ROW e-Review Tracker
Every project on Denver DOTI's public right-of-way e-Review index — encroachments, vacations, easement relinquishments, utility work, and capital projects — cross-referenced against each project's agency Comment Report for denials, flagged conditions, and bike lane elements.
Type
| Project | Type | Agencies | Outcome | |
|---|---|---|---|---|
| 2026-VACA-0000011 KSE Arena Redevelopment 1000 Chopper Cir Vacation | VACA | 26 | Denial · 3 | |
| CenturyLink Referral Denied PWPRS Project Number: 2026-VACA-0000011 KSE Arena Redevelopment 1000 Chopper Cir Vacation Reviewing Agency/Company: Centurylink/Lumen Reviewers Name: Briana Salles Reviewers Phone: 361-652-8608 Reviewers Email: briana.salles@lumen.com Approval Status: Denied C… DES Transportation Review Denied No Transportation exception to alley ROW vacation for private street. Awaiting City (storm sewer/drainage), Denver Water, and other utility service provider comment regarding utility service extensions and easements that may be required in and adjacent to this… Survey Review Denied Uploaded survey redline comments in E-Review. Review Status: Approved - No Response All documents in this project (11) ★ 2026-VACA-0000011 Comment Report 5-29-2026.pdf Ball Arena_Alley Legal and Exhibit_S1.pdf KDC Alley Vacation Site Plan.pdf KDC Arena_Alley Legal Exhibit_vacation-checklist-application_S1.pdf Kroenke Arena Company - Title Commtment 70861584 - Revision_4.pdf Kroenke Parking CURRENT TITLE Commitment_revision_3.pdf REDLINES- CenturyLink- Salles - No Objection.pdf REDLINES- CenturyLink- Salles- Objection Letter.docx REDLINES- Survey- Breitnauer.pdf Title Commitment -LTGC 1450 5th Street 74179.1.pdf Title Commitment- LTGC Arena and Surrounding Parcels (74180.1).pdf | ||||
| 2026-VACA-0000009 AHRT 3707 Walnut St Vacation | VACA | 24 | Denial · 1 | |
| Survey Review Denied See red lines for further comments. Review Status: Approved - No Response | ||||
| 2026-VACA-0000006 555 N Josephine St Vacation | VACA | 26 | Denial · 2 | |
| Construction Engineering Review Denied See checklist and application. Vacations, dedications and easements need to be hatched. Survey Review Denied Survey redline comments were uploaded in E-Review. All documents in this project (7) ★ 2026-VACA-0000006 - Comment Report - 04.21.2026.pdf Checklist and Application.pdf Legal Description.pdf REDLINES - Survey- TBreitnaauer - 20260407-2026-VACA-006-1stSubmittal-Survey RedlineComments.pdf REDLINES- CenturyLink- Salles- No Reservations.pdf REDLINES-CenturyLink-BSales REDLINES.pdf Site Plan.pdf | ||||
| 2026-VACA-0000005 2465 S Downing St - Porter Hospital Alley Vacation | VACA | 26 | Denial · 3 | |
| CenturyLink Referral Denied PWPRS Project Number: 2026-VACA-0000005 - 2465 S Downing St - Porter Hospital Alley Vacation Reviewing Agency/Company: Centurylink/Lumen Reviewers Name: Briana Salles Reviewers Phone: 361-652-8608 Reviewers Email: briana.salles@selectrow.com Approval Status: D… DES Transportation Review Denied 1. Partial alley vacation cannot be approved since it is creating dead-end alley. An L-out has to be constructed 2. If alley vacation would be approved, it should be called out as 18' alley to include 2' dedication completed in 2024 3. Utility easement should… DES Wastewater Review Denied Easement reservation is needed to cover the existing public sanitary sewer or the re-location of the sewer needed to be done prior to vacation approval. | ||||
| 2026-VACA-0000001 1871 S University Blvd DU Alley Vacation | VACA | 26 | Denial · 3 | |
| DES Transportation Review Denied PWPRS Project Number: 2026-VACA-0000001 1871 S University Blvd DU Alley Vacation Reviewing Agency/Company: DOTI DES Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.christensen@denvergov.org Approval Status:… DES Wastewater Review Denied Denver GIS indicates that the existing alley ROW between Asbury and Jewell is aproximately 22 to 24 feet, not 15'. Survey Review Denied Comments and redlines in project folder Review Status: Approved - No Response All documents in this project (7) ★ 2026-VACA-0000001 Comment Report 2-23-2026.pdf DU Alley Vacation Request_Application.pdf DU Alley Vacation Segment 1_Legal Description.pdf DU Alley Vacation Segment 2_Legal Description.pdf DU Alley Vacatoin Request_Site Plan.pdf REDLINES- CenturyLink- Salles - Objection Letter.pdf REDLINES- Survey- Pfohl.pdf | ||||
| 2026-UTIL-0000150 Xcel - HKS Utility Services - E 46th Ave and SPR Trail-Bridge | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Add EOP-EOP dimension on each sheet on each street where work is being performed. 2. Sheet 6: Proposed transformer is located in South Platte Levee NO DIG area. Work in this area must be reviewed All documents in this project (4) | ||||
| 2026-UTIL-0000149 Xcel - HKS Utility Services LLC - W 38th Ave and Huron | UTIL | 8 | Denial · 3 | |
| City Forester Review Denied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. 1. ATTN: Per development no 2020PM0000591, gas line route on Galapago must be adjusted t… Comments: Denied 1. Add ROW-ROW dimension on each sheet on each street where work is being proposed. 2. Sheet 8: Dimension running line to storm manhole. Must comply with 5' minimum distance requirement. Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000149 - Xcel - HKS Utility Services LLC - W 38th Ave and Huron Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied C… | ||||
| 2026-UTIL-0000145 CenturyLink - Pauley Construction - 21530 Stoll Pl | UTIL | 8 | Denial · 3 | |
| City Forester Review Denied Plan file is not available on e-review ERA Transportation Review Denied 1. Please provide dimensions from bore line to sidewalk, BOC, EOP 2. Sheet 11, 12 and 15 - Bore lines can by no means go thorough signal clear zones 3. Sheet 13 - Adjust street name labels, should be 51st Ave (not PL) 4. Sheet 13 - Show clear zone per CCD Std… PW Construction Engineering Review Denied RESTUBMIT. RE-READ the UPR Submittal checklist. On the next submittal, don't check items that are not show on the plans. | ||||
| 2026-UTIL-0000144 Xcel - HKS Utility Services - 1055 Clermont St | UTIL | 6 | Denial · 2 | |
| City Forester Review Denied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Comments: Denied 1. Reference specific record/project number for project showing future conditions of area to verify future conditions. All documents in this project (6) 1055 Clermont St. - Electric Installation (2026-07-08).pdf 1055 Clermont St. - UPR Application (2026-07-08).pdf 1055 Clermont St. - UPR Checklist (2026-07-08).pdf ★ 2026-UTIL-0000144 - Comment Report - 07.27.26.pdf 2026-UTIL-0000144 - Revised Comment Report - 07.30.26.pdf REDLINES - OCF - EHuetig Comments 7-22-26__2026-UTIL-0000144.pdf | ||||
| 2026-UTIL-0000143 Xcel - Sitewise LLC - 1570 S VALLEJO | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Dimension ROW to ROW. 2. Dimension EOP to EOP. All documents in this project (7) 1570 S Vallejo St_QLA_REDUCED_JK SIGNED.pdf ★ 2026-UTIL-0000143 Comment Report 7-23-2026.pdf 2026-UTIL-0000143 Revised Comment Report 7-28-2026.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig.pdf Utility Plan Review Application 1570 S Vallejo St..pdf Utility Plan Review checklist 1570 S VALLEJO.pdf | ||||
| 2026-UTIL-0000142 Zayo Fiber Solutions - 800 18th St | UTIL | 7 | Denial · 1 | |
| Comments: Denied 1. The use of aerial photography is not a sufficient representation of the existing conditions , especially where shadows obscure roadway features?or the resolution of the photo is low and features are not easily discernible.? | ||||
| 2026-UTIL-0000137 Xcel - HKS Utility Services - UNIV1924 Feeder | UTIL | 8 | Denial · 2 | |
| City Forester Review Denied Denied OCF Comments 7-15-26 1. Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. A. Sheet 5: Move switch cabinet 8' west of proposed site… ERA Transportation Review Denied 1. Sheet 5: Dimension proposed pole to BOC. Distance must comply with 5.5' minimum for future sidewalk expansion. All documents in this project (6) | ||||
| 2026-UTIL-0000135 Xcel - HKS Utility Services - MONR1081 Feeder | UTIL | 7 | Denial · 2 | |
| City Forester Review Denied Comments: Denied All documents in this project (10) ★ 2026-UTIL-0000135 - Comment Report - 07.15.2026.pdf 2026-UTIL-0000135 - Revised Comment Report - 07.29.2026.pdf 2026-UTIL-0000135 - Revised Comment Report - 07.30.2026.pdf 2026-UTIL-0000135 Final Approved Plan Set.pdf MONR1081 Feeder - Electric Installation.pdf MONR1081 Feeder - UPR Application.pdf MONR1081 Feeder - UPR Checklist.pdf REDLINES - OCF - Ehuetig - Comments 7-9-26 - MONR1081 Feeder - Electric.pdf REDLINES - OCF - EHuetig - Approved 7-27-26__MONR1081 Feeder - Electric (2026-07-23).pdf REDLINES -EPR Transportation- VCuellar - MONR1081 Feeder - Electric Installation (2026-07-23).pdf | ||||
| 2026-UTIL-0000132 Xcel - HKS Utility Services - 3721 Globeville Rd | UTIL | 10 | Denial · 2 | |
| City Forester Review Denied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. 1. Sheet 6: Locate bore & trench on south side of Globeville at midpoint b/w ROW trees.… Comments: Denied 1. Dimension proposed SC to BOC. Must comply with 5.5' minimum distance requirement for future expansion of 5' attached sidewalk. All documents in this project (11) ★ 2026-UTIL-0000132 - Comment Report - 7.6.26.pdf 2026-UTIL-0000132 - Comment Report - 7.7.26.pdf 2026-UTIL-0000132 - Revised Comment Report - 7.21.26.pdf 2026-UTIL-0000132 Final Approved Plan Set.pdf 3721 Globeville Rd. - Electric Installation.pdf 3721 Globeville Rd. - UPR Application.pdf 3721 Globeville Rd. - UPR Checklist.pdf REDLINES - CDOT - MWhite - NW_028_C.pdf REDLINES - EPR Transportation - VCuellar - 3721 Globeville Rd. - Electric Installation.pdf REDLINES - OCF - EHuetig - Comments 6-30-26__2026-UTIL-0000132.pdf REDLINES - OCF - EHuetig - Approved 7-15-26__3721 Globeville Rd. - Electric 2026-07-13.pdf | ||||
| 2026-UTIL-0000131 Hyperfiber - ITG - Picadilly Rd and Green Valley Ranch Blvd | UTIL | 8 | Denial · 4 | |
| Parks and Recreation Review Denied PWPRS Project Number: 2026-UTIL-0000131 - Hyperfiber - ITG - Picadilly Rd and Green Valley Ranch Blvd Reviewing Agency/Company: Parks Planning Design and Construction Reviewers Name: Greg Neitzke Reviewers Phone: 3039162689 Reviewers Email: greg.neitzke@denver… ERA Transportation Review Denied 1. Include trench footage in bill of materials. 2. If trench footage exceeds 1,750 LF: Due to the project's limit of disturbance (Open trench equal to or exceeding PW Construction Engineering Review Denied Please Send PWPR-019 Denver Water Referral Denied | ||||
| 2026-UTIL-0000128 HyperFiber - ITG - Maxwell Pl and Kirk St | UTIL | 7 | Denial · 3 | |
| City Forester Review Denied Denied: 1) No trenching in the amenity zone Comments: Denied Previous approval was an error. The following comments must be addressed. PW Construction Engineering Review Denied This plan set references PWPR-019. Please send a copy to kim.blair@denvergov.org | ||||
| 2026-UTIL-0000126 CenturyLink - Pauley Construction - 4872 Cathay St | UTIL | 7 | Denial · 1 | |
| Comments: Denied 1. Sheet 10: Add and dimension missing sanitary lateral that runs to 5152 N Espana Way. Must comply with minimum distance requirements. All documents in this project (8) | ||||
| 2026-UTIL-0000123 Comcast - ITG Communications - 11440 E 56th Ave | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Include UPR number on top front center of cover sheet. 2. Please use aerial images for plans that clearly show the existing conditions for the area, including the adjacent All documents in this project (7) | ||||
| 2026-UTIL-0000122 Xcel - HKS Utility Services - 3515 Garfield St | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Application mentions proposed installation of 2 poles, but only one is being shown on plans. Please indicate where second pole is being proposed. If it is not in public ROW, show on plans but indicate that it is not being All documents in this project (7) ★ 2026-UTIL-0000122 - Comment Report - 06-29-2026.pdf 2026-UTIL-0000122 Final Approved Plan Set.pdf 2026-UTIL-0000122 Revised Comment Report 7-15-2026.pdf 3515 Garfield St. - UPR Application.pdf 3515 Garfield St. - UPR Checklist.pdf 3515 Garfield St. - Utility Pole Installation.pdf REDLINES- ER Transportation- Leyva- Approved.pdf | ||||
| 2026-UTIL-0000121 Segura Fiber - AZ Field Services -18381 Green Valley Ranch Blvd | UTIL | 7 | Denial · 3 | |
| City Forester Review Denied Forestry Comments: 1) Include OCF Tree Protection Standard Notes and Detail - see OCF website. ERA Transportation Review Denied 1. Add city UPR project number centered on top of the cover (e.g. 2019-UTIL-0001234) 2. Move running line out of amenity zone and into roadway to maximize planting area. Please note, if the running line is shifted by more than 5', resubmission of plans is requ… Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000121 - Segura Fiber - AZ Field Services -18381 Green Valley Ranch Blvd Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status:… All documents in this project (6) 2026-UTIL-0000121 - Comment Report - 7-9 - 26.pdf ★ 2026-UTIL-0000121 - Revised Comment Report - 7-30-26.pdf 26859002-Denver Permit Checklist.pdf dotipt-121.2 utility plan review application.pdf S0024476 Peter Defries Corporation dba Dion's 18381 Green Valley Ranch BLVD.Pothole Permit Drawings.Rev 0.260417.pdf TCP- 26859002 18381 Green Valley Ranch blvd.pdf | ||||
| 2026-UTIL-0000119 Comcast - Mastec - 4698 Peoria St | UTIL | 14 | Denial · 2 | |
| City Forester Review Denied Denied: 1) Sheet 10 - show TPZ fencing as perimeter around ROW tree canopy adjacent to HH install. Add note to reference OCF Tree Protection Standard Notes. ERA Transportation Review Denied 1. Sheet 8: ROW line is not being shown accurately on plans. ROW line is closer to west edge of sidewalk. Consider moving running line to roadway to move out of private property. Add callout pointing to where work exists public | ||||
| 2026-UTIL-0000114 Comcast - ITG Communications - 1490 S Shoshone St | UTIL | 7 | Denial · 1 | |
| ERA Transportation Review Denied 1. Please show existing conditions using aerial photography. Add line work for all fences, gates, walks buildings and driveways to demonstrate that the proposed location does not adversely affect the adjacent property.? 2. Sheet 7: Add existing sanitary latera… All documents in this project (5) | ||||
| 2026-UTIL-0000113 CenturyLink - Pauley Construction - 4898 Halifax St | UTIL | 7 | Denial · 2 | |
| Comments: Denied 1. Add not stating that work exiting public ROW is not approved nor permitted under this UPR . 2. Please protect all green infrastructure, sanitary sewer, storm drain pipes and appurtenances during construction. PW Construction Engineering Review Denied REDLINES uploaded to Ereview page | ||||
| 2026-UTIL-0000112 CenturyLink - Pauley Construction - 4770 N Forest St | UTIL | 7 | Denial · 1 | |
| Comments: Denied 1. Show missing sanitary lateral located near proposed work. Closest edge of proposed work must be at least 5' from sanitary lateral. All documents in this project (9) 2026-UTIL-0000112 - Comment Report - 06.23.2026.pdf ★ 2026-UTIL-0000112 - Revised Comment Report - 06.29.2026.pdf 2026-UTIL-0000112 - Revised Comment Report - 07.07.26.pdf 2026-UTIL-0000112 Final Approved Plan Set.pdf Denver UPR Checklist.pdf P.395801 Denver Utility Plan Application.pdf P.395801-26036.00-FOREST ST 20260605.pdf REDLINES - EPR Transportation - VCuellarLeyva - P.395801-26036.00-FOREST ST 20260629.pdf REDLINES - kdb P.395801-26036.00-FOREST ST 20260605.pdf | ||||
| 2026-UTIL-0000103 Xcel - HKS Utility Services LLC - E Yale Ave and S Holly St | UTIL | 8 | Denial · 2 | |
| City Forester Review Denied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. 1. CRITICAL: Open trench within tree protection zone/dripline at Yale & Hudson is not pe… ERA Transportation Review Denied 1. Sheet 5: Work located on private property. The City and County of Denver does not review/approve nor inspect work outside the public ROW. Contractor shall obtain property owner's permission prior to construction. Remove or | ||||
| 2026-UTIL-0000102 Comcast - Mastec - 9313 W Saratoga Pl | UTIL | 7 | Denial · 2 | |
