023 Group 15 ADDRESS CARDS.pdfCrown Castle 2023 Group 15 APPLICATION FORM.pdfCrown Castle 2023 Group 15 CONSTRUCTION DRAWINGS.pdfCrown Castle 2023 Group 15 FOUNDATION CALCULATIONS.pdfCrown Castle 2023 Group 15 POLE DISCRIPTIONS.docxCrown Castle 2023 Group 15 RF REPORTS.pdfCrown Castle 2023 Group 15 SHOT CLOCK COVER LETTER.pdfCrown Castle 2023 Group 15 SMALL GROUP TRACKER.xlsxCrown Castle 2023 Group 15 STRUCTURAL CALCULATIONS.pdfREDLINES- Survey- Sperling.pdf | ||||
2023-ENCROACHMENT-0000120 Tier II Crown Castle 2023 Group 14 ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (12) Crown Castle Fiber LLC - 2023 - Group 14 - ADDRESS CARD.pdfCrown Castle Fiber LLC - 2023 - Group 14 - APPLICATION FORM.pdfCrown Castle Fiber LLC - 2023 - Group 14 - CONSTRUCTION DRAWING.pdfCrown Castle Fiber LLC - 2023 - Group 14 - FOUNDATION CALCULATIONS.pdfCrown Castle Fiber LLC - 2023 - Group 14 - POLE DISCRIPTION.docxCrown Castle Fiber LLC - 2023 - Group 14 - RF REPORT.pdfCrown Castle Fiber LLC - 2023 - Group 14 - SHOT CLOCK COVER LETTER.pdfCrown Castle Fiber LLC - 2023 - Group 14 - SMALL GROUP TRACKER.xlsxCrown Castle Fiber LLC - 2023 - Group 14 - STRUCTURAL CALCULATIONS.pdfCrown Castle Fiber LLC - 2023 - Group 14 - SUBMITTAL CHECKLIST.pdfREDLINES - Survey - Svechovsky.pdfREDLINES ROWS Inspector Blair.pdf | ||||
2023-ENCROACHMENT-0000118 Tier II Crown Castle 2023 Group 13 ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (10) Crown Castle Fiber LLC - 2023 - Group 13 - ADDRESS CARD.pdfCrown Castle Fiber LLC - 2023 - Group 13 - APPLICATION FORM.pdfCrown Castle Fiber LLC - 2023 - Group 13 - CONSTRUCTION DRAWING.pdfCrown Castle Fiber LLC - 2023 - Group 13 - FOUNDATION CALCULATIONS.pdfCrown Castle Fiber LLC - 2023 - Group 13 - POLE DISCRIPTION.docxCrown Castle Fiber LLC - 2023 - Group 13 - RF REPORT.pdfCrown Castle Fiber LLC - 2023 - Group 13 - SHOT CLOCK COVER LETTER.pdfCrown Castle Fiber LLC - 2023 - Group 13 - SMALL GROUP TRACKER.xlsxCrown Castle Fiber LLC - 2023 - Group 13 - STRUCTURAL CALCULATIONS.pdfCrown Castle Fiber LLC - 2023 - Group 13 - SUBMITTAL CHECKLIST.pdf | ||||
2023-ENCROACHMENT-0000117 Tier II Crown Castle FIber 2023 Group 11 ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (10) Crown Castle Fiber LLC - 2023 - Group 11 - ADDRESS CARD.pdfCrown Castle Fiber LLC - 2023 - Group 11 - APPLICATION FORM.pdfCrown Castle Fiber LLC - 2023 - Group 11 - CONSTRUCTION DRAWINGS.pdfCrown Castle Fiber LLC - 2023 - Group 11 - FOUNDATION CALCULATIONS.pdfCrown Castle Fiber LLC - 2023 - Group 11 - POLE DISCRIPTION.docxCrown Castle Fiber LLC - 2023 - Group 11 - RF REPORT.pdfCrown Castle Fiber LLC - 2023 - Group 11 - SHOT CLOCK COVER LETTER.pdfCrown Castle Fiber LLC - 2023 - Group 11 - SMALL GROUP TRACKER.xlsxCrown Castle Fiber LLC - 2023 - Group 11 - STRUCTURAL CALCULATIONS.pdfCrown Castle Fiber LLC - 2023 - Group 11 - SUBMITTAL CHECKLIST.pdf | ||||