| City Forester Review Denied OCF Comments 6-2-26 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, ERA Transportation Review Denied 1. Work shown is going outside public right-of-way. This work shall not be permitted under this UPR. Please remove this work from the UPR plans and/or clearly note and provide callout for EACH location that it is not part of the UPR | ||||
| 2026-UTIL-0000100 Xcel - HKS Utility Services LLC - Tower Rd and Green Valley Ranch Blvd | UTIL | 7 | Denial · 2 | |
| Parks and Recreation Review Denied PWPRS Project Number: 2026-UTIL-0000100 - Xcel - HKS Utility Services LLC - Tower Rd and Green Valley Ranch Blvd ERA Transportation Review Denied 1. Sheet 14: Proposed location of work is in a park and will also require approved status from Parks reviewers. Please provide proof of approval/no objection when obtained. | ||||
| 2026-UTIL-0000098 Xcel - Sitewise LLC - Clarkson from 14th to 18th crossing Colfax | UTIL | 7 | Denial · 1 | |
| Comments: Denied 1. Due to the project's limit of disturbance (Open trench equal to or exceeding 1,750 LF) a Construction Activities | ||||
| 2026-UTIL-0000096 HyperFiber - ITG Communications - 1101 Auraria PKWY- Ball Arena Property Redevelopment - Phase 1 | UTIL | 8 | Denial · 1 | |
| ERA Transportation Review Denied 1. Dimension all proposed work (handholes, transformers, bore pits, running line, etc.) to BOC, ROW, and edge of walk. 2. Show all utility mains and services, including but not limited to; water, sanitary sewer, manholes, and storm sewer. Dimension to proposed… All documents in this project (9) 2026-UTIL-0000096 Comment Report 5-29-2026.pdf ★ 2026-UTIL-0000096 Revised Comment Report 07.29.2026.pdf BA-PH1-UTIL-UPR-0001-APPLICATIONS.pdf BA-PH1-UTIL-UPR-0001-PLANS.pdf BA-PH1-UTIL-UPR-0001-SUBMITTAL CHECKLIST.pdf REDLINES - EPR TRANS- VCuellar - Updated 2026-UTIL-0000096 BA-PH1-UTIL-UPR-0001-PLANS (060826).pdf REDLINES - EPRTrans - VCuellar - 2026-UTIL-0000096 BA-PH1-UTIL-UPR-0001-PLANS (REV3 072126).pdf REDLINES - OFC - EHuetig - Approved - 2026-UTIL-0000096 BA-PH1-UTIL-UPR-0001-PLANS (060826).pdf REDLINES- Forestry- Huetig.pdf | ||||
| 2026-UTIL-0000095 Comcast - Mastec - 3512 S Hillcrest Dr | UTIL | 8 | Denial · 3 | |
| City Forester Review Denied ERA Transportation Review Denied Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000095 - Comcast - Mastec - 3512 S Hillcrest Dr Reviewing Agency/Company: Denver Water | ||||
| 2026-UTIL-0000094 Xcel - HKS Utility Services LLC - 3988 Galapago St | UTIL | 6 | Denial · 2 | |
| City Forester Review Denied 05/27/2026 Denied ERA Transportation Review Denied 1. Sheet 7: Add and dimension storm manhole at the intersection of W 39th Ave and N Galapago St. Ensure open trench and running line are at least 5' from manhole. | ||||
| 2026-UTIL-0000087 Xcel - HKS Utility Services - 1001 N. Alcott St | UTIL | 6 | Denial · 1 | |
| Comments: Denied PWPRS Project Number: 2026-UTIL-0000087 -Xcel - HKS Utility Services - 1001 N. Alcott St Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments:… All documents in this project (7) | ||||
| 2026-UTIL-0000084 Xcel - HKS Utility Services - 6298 N. Argonne St | UTIL | 7 | Denial · 2 | |
| Comments: Denied 1. Sheet 6: Dimension proposed bore pit to storm main. Must comply with minimum distance requirements. 2. Running line/work crosses over a bridge. Contact?DOTI Bridge Group at?DOTI.Bridges@Denvergov.org?. UPR PW Construction Engineering Review Denied see kdb red lines. Review Status: Approved | ||||
| 2026-UTIL-0000082 Denver Water - Denver Water - Virginia Village - S Fairfax St from E Mexico Ave to E Florida Ave and in S Eudora St from E Florida Ave to E Louisiana Ave | UTIL | 8 | Denial · 2 | |
| City Forester Review Denied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No ERA Transportation Review Denied All documents in this project (8) ★ 2026-UTIL-0000082 - Comment Report - 04.24.26.pdf 2026-UTIL-0000082 - Revised Comment Report -06.08.2026.pdf 22979 - Site Plans.pdf 22979 - UPRAPP.pdf 22979 - URPCHECKLIST.pdf EPR TRANS-VCuellar-Leyva- REDLINES - 2026-UTIL-0000082.pdf OCF - REDLINES - 2026-UTIL-0000082 - OCF Comments 06.05.2026.pdf OCF - REDLINES - 2026-UTIL-0000082 - OCF Comments 4-21-26.pdf | ||||
| 2026-UTIL-0000080 Xcel - HKS Utility Services - UNIV1024 Feeder | UTIL | 7 | Denial · 3 | |
| City Forester Review Denied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No Comments: Denied Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000080 - Xcel - HKS Utility Services - UNIV1024 Feeder Reviewing Agency/Company: Denver Water All documents in this project (9) ★ 2026-UTIL-0000080 Comment Report 4-22-2026.pdf 2026-UTIL-0000080 Revised Comment Report 4-23-2026.pdf REDLINES- CDOT- White.pdf REDLINES- Denver Water- Naso- Easement 421-365.pdf REDLINES- Denver Water- Naso.pdf REDLINES- Forestry- Huetig.pdf UNIV1024 Feeder - Electric Installation.pdf UNIV1024 Feeder - UPR Application.pdf UNIV1024 Feeder - UPR Checklist.pdf | ||||
| 2026-UTIL-0000073 Xcel - HKS Utility Services - 1000 S Logan St | UTIL | 8 | Denial · 1 | |
| City Forester Review Denied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No All documents in this project (8) 1000 S. Logan St. - Electric Installation.pdf 1000 S. Logan St. - UPR Application.pdf 1000 S. Logan St. - UPR Checklist.pdf ★ 2026-UTIL-0000073 Comment Report 4-21-2026.pdf 2026-UTIL-0000073 Final Approved Plan Set.pdf 2026-UTIL-0000073 Revised Comment Report 5-12-2026.pdf REDLINES - OCF - EHuetig Comments 4-6-25__2026-UTIL-0000073.pdf REDLINES- Forestry- Huetig- Approved.pdf | ||||
| 2026-UTIL-0000064 Xcel - HKS Utility Services - 95 N. Lincoln St | UTIL | 8 | Denial · 1 | |
| City Forester Review Denied Denied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No All documents in this project (10) 2026-UTIL-0000064 Comment Report 4-7-2026.pdf 2026-UTIL-0000064 Final Approved Plan Set.pdf ★ 2026-UTIL-0000064 Revised Comment Report 4-16-2026.pdf 2026-UTIL-0000064 Revised Comment Report 4-21-2026.pdf 95 N. Lincoln St. - Electric Installation.pdf 95 N. Lincoln St. - UPR Application.pdf 95 N. Lincoln St. - UPR Checklist.pdf REDLINES- ER Transportation- Leyva- Approved.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig.pdf | ||||
| 2026-UTIL-0000062 Comcast - ITG Communications LLC - 2700 S Holly St | UTIL | 8 | Denial · 2 | |
| ERA Transportation Review Denied 1. Running line goes over bridge at beginning of project. Refer to the Bridge Group @ DOTI.Bridges@denvergov.org. Bridge group must provide approval or denial of the proposed work (if they deem Comments: Denied PWPRS Project Number: 2026-UTIL-0000062 - Comcast - ITG Communications LLC - 2700 S Holly St Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comme… All documents in this project (4) | ||||
| 2026-UTIL-0000059 Hyper Fiber - ITG - Dunkirk St and E 56th Ave | UTIL | 8 | Denial · 2 | |
| Comments: Denied 1. For future plans, reserve spot for City UPR project number centered on top of the cover (e.g. 2026-UTIL-00000XX) if City UPR project number is not yet issued. Add specific UPR number to cover sheet now that it has been issued. PW Construction Engineering Review Denied See kdb red lines. All documents in this project (8) ★ 2026-UTIL-0000059 Comment Report 3-31-2026.pdf 2026-UTIL-0000059 Revised Comment Report 06-23-2026.pdf 2026-UTIL-0000059 Revised Comment Report 6-23-2026.pdf OLT2 FDA7 - CCD Application - 031226.pdf OLT2 FDA7 - UPR Checklist 2.7 - 031226.pdf REDLINES- Contruction Engineering- Blair.pdf REDLINES- ER Transportation- Leyva- Approved.pdf RFUSA CO GREEN VALLEY RANCH A2-07 ECA 031026 R2.pdf | ||||
| 2026-UTIL-0000058 Hyperfiber - ITG - N Dunkirk St and Maxwell Place | UTIL | 8 | Denial · 3 | |
| Comments: Denied 1. For future plans, reserve spot for City UPR project number centered on top of the cover (e.g. 2026-UTIL-00000XX) if City UPR project number is not yet issued. Add specific UPR number to cover sheet now that it has been issued. PW Construction Engineering Review Denied see kdb red lines. Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000058 - Hyperfiber - ITG - N Dunkirk St and Maxwell Place Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Commen… All documents in this project (8) ★ 2026-UTIL-0000058 Comment Report 3-27-2026.pdf 2026-UTIL-0000058 Revised Comment Report 6-23-2026.pdf 2026-UTIL-0000058 Revised Comment Report 6-29-2026.pdf OLT2 FDA6 - CCD Application - 031126.pdf OLT2 FDA6 - UPR Checklist 2.6 - 031126.pdf REDLINES - EPR Transportation - VCuellar - RFUSA_COGV0206_ECA_061926_R6.pdf REDLINES- Construction Engineering- Blair.pdf RFUSA CO GREEN VALLEY RANCH A2-06 ECA 031026 R2.pdf | ||||
| 2026-UTIL-0000056 Zayo Fiber Solutions - 10700 E 45th Ave | UTIL | 7 | Denial · 2 | |
| ERA Transportation Review Denied 1. Show and dimension all Signal Equipment Clear Zones along the alignment.? No facilities including bored conduits or handholes are allowed in the Equipment Clear Zone as shown on?City and County of Denver Transportation PW Construction Engineering Review Denied see kdb red lines. Review Status: Approved - No Response All documents in this project (11) 2026-UTIL-0000056 - Final Approval Plan Set.pdf ★ 2026-UTIL-0000056 Comment Report 3-27-2026.pdf 2026-UTIL-0000056 Revised Comment Report 4-1-2026.pdf 2026-UTIL-0000056 Revised Comment Report 4-15-2026.pdf 2026-UTIL-0000056 Revised Comment Report 4-21-2026.pdf Application Updated E 45th Ave.pdf ChecklistE 45th Ave.pdf Plans -10700 E 45th Ave.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- ER Transportation- Leyva- Approved.pdf REDLINES- ER Transportation- Leyva- Bridge No Objection Email.pdf | ||||
| 2026-UTIL-0000054 Hyperfiber - ITG - N Dunkirk St and N Dunkirk Way | UTIL | 8 | Denial · 2 | |
| ERA Transportation Review Denied 1. Sheet C1: Dimension running line to inlet. 2. Add and dimension ALL service lines/laterals that come close to the running line. Link for plat maps: Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000054 - Hyperfiber - ITG - N Dunkirk St and N Dunkirk Way Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Commen… All documents in this project (9) ★ 2026-UTIL-0000054 Comment Report 3-26-2026.pdf 2026-UTIL-0000054 Revised Comment Report 3-26-2026.pdf 2026-UTIL-0000054 Revised Comment Report 6-16-2026.pdf 2026-UTIL-0000054 Revised Comment Report 6-5-2026.pdf 2026-UTIL-0000054 Revised Comment Report 6-9-2026.pdf OLT2 FDA4 - CCD Application - 031026.pdf OLT2 FDA4 - UPR Checklist 2.4 - 031026.pdf REDLINES- ER Transportation- Leyva- Approved.pdf RFUSA_ CO GREEN VALLEY RANCH A2-04_ECA_031026_R2 (1).pdf | ||||
| 2026-UTIL-0000053 Hyperfiber - ITG - Green Valley Ranch Blvd and Argonne St | UTIL | 8 | Denial · 2 | |
| Comments: Denied 1. Running line goes through signal clear zone across from N Ceylon St. Show and dimension all Signal Equipment Clear Zones along the alignment.? No facilities including bored conduits or handholes are allowed in the Equipment Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000053 - Hyperfiber - ITG - Green Valley Ranch Blvd and Argonne St Reviewing Agency/Company: Denver Water All documents in this project (6) | ||||
| 2026-UTIL-0000052 Hyperfiber - ITG - Tower Rd and E 45th Ave | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Please reference correct restoration notes. On sheet C1, TSD 12.1 for landscape is being referenced for a bore pit that is on concrete and not on landscape. TSD 12.3 for trench patch (concrete) is more appropriate for this All documents in this project (7) ★ 2026-UTIL-0000052 Comment Report 3-26-2026.pdf 2026-UTIL-0000052 Final Approved Plan Set.pdf 2026-UTIL-0000052 Revised Comment Report 5-29-2026.pdf OLT2 FDA2 - CCD Application - 031026.pdf OLT2 FDA2 - UPR Checklist 2.2 - 031026.pdf REDLINES- ER Transportation- Leyva.pdf RFUSA CO GREEN VALLEY RANCH A2 02 ECA 031026 R4.pdf | ||||
| 2026-UTIL-0000051 2nd - Zayo Fiber Solutions- 910 E 15th | UTIL | 8 | Denial · 1 | |
| ERA Transportation Review Denied 05/04/2026 Denied All documents in this project (7) | ||||
| 2026-UTIL-0000051 Zayo Fiber Solutions- 910 E 15th | UTIL | 8 | Denial · 2 | |
| Comments: Denied 1. Disturbance of the pedestrian way?(curb ramp, sidewalk and crosswalk) within 10 ft of an existing curb ramp will require the reconstruction of the curb ramp in compliance with current CCD and ADA standards, if not already fully Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000051 - Zayo Fiber Solutions- 910 E 15th Reviewing Agency/Company: Denver Water All documents in this project (5) | ||||
| 2026-UTIL-0000047 HyperFiber - ITG- Tower Rd and E 43rd Ave | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. For future plans, reserve spot for City UPR project number centered on top of the cover (e.g. 2026-UTIL-00000XX) if City UPR project number is not yet issued. Add specific UPR number to cover sheet now that it has been issued. All documents in this project (10) 2026-UTIL-0000047 Comment Report 3-18-2026.pdf 2026-UTIL-0000047 Final Approved Plan Set.pdf 2026-UTIL-0000047 Revised Comment Report 4-21-2026.pdf ★ 2026-UTIL-0000047 Revised Comment Report 4-23-2026.pdf 2026-UTIL-0000047 Revised Comment Report 5-29-2026.pdf Application.pdf Checklist.pdf GREEN VALLEY RANCH Plans.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2026-UTIL-0000045 Comcast - Mastec - 4494 WALDEN ST DENVER CO 80249 | UTIL | 8 | Denial · 2 | |
| Comments: Denied 1. Add City UPR project number centered on top of the cover 2. Disturbance of the pedestrian way?(curb ramp, sidewalk and crosswalk) within 10 ft of an existing curb ramp will PW Construction Engineering Review Denied See your sheet 5 CCD Std Dwg 7.9 - Show and avoid Signal Eqpt Clear Zones. | ||||
| 2026-UTIL-0000043 Vero Fiber Networks - Redline Design - E Alameda A | UTIL | 7 | Denial · 2 | |
| ERA Transportation Review Denied 1. Add better vicinity map. Location of project is hard to tell from provided vicinity map. 2. Dimension EOP to EOP, ROW to ROW on all sheets on streets where work is being proposed. Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000043 - Vero Fiber Networks - Redline Design - E Alameda A Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comme… | ||||
| 2026-UTIL-0000040 Xcel - HKS Utility Services - 4201 E Arkansas Ave | UTIL | 9 | Denial · 1 | |
| ERA Transportation Review Denied 1. Show and dimension all Signal Equipment Clear Zones along the alignment.? No facilities including bored conduits or handholes are allowed in the Equipment Clear Zone as shown on?City and County of Denver Transportation All documents in this project (10) 2026-UTIL-0000040 Comment Report 03.04.2026.pdf 2026-UTIL-0000040 Final Approved Plan Set.pdf ★ 2026-UTIL-0000040 Revised Comment Report 4-7-2026.pdf 2026-UTIL-0000040 Revised Comment Report 5-20-2026.pdf 4201 E. Arkansas Ave. - Electric Installation.pdf 4201 E. Arkansas Ave. - UPR Application.pdf 4201 E. Arkansas Ave. - UPR Checklist.pdf REDLINES - EHuetig - 2026-UTIL-0000040 - OCF Comments 3-3-26.pdf REDLINES- ER Transportation- Leyva.pdf REDLINES- Forestry- Huetig- Approved.pdf | ||||
| 2026-UTIL-0000036 Comcast - Mastec - 9100 E Lowry Blvd | UTIL | 9 | Denial · 3 | |
| City Forester Review Denied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No PW Construction Engineering Review Denied See kdb red lines. Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000036 - Comcast - Mastec - 9100 E Lowry Blvd Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments: Need to m… All documents in this project (12) ★ 2026-UTIL-0000036 Comment Report 2-26-2026.pdf 2026-UTIL-0000036 Final Approved Plan Set.pdf 2026-UTIL-0000036 Revised Comment Report 3-12-2026.pdf 2026-UTIL-0000036 Revised Comment Report 3-3-2026.pdf 2026-UTIL-0000036 Revised Comment Report 3-5-2026.pdf 2026-UTIL-0000036 Revised Comment Report 4-22-2026.pdf 2026-UTIL-0000036 Revised Comment Report 4-23-2026.pdf Application.pdf Checklist.pdf Plans.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- Forestry- Huetig.pdf | ||||
| 2026-UTIL-0000034 Denver Water - PT 23030 - Berkley Project N Stuart St N Raleigh St N Quitman St | UTIL | 8 | Denial · 1 | |
| City Forester Review Denied 2026-UTIL-0000034 OCF Comments 2-18-26 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Projec… All documents in this project (9) 2026-UTIL-0000034 - Final Approval Plan Set.pdf ★ 2026-UTIL-0000034 Comment Report 2-23-2026.pdf 2026-UTIL-0000034 Revised Comment Report 2-24-2026.pdf 2026-UTIL-0000034 Revised Comment Report 5.15.26.pdf 23030 CCD 1ST SUBMITTAL PE Signed.pdf 23030 UPRAPP 1ST SUB.pdf 23030 UPRCHECKLIST 1ST SUB.pdf REDLINES - EPR - VCuellar- 23030_FOR REVIEW.pdf REDLINES- Forestry- Huetig.pdf | ||||
| 2026-UTIL-0000030 Denver Water - PT 22844 - Acoma St Improvements - 5280 Trail | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Disturbance of the pedestrian way?(curb ramp, sidewalk and crosswalk) within 10 ft of an existing curb ramp will require the reconstruction of the curb ramp in compliance with current CCD and ADA standards, if not already fully All documents in this project (8) ★ 2026-UTIL-0000030 Comment Report 2-19-2026.pdf 2026-UTIL-0000030 Final Approval Plan Set.pdf 2026-UTIL-0000030 Revised Comment Report 02.27.2026.pdf 2026-UTIL-0000030 Revised Comment Report 2-19-2026.pdf 22844 CCD 1ST SUBMITTAL PE Signed.pdf 22844 UPRAPP 1ST SUB.pdf 22844 UPRCHECKLIST 1ST SUB.pdf REDLINES - ER Transportation - VCL 22844_CCD_3RD SUBMITTAL Copy.pdf | ||||
| 2026-UTIL-0000026 Vero Fiber Networks - 600 S Clinton St | UTIL | 9 | Denial · 3 | |
| City Forester Review Denied OCF Comments 2-12-26 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No ERA Transportation Review Denied 1. Required plan notes, Forestry Notes & Details Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000026 - Vero Fiber Networks - 600 S Clinton St Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments: Call ou… All documents in this project (11) ★ 2026-UTIL-0000026 Comment Report 2-17-2026.pdf 2026-UTIL-0000026 Final Approved Plan Set.pdf 2026-UTIL-0000026 Revised Comment Report 03-06-2026.pdf 2026-UTIL-0000026 Revised Comment Report 3-11-2026.pdf 2026-UTIL-0000026 Revised Comment Report 3-6-2026.pdf REDLINES- ER Transportation- Leyva- Approved.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig.pdf SIGNED Windsor Gardens utility-plan-review-checklist.pdf UPR application.pdf WSG Combined Permits.pdf | ||||
| 2026-UTIL-0000022 Xcel - HKS Utility Services - 1255 Vrain St | UTIL | 7 | Denial · 1 | |
| Comments: Denied All documents in this project (7) 1255 Vrain St. - UPR Application.pdf 1255 Vrain St. - UPR Checklist.pdf 1255 Vrain St. - Utility Pole Installation.pdf ★ 2026-UTIL-0000022 Comment Report 2-6-2026.pdf 2026-UTIL-0000022 Final Approved Plan Set.pdf 2026-UTIL-0000022 Revised Comment Report 2-19-2026.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2026-UTIL-0000019 Xcel - HKS Utility Services - E. 46th Ave. and N. Yampa St | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Lots of work shown is going outside public right-of-way. This work shall not be permitted under this UPR. Clearly note and provide callout for EACH location where work goes outside of public ROW. Separate agreements shall be All documents in this project (6) ★ 2026-UTIL-0000019 Comment Report 2-5-2026.pdf 2026-UTIL-0000019 Final Approved Plan Set.pdf 2026-UTIL-0000019 Revised Comment Report 2-12-2026.pdf E. 46th Ave. and N. Yampa St. - Electric Installation.pdf E. 46th Ave. and N. Yampa St. - UPR Application.pdf E. 46th Ave. and N. Yampa St. - UPR Checklist.pdf | ||||
| 2026-UTIL-0000016 Xcel - HKS Utility Services - Florida and Raritan | UTIL | 8 | Denial · 1 | |
| ERA Transportation Review Denied 1. Disturbance of the pedestrian way?(curb ramp, sidewalk and crosswalk) within 10 ft of an existing curb ramp will require the reconstruction of the curb ramp in compliance with current CCD and ADA standards, if not already fully compliant per DOTI Rules and… | ||||
| 2026-UTIL-0000011 2nd - Xcel - HKS Utility Services - E 56th Ave | UTIL | 8 | Denial · 3 | |
| ERA Transportation Review Denied 1. Due to the project's limit of disturbance (Open trench equal to or exceeding 1,750 LF) a Construction Activities Stormwater Discharge Permit (CASDP) is required. Please prepare CASDP package in accordance with the City PW Construction Engineering Review Denied RECONSIDER open trench in E 56th (Joliet to Chambers). Denver Water Referral Denied Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments: Pending license agreement for crossing 02/03/2026 Denied PWPRS Project Number: 2026-UTIL-0000011 - Xcel - HKS Utility Services… All documents in this project (5) | ||||
| 2026-UTIL-0000011 Xcel - HKS Utility Services - E 56th Ave | UTIL | 7 | Denial · 3 | |
| ERA Transportation Review Denied 1. Add and dimension sanitary service line on SE corner of Joliet St. and 56th Ave. 2. Sheet 5 to Sheet 10: Work along E 56th Ave. is not within Denver and therefore will not be approved nor permitted PW Construction Engineering Review Denied See kdb red lines. Review Status: Approved - No Response Denver Water Referral Denied PWPRS Project Number: 2026-UTIL-0000011 - Xcel - HKS Utility Services - E 56th Ave Reviewing Agency/Company: Denver Water | ||||
| 2026-UTIL-0000010 Comcast - ITG Communications - 4600 Leetsdale Dr | UTIL | 8 | Denial · 2 | |
| City Forester Review Denied 2026-UTIL-0000010 OCF Comments 1-26-26 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Projec… Comments: Denied 1. What's the "POTHOLE ONLY PLAN SET" note on cover page? Please remove. 2. Add UPR project number on the plan set. | ||||
| 2026-UTIL-0000006 Xcel - HKS Utility Services - E. 2nd Ave. and Fillmore St | UTIL | 7 | Denial · 3 | |
| City Forester Review Denied Comments: Denied 1. Show and dimension all Signal Equipment Clear Zones along the alignment.? No facilities including bored conduits or handholes are allowed in the Equipment Clear Zone as shown on?City and County of Denver Transportation PW Construction Engineering Review Denied See kdb red lines. All documents in this project (7) ★ 2026-UTIL-0000006 Comment Report 1-26-2026.pdf E. 2nd Ave. and Fillmore St. - Electric Installation.pdf E. 2nd Ave. and Fillmore St. - UPR Application.pdf E. 2nd Ave. and Fillmore St. - UPR Checklist.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- Forestry- Huetig- Fillmore approved development plans.pdf REDLINES- Forestry- Huetig- OCF Comments.pdf | ||||
| 2026-UTIL-0000005 Xcel - Q3 - 1000 S Logan St | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Proposed poles and guy wires were not included within UPR application. Send a updated application. 2. All proposed work must be 5' from sanitary sewer main and manholes. All documents in this project (11) 112063101 1000 S Logan St IFA 2025-12-30 PE STAMP FLAT.pdf 2026-UTIL-0000005 Comment Report 1-26-2026.pdf 2026-UTIL-0000005 Final Approved Plan Set.pdf ★ 2026-UTIL-0000005 Revised Comment Report 2-11-2026.pdf 2026-UTIL-0000005 Revised Comment Report 4-2-2026.pdf REDLINES- ER Transportation- Leyva- Approved.pdf REDLINES- Forestry- Huetig- 1000 S Logan SDP.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig- OCF Comments.pdf UPR Checklist DENVER.pdf UPR Submittal Application DENVER.pdf | ||||
| 2026-RELINQ-0000011 AHRT 1086 N Meade St Relinquishment | RELINQ | 18 | Denial · 1 | |
| DES Transportation Review Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. All documents in this project (6) | ||||
| 2026-RELINQ-0000010 Access Easement 4991 N Telluride St Partial Relinquishment | RELINQ | 21 | Denial · 1 | |
| Survey Review Denied Denied REDLINES ARE UPLOADED TO THE E-REVIEW WEB- Survey redlines uploaded in Accela and E-Review. PAGE All documents in this project (9) 18-026 Partial Easement Vacation Legal Description 20260310.docx 18-026 Partial Easement Vacation Legal Description_signed 20260310.pdf ★ 2026-RELINQ-0000010 - Comment Report 5.27.2026.pdf Easement Relinquishment Submittal Checklist.pdf Originating Document.pdf REDLINES CenturyLink Lumen - P870086- NO RESERVATION LETTER. PDF.pdf REDLINES- CenturyLink- NO RESERVATION LETTER.pdf REDLINES- Survey- Lee.pdf Site Plan.pdf | ||||
| 2026-RELINQ-0000005 655 Curtis St Auraria Campus Relinquishment | RELINQ | 17 | Denial · 2 | |
| CenturyLink Referral Denied PWPRS Project Number: 2026-RELINQ-0000005 655 Curtis St Auraria Campus Relinquishment Xcel Referral Denied PWPRS Project Number: 2026-RELINQ-0000005 655 Curtis St Auraria Campus Relinquishment Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewers Phone: 3035713306 Reviewers Email: Don… | ||||
| 2026-ENCROACHMENT-0000121 Tier III - 723 E 6th Ave - Patio | ENCROACHMENT | 26 | Denial · 3 | |
| DS Transportation Review Denied 1. For reference: 2026 Transportation Standard Drawings (TSD) January 2026 may be found at https://www.denvergov.org/files/assets/public/v/1/doti/documents/standards/doti.es.2026.001.06-transportation_sta ndard_drawings.pdf and Outdoor Places Program (OPP) fou… Survey Review Denied Construction Engineering Review Denied 1. Prior to the solicitation of bids or proposals from general contractors, the developer of this project is strongly encouraged to schedule an office meeting with the Right-of-Way Services Construction Inspections team (303) 446-3469 to discuss the project's… All documents in this project (8) 2026-01-13_Don's_Encroachment Exhibit.pdf 2026-01-13_Don's_Legal Description.docx 2026-01-13_Don's_Tier III Application - Signed.pdf 2026-01-13_Don's_Tier III Checklist.pdf ★ 2026-ENCROACHMENT-0000121 - Comment Report - 7-13-26.pdf Don's OP Plan_723 E 6th Ave_06-25-2026.pdf REDLINES - Accessibility Redlines - JPasillas2026-ENCROACHMENT-0000121-Accessibility Redlines.pdf REDLINES -CenturyLink- PMedrano - Letter of No Objection P870526.pdf | ||||
| 2026-ENCROACHMENT-0000113 Tier II 225 N Clayton Street Soil Cells | ENCROACHMENT | 21 | Denial · 1 | |
| Denver Water Referral Denied PWPRS Project Number: 2026-ENCROACHMENT-0000113 - Tier II 225 N Clayton Street Soil Cells Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments… All documents in this project (15) 2023PM0000357_Timber 225 ENCROACHMENT EXHIBITS_REV.1-05-18-2026.pdf 2023PM0000357_Timber 225 Tier II Encroachemnt Checklist_Signed.pdf 2023PM0000357_Timber 225 Tier II Encroachment Application_Signed.pdf 2023PM0000357_Timber 225 TIER II ENCROACHMENT DESCRIPTIONS-05-18-2026.docx 2023PM0000357_Timber 225 Tier II Encroachment Details.pdf 2023PM0000357_Timber 225 Tier II Encroachment Site Plan.pdf 2023PM0000357_Timber 225 TIER II PROPOSED PARCEL DESCRIPTION-05-07-2026.docx 2023PM0000357_Timber 225 Title Info.pdf ★ 2026-ENCROACHMENT-0000113 Comment Report 7-7-2026.pdf Citygreen_Stratavault_Structural Soil_Cell_Details.pdf citygreen_Stratavault-Brochure_US_Jul2024-WEB-Letter.pdf Citygreen-Stratavault-TechSheet-July-2024.pdf REDLINES- CenturyLink- Letter of No Objection.pdf REDLINES- Survey- Breitnauer- Encroachment Requirements.docx REDLINES- Survey- Breitnauer.pdf | ||||
| 2026-ENCROACHMENT-0000098 1550 Wewatta St Bike Hub | ENCROACHMENT | 26 | Denial · 3 | |
| Survey Review Denied Survey redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf). REDLINES ARE UPLOADED TO THE E-REVIEW WEBPAGE DES Wastewater Review Denied 1) Submit site plan signed and sealed by licensed engineer as required in Encroachment Permit Submittal Checklist. Plan should specifically address existing utilities and proposed grading. Plan should include the demolition or relocation of utilities as requir… Building Department Review Denied CPD Building Department is concerned that the Fire Separation Distance between the proposed bicycle storage building and the existing Triangle Building can bring the Triangle Building exterior wall construction out of compliance with 2025 Denver Building Code… All documents in this project (10) 20260520 Existing Utilities Floodplain and Asbuilts.pdf 20260520_Bike Building Encroachment Application.pdf 20260520_Bike Building Encroachment Submittal Checklist.pdf 20260520_Bike Building Encroachment Submittal.pdf 20260520_Land Description 2.pdf 20260520_Land Description.docx 20260520_Land Description.pdf ★ 2026-ENCROACHMENT-0000098 Comment Report 6.8.26.pdf 2026-ENCROACHMENT-0000098 Lumen no objection letter.pdf REDLINES- Survey- Savich.pdf | ||||
| 2026-ENCROACHMENT-0000094 Tier II - 1650 N Hooker Street - Non Removal Planters | ENCROACHMENT | 23 | Denial · 3 | |
| Survey Review Denied Survey comments/redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) Denver Water Referral Denied PWPRS Project Number: 2026-ENCROACHMENT-0000094 - Townview Apartments - 1650 N Hooker Street - Non Removal Planters Reviewing Agency/Company: Denver Water Comment Report Page 4 of 6 Tier II - Townview Apartments - 1650 N Hooker Street - Non Removal Planters 06… ERA Review Denied We need an encroachment submittal checklist All documents in this project (9) 1600 N Hooker St Denver - SDP-2 - Survey (2).pdf 1600 N Hooker St Denver - SDP-2 - Survey.pdf ★ 2026-ENCROACHMENT-0000094 - Comment Report - 06.25.26.pdf 2026-ENCROACHMENT-0000094 -RevisedComment Report - 07.07.26.pdf REDLINES- CentuyrLink- Letter of No Objection P870431.pdf REDLINES- Survey- Savich.pdf Townview_Encroachment Application.pdf Townview_Encroachment Site Plans.pdf Townview_Encroachment Tier Determination.pdf | ||||
| 2026-ENCROACHMENT-0000052 Tier II - 1250 N Knox Ct - Lakewood Gulch Bridge Mural | ENCROACHMENT | 23 | Denial · 1 | |
| Survey Review Denied requires a site plan, the deed of the property that benefits the encroachment and the deed description in a Word document All documents in this project (11) ★ 2026-ENCROACHMENT-0000052 Comment Report 5-21-2026.pdf Application - signed.pdf Lakewood Dry Gulch Trail Safety Project-DRAFT.pdf Mock up at Location.jpg Mural Mockup.jpg Project Site 1.jpeg Project Site 2.jpeg Project Site 3.jpeg Property Record.png REDLINES- CenturyLink- Letter of No Objection.pdf REDLINES- Survey- Sperling.docx | ||||
| 2026-ENCROACHMENT-0000047 Tier III - 60 S Eudora Fence and Columns | ENCROACHMENT | 25 | Denial · 3 | |
| Survey Review Denied Uploaded survey and redline comments in E-Review. City Council Referral Denied PWPRS Project Number: 2026-ENCROACHMENT-0000047 Tier III - 60 S Eudora Fence and Columns Reviewing Agency/Company: Denver City Council District 5 Reviewers Name: Councilwoman Amanda Sawyer Reviewers Phone: 7203375555 Reviewers Email: denvercouncil5@denvergov.o… ROW - Supplemental Review Denied 05/19/2026 Denied PWPRS Project Number: 2026-ENCROACHMENT-0000047 Tier III - 60 S Eudora Fence and Columns Reviewing Agency/Company: Hilltop Heritage Association RNA Reviewers Name: Matthew DuPree Reviewers Phone: 3033557777 Reviewers Email: comm34@comcast.net… All documents in this project (9) 23130-24X36L SIGNED 1.pdf 60 S Eudora-Right of Way Encroachment Letter 1.docx 60 S Eudora-Site Plan for Encroachment Permit 1.pdf ★ Comment Report 2026-ENCROACHMENT-0000047 5.19.2026.pdf encroachment-permit-submittal-checklist-signed.pdf LONO-Encroachment P870043_5.12.26.pdf REDLINES Hilltop RNA 2026-Encroachment-0000047 - 60 S Eudora St - Hilltop Neighborhood Association.pdf REDLINES Hilltop RNA DOTI 2026-ENCROACHMENT-0000047 60 S Eudora.pdf REDLINES SURVEY 20260513-2026ENCROACH047-Survey RedlineComments.pdf | ||||
| 2026-ENCROACHMENT-0000042 Tier II - AHEC - 1201 5th Street Underground Conduit | ENCROACHMENT | 25 | Denial · 1 | |
| Survey Review Denied Survey comments / redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) REDLINES uploaded to E-review webpage All documents in this project (11) 2026ENCROACHMENT0000042 - AHEC MV Admin and 5th Street - 5th Street Hub Building - CCD Mapping Property Record Search Documentation.pdf ★ 2026-ENCROACHMENT-0000042 Comment Report 6-16-2026.pdf AHEC Admin Building - CCD Property Record Search Documentation.pdf Application.pdf Encroachment Checklist.pdf Encroachment LandE-Signed.pdf Encroachment Legal.docx Properties Legal Descriptions.docx REDLINES- CenturyLink- Letter of No Objection.pdf REDLINES- Survey- Savich.pdf Site Plan Exhibit.pdf | ||||
| 2026-ENCROACHMENT-0000031 Tier III - 2500 S Milwaukee Fence | ENCROACHMENT | 24 | Denial · 3 | |
| Survey Review Denied Comments in project folder City Forester Review Denied ROW - Supplemental Review Denied PWPRS Project Number: 2026-ENCROACHMENT-0000031 - Tier III - 2500 S Milwaukee Fence Reviewing Agency/Company: University Park Community Council (a registered RNO) Reviewers Name: Mike Cox Reviewers Phone: 303-638-4689 Reviewers Email: MikeCox333@gmail.com All documents in this project (9) | ||||
| 2026-ENCROACHMENT-0000029 Tier III - 1630 S Acoma Street - Art Work | ENCROACHMENT | 25 | Denial · 1 | |