2023-ENCROACHMENT-0000116 Tier II Crown Castle Fiber 2023 Group 10 ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (10) Crown Castle 2023 Group 10 ADDRESS CARD.pdfCrown Castle 2023 Group 10 APPLICATION FORM.pdfCrown Castle 2023 Group 10 CONSTRUCTION DRAWING.pdfCrown Castle 2023 Group 10 FOUNDATION CALCULATIONS.pdfCrown Castle 2023 Group 10 POLE DISCRIPTION.docxCrown Castle 2023 Group 10 RF REPORT.pdfCrown Castle 2023 Group 10 SHOT CLOCK COVER LETTER.pdfCrown Castle 2023 Group 10 SMALL GROUP TRACKER.xlsxCrown Castle 2023 Group 10 STRUCTURAL CALCULATIONS.pdfCrown Castle 2023 Group 10 SUBMITTAL CHECKLIST.pdf | ||||
2023-ENCROACHMENT-0000063 Tier II - 1906 Pearl St - Awning ENCROACHMENTDenial · 528 agencies | ENCROACHMENT | 28 | Denial · 5 | |
DS Transportation ReviewDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. DS Project Coordinator ReviewDenied PWPRS Project Number: 2023-ENCROACHMENT-0000063 - Tier II - 1906 Pearl St - Awning Reviewing Agency/Company: Development Services / Project Coordination Reviewers Name: Tiffany Holcomb Reviewers Phone: 720-865-3018 Reviewers Email: Tiffany.Holcomb@denvergov.or… Survey ReviewDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. DES Wastewater ReviewDenied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. ERA Transportation ReviewDenied 1. Remove "Encroachment A" from the Encroachment Exhibit. Based on other submittal documents, it does not appear to be included with this application. If Encroachment A is to be included in this permit, please provide all required information per the Submittal… All documents in this project (11) ★ 2023-ENCROACHMENT-0000063 Comment Report 07-12-2023.pdfEncroachment Checklist.pdfEncroachmentApplication - 1906-N-Pearl-St - 05-31-2023.pdfEncroachmentCOI - 1906-N-Pearl-St - 05-31-2023.pdfEncroachmentExhibit - 1906-N-Pearl-St - 05-31-2023.pdfEncroachmentLegalDesc - 1906-N-Pearl-St - 05-31-2023.docxPropertyLegalDesc - 1906-N-Pearl-St - 05-31-2023.docxREDLINES Xcel George.pdfSitePlan - 1906-N-Pearl-St - 05-31-2023.pdfTitle Report - 1906-N-Pearl-St - 05-31-2023.pdfWarranty Deed - 1906-N-Pearl-St - 05-31-2023.pdf | ||||
2023-ENCROACHMENT-0000043 Tier III - 1000 N Broadway - Light Well ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (10) Current Title Work-Warranty Deed.pdfEncroachment Application for Light Well.pdfLegal Description.docxPlans.pdfREDLINES- DS WW- Harris- Flo2D.pdfREDLINES- DS WW- Harris- Preliminary sump routing.pdfREDLINES- Survey- Sperling.docxSportscastle_Light Well Encroachment-Arch Details.pdfStrucPlan_1000BroadwaySt_05-02-2023.pdfSubmittal Checklist.pdf | ||||
2023-ENCROACHMENT-0000017 Tier II Crown Castle 2023 Group 6 ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (10) Crown Castle Fiber LLC - 2023 - Group 6 - APPLICATION FORM.pdfCrown Castle Fiber LLC - 2023 - Group 6 - ADDRESS CARD.pdfCrown Castle Fiber LLC - 2023 - Group 6 - CONSTRUCTION DRAWING.pdfCrown Castle Fiber LLC - 2023 - Group 6 - FOUNDATION CALCULATIONS.pdfCrown Castle Fiber LLC - 2023 - Group 6 - POLE LOCATION DECSRIPTION.docxCrown Castle Fiber LLC - 2023 - Group 6 - RF REPORT.pdfCrown Castle Fiber LLC - 2023 - Group 6 - SMALL GROUP TRACKER.xlsxCrown Castle Fiber LLC - 2023 - Group 6 - STRUCTURAL CALCULATIONS.pdfCrown Castle Fiber LLC - 2023 - Group 6 - SUBMITTAL CHECKLIST.pdfCrown Castle Fiber LLC - 2023 - Group 6- SHOT CLOCK COVER LETTER.pdf | ||||