| Survey Review Denied Comments in project folder All documents in this project (6) 2026-03-09 Urban Peak Cloud Art - Architectural Drawings_rev 1.pdf 2026-03-11 Urban Peak Cloud Art - ROW Encroachment Application.pdf ★ 2026-ENCROACHMENT-0000029 Comment Report 4-21-2026.pdf encroachment-permit-submittal-checklist.pdf REDLINES- CenturyLink- Medrano - No Objection.pdf REDLINES- Survey- Pfohl.docx | ||||
| 2026-ENCROACHMENT-0000026 Tier III - 3303 East Asbury Ave - Pavers - Fence | ENCROACHMENT | 21 | Denial · 3 | |
| Survey Review Denied Comments and redlines in project folder Denver Water Referral Denied PWPRS Project Number: 2026-ENCROACHMENT-0000026 - Tier III - 3303 East Asbury Ave - Pavers - Fence Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied… ROW - Supplemental Review Denied PWPRS Project Number: 2026-ENCROACHMENT-0000026 - Tier III 3303 East Asbury Ave - Pavers - Fence Improvements Reviewing Agency/Company: University Park Community Council Reviewers Name: John Hesse Reviewers Phone: 720-454-8300 Reviewers Email: zoning@uparkcc.o… All documents in this project (7) 2026 0302 ASBURY HOUSE - ENCROACHMENT SUBMITTAL.pdf ★ 2026-ENCROACHMENT-0000026 Comment Report 4-10-2026.pdf dotipt 105 encroachment application 2025 0211.pdf dotipt 105.3.2 encroachment checklist 2026 0318.pdf dotipt 105.3.2 encroachment checklist.pdf REDLINES- CenturyLink- Medrano- No Objection.pdf REDLINES- Survey- Pfohl.pdf | ||||
| 2026-ENCROACHMENT-0000025 Tier II 2718 Walnut St | ENCROACHMENT | 26 | Denial · 3 | |
| DS Transportation Review Denied PWPRS Project Number: 2026-ENCROACHMENT-0000025 Tier II 2718 Walnut St Reviewing Agency/Company: DOTI EPR Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.christensen@denvergov.org Approval Status: Denied Co… Survey Review Denied See Survey comments/checklist. DES Wastewater Review Denied This encroachment is in an area of known localized flooding, based on City stormwater modeling. The proposed encroachment must be analyzed for its effect on this flooding, and must be demonstrated to cause no more harm than previous to other properties as a re… All documents in this project (12) ★ 2026-ENCROACHMENT-0000025 Comment Report 4-8-2026.pdf 2718 Walnut - Architectural Elevation.pdf 2718 Walnut - Civil Site Plan.pdf 2718 Walnut - Encroachment Application.pdf 2718 Walnut - Encroachment Checklist.pdf 2718 Walnut - Property Legal Description.docx 2718 Walnut - Special Warranty Deed - Rec #2026009299.pdf 2718 Walnut - Structural Plans.pdf REDLINES- CenturyLink- Medrano- No Objection.pdf REDLINES- DS WW- Martel.pdf REDLINES- Survey- Castaneda.docx REDLINES WW Martel_2026-ENCROACHMENT-0000025_WASTEWATER_Statement of No Impact.pdf | ||||
| 2026-ENCROACHMENT-0000021 Tier III 1096 S Gaylord Wash Park Social Existing Awning | ENCROACHMENT | 24 | Denial · 3 | |
| Survey Review Denied Survey comments copied to Project REDLINES folder. Building Department Review Denied I'm unable to find a record of a building construction permit for the canopies in question and they might present an increase in the A-2 fire-area beyond the allowable 5,000sf (including the second floor). Please submit a code analy- sis and design drawings of… Denver Office of Disability Rights Referral Denied All outdoor patio areas in the ROW must comply with all ADA requirements and provide outdoor Accessible Dining Sur- faces/Tables with accessible furniture that complies with all applicable 2010 ADA/A117.1 requirements (specifically all heights and under table… All documents in this project (17) 1096_S_Gaylord_Plan_FINAL_PROJECTION_VERIFIED.pdf ★ 2026-ENCROACHMENT-0000021 Comment Report 4-3-2026.pdf Building Elevation REVISED 2026.v2 1.pdf Correction order issued to Wash Park Grill at 1096 S Gaylord St.pdf dotipt-105-encroachment_application.pdf Land description of the benefiting property .pdf Parcel Description.png PERMIT SUBMITIAL CHECKLIST 1.pdf Recorded Special Warranty Deed.pdf REDLINES- ADA- Pasillas.pdf REDLINES- CenturyLink- Letter of No Objection.pdf REDLINES- Survey- Pfohl.pdf site plan_1096 S Gaylord st.pdf Wash_Park_Social_Encroachment_Permit_Set_COMPRESSED.pdf Wash_Park_Social_Signage_Proposal.pdf WPS_DOTI_Awning_Projections_Pic.pdf WPS_DOTI_Awning_Projections_WITH_RECOMMENDATIONS.pdf | ||||
| 2026-ENCROACHMENT-0000020 2nd - Tier II - 2345 E Evans Ave Ramp Railing and Step | ENCROACHMENT | 23 | Denial · 1 | |
| Survey Review Denied redlines in project folder Review Status: Approved All documents in this project (8) ★ 2026-ENCROACHMENT-0000020 Comment Report 5-29-2026.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Survey- Pfohl.docx Sub 2 - 2026-ENCROACHMENT-0000020 - SITE PLAN.pdf Sub 2 - 2026-ENCROACHMENT-0000020 1st Submittal Comment Report 4-21-2026.pdf Sub 2 - B1 - ENCROACHMENT APPLICATION - SIGNED.pdf Sub 2 - B2 - ENCROACHMENT CHECKLIST - SIGNED.pdf Sub 2 - B4 - BENEFITING PROPERTY LAND DESCRIPTION.pdf | ||||
| 2026-ENCROACHMENT-0000020 Tier II - 2345 E Evans Ave Ramp Railing and Step | ENCROACHMENT | 22 | Denial · 2 | |
| DS Transportation Review Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. Survey Review Denied Comments and redlines in project folder All documents in this project (10) ★ 2026-ENCROACHMENT-0000020 Comment Report 4-17-2026.pdf A2 - TEP PLAN SET.pdf B1 - ENCROACHMENT APPLICATION - SIGNED.pdf B2 - ENCROACHMENT CHECKLIST - SIGNED.pdf B3 - ENCROACHMENT SITE PLAN.pdf B4 - BENEFITING PROPERTY LAND DESCRIPTION.pdf REDLINES- CenturyLink- Medrano- Letter of No Objection.pdf REDLINES- DODR- Pasillas.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Survey- Pfohl.pdf | ||||
| 2026-ENCROACHMENT-0000018 Tier II - 3330 W 24th Ave - Private Sewer System | ENCROACHMENT | 24 | Denial · 2 | |
| Survey Review Denied Survey comments and Site Plan redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) Denver Water Referral Denied PWPRS Project Number: 2026-ENCROACHMENT-0000018 - Tier II - 3330 W 24th Ave - Private Sewer System Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied… All documents in this project (6) | ||||
| 2026-ENCROACHMENT-0000003 Tier III - 200 Colorado Blvd - Retaining Wall - Fence - Stairs - ETC | ENCROACHMENT | 26 | Denial · 7 | |
| DS Transportation Review Denied PWPRS Project Number: 2026-ENCROACHMENT-0000003 - Tier III - 200 Colorado Blvd - Retaining Wall - Fence - Stairs - ETC Reviewing Agency/Company: DOTI DES Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.chri… Survey Review Denied Added survey and redline comments in the document folder. DES Wastewater Review REDLINES uploaded to E-review webpage Denied Show storm infrastructure on the plan, all fence structures will need to be 10' minimum away from any public infrastructure. ERA Transportation Review Denied 1. There is only 8 feet of right-of-way (ROW) along Colorado Blvd, which does not meet city standards. Encroachments will not be permitted along Colorado Blvd. and must be removed, including existing timber landscape walls. All private facilities along Colorad… ERA Wastewater Review Denied Show existing storm inlet on 2nd Ave. near stop sign. Is the inlet being reconstructed with the new 5' sidewalk along 2nd Ave? Xcel Referral Denied PWPRS Project Number: 2026-ENCROACHMENT-0000003 - Tier III - 200 Colorado Blvd - Retaining Wall - Fence - Stairs - ETC Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewers Phone… Denver Fire Department Review Denied Please address the following comment(s): 1. There is an existing fire hydrant located at the northeast corner of Colorado Blvd. and 2nd Ave adjacent to the proposed scope of work. Provide dimensions around fire hydrant and demonstrate the proposed retaining wa… All documents in this project (10) 200 Colorado DOTI Encroachment Application.pdf 200 Colorado DOTI Encroachment Permit Drawing R1.pdf 200 Colorado Legal.pdf 200 Colorado Warranty Deed.pdf ★ 2026-ENCROACHMENT-0000003 Comment Report 2-2-2026.pdf REDLINES- ER Transportation- Kijowski.pdf REDLINES- ER WW- Sasarak.pdf REDLINES- Fire Prevention- Grier.pdf REDLINES- Survey- Breitnauer- ENCROACHReqmts.docx REDLINES- Survey- Breitnauer.pdf | ||||
| 2026-ENCROACHMENT-0000001 Tier III 2904 S Ingalls Wy - Fence Driveway and Shed | ENCROACHMENT | 24 | Denial · 1 | |
| ERA Transportation Review Denied PWPRS Project Number: 2026-ENCROACHMENT-0000001 Tier III 2904 S Ingalls Wy - Fence Driveway and Shed Reviewing Agency/Company: ER Transportation Reviewers Name: Kelsey Kijowski Reviewers Phone: 7209138834 Reviewers Email: kelsey.kijowski@denvergov.org Approval… All documents in this project (12) 2025 09 01_23-47 34.PNG 2025 09 01_23-47 47.PNG 2026-ENCROACHMENT-0000001 Comment Report 1-29-2026.pdf ★ 2026-ENCROACHMENT-0000001 Revised Comment Report 7-28-2026.pdf 2904 s ingalls way DAS zoning study 23.12.25 E-SIGN.pdf Encroachment Checklist Berry 12.23.25.pdf Encroachmentt Application Berry 12.23.25.pdf Parcel Land Description_2904 S Ingalls Wy..docx Proof of Ownership.pdf REDLINES- ER Transportation- Kijowksi.pdf REDLINES- Survey- Pfohl.docx ZoningRelief_2904SIngalls_05-19-2025.pdf | ||||
| 2025-VACA-0000017 3333 N Colorado Blvd Vacation | VACA | 27 | Denial · 3 | |
| DES Transportation Review Denied PWPRS Project Number: 2025-VACA-0000017 3333 N Colorado Blvd Vacation Reviewing Agency/Company: DOTI DES Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.christensen@denvergov.org Approval Status: Denied Com… ERA Transportation Review Denied 1. Call out and hatch the location of area to be vacated on the Site Plan. 2. A ROW dedication will be required, per Transportation Standard drawing 10.5 "L" Type Alley Configurations. This dedication will need to occur prior to the proposed ROW vacation. Plea… Survey Review Denied See Survey red lines for Exhibit and for Site Plan. Review Status: Approved - No Response All documents in this project (11) ★ 2025-VACA-0000017 Comment Report 12.31.25.pdf 2025-VACA-0000017 Site Plan Survey Red Lines 2025.12.23.pdf 2025-VACA-0000017 Survey Red Lines 2025.12.23.pdf application signature.pdf hatch area of ROW vacation request.pdf row vacation checklist application.pdf subject alley requesting vacation DigTix.jpg submital signature.pdf SURVEY 3333 COLORADO BLVD.pdf survey ALLEY VACATION DESCRIPTION 11-11-2025.docx survey exhibit a 240903_VAC-ALLEY-V0-BINDER.pdf | ||||
| 2025-VACA-0000012 Ball Arena Redevelopment 12th and Service Drive | VACA | 24 | Denial · 3 | |
| DES Transportation Review Denied 1. Coordinate shared boundary12th/Service Drive Vacation meets up with the Vacation being reviewed as Denver Fire Department Review Denied This would not allow DFD to have access to the north and west side of the building. Provide further information to substantiate that access will not be impeded in order to gain approval for this vacation. Survey Review Denied Survey redline comments were uploaded in E-Review. Review Status: Approved - No Response All documents in this project (9) ★ 2025-VACA-0000012 Comment Report 10-17-2025.pdf Kroenke Arena Company - Title Commtment 70861584 - Revision_4.pdf Kroenke Parking CURRENT TITLE Commitment_revision_3.pdf KSE Ball Arena_Site Investigation Work Plan_12-1-2023.pdf REDLINES- Survey- Breitnauer.pdf ROW Vacation 3 2025-09-03_Legal and Exhibit.pdf SPLevel Cub Application.pdf Title Commitment -LTGC 1450 5th Street 74179.1.pdf Title Commitment- LTGC Arena and Surrounding Parcels 74180.1.pdf | ||||
| 2025-VACA-0000009 3600 Park Ave West | VACA | 21 | Denial · 1 | |
| Survey Review Denied Please see attached redline comments Review Status: Approved - No Response All documents in this project (4) | ||||
| 2025-VACA-0000002 3424 W 25th Ave Lot Vacation | VACA | 29 | Denial · 2 | |
| City Councilperson and Aides Referral Denied PWPRS Project Number: 2025-VACA-0000002 3424 W 25th Ave Lot Vacation Reviewing Agency/Company: Denver City Council Reviewers Name: Councilwoman Amanda P. Sandoval Reviewers Phone: 720-337-7701 Reviewers Email: amanda.sandoval@denvergov.org Approval Status: Den… DES Transportation Review Denied | ||||
| 2025-UTIL-0000286 Xcel - HKS Utility Services - 529 Cherokee St | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Pole must be at least 3' from the BOC when there is on-street parking. 2. Pole is within pedestrian sight triangle. Remove or relocate pole. | ||||
| 2025-UTIL-0000283 Denver Water - S Park Hill Neighborhood - N Jasmine St | UTIL | 9 | Denial · 1 | |
| PW Construction Engineering Review Denied See kdb red lines. All documents in this project (7) ★ 2025-UTIL-0000283 Comment Report 01.07.2026.pdf 2025-UTIL-0000283 Final Approved Plan Set.pdf 2025-UTIL-0000283 Revised Comment Report 1-8-2026.pdf 22749 CCD 1ST SUBMITTAL PE Signed.pdf 22749 UPRAPP 1ST SUB.pdf 22749 UPRCHECKLIST 1ST SUB.pdf REDLINES- kdb- Construction Engineering red lines 22749_CCD_1ST SUB.pdf | ||||
| 2025-UTIL-0000281 Xcel - HKS Utility Services - 3575 Chestnut Pl | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Disturbance of the pedestrian way?(curb ramp, sidewalk and crosswalk) within 10 ft of an existing curb ramp will require the reconstruction of the curb ramp in compliance with current CCD and ADA standards, if not already fully All documents in this project (8) ★ 2025-UTIL-0000281 Comment Report 1-7-2026.pdf 2025-UTIL-0000281 Final Approved Plan Set.pdf 2025-UTIL-0000281 Revised Comment Report 2-10-2026.pdf 3575 Chestnut Pl. - Electric Installation.pdf 3575 Chestnut Pl. - UPR Application.pdf 3575 Chestnut Pl. - UPR Checklist.pdf REDLINES- ER Transportation- Leyva- Clear Zone Request.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2025-UTIL-0000280 Xcel - HKS Utility Services - DTERTR08 Feeder | UTIL | 9 | Denial · 2 | |
| ERA Transportation Review Denied 1. Project goes over a bridge. Please contact?DOTI Bridge Group at?DOTI.Bridges@Denvergov.org?. Plans will not be approved until approval is obtained from the Bridge Group. PW Construction Engineering Review Denied 1. Prior to the solicitation of bids or proposals from general contractors, the developer of this project is strongly encouraged to schedule an office meeting with the Right-of-Way Services Construction Inspections team (303) 446-3469 to discuss the project's… All documents in this project (8) ★ 2025-UTIL-0000280 Comment Report 1-5-2026.pdf 2025-UTIL-0000280 Final Approved Plan Set.pdf 2025-UTIL-0000280 Revised Comment Report 04-21-2026.pdf 2025-UTIL-0000280 Revised Comment Report 4-21-2026.pdf DTERTR08 Feeder - Electric Installation.pdf DTERTR08 Feeder - UPR Application.pdf DTERTR08 Feeder - UPR Checklist.pdf REDLINES- ER Transportation- Leyva- Approved.pdf | ||||
| 2025-UTIL-0000279 Xcel - HKS Utility Services - 1850 S. Irving St | UTIL | 8 | Denial · 1 | |
| Denver Water Referral Denied PWPRS Project Number: 2025-UTIL-0000279 - Xcel - HKS Utility Services - 1850 S. Irving St Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 303-628-6302 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments… All documents in this project (6) | ||||
| 2025-UTIL-0000276 Xcel - HKS Utility Services - 4681 W. 46th Ave | UTIL | 8 | Denial · 1 | |
| ERA Transportation Review Denied 1. Pole is located within the pedestrian sight triangle. Please remove or relocate proposed pole. All documents in this project (7) ★ 2025-UTIL-0000276 Comment Report 12.31.2025.pdf 2025-UTIL-0000276 Final Approved Plan Set.pdf 2025-UTIL-0000276 Revised Comment Report 1-5-2026.pdf 4681 W 46th Ave. - UPR Application.pdf 4681 W 46th Ave. - UPR Checklist.pdf 4681 W. 46th Ave. - Electric Installation.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2025-UTIL-0000275 Xcel - HKS Utility Services - DTERTR08 Feeder | UTIL | 9 | Denial · 2 | |
| ERA Transportation Review Denied 1. Note: W 17th Ave. is a Moratorium St. between project boundaries. Asphalt patches shall conform to City and County of Denver Transportation Standards and Details standard drawing no.12.2?Trench Vertical patch (Asphalt) in PW Construction Engineering Review Denied 1. Prior to the solicitation of bids or proposals from general contractors, the developer of this project is strongly encouraged to schedule an office meeting with the Right-of-Way Services Construction Inspections team (303) 446-3469 to discuss the project's… All documents in this project (8) ★ 2025-UTIL-0000275 Comment Report 12.30.25.pdf 2025-UTIL-0000275 Final Approved Plan Set.pdf 2025-UTIL-0000275 Revised Comment Report 04-21-2026.pdf 2025-UTIL-0000280 Revised Comment Report 4-21-2026.pdf DTERTR08 Feeder - Electric Installation.pdf DTERTR08 Feeder - UPR Application.pdf DTERTR08 Feeder - UPR Checklist.pdf REDLINES- ER Transportation- Leyva- Approved.pdf | ||||
| 2025-UTIL-0000270 Xcel - Q3 - 3333 Mariposa St | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Dimension pole to sidewalk. Must be at least 6" from existing sidewalk. All documents in this project (7) | ||||
| 2025-UTIL-0000269 Comcast - ITG Communications - 2500 E 1ST AVE | UTIL | 9 | Denial · 1 | |
| ERA Transportation Review Denied 1. Add UPR number to plans, front and center of cover page. 2. Work located on private property. The City and County of Denver does not review/approve nor inspect work All documents in this project (9) 2025-UTIL-0000269 Comment Report 12.18.2025.pdf 2025-UTIL-0000269 Final Approved Plan Set.pdf ★ 2025-UTIL-0000269 Revised Comment Report 12-15-2026.pdf 2025-UTIL-0000269 Revised Comment Report 2-24-2026.pdf Application 2500 E 1st Ave.pdf Checklist 2500 E 1st Ave.pdf JB2345117 - 2500 E 1st Ave Denver.pdf REDLINES- ER Transportation- Leyva.pdf REDLINES- Forestry- Huetig- Approved.pdf | ||||
| 2025-UTIL-0000268 2nd - Comcast - ITG Communications 4101 BRIGHTON BLVD | UTIL | 10 | Denial · 1 | |
| ERA Transportation Review Denied 1. Sheet 10: Add missing storm line that runs between STA 14+50 SW and 15+30 SW and dimension to running line. 2. Sheet 11: Proposed handhole is located on the sidewalk. Please remove or relocate to where it's not disturbing the All documents in this project (6) ★ 2025-UTIL-0000268 Comment Report 1-23-2026.pdf 2025-UTIL-0000268 Revised Comment Report 2-25-2026.pdf dotipt-121.2-utility plan review application 4101 Brighton Blvd -2.pdf JB2192079 - 4101 Brighton Blvd Denver addressed.pdf pwpt-121.2-utility-plan-review-checklist 4101 Brighton Blvd-2.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2025-UTIL-0000268 Comcast - ITG Communications - 4101 BRIGHTON BLVD | UTIL | 7 | Denial · 1 | |
| ERA Transportation Review Denied 1. Add UTIL number on cover page. 2. Dimension running line to all inlets. Must comply with 2' minimum distance requirement. | ||||
| 2025-UTIL-0000264 Xcel - HKS Utility Services - 2160 S. Clermont St | UTIL | 9 | Denial · 1 | |
| City Forester Review Denied OCF Comments 12-4-25 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No All documents in this project (10) ★ 2025-UTIL-0000264 Comment Report 12-16-2025.pdf 2025-UTIL-0000264 Final Approved Plan Set.pdf 2025-UTIL-0000264 Revised Comment Report 1-15-2026.pdf 2025-UTIL-0000264 Revised Comment Report 1-21-2026.pdf 2160 S. Clermont St. - Electric Installation.pdf 2160 S. Clermont St. - UPR Application.pdf 2160 S. Clermont St. - UPR Checklist.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig- OCF Comments.pdf REDLINES- Forestry- Huetig- Site Development Plan.pdf | ||||
| 2025-UTIL-0000261 Xcel - Q3 - 949 Bryant St - WO no.111630804 | UTIL | 9 | Denial · 2 | |
| ERA Transportation Review Denied 1. Sheet 9: Dimension running line to sanitary sewer manhole. 2. Sheet 9: Dimension running line to storm manhole and inlet. Denver Water Referral Denied PWPRS Project Number: 2025-UTIL-0000261 - Xcel - Q3 - 949 Bryant St - WO no.111630804 Reviewing Agency/Company: Denver Water All documents in this project (13) 111630804_949 BRYANT ST_IFA_2025-11-17_PE STAMP FLAT.pdf 2025-UTIL-0000261 Comment Report 12-12-2025.pdf 2025-UTIL-0000261 Final Approved Plan Set.pdf 2025-UTIL-0000261 Revised Comment Report 3-10-2026.pdf ★ 2025-UTIL-0000261 Revised Comment Report 3-16-2026.pdf 2025-UTIL-0000261 Revised Comment Report 3-17-2026.pdf 2025-UTIL-0000261 Revised Comment Report 4-8-2026.pdf Application_949 Bryant St_111630804.pdf REDLINES- ER Transportation- Leyva- Approved.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig- OCF Comments.pdf REDLINES- Forestry- Huetig- SDP for 9th.pdf UPR Checklist_949 Bryant St_111630804.pdf | ||||
| 2025-UTIL-0000260 Xcel - HKS Utility Services - 3850 Blake St | UTIL | 7 | Denial · 1 | |
| PW Construction Engineering Review Denied 1. Prior to the solicitation of bids or proposals from general contractors, the developer of this project is strongly encouraged to schedule an office meeting with the Right-of-Way Services Construction Inspections team (303) 446-3469 to discuss the project's… | ||||
| 2025-UTIL-0000258 Comcast - Mastec - 100 S MONROE ST | UTIL | 9 | Denial · 1 | |
| City Forester Review Denied 2025-UTIL-0000258 - Monroe: Bayaud to Cedar OCF Comments 11-24-25 1. Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the followi… All documents in this project (12) 2025-UTIL-0000258 Comment Report 12-3-2025.pdf 2025-UTIL-0000258 Final Approved Plan Set.pdf ★ 2025-UTIL-0000258 Revised Comment Report 12-5-2025.pdf 2025-UTIL-0000258 Revised Comment Report 12-8-2025.pdf 2025-UTIL-0000258 Revised Comment Report 12-9-2025.pdf PLANS JB 2175452 100 S MONROE ST Rev1.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- ER Transportation- Leyva.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig.pdf UPR Application.pdf UPR Checklist.pdf | ||||
| 2025-UTIL-0000256 Verizon - ADB Companies - 4905 E Yale Ave | UTIL | 9 | Denial · 3 | |
| City Forester Review Denied ERA Transportation Review Denied 1. E Yale Ave is a Moratorium Street between project boundaries. Asphalt patches shall conform to City and County of Denver Transportation Standards and Details standard drawing no.12.2?Trench Vertical patch (Asphalt) in Comments: Denied PWPRS Project Number: 2025-UTIL-0000256 - Verizon - ADB Companies - 4905 E Yale Ave Reviewing Agency/Company: Denver Water All documents in this project (7) 2025-UTIL-0000256 - REDLINES - CityOfForester-EHuetig.pdf ★ 2025-UTIL-0000256 Comment Report 12.2.2025.pdf 2025-UTIL-0000256 Revised Comment Report 12-19-2025.pdf ADB_DEN_2509BEPU_FAILURE_DOMAIN_SHERIDAN_TO_CLINTON_CLIRING_0003_PERMITPRINT (1).pdf FD SHERIDAN TO CLINTIN RING 003 -utility-plan-review-application.pdf FD SHERIDAN TO CLINTIN RING 003 -utility-plan-review-checklist.pdf REDLINES- Forestry- Huetig- Approved.pdf | ||||
| 2025-UTIL-0000254 Denver Water - North Washington Street and E 48th Avenue | UTIL | 8 | Denial · 1 | |
| Comments: Denied 1. Refer to the Bridge Group @ DOTI.Bridges@denvergov.org. Plans will not be approved until they are reviewed and approved by the DOTI bridges group. All documents in this project (7) | ||||
| 2025-UTIL-0000252 Denver Water - PT 22750 - Park Hill - Montclair Neighborhood | UTIL | 8 | Denial · 1 | |
| ERA Transportation Review Denied 1. Dimension running line to nearby inlets. Must comply with 2' minimum distance requirement. 2. Dimension running line to nearby storm and sanitary mains and manholes. All documents in this project (7) | ||||
| 2025-UTIL-0000250 Xcel - HKS Utility Services - 3210 N. Franklin St | UTIL | 8 | Denial · 1 | |
| ERA Transportation Review Denied 1. Please relocate pole, as it seems to be directly in front of a driveway. Ensure the pole is not blocking any entrance or access points such as gates, garage doors, parking spots etc. All documents in this project (7) ★ 2025-UTIL-0000250 - Comment Report - 11.13.25.pdf 2025-UTIL-0000250 Final Approved Plan Set.pdf 2025-UTIL-0000250 Revised Comment Report 12-2-2025.pdf 3210 N. Franklin St. - UPR Application (2025-10-22).pdf 3210 N. Franklin St. - UPR Checklist (2025-10-22).pdf 3210 N. Franklin St. - Utility Pole Installation (2025-10-22).pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2025-UTIL-0000249 Denver Water - PT 22745 - Speer Neighborhood - N Pearl St | UTIL | 8 | Denial · 1 | |
| ERA Transportation Review Denied 1. Sheet 3: Dimension running line to storm main and manhole on N Pearl St. and E 4th Ave. Must comply with 5' minimum distance requirement. All documents in this project (7) | ||||
| 2025-UTIL-0000247 Crown Castle - Wavelink - 4650 N Columbine St | UTIL | 8 | Denial · 1 | |
| ERA Transportation Review Denied 1. Dimension running line to sanitary sewer manhole. Must comply with 5' minimum distance requirement. | ||||
| 2025-UTIL-0000244 Comcast - Mastec - 2135 WESLEY DR DENVER CO | UTIL | 8 | Denial · 2 | |
| City Forester Review Denied Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No ERA Transportation Review Denied 1. Add city UPR project number centered on top of the cover page. 2. Show and dimension all Signal Equipment Clear Zones along the alignment.? No facilities including bored conduits All documents in this project (11) ★ 2025-UTIL-0000244 Comment Report 11-3-2025.pdf 2025-UTIL-0000244 Final Approved Plan Set.pdf 2025-UTIL-0000244 Revised Comment Report 11-18-2025.pdf 2025-UTIL-0000244 Revised Comment Report 11-7-2025.pdf JB 1952557 - 2135 E Wesley Ave - QLB Plan Set.pdf JB1952557 SR1660028 2135 E Wesley Ave - TCP.pdf REDLINES- ER Transportation- Leyva.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig.pdf UPR Application (1).pdf UPR Checklist (1).pdf | ||||
| 2025-UTIL-0000239 Denver Water - PT 22747 - Cheesman Country Club Neighborhood - Marion and Lafayette | UTIL | 9 | Denial · 1 | |
| ERA Transportation Review Denied 1. Due to the project's limit of disturbance (greater than one acre and/or greater than 1,750 linear feet) a Construction All documents in this project (8) ★ 2025-UTIL-0000239 Comment Report 10-30-2025.pdf 2025-UTIL-0000239 Final Approved Plan Set.pdf 2025-UTIL-0000239 Revised Comment Report 11-12-2025.pdf 22747 CCD 1ST SUBMITTAL SIGNED.pdf 22747 UPRAPP 1ST SUB.pdf 22747 UPRCHECKLIST 1ST SUB.pdf REDLINES- ER Transportation- Leyva- Approved.pdf REDLINES- Forestry- Huetig.pdf | ||||
| 2025-UTIL-0000236 Xcel - HKS Utility Services - Bark 17th Feeder | UTIL | 10 | Denial · 4 | |
| City Forester Review Denied Denied - please refer to attached Forestry Comments: 1) Sheet 5 - Show TPZ fencing and reference OCF Tree Protection Notes 2) Sheet 11 - Relocate OT outside of amenity zone and tree protection zone REDLINES uploaded to E-review webpage ERA Transportation Review Denied 1. Due to the project's limit of disturbance (open trench equal to or exceeding 1,500 linear feet) a Construction Activities Stormwater Discharge Permit (CASDP) is required. Please prepare CASDP package in accordance with the ERA Erosion Control Review Denied CASDP required. Apply for coverage under XCEL Linear Umbrella CASDP 2024-EC-0000189. This UPR record status will be revised to approved upon receipt of CASDP application. Denver Water Referral Denied PWPRS Project Number: 2025-UTIL-0000236 - Xcel - HKS Utility Services - Bark 17th Feeder Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 0000000000 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments: M… All documents in this project (12) ★ 2025-UTIL-0000236 Comment Report 10-28-2025.pdf 2025-UTIL-0000236 Final Approved Plan Set.pdf 2025-UTIL-0000236 Revised Comment Report 11-13-2025.pdf 2025-UTIL-0000236 Revised Comment Report 11-20-2025 2.pdf 2025-UTIL-0000236 Revised Comment Report 11-20-2025.pdf 2025-UTIL-0000236 Revised Comment Report 3-12-2026.pdf Bark 17th Feeder Market St. to 15th St. - Electric Installation.pdf Bark 17th Feeder Market St. to 15th St. - UPR Application.pdf Bark 17th Feeder Market St. to 15th St. - UPR Checklist.pdf REDLINES- Denver Water- Naso.pdf REDLINES- ER Transportation-Leyva.pdf REDLINES- Forestry- Evers.pdf | ||||
| 2025-UTIL-0000230 Xcel - HKS Utility Services - 3061 S. Bryant St | UTIL | 7 | Denial · 1 | |
| ERA Transportation Review Denied 1. Dimension sidewalk. 2. Dimension pole to edge of sidewalk. Pole must allow enough space for a 5' sidewalk and must be at least 6" from | ||||
| 2025-UTIL-0000227 Xcel - Q3 Contracting - 3250 E 2nd Ave | UTIL | 8 | Denial · 1 | |
| ERA Transportation Review Denied 1. Dimension SC to BOC , EOP, and edge of walk. Must comply with minimum distance requirements (3', 2' and 6", respectively). All documents in this project (7) 111487889_3250 E 2ND AVE_IFA2_2025-10-22_PE STAMP FLAT.pdf ★ 2025-UTIL-0000227 - Comment Reports - 11.12.2025.pdf 2025-UTIL-0000227 Final Approved Plan Set.pdf 2025-UTIL-0000227 Revised Commnet Report 1-15-2026.pdf REDLINES- ER Transportation- Leyva.pdf UPR Checklist DENVER_3250 E 2nd Ave_111487889 (2).pdf UPR Submittal Application DENVER_3250 E 2nd Ave_111487889 (2).pdf | ||||
| 2025-UTIL-0000218 Xcel - HKS Utility Services - 17th and Grant Vault RELO | UTIL | 9 | Denial · 1 | |
| ERA Transportation Review Denied 1. Sheet 5: Dimension running line to inlet. Must comply with 2' minimum requirement. 2. Sheet 5: Dimension switch cabinet to EOP, edge of walk, and ROW. All documents in this project (6) 17th and Grant Vault RELO - Electric Installation (2025-09-25).pdf 17th and Grant Vault RELO - UPR Checklist (2025-09-24).pdf 17th and Grant Vault RELO - UPR Application (2025-09-24).pdf ★ 2025-UTIL-0000218 - Comment Report - 10.16.25.pdf 2025-UTIL-0000218 Final Approved Plan Set.pdf 2025-UTIL-0000218 Revised Comment Report 10-28-2025.pdf | ||||
| 2025-UTIL-0000216 2nd - Xcel - HKS Utility Services - 2650 Larimer St | UTIL | 9 | Denial · 1 | |
| ERA Transportation Review Denied 1. Large utility vaults should be in the roadway or parking lane where access requirements allow it. There is sufficient space on Lawrence St. for the proposed vault. Is there a reason why installation under the sidewalk is preferred? All documents in this project (8) ★ 2025-UTIL-0000216 Comment Report 3-3-2026.pdf 2025-UTIL-0000216 Revised Comment Report 3-5-2026.pdf 2nd Submittal 2650 Larimer St. - Electric Installation.pdf 2nd Submittal 2650 Larimer St. - UPR Application.pdf 2nd Submittal 2650 Larimer St. - UPR Checklist.pdf REDLINES- ER Transportation- Leyva- Approved Plans.pdf REDLINES- ER Transportation- Leyva- Request for Clear Zone Access.pdf REDLINES- ER Transportation- Leyva- Request for Updates on 2 Clear Zone Requests.pdf | ||||
| 2025-UTIL-0000216 Xcel - HKS Utility Services - 2650 Larimer St | UTIL | 7 | Denial · 1 | |
| ERA Transportation Review Denied 1. Remove all work in signal clear zones. No facilities including bored conduits or handholes are allowed in the Equipment Clear Zone as shown on?City and County of Denver Transportation Standards and Details?standard All documents in this project (8) ★ 2025-UTIL-0000216 Comment Report 10-14-2025.pdf 2650 Larimer St. - Electric Installation (2025-09-23).pdf 2650 Larimer St. - UPR Application (2025-09-25).pdf 2650 Larimer St. - UPR Checklist (2025-09-25).pdf REDLINES- ER Transportation- Leyva- Approved Plans.pdf REDLINES- ER Transportation- Leyva- Request for Clear Zone Access.pdf REDLINES- ER Transportation- Leyva- Request for Updates on 2 Clear Zone Requests.pdf REDLINES- Forestry- Evers.pdf | ||||
| 2025-UTIL-0000212 Xcel - Q3 Contracting - North 1434 Feeder 107792143- Race St. and E 37th Ave | UTIL | 8 | Denial · 2 | |
| City Forester Review Denied Denied: 1) Include OCF Tree Protection Standard Notes and Detail. ERA Transportation Review Denied 1. Ensure all streets are labeled. All documents in this project (11) 107792143_NORTH 1434 FEEDER_RACE ALT ROUTE_IFA2_2025-09-19.pdf 2025-UTIL-0000212 Comment Report 10-6-2025.pdf 2025-UTIL-0000212 Final Approval Plans.pdf ★ 2025-UTIL-0000212 Revised Comment Report 11-24-2025.pdf 2025-UTIL-0000212 Revised Comment Report 11-26-2025.pdf 2025-UTIL-0000212 Revised Comment Report 11-3-2025.pdf 2025-UTIL-0000212 Revised Comment Report 12-19-2025.pdf REDLINES- DPR- Cervera.pdf REDLINES- ER Transportation- Leyva.pdf UPR Checklist DENVER North 1434 Feeder.pdf UPR Submittal Application DENVER_North 1434 Feeder_09.19.25.pdf | ||||
| 2025-UTIL-0000209 Xcel - Q3 Contracting - 242 Milwaukee St WO110019473 | UTIL | 6 | Denial · 1 | |
| ERA Transportation Review Denied 1. Dimension all poles to EOP. 2. Dimension all poles to ROW. All documents in this project (7) 110019473_242 Milwaukee St_IFA2_2025-09-12_PE STAMP FLAT.pdf 2025-UTIL-0000209 - Final Approval Plan Set.pdf ★ 2025-UTIL-0000209 Comment Report 10-14-2025.pdf 2025-UTIL-0000209 Revised Comment Report 12-9-2025.pdf REDLINES- ER Transportation- Leyva.pdf UPR Checklist DENVER 242 Milwaukee St_110019473.pdf UPR Submittal Application DENVER_242 Milwaukee St_110019473.pdf | ||||
| 2025-UTIL-0000207 Xcel - HKS Utility Services - UNIV1024 Feeder | UTIL | 9 | Denial · 2 | |