2023-ENCROACHMENT-0000015 2ND SUBMITTAL - Tier III - 3575 Chestnut Pl - Plaza ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
2023-ENCROACHMENT-0000015 Tier III - 3575 Chestnut Pl - Plaza ENCROACHMENTNo report yet— agencies | ENCROACHMENT | — | No report yet | |
All documents in this project (8) 23.0307 Tier III encroashment permit.pdf3575 Chestnut Pl - 1st Submittal TEP - 2023-02-24.pdf3575 Chestnut Pl - Coffee_C01 Site Plan and Details.pdfdotipt-105.3.2-encroachment_checklist.pdfEmail with encroachment image.pdfREDLINES- Building- Peetz.pdfREDLINES- Survey- Castaneda- Denial- Exhibit.pdfREDLINES- Survey- Castaneda.docx | ||||
2022-VACA-0000015 2nd Submittal - 32nd and Tejon Assemblage 3222 Tejon St Vacation VACANo report yet— agencies | VACA | — | No report yet | |
All documents in this project (11) 1939 W. 32ND EGRESS DIAGRAM.pdf2022-VACA-0000015 - 3222 Tejon St - Response Comments 1 - 12.09.2024.pdf22VAC15-Survey-Redline- Gulaid.pdfAcceptance Letter - 1925 W 32nd Ave_secured.pdfAcceptance Letter - 3216 Tejon - 07.28.2023_signed.pdfAcceptance Letter - 3222 Tejon - 07.28.2023_signed.pdfAcceptance Letter_ 1939 W 32nd Ave - Steve Trese.pdfLSP Survey 3216 3222 3232 N Tejon St 052523.pdfREDLINES- CenturyLink- Letter of No Objection.pdfTurning Exhibits Option 1 - 12.09.2024.pdfUtilites - ESI Land Surveying - Tejon 05.25.23.pdf | ||||
2022-RELINQ-0000021 38th and Huron North Partial Relinquishment RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (5) _EXTERNAL_ FW_ 2022-RELINQ-0000021 Updates .msg2020PM591_North Easement_Original Holding Document - 9200095493.pdf38th Huron - 2022-RELINQ-0000021 - Lot 1 Block 1 Easement Exhibit - 2026-02-12.pdfdoti.pt.2024-302.3-easement-relinquishment-checklist-application -REF 2022-RELINQ-000021.pdfLegal Description - 2022-RELINQ-0000021.pdf | ||||
2021-RELINQ-0000013 1235 N Yates Street Sewer Easement RELINQNo report yet— agencies | RELINQ | — | No report yet | |
All documents in this project (8) 1235 N. YATES-ESMNT RELINQ EXHIBIT-R1-230403.pdf1235 North Yates Street - PROPOSED SITE PLAN.pdfEXHIBIT A-LEGAL DESCRIPTION-R1.docxREDLINES- Centurylink- Key.pdfREDLINES- Survey- Sperling.pdfSUBMITTAL 3_1235 North Yates Street - EASEMENT RELINQUISHMENT APPLICATION.pdfSUBMITTAL 3_1235 North Yates Street - EASEMENT RELINQUISHMENT LETTER and EXHIBIT A.pdfSUBMITTAL 3_1235 North Yates Street - ORIGINAL DEED OF EASEMENT.pdf | ||||
No projects matching your filters.
Source: Denver's public e-Review. "Denial" reflects at least one reviewing agency's status reading "Denied" as of that report's last update — many are resolved in a later resubmittal. The 🚲 bike lane flag is a keyword match against project titles, filenames, and comment-report text, with generic Parks & Rec boilerplate filtered out — treat it as a research lead, not a verified list. Refreshed manually.