| Parks and Recreation Review Denied PWPRS Project Number: 2025-UTIL-0000207 - Xcel - HKS Utility Services - UNIV1024 Feeder Reviewing Agency/Company: Parks and Recreation Reviewers Name: Jennifer Cervera Reviewers Phone: 7209135862 Reviewers Email: Jennifer.Cervera@denvergov.org Approval Status:… ERA Transportation Review Denied 1. Sheet 6: Dimension all bore pits to nearby water, storm, and sanitary sewer lines. Must comply with 5' minimum requirement. All documents in this project (12) 2025-UTIL-0000207 Comment Report 09.29.2025.pdf 2025-UTIL-0000207 Final Approval Plan Set.pdf 2025-UTIL-0000207 Revised Comment Report 10-1-2025.pdf ★ 2025-UTIL-0000207 Revised Comment Report 10-27-2025.pdf 2025-UTIL-0000207 Revised Comment Report 11-18-2025.pdf 2025-UTIL-0000207 Revised Comment Report 3-5-2026.pdf REDLINES - Forestry - Huetig.pdf REDLINES- ER Transportation- Leyva.pdf REDLINES- Forestry- Huetig- Approved.pdf UNIV1024 - UPR Application.pdf UNIV1024 - UPR Checklist.pdf UNIV1024 Feeder - Electric Installation.pdf | ||||
| 2025-UTIL-0000203 Xcel - HKS Utility Services - 1725 Marion St | UTIL | 8 | Denial · 1 | |
| ERA Transportation Review Denied 1.Please confirm that the pole is not blocking any entrance or access points. It appears as if the pole would block access to the existing dumpsters. All documents in this project (7) 1725 Marion St. - Uitility Pole Installation (2025-09-09).pdf 1725 Marion St. - UPR Application (2025-09-09).pdf 1725 Marion St. - UPR Checklist (2025-09-09).pdf ★ 2025-UTIL-0000203 Comment Report 09.25.25.pdf 2025-UTIL-0000203 Final Approved Plan Set.pdf 2025-UTIL-0000203 Revised Comment Report 9-30-2025.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2025-UTIL-0000191 Comcast - ITG Communications LLC - 3140 S Dahlia St | UTIL | 8 | Denial · 1 | |
| ERA Transportation Review Denied 1. Note: Please reserve spot centered on top of the cover sheet for utility project number (e.g. 2025-UTIL-XXXXXXX). All documents in this project (9) ★ 2025-UTIL-0000191 Comment Report 9-15-2025.pdf 2025-UTIL-0000191 Final Approval Plan Set.pdf 2025-UTIL-0000191 Revised Comment Report 10-3-2025.pdf 2025-UTIL-0000191 Revised Comment Report 1-23-2026.pdf 2025-UTIL-0000191 Revised Comment Report 9-16-2025.pdf dotipt-121.2-utility_plan_review_applicatioJB0002238347.pdf JB2238347 - 3140 Dahlia St.pdf pwpt-121.2-utility-plan-review-checklist- JB0002238347.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2025-UTIL-0000171 HyperFiber - ITG - Towe Rd and E 45th Ave. COGV-A2-02 | UTIL | 8 | Denial · 3 | |
| Parks and Recreation Review Denied DPR Comments provided in documents ERA Transportation Review Denied 1. Please remove all work not located on CCD ROW (Aurora City Road) form UPR plan. We do not review or approve this work. Denver Water Referral Denied PWPRS Project Number: 2025-UTIL-0000171 - HyperFiber - ITG - Towe Rd and E 45th Ave. COGV-A2-02 Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 0000000000 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comm… All documents in this project (8) 10005_HF_CO GREEN VALLEY RANCH A2-01_ECA_08012025_R6.pdf 2025-UTIL-0000171 Comment Reports 08.20.25.pdf ★ 2025-UTIL-0000171 Comment Reports 08.26.25.pdf 2025-UTIL-0000171 Revised Comment Reports 11-3-2025.pdf 2025-UTIL-0000171 Revised Comment Reports 12-29-2025.pdf Application.pdf REDLINES- DPR- Cervera- Approved.pdf REDLINES- DPR Comments 10005_HF_CO GREEN VALLEY RANCH A2-01_ECA_08012025_R6.pdf | ||||
| 2025-UTIL-0000170 2nd - Xcel - HKS Utility Services - 901 N. Navajo St | UTIL | 8 | Denial · 2 | |
| City Forester Review Denied OCF Comments 12-9-25 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in the subject line: Project No ERA Transportation Review Denied 1. Dimension switch cabinet to edge of walk, EOP, and BOC. SC must be at least 3' from the BOC and 6" from the edge of walk. All documents in this project (11) ★ 2025-UTIL-0000170 Comment Report 12-23-2025.pdf 2025-UTIL-0000170 Final Approved Plan Set.pdf 2025-UTIL-0000170 Revised Comment Report 1-16-2026.pdf 2025-UTIL-0000170 Revised Comment Report 1-7-2026.pdf 2nd Submittal Application 901 N. Navajo St..pdf 2nd Submittal Checklist 901 N. Navajo St..pdf 2nd Submittal Plans 901 N. Navajo St. - Electric Installation.pdf REDLINES- ER Transportation- Leyva- Approved.pdf REDLINES- ER Transportation- Leyva- Clear Zone Approval.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig.pdf | ||||
| 2025-UTIL-0000170 Xcel - HKS Utility Services - 901 N. Navajo St | UTIL | 7 | Denial · 2 | |
| City Forester Review Denied 2025-UTIL-0000170 - 901 Navajo Xcel OCF Comments 8-18-25 ERA Transportation Review Denied 1. Note: W. 11th Ave. is a Moratorium Street between project boundaries. Asphalt patches shall conform to City and All documents in this project (9) ★ 2025 -UTIL- 0000170 Comment Reports 08.19. 2025.pdf 2025-UTIL-0000170 Revised Comment Reports 9-11-2025.pdf 2025-UTIL-0000170 Revised Comment Reports 9-4-2025.pdf 901 N. Navajo St. - Electric Installation.pdf 901 N. Navajo St. - UPR Application.pdf 901 N. Navajo St. - UPR Checklist.pdf REDLINES - Office of the City Forester - EHuetig.pdf REDLINES- ER Transportation- Leyva.pdf REDLINES- Forestry- Huetig- Approved.pdf | ||||
| 2025-UTIL-0000146 Denver Water-Intersection of 49th Avenue and Washington Street | UTIL | 7 | Denial · 1 | |
| ERA Transportation Review Denied 1. Dimension the running line to the 8" sanitary main and manholes to the West of the running line. | ||||
| 2025-UTIL-0000139 Crown Castle - Wavelink - 5586 N Elkhart St | UTIL | 8 | Denial · 2 | |
| ERA Transportation Review Denied 1. Replace standard notes with current Required Plan Notes (revised 5/18/20), available for download under Utility Plan Review at PW Construction Engineering Review Denied See kdb red lines. | ||||
| 2025-UTIL-0000136 – Xcel - HKS Utility Services - 4305 W. 46th Ave | UTIL | 15 | Denial · 1 | |
| ERA Transportation Review Denied 1. We can only approve work that is within current right-of-way. If it's only proposed, we cannot review or approve. 2. Street Cut Pavement Repair Markers will be required. 3. Please protect all green infrastructure, sanitary sewer, storm drainpipes and appurt… | ||||
| 2025-UTIL-0000089 Xcel - HKS Utility Services - S. Dahlia St. and Highline Canal | UTIL | 8 | Denial · 2 | |
| ERA Transportation Review Denied 1. Street lights must be placed to allow a minimum of 0.5 ft clearance to a 5 ft attached walk. 2. Show Signal Equipment Clear Zones on the east side of Dahlia St at Highline Pl. Bore line must be constructed to minimize encroachment into clear zone. Denver Water Referral Denied PWPRS Project Number: 2025-UTIL-0000089 - Xcel - HKS Utility Services - S. Dahlia St. and Highline Canal Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 0000000000 Reviewers Email: kela.naso@denverwater.org Approval Status: De… All documents in this project (6) ★ 2025-UTIL-0000089 Comment Report 5-20-2025.pdf 2025-UTIL-0000089 Final Approved Plan Set.pdf 2025-UTIL-0000089 Revised Comment Report 6-16-2026.pdf REDLINES- ER Transportation- Leyva.pdf S. Dahlia St. and Highline Canal - Electric Installation.pdf S. Dahlia St. and Highline Canal - UPR Application.pdf | ||||
| 2025-UTIL-0000080 Crown Castle - Wavelink - East 8th Ave and Lincoln Street | UTIL | 15 | Denial · 1 | |
| ERA Transportation Review Denied 1. Relocation of small cell node is not approved with this Utility Plan Review. Submit a revised SONO per Small Cell Co-Location process at https://www.denvergov.org/Government/Agencies-Departments-Offices/Agencies-Departments-Offices-Directory/D epartment-of-… | ||||
| 2025-UTIL-0000058 Sturgeon Electric Company - E Yale Ave between Dahlia St and Holly St | UTIL | 15 | Denial · 2 | |
| City Forester Review Denied 2025-UTIL-0000058 - Yale: Dahlia to Holly OCF Comments 4-1-25 1. Address OCF comments on attached redlined plans (uploaded to ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in… Denver Water Referral Denied PWPRS Project Number: 2025-UTIL-0000058 - Sturgeon Electric Company - E Yale Ave between Dahlia St and Holly St Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso | ||||
| 2025-RELINQ-0000020 3698 N Xanthia St Relinquishment | RELINQ | 19 | Denial · 2 | |
| Survey Review Denied Redlines in project folder Review Status: Comments Compiled DES Wastewater Review Denied The requested relinquishment is the easement access to the existing public storm and sanitary mains traversing the RK Mechanical site. After reviewing the current site configuration, this route is the only access to the public main and manholes. Please provide… All documents in this project (8) ★ 2025-RELINQ-0000020 Comment Report 1-14-2026.pdf REDLINES- Survey- Pfohl.pdf Xanthia Multi-Family_Access Esmt Relinq - Application_SIGNED.pdf Xanthia Multi-Family_Access Esmt Relinq - Checklist_SIGNED.pdf Xanthia Multi-Family_Access Esmt Relinq - Legal and Exhibit.pdf Xanthia Multi-Family_Access Esmt Relinq - Map Check.DOC Xanthia Multi-Family_Access Esmt Relinq - Original Document.pdf Xanthia Multi-Family_Access Esmt Relinq - Site Plan.pdf | ||||
| 2025-RELINQ-0000018 2625 E Cedar Ave Relinquishment | RELINQ | 24 | Denial · 1 | |
| DES Wastewater Review Denied The new PNEE needs to be in place and recorded prior to approval of this relinquishment. | ||||
| 2025-RELINQ-0000017 Broadway Station Soccer Stadium 748 S Cherokee St | RELINQ | 20 | Denial · 1 | |
| Xcel Referral Denied PWPRS Project Number: 2025-RELINQ-0000017 Broadway Station Soccer Stadium 748 S Cherokee St Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy | ||||
| 2025-RELINQ-0000016 Broadway Station Filing No. 4 - 748 S Cherokee St | RELINQ | 20 | Denial · 1 | |
| Xcel Referral Denied PWPRS Project Number: 2025-RELINQ-0000016 Broadway Station Filing No. 4 - 748 S Cherokee St Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy | ||||
| 2025-RELINQ-0000015 2860 N Bryant St Relinquishment | RELINQ | 19 | Denial · 2 | |
| Survey Review Denied Comments and redlines in project folder Review Status: Comments Compiled Xcel Referral Denied PWPRS Project Number: 2025-RELINQ-0000015 2860 N Bryant St Relinquishment Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Donna.L.George@xcelenergy.co… All documents in this project (8) ★ 2025-RELINQ-0000015 Comment Report 9-15-2025.pdf 29th and Speer_Relinquishment Application.pdf 29th and Speer_Relinquishment Checklist.pdf 29th and Speer_Relinquishment Legal and Exhibit.pdf 29th and Speer_Relinquishment Legal Description.docx 29th and Speer_Relinquishment Site Plan.pdf 29th and Speer_Reserved Utility Easement Ordinance.pdf REDLINES- Survey- Pfohl.pdf | ||||
| 2025-RELINQ-0000009 KS105 4201 E Arkansas Ave Relinquishment | RELINQ | 20 | Denial · 1 | |
| Survey Review Denied Comments and redlines in project folder All documents in this project (9) 01_KS150_Easement Relinquishment Application_SIGNED.pdf 02_KS150_Recorded Subdivision Plat.pdf 03_KSS150_6ft Util Esmt Relinquishment Closure Sheet.pdf 03_KSS150_L&E_Utility Easement Relinquishment.pdf 05_KSS150_SITE PLAN_Utility Easement Relinquishment.pdf ★ 2025-RELINQ-0000009 Comment Report 07-25-2025.pdf KSS150_L&E_Proposed Utility Easement.pdf KSS150_Proposed Utility Easement Closure Sheet.pdf REDLINES- Survey- Pfohl.pdf | ||||
| 2025-RELINQ-0000003 Augustana Lutheran Church | RELINQ | 23 | Denial · 3 | |
| Construction Engineering Review Denied Which document shows and labels the new easement? DES Wastewater Review Denied ERA Transportation Review Denied 1. Update Checklist - No. 3 is not completed: is this a partial or whole easement relinquishment (Application form says "entirety")? If partial relinquishment, legal description is required. 2. Update Application form: a. Project Information not completed - Is… All documents in this project (13) 2023-DED-0060-FINAL RECORDED EASEMENT 2023078184.pdf ★ 2025-RELINQ-0000003 Comment Report 06-18-2025.pdf 5088 E Dakota Site Plan with Easement Shown.pdf Easement top Be Relinquished Recordation No 2002033206 2002-02-19.pdf Exhibit A DRAINAGE.pdf Habitat Metro Denver - Application for Easement Relinquishmewnt 250428.pdf REDLINES- CenturyLink- Hill - Letter.pdf REDLINES- CenturyLink- Hill.pdf REDLINES- ER Trans- 01_Habitat Metro Denver - Application for Easement Relinquishment 250428_11072025.pdf REDLINES- ER Trans- 02_Habitat Metro Denver Easement Relinquishment Response to Comments 11072025.pdf REDLINES- ER Trans- 03_2023-DED-0060-FINAL RECORDED EASEMENT 2023078184.pdf REDLINES- ER Trans- 04_Easement Relinquishment Exhibit for Illustrative Purposes Only.pdf REDLINES- ER Trans- LOAfin Leetsdale.pdf | ||||
| 2025-ENCROACHMENT-0000164 Tier III - 2535 W 35th Ave Garage | ENCROACHMENT | 21 | Denial · 1 | |
| Survey Review Denied Survey comments/redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) All documents in this project (14) ★ 2025-ENCROACHMENT-0000164 Comment Report 1-21-2026.pdf 2529-2535 W 35TH ZONE LOT AMENDMENT 9-25-25 for ROW app - Copy.pdf a_2025Encroach164_SitePlan-001.pdf b_2025Encroach164_VestingDeed-001.pdf c_2025Encroach164_TitleCommitment-001.pdf d_2025Encroach164_DeedDesc-001.docx DEED OF TRUST.pdf dotipt-105.3.2-encroachment_checklistV3.pdf dotipt-105-encroachment application 2535 W 35TH AVE.pdf e_2025Encroach164_Desc and Illus-002.pdf EXHIBIT A LEGAL DESCRIPTION 2535 W 35TH AVE.pdf f_2025Encroach164_Desc-002.docx REDLINES- Survey- Savich.pdf w 35th EXHIBIT B garge easement 2025-09-26.pdf | ||||
| 2025-ENCROACHMENT-0000163 Tier II - 3575 Chestnut Pl Weather Monitoring Box | ENCROACHMENT | 27 | Denial · 2 | |
| Survey Review Denied Survey checklist with needed items is in project Red Lines folder. Xcel Referral Denied PWPRS Project Number: 2025-ENCROACHMENT-0000163 - Tier II - 3575 Chestnut Pl Weather Monitoring Box Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewers Phone: 3035713306 Review… | ||||
| 2025-ENCROACHMENT-0000162 Tier III - 1900 16th Street Plaza Sculpture | ENCROACHMENT | 26 | Denial · 4 | |
| Survey Review Denied Survey redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) REDLINES uploaded to E-review webpage DES Wastewater Review Denied As noted by other reviewers, two large Metro Water Recovery sanitary mains appear to exist under the work area. These should be shown on the design plans, and MWRD approval must be obtained for this work. In addition, CCD GIS data indicates an active sanitary… ERA Transportation Review Denied 1. Add dimension(s) from proposed Encroachment(s) to the adjacent flowline. 2. Dimension and label the pedestrian access route (PAR). 3. There are two large MWRD sanitary mains through this location. Show the outer limits of both pipes on the Site Plan. Approv… ERA Wastewater Review Denied Show existing 60-inch and 58-inch Metro Water Recover mains and existing sanitary service. Verify application has been reviewed and approved by Metro. All documents in this project (9) ★ 2025-ENCROACHMENT-0000162 Comment Report 1-15-2026.pdf 251218 Dreamscape MEP Teir III Application.pdf 251218 Dreamscape MEP Teir III Legal.docx 251219 Dreamscape MEP Teir III Checklist.pdf 251219 Dreamscape MEP Teir III Letter.pdf 251219 Dreamscape MEP Teir III Plans.pdf REDLINES- DS WW- Martel.png REDLINES- ER Transportation- Kijowski.pdf REDLINES- Survey- Savich.pdf | ||||
| 2025-ENCROACHMENT-0000161 Tier II - 2501 Blake St Ramp Canopy Platform | ENCROACHMENT | 23 | Denial · 3 | |
| Survey Review Denied Survey comments & redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) ERA Transportation Review Denied 1. Note: this existing encroachment is Tier III since it does not meet the requirements for a Tier II. To qualify this as a Tier II, you will need to modify the ramp/stairs such that: 1) they do not project into the ROW more than 5 feet, and 2) do not change d… ERA Wastewater Review Denied The proposed canopy should be have a gutter with downspouts. Revise plans to show downspout discharge locations in compliance with city criteria. All documents in this project (10) 202527 LSP R2 DSsigned.pdf ★ 2025-ENCROACHMENT-0000161 Comment Report 1-16-2026.pdf 2501 Blake st Land Description.docx 2501 Blake st Title.pdf 25075 - ELEMENTS.denver - architectural drawings.pdf 25075 - ELEMENTS.denver - Tier II Application 2025-12-12 signed.pdf 25075 - ELEMENTS.denver - Tier II Checklist 2025-12-12.pdf REDLINES- ER Transportation- Kijowski.pdf REDLINES- Forestry- Evers.pdf REDLINES- Survey- Savich.pdf | ||||
| 2025-ENCROACHMENT-0000160 Tier III - 2595 S Vine St - Fence | ENCROACHMENT | 23 | Denial · 2 | |
| Survey Review Denied Comments in project folder Review Status: Approved w/Conditions ERA Transportation Review Denied 1. Show the existing alley. 2. Show the property line. 3. Show and label Vine Street. 4. Add the 10x10 pedestrian sight triangle at the alley. Ensure it is placed at the location of the compliant sidewalk and not the existing condition. 5. Add dimensions betwe… | ||||
| 2025-ENCROACHMENT-0000159 Tier III - 661 N Williams - Retaining Wall - Foundational Wall | ENCROACHMENT | 24 | Denial · 2 | |
| Survey Review Denied survey comments are in the project folder need documents: deed, deed in Word, title commitment, Exhibit A and description in Word REDLINES uploaded to E-review webpage ERA Transportation Review Denied 1. Per 2025-LOG-0003255 review in July 2025, the stairs encroaching 4 feet into the 16-foot alley must be removed, and permit (2011-Encroachment-0057601) revoked as this is a significant impact to the public travel way. No action is needed for the revocation -… All documents in this project (8) | ||||
| 2025-ENCROACHMENT-0000157 Tier III - 1901 29th Street Crossroads Shelter Repair | ENCROACHMENT | 25 | Denial · 3 | |
| DS Transportation Review Denied PWPRS Project Number: 2025-ENCROACHMENT-0000157 - Tier III - 1901 29th Street Crossroads Shelter Repair Reviewing Agency/Company: DOTI DES Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.christensen@denverg… Survey Review Denied Survey comments are in the project REDLINES folder (REDLINES- Survey- Savich.docx). ERA Transportation Review Denied 1. Provide a Site Plan that includes all required items on the Permit Submittal Checklist. Specifically, we need to see distance from encroachments to the nearest flowline, distance from property line to back of curb, and distance the encroachments project int… All documents in this project (11) ★ 2025-ENCROACHMENT-0000157 Comment Report 12-30-2025.pdf 2025-ENCROACHMENT-0000157 Revised Comment Report 3-2-2026.pdf DOTI_ENCROACHMENT_TIER 3_APP_1901 29TH ST_12.4.25.pdf DOTI_ENCROACHMENT_TIER 3_ARCH_DWGS_1901 29TH ST_12.4.25.pdf DOTI_ENCROACHMENT_TIER 3_CHKLST_1901 29TH ST_12.4.25.pdf DOTI_ENCROACHMENT_TIER 3_DWGS_1901 29TH ST_12.4.25.pdf DOTI_ENCROACHMENT_TIER 3_PARCEL LAND DESCRP_1901 29TH ST_12.4.25.docx DOTI_ENCROACHMENT_TIER 3_WARRANTY DEED_1901 29TH ST_12.4.25.pdf REDLINES- ER Transportation- Kjowski- Approval.pdf REDLINES- ER Transportation- Kjowski- ELEVATION DWGS- Approval.pdf REDLINES- Survey- Savich.docx | ||||
| 2025-ENCROACHMENT-0000152 Tier II - 639 29th St Art Sculpture | ENCROACHMENT | 26 | Denial · 2 | |
| DS Transportation Review Denied PWPRS Project Number: 2025-ENCROACHMENT-0000152 - Tier II - 639 29th St Art Sculpture Reviewing Agency/Company: DOTI DES Transportation Reviewers Name: Mindy Christensen Reviewers Phone: 720-865-3216 Reviewers Email: mindy.christensen@denvergov.org Approval St… Survey Review Denied Survey comments and redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf). All documents in this project (14) ★ 2025-ENCROACHMENT-0000152 Comment Report 12-18-2025.pdf 25.11.19_Welton_encroachment_application.pdf 29th and Welton Existing Site Survey.pdf 29th and Welton Tier II Encroachment Permit Set - 11.21.25.pdf 29th and Welton Tier II Encroachment Permit Set - 12.23.25.pdf a_2025Encroach152-SitePlan-001.pdf Art Recommendation 639 29thSt MC 10.30.25.pdf b_2025Encroach152-VestingDeed-001.pdf c_2025Encroach152-TitleCommitment-001.pdf d_2025Encroach152-VestingDesc-001.docx dotipt-105.3.2-encroachment_checklist - 29th & Welton.pdf Parcel Description of Property.pdf REDLINES- Survey- Savich.pdf Title Commitment.pdf | ||||
| 2025-ENCROACHMENT-0000151 Tier II-600 N Galapagos - Ramp and Stairs | ENCROACHMENT | 22 | Denial · 2 | |
| Survey Review Denied missing deed, title commitment and description is incorrect comments in the Redlines folder ERA Wastewater Review Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. All documents in this project (9) ★ 2025-ENCROACHMENT-0000151 - Comment Report 12.17.25.pdf Appication for Encroachment signed 10-23-25.pdf Drwg A-1 Iss 4 12-18-24-sealed.pdf Drwg A-1a Ext Ramp 10-15-24-sealed.pdf Drwg X-5 10-22-2025-sealed 003.pdf ENCROACHReqmts 2025ENCROACHMENT151.docx LEGAL DESCRIPTION.docx REDLINES-SURVEY-DSperling.docx Spec Sht EXT Ramp 9-20-23.pdf | ||||
| 2025-ENCROACHMENT-0000149 Tier III 225 E Bayaud Ave - Fence - Stairs - Landscaping | ENCROACHMENT | 25 | Denial · 7 | |
| DS Transportation Review Denied 1. Confirm 6-foot tall privacy fence detail and any zoning approval being pursued for wall/fence (if applicable), i.e. an encroachment permit does not replace a zoning approval for a front yard wall/fence. 2. Depict 30'x30' Corner Sight Triangle at E Bayaud Av… Survey Review Denied survey comments are in the redline folder missing many components needed for a Tier III encroachment ERA Transportation Review Denied 1. Fences shall be placed a minimum of 6 inches horizontal clearance behind the back of the sidewalk to allow for sidewalk maintenance. 2. Provide typical cross-section or elevation detail for the proposed fence. 3. Provide typical cross-section or elevation d… Xcel Referral Denied PWPRS Project Number: 2025-ENCROACHMENT-0000149 Tier III 225 E Bayaud Ave - Fence - Stairs - Landscaping Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewers Phone: 3035713306 R… City Forester Review Denied OCF Comments 12-4-25 ROW - Supplemental Review Denied PWPRS Project Number: 2025-ENCROACHMENT-0000149 Tier III 225 E Bayaud Ave - Fence - Stairs - Landscaping Reviewing Agency/Company: West Washington Park Neighborhood Association Reviewers Name: Kathryn Fontaine for WWPNA Board Reviewers Phone: 3037758624 Review… ROW - Supplemental Review Denied PWPRS Project Number: 2025-ENCROACHMENT-0000149 Tier III 225 E Bayaud Ave - Fence - Stairs - Landscaping Reviewing Agency/Company: neighborhood resident Reviewers Name: Gertrude Grant Reviewers Phone: 3037443882 Reviewers Email: gertiegrant@estreet.net Approva… All documents in this project (10) ★ 2025-ENCROACHMENT-0000149 Comment Report 12-16-2025.pdf 225 E Bayaud - Encroachment Application - 20251117.pdf 225 E Bayaud - Encroachment Checklist - 20251117.pdf 225 E Bayaud - Land Title.pdf 225 E Bayaud - Parcel Land Description.docx 225 E Bayaud - Tier III Encroachment Permit Plans - 20251117.pdf REDLINES- Forestry- Huetig.pdf REDLINES- RNO- Fontaine.pdf REDLINES- Survey- Sperling.docx REDLINES_ER TRANS KIJOWSKI 225 E Bayaud - Tier III Encroachment Permit Plans - 20260714.pdf | ||||
| 2025-ENCROACHMENT-0000146 Tier II 85 N Lincoln St - Soil Cells - Canopy and Overhang - Paving - Lights | ENCROACHMENT | 28 | Denial · 2 | |
| Survey Review Denied redlines and comments are in the folder Xcel Referral Denied PWPRS Project Number: 2025-ENCROACHMENT-0000146 - Tier II 85 N Lincoln St - Soil Cells - Canopy and Overhang - Paving - Lights Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewe… All documents in this project (12) 2025-1010 - 95 LINCOLN ROW ENCROACHMENT TITLE COMMITMENT II.pdf 2025-1010 - 95 LINCOLN ROW ENCROACHMENT APP.pdf 2025-1010 - 95 LINCOLN ROW ENCROACHMENT CHECKLIST.pdf 2025-1010 - 95 LINCOLN ROW ENCROACHMENT CLOSURE REPORT.pdf 2025-1010 - 95 LINCOLN ROW ENCROACHMENT LEGAL EXHIBIT.pdf 2025-1010 - 95 LINCOLN ROW ENCROACHMENT PLANS.pdf 2025-1010 - 95 LINCOLN ROW ENCROACHMENT TIER ENCROACHMENT EXHIBIT.pdf 2025-1010 - 95 LINCOLN ROW ENCROACHMENT TITLE COMMITMENT I.pdf 2025-1010 - 95 LINCOLN ROW ENCROACHMENT WARRANTY DEED.pdf ★ 2025-ENCROACHMENT-0000146 Comment Report 12-5-2025.pdf REDLINES- Survey- Sperling- ENCROACHReqmts.docx REDLINES- Survey- Sperling- LEGAL EXHIBIT.pdf | ||||
| 2025-ENCROACHMENT-0000145 Tier III – 3420 Steele Street– Stairs | ENCROACHMENT | 21 | Denial · 1 | |
| Survey Review Denied See Survey ENCROACHReqmts doc for needed documents. All documents in this project (11) ★ 2025-ENCROACHMENT-0000145 Comment Report 11.17.25.pdf 2025-ENCROACHMENT-0000145 Survey Comments ENCROACHReqmts 2025.11.14.docx 3201 Bruce Randolph 251002.pdf 3201 Bruce Randolph Side Elevation.pdf 3201 Bruce Randolph Siet Plan.pdf 3240 Encroachment App Completed.pdf Approved SUDP Site Plan 5.5.2023.pdf ArchPlans 3420NSteeleSt 05-16-2025.pdf doti.pt.2023.105 tier determination checklist SIGNED.pdf NarrativeLetter 3240NSteeleSt 05-16-2025.pdf REDLINES- CenturyLink- Medrano- No Objection.pdf | ||||
| 2025-ENCROACHMENT-0000144 Tier III - 4101 E Wesley Ave - Fence | ENCROACHMENT | 23 | Denial · 4 | |
| Survey Review Denied Comments and redlines in project folder Review Status: Denied ERA Transportation Review Denied 1. The Encroachment Section detail indicates that the Gabion Pilaster is located at back of walk. All facilities, including the pilasters, shall be placed minimum 6-inches behind sidewalk. Update detail to show required clearance and add dimension. Note: the c… Xcel Referral Denied PWPRS Project Number: 2025-ENCROACHMENT-0000144 - Tier III - 4101 E Wesley Ave - Fence Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Donna George Reviewers Phone: 3035713306 Reviewers Email: Do… Denver Water Referral Denied PWPRS Project Number: 2025-ENCROACHMENT-0000144 - Tier III - 4101 E Wesley Ave - Fence Reviewing Agency/Company: Denver Water Reviewers Name: Kela Naso Reviewers Phone: 0000000000 Reviewers Email: kela.naso@denverwater.org Approval Status: Denied Comments: Una… All documents in this project (8) ★ 2025-ENCROACHMENT-0000144 Comment Report 11-13-2025.pdf 4101 E. Wesley Ave_Pilaster Exhibit.pdf dot.pt.2023.105 tier determination checklist.pdf dotipt-105-encroachment_application.pdf REDLINES- Survey- Pfohl.pdf ROW Encroachment Exhibit.pdf WZP03X-Landscape Plan SDP-Encroach Permit 10-10-25.pdf WZP03X-ROW Encroachment-Layout1.pdf | ||||
| 2025-ENCROACHMENT-0000139 Tier III-1395 S St Paul Street | ENCROACHMENT | 22 | Denial · 1 | |
| Survey Review Denied Comments and redlines in project folder All documents in this project (6) | ||||
| 2025-ENCROACHMENT-0000132 Tier III - 600 16th St and Glenarm Place - Canopy Artwork | ENCROACHMENT | 26 | Denial · 3 | |
| Survey Review Denied Redlines regarding the Site Plan are in the project REDLINES folder (REDLINES- Survey- Savich.pdf). REDLINES uploaded to E-review webpage ERA Wastewater Review Denied The minimum clearance above storm and sanitary lines is 23'. Please clarify if the drawing on sheet 10 of 12 is an illustration of the artwork "retracted" to create a 31.67 foot clearance. Show where the storm drains are located on this drawings. Can a 23' min… Xcel Referral Denied PWPRS Project Number: 2025-ENCROACHMENT-0000132-Tier III - 600 16th St and Glenarm Place - Canopy Artwork Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Ema… | ||||
| 2025-ENCROACHMENT-0000125 Tier III - 1730 Wynkoop Street - Machete - Patio | ENCROACHMENT | 29 | Denial · 5 | |
| Survey Review Denied Survey comments are in the project REDLINES folder (REDLINES- Survey- Savich.docx) ERA Transportation Review Denied 1. Since you are part of a multi-tenant property, you must get permission from the property/building owner. Please provide a letter of approval. 2. Flex posts and rubber curbs shall be placed at least 1 foot away from the gutter pan. Provide dimension/note on… ERA Wastewater Review Denied Label the size of the existing storm line running parallel to Wynkoop between the curb and building . Is this existing storm line and existing storm manhole privately maintained? City GIS records do not show these facilities. If the manhole and main are city f… Xcel Referral Denied PWPRS Project Number: 2025-ENCROACHMENT-0000125-Tier III - 1730 Wynkoop Street - Machete - Patio Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Donna… City Forester Review Denied Please refer to attached Forestry Comments: 1) Ensure ROW tree trunks are protected from potential conflict. Maintain buffer of material min 10' from trunk of tree. Note on plan. 2) Show TPZ fencing as perimeter around tree grate on construction sheets. REDLIN… All documents in this project (15) 1730 Wynkoop Machete_LEGAL DESCRIPTION.docx 2025-09-26_1730 Wynkoop Machete_Survey Plat.pdf 2025-09-30_1730 Wynkoop Machete_Tier III Plan.pdf 2025-10-01_1730 Wynkoop Machete_Tier III Application.pdf 2025-10-01_1730 Wynkoop Machete_Tier III Checklist.pdf ★ 2025-ENCROACHMENT-0000125 Comment Report 10-28-2025.pdf Machete OPP Plan_1730 Wynkoop_09-29-25.pdf ModStreet Parklet Plans_1730 Wynkoop_09.23.25.pdf REDLINES- ER Transportation- Leyva- Approved.pdf REDLINES- ER Transportation- Leyva- Landlord approval letter.pdf REDLINES- Forestry- Evers.pdf REDLINES- Survey- Savich.docx REDLINES- Xcel- George- OPP Plan.pdf REDLINES- Xcel- George- WY17.1 MAP.pdf REDLINES-CenturyLink- McLean.pdf | ||||
| 2025-ENCROACHMENT-0000123 Tier II - 3737 Blake - EV Chargers - CCD | ENCROACHMENT | 24 | Denial · 4 | |
| Survey Review Denied See ENCROACHReqmts Checklist for all documents needed. Review Status: Approved Construction Engineering Review Denied 1. Prior to the solicitation of bids or proposals from general contractors, the developer of this project is strongly encouraged to schedule an office meeting with the Right-of-Way Services Construction Inspections team (303) 446-3469 to discuss the project's… City Forester Review Denied Denied - Do not locate EV infrastructure within existing tree planters. ERA Review Denied Please provide the completed and signed submittal checklist. All documents in this project (15) 2020051465.pdf ★ 2025-ENCROACHMENT-0000123 Comment Report 10-30-2025.pdf 3600 Blake.pdf asmt_02271.pdf dotipt-105.3.2-encroachment_checklist_signed.pdf Encroachment Application_Blake Street.pdf Overview.png Plans 3737 Blake St_9-24-25.pdf REDLINES- ER Transportation- Kijowski- Approved Plans.pdf REDLINES- ER Transportation- Kijowski- signage detail.pdf REDLINES- Forestry- Evers.pdf REDLINES- Survey- Castaneda.docx Sideview.png UPDATED 3737 BLAKE STREET_10-3-25 Signed and Sealed.pdf UPDATED 3737 BLAKE STREET_sidewalk width callout.pdf | ||||
| 2025-ENCROACHMENT-0000122 Tier III - 865 S Milwaukee | ENCROACHMENT | 24 | Denial · 3 | |
| Survey Review Denied Comments and redlines in project folder Review Status: Denied ERA Wastewater Review Denied Pursuant to Section 13.11.1 of the Storm Drainage Design and Technical Manual, provide specifications for the pipe thickness, cover, bedding, and backfill material validating the pipe can withstand HS-2O loading. Pursuant to Section 9.7 of the Storm Drainage D… City Forester Review Denied 2025-ENCROACHMENT-0000122 - 865 S Milwaukee OCF Comments 10-22-25 1. Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the followi… All documents in this project (8) ★ 2025-ENCROACHMENT-0000122 Comment Report 10-24-2025.pdf 865 S Milwaukee dewatering 09-14-25 signed.pdf A dotipt-105.3.2-encroachment_checklist.pdf Deed Commitment.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Survey- Pfohl.pdf SIGNED 865 S_MILWAUKEE encroachment_application.pdf | ||||
| 2025-ENCROACHMENT-0000118 Tier II - 2099 Welton Street | ENCROACHMENT | 22 | Denial · 2 | |
| DS Transportation Review Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. Survey Review Denied Survey comments/site plan markup are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) All documents in this project (8) 2025-09-11_Five Points Encroachment_Drawings.pdf 2025-09-18_encroachment_application_Signed.pdf ★ 2025-ENCROACHMENT-0000118 Comment Report 10-14-2025.pdf dotipt-105.3.2-encroachment_checklist.pdf Parcel Land Description.docx REDLINES- Survey- Savich- Approved.pdf REDLINES- Survey- Savich.pdf Transmittal.pdf | ||||
| 2025-ENCROACHMENT-0000117 Tier II - 4100 W Conejos EV Charger | ENCROACHMENT | 22 | Denial · 3 | |
| Survey Review Denied Minor survey comments regarding the site plan are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) REDLINES uploaded to E-review webpage ERA Transportation Review Denied 1. Show the existing public trees and provide dimensions between the proposed encroachments and the trees. 2. In general, more detail needs to be provided for each proposed facility to ensure they meet transportation standards. These facilities may not be "fie… City Forester Review Denied 2025-ENCROACHMENT-0000117 - 4100 W Conejos OCF Comments 10-7-25 Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines. Include the following in… All documents in this project (13) ★ 2025-ENCROACHMENT-0000117 Comment Report 10-14-2025.pdf Encroachment Application Conejos and Quitman.pdf Encroachment overview.png Encroachment street view.png Encroachment Tier Determination Checklist Conejos and Quitman.pdf QUITMAN encroachment detail.pdf REDLINES- ER Transportation- Kijowski- Updated Signage.pdf REDLINES- ER Transportation- Kijowski- Updated Site Plan.pdf REDLINES- ER Transportation- Kijowski.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Survey- Savich- Approved.pdf REDLINES- Survey- Savich.pdf Sidewalk width.png | ||||
| 2025-ENCROACHMENT-0000112 Tier II 3575 Chestnut Pl EV Chargers | ENCROACHMENT | 23 | Denial · 3 | |
| Survey Review Denied See Encroachment Survey Checklist Comments. Review Status: Approved w/Conditions ERA Transportation Review Denied 1. Please see uploaded `ER Transportation REDLINE.pdf'. This application shall not be approved until the described Land Use matters have been resolved. 2. The plan does not appear to reflect the public ROW correctly. You are showing what looks to be a 5-foot a… City Forester Review Denied Denied: 1) Show all existing ROW trees on plans. 2) Keep all excavation a min 10' from trunk of existing trees. 3) Show Tree Protection Fencing for work around existing ROW trees. 4) Charger not permitted inside tree planter - locate in-between planter and cur… All documents in this project (9) ★ 2025-ENCROACHMENT-0000112 Comment Report 10-1-2025.pdf CHESTNUT_encroachment detail.pdf Encroachment Application_Chestnut Pl.pdf Encroachment overview.png Encroachment street view.png Encroachment Tier Determination Checklist_Chestnut.pdf QUITMAN_encroachment detail.pdf REDLINES- CenturyLink- Medrano- Letter of No Objection.pdf REDLINES- Survey- Castaneda.docx | ||||
| 2025-ENCROACHMENT-0000106 – Tier II - 4545 W 29th Ave EV Charger | ENCROACHMENT | 25 | Denial · 3 | |
| DS Transportation Review Denied Non-authorized use of encroachment permit. Please place charger inside property line. Survey Review Denied Survey comments are in the project REDLINES folder (REDLINES- Survey- Savich.docx) REDLINES uploaded to E-review webpage ERA Transportation Review Denied 1. The encroachment permit will not approve you to privatize the parking spot. However, you are allowed to put a placard on the encroachment to indicate it is for private use. Even with approval of an encroachment permit, you cannot prohibit people from parkin… All documents in this project (11) 2020127562 Warranty Deed.pdf ★ 2025-ENCROACHMENT-0000106 Comment Report 9-9-2025.pdf 4545 w 29th Engineer plans.pdf CO Denver Print Page.pdf Encroachment App checklist.pdf encroachment app signed.pdf FEMA Map 2.pdf FEMA Map.pdf REDLINES- CenturyLink- Canary.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Survey- Savich.docx | ||||
| 2025-ENCROACHMENT-0000096 Tier II Cherry Lane 2500 E 2nd Ave - Soil Cells | ENCROACHMENT | 27 | Denial · 3 | |
| Survey Review Denied Survey requirements, comments, and redline comments were uploaded in E-Review. DES Wastewater Review Denied Soil cells need to be a minimum of 10' from any public sanitary or storm infrastructure Denver Water Referral Denied All documents in this project (10) ★ 2025-ENCROACHMENT-0000096 Comment Report 8-20-2025.pdf REDLINE- PW SURVEY 20250731.pdf REDLINES - PW Survey 20250730-ENCROACHReqmts.docx REDLINES- CenturyLink- Hoopes.pdf WCL_Parcel Land Description.docx WCL_Soil Cell Encroachment_Application - Signed.pdf WCL_Soil Cell Encroachment_Checklist.pdf WCL_Soil Cell Encroachment_Drawings 2.pdf WCL_Soil Cell Product Data_RootSpace.pdf WCL_Title Commitment - 2.15.2025.pdf | ||||
| 2025-ENCROACHMENT-0000092 Tier II Flock Safety Cameras - Multiple Locations | ENCROACHMENT | 25 | Denial · 3 | |
| DS Transportation Review Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. ROW - Supplemental Review Denied Denied PWPRS Project Number: 2025-ENCROACHMENT-0000092 - Tier II Flock Safety Cameras - Multiple Locations Reviewing Agency/Company: Villa Park Neighborhood Association Reviewers Name: Kathy Sandoval on behalf of the Villa Park Neighborhood Association board a… ROW - Supplemental Review Denied PWPRS Project Number: 2025-ENCROACHMENT-0000092 - Tier II Flock Safety Cameras - Multiple Locations Reviewing Agency/Company: Denver City Council District 3 Reviewers Name: Jamie Torres Reviewers Phone: 720-337-3333 Reviewers Email: Jamie.Torres@denvergov.org… All documents in this project (6) | ||||
| 2025-ENCROACHMENT-0000085 Tier III 1601 Lowell Blvd Ambulance Drop-off Canopy | ENCROACHMENT | 25 | Denial · 1 | |
| Survey Review Denied PWPRS Project Number: 2025-ENCROACHMENT-0000085 - Tier III 1601 Lowell Blvd Ambulance Drop-off Canopy Reviewing Agency/Company: DOTI-ROWS Survey Reviewers Name: Brian Pfohl Reviewers Phone: 630.202.6564 Reviewers Email: brian.pfohl@denvergov.org Approval Statu… All documents in this project (14) 1011656_HCA SLOAN LAKE_S.pdf ★ 2025-ENCROACHMENT-0000085 Comment Report 07-23-2025.pdf AE107.pdf Encroachment Application6-4-25.pdf Encroachment Description.docx Encroachment Plan.pdf Existing Conditions Plan.pdf Hospital Parcels.docx Permit Submittal Checklist 6-25-25 Signed.pdf REDLINES- CenturyLink- Hoopes.pdf REDLINES- Survey- Pfohl.pdf S110 - CANOPY PLANS.pdf S200 - FOUNDATION SECTIONS AND DETAILS.pdf Vesting Deeds for Parcel 1 and 2.pdf | ||||
| 2025-ENCROACHMENT-0000084 Tier II 1962 Market Street Projecting Signs | ENCROACHMENT | 24 | Denial · 1 | |
| DS Project Coordinator Review Denied All documents in this project (10) ★ 2025-ENCROACHMENT-0000084 Comment Report 07-23-2025.pdf Encroachment Application_Tier II Signage_1962 Market St_06 30 2025.pdf Encroachment Info_Tier II Signage_1962 Market St_06 30 2025.pdf Encroachment Submittal Cklist_Tier II Signage_1962 Market St_06 30 2025.pdf Parcel Land Description_Tier II Signage_1962 Market St_06 30 2025.docx REDLINES - Survey - Pfohl.docx REDLINES- CenturyLink- Hoopes.pdf Site Plan_Tier II Signage_1962 Market St_06 30 2025.pdf Special Warranty Deed_Tier II Signage_1962 Market St_06 30 2025.pdf Vicinity Map_Tier II Signage_1962 Market St_06 30 2025.pdf | ||||
| 2025-ENCROACHMENT-0000081 Tier II - 5575 E 33rd Ave EV Charger | ENCROACHMENT | 24 | Denial · 4 | |
| Survey Review Denied See Encroachment Reqmts document. Review Status: Approved ERA Transportation Review Denied 1. Additional survey/details needed showing placement of pedestal, dimension from pedestal to face of curb, dimension from pedestal to back of sidewalk, and distance from right-of-way. Dimensions also need to include locations/placement for bollards. Typical p… Construction Engineering Review Denied Demonstrate ADA compliance once the Charging Station is installed. See kdb red lines. REDLINES uploaded to E-review webpage City Forester Review Denied Denied - Please coordinate with Forestry Operations, Darren.Potucek@denvergov.org, for impact on internal site trees. All documents in this project (9) ★ 2025-ENCROACHMENT-0000081 Comment Report 7-21-2025.pdf Charger location.png Charger location_overhead.png Encroachment Application_Pauline Robinson_signed.pdf Encroachment Tier Determination Checklist_Pauline Robinson.pdf PAULINE ROBINSON LIBRARY_3-25-25.pdf REDLINES- CenturyLink- Canary - Letter of No Objection.pdf REDLINES- ER Transportation- Kijowski.pdf Sidwalk width_9ft.png | ||||
| 2025-ENCROACHMENT-0000073 Tier III 2380 S Monroe St Fence and Retaining Wall | ENCROACHMENT | 25 | Denial · 1 | |
| Survey Review Denied Comments and redlines in project folder All documents in this project (7) | ||||
| 2025-ENCROACHMENT-0000054 Tier III 2400 S Jackson St Fence | ENCROACHMENT | 26 | Denial · 1 | |
| Survey Review Denied Comments and redlines in project folder All documents in this project (8) 2025-ENCROACHMENT-0000054 Comment Report 6-10-2025.pdf ★ 2025-ENCROACHMENT-0000054 Revised Comment Report 06-11-2025.pdf DOTEncroachmentApp_2400SouthJacksonStreet_05-12-2025.pdf EncroachmentChecklist_2400SouthJackson_05-14-25.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Survey- Pfohl.pdf SitePlans_2400SouthJacksonStreet_04-25-25.pdf | ||||
| 2025-ENCROACHMENT-0000052 Tier II 3950 N Williams St Suspended Paver System | ENCROACHMENT | 24 | Denial · 2 | |
| Survey Review Denied See additional comments, checklist and red lines. CenturyLink Referral Denied We received the following email with contact information for the reviewer assigned to this project. Please contact the reviewer to work towards their approval. Good morning. We have received your request for an encroachment and have set up a Lumen project acco… All documents in this project (11) 2025-0318_40thWilliams_Application.pdf 2025-0318_40thWilliams_Checklist.pdf 2025-0318_40thWilliams_Exhibits.pdf 2025-0318_40thWilliams_Legal Description.docx 2025-0318_40thWilliams_Legal Dsigned.pdf 2025-0318_40thWilliams_Title Commitment.pdf ★ 2025-ENCROACHMENT-0000052 Comment Report 06-03-2025.pdf REDLINES - Survey - Castaneda - Land Description.pdf REDLINES - Survey - Castaneda - Property Description Comments.docx REDLINES - Survey - Castaneda.docx REDLINES- Centurylink- Canary- Letter of No Objection.pdf | ||||
| 2025-ENCROACHMENT-0000049 Tier III 1550 Wewatta Plaza of the Americas Renovation | ENCROACHMENT | 27 | Denial · 3 | |
| Survey Review Denied Survey comments are in the project REDLINES folder (REDLINES- Survey- Savich.docx) REDLINES are uploaded to the E-Review webpage. City Forester Review Denied Please refer to attached Forestry Comments: ERA Review Denied Denied until we can confirm the ownership of this encroachment. All documents in this project (9) 20250418_Encroachment Application.pdf 20250418_Encroachment Resubmittal.pdf 20250418_Encroachment Submittal Checklist.pdf 20250418_Existing Utilities, Floodplain, and Asbuilts.pdf 20250418_Land Description.docx 20250418_Land Description.pdf ★ 2025-ENCROACHMENT-0000049 Comment Report 05-23-2025.pdf REDLINES- CenturyLink- Approval Letter.pdf REDLINES- Survey- Savich.docx | ||||
| 2025-ENCROACHMENT-0000043 Tier II 10390 Havana St Monument Signs | ENCROACHMENT | 22 | Denial · 3 | |
| Survey Review Denied See survey redlines ERA Wastewater Review Denied S1 and S2 at Havana St and 47th Ave require more detailed drawings to show where the sign foundations are located in relations to the existing box culvert at crossing under 47th ave. It appears the new "tower" portion of the signs are located directly above th… Xcel Referral Denied PWPRS Project Number: 2025-ENCROACHMENT-0000043 Tier II 10390 Havana St Monument Signs Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Donna.L.George@… All documents in this project (13) ★ 2025-ENCROACHMENT-0000043 Comment Report 05-15-2025.pdf AGI Prologis - Denver - Monument 1-02 - PERMIT.pdf AGI Prologis - Denver - Monument 2-02 - PERMIT.pdf AGI Prologis - Denver - Monument 3-02 - PERMIT.pdf Encroachment Checklist.pdf REDLINES - LUMEN - Canary - P865820 Rev 6-2-25.pdf REDLINES - Svechovsky - Denied.pdf REDLINES- ER WW- Sasarak- S1.pdf REDLINES- ER WW- Sasarak- S2.pdf Sign Application - 2.0.pdf Stamped - E01 Site Plan Scaled.pdf Stamped - E02 Site Plan Scaled.pdf Stamped - E03 Site Plan Scaled.pdf | ||||
| 2025-ENCROACHMENT-0000041 Tier III Iowa Underpass - DOTI | ENCROACHMENT | 23 | Denial · 1 | |
| Survey Review Denied Comments and redlines in project folder Review Status: Approved All documents in this project (7) ★ 2025-ENCROACHMENT-0000041 Comment Report 5-14-2025.pdf dotipt-105.3.2-encroachment_checklist Iowa Underpass signed.pdf dotipt-105-encroachment_application Iowa Underpass signed.pdf Pages from Iowa Underpass-ConstructionPlans Encroachment Submittal.pdf REDLINES- CDOT- White.pdf REDLINES- Survey- Pfohl.pdf REDLINES- Xcel- George.pdf | ||||
| 2025-ENCROACHMENT-0000036 Tier III 1555 Blake Street Raised Deck | ENCROACHMENT | 27 | Denial · 2 | |
| Survey Review Denied Survey comments/redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) Landmark Review Denied This will need review by the Lower Downtown Design Review Commission. Please submit the following to Landmark Preservation via email at landmark@denvergov.org: - A completed Landmark application form and checklist, which you can find here: https://denvergov.or… All documents in this project (9) 001_1555_SugarCube_Encroachment_Application.pdf 002_SUGARCUBE BUILDING PERMIT PLAN_250328.pdf 003_Encroachment_Checklist_Signed.pdf 004_Title Policy.pdf 005_Special_Warranty_Deed.pdf 1547 Blake Street Parcel Description.docx ★ 2025-ENCROACHMENT-0000036 Revised Comment Report 06-09-2025.pdf REDLINES- CenturyLink- Hoopes.pdf REDLINES- Survey- Savich.pdf | ||||
| 2025-ENCROACHMENT-0000035 Tier III 1530 16th Street Raised Deck | ENCROACHMENT | 27 | Denial · 4 | |
| Survey Review Denied Survey comments/redlines are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) ERA Transportation Review Denied 1. While proposed placement may fall in line with mall reconstruction, additional detail required showing the route connection. Please show actual striping and lane widths for streets on opposite ends of intersection. Mall reconstruction starts/ends at Market… ERA Wastewater Review Denied On Sheet 2, show the existing inlet located in the southerly flowline of 16th Street. This inlet must remain accessible and cannot be covered by the proposed decking. The gutter pan bridge needs to be removable so the flowline can be accessed for debris remova… Landmark Review Denied This will need review by the Lower Downtown Design Review Commission. Please submit the following to Landmark Preservation via email at landmark@denvergov.org: - A completed Landmark application form and checklist, which you can find here: https://denvergov.or… All documents in this project (9) 001_1530_Historic_Sugar_Encroachment_Application_signed.pdf 002_SUGAR BUILDING PERMIT PLAN_250328.pdf 003_1530_Historic_encroachment_checklist_signed.pdf 004_Title_Policy_04-08.pdf 005_Special_Warranty_Deed.pdf 1530 16th Street Parcel Description.docx ★ 2025-ENCROACHMENT-0000035 Revised Comment Report 06-06-2025.pdf REDLINES - Forestry - Evers.pdf REDLINES- Survey- Savich.pdf | ||||
| 2025-ENCROACHMENT-0000026 Tier II Lowell Blvd and Evans Ave Green Infrastructure Improvements | ENCROACHMENT | 25 | Denial · 5 | |
| Survey Review Denied See Survey comments in Project REDLINES folder. Review Status: Denied ERA Transportation Review Denied The submitted plan does not include any revisions from the 2025-CIP-0000013 plan set. There were several comments made to the CIP that were not addressed that would affect this plan. Approval will be withheld until comments from 2025-CIP-0000013 are resolved. CenturyLink Referral Denied Denied on behalf of CenturyLink. We received the following email with contact information for the reviewer assigned to this project. Please contact the reviewer to work towards their approval. "Good afternoon. We have received your request for an encroachment… City Forester Review Denied 1. Are the 51st and Steel improvements included in this? Alder is not an OCF approved ROW species. 2. For Lowell and Evans, still showing water lines conflicting with proposed trees. Still need information on when these will be relocated. Tree protection for e… ROW - Supplemental Review Denied PWPRS Project Number: 2025-ENCROACHMENT-0000026 Tier II Lowell Blvd and Evans Ave Green Infrastructure Improvements Reviewing Agency/Company: Forestry Reviewers Name: Darren Potucek Reviewers Phone: 3163042366 Reviewers Email: darren.potucek@denvergov.org Appr… | ||||
| 2025-ENCROACHMENT-0000020 Tier III 40th and Fox Pedestrian Bridges | ENCROACHMENT | 26 | Denial · 2 | |
| Survey Review Denied PWPRS Project Number: 2025-ENCROACHMENT-0000020 - Tier III 40th and Fox Pedestrian Bridges Reviewing Agency/Company: ROW/Survey Reviewers Name: Ali Gulaid Reviewers Phone: 720.865.3132 Reviewers Email: ali.gulaid@denvergov.org Approval Status: Denied Comments:… ERA Transportation Review Denied 1. As noted in the narrative, and per requirements of the Encroachment Rules and Regs, a min 24 ft clearance is required for these particular locations due to existing utilities in the roadway. While the bridges appear to provide that clearance, the drawings a… All documents in this project (8) 2025-0211_Tier III Encroachment Narrative.pdf ★ 2025-ENCROACHMENT-0000020 Revised Comment Report 7-22-2025.pdf 250721-REDLINES- SURVEY- Gulaid - 7-22-2025.pdf 40TH and FOX - dotipt-105-encroachment_application - COMPLETED.pdf 40TH and FOX_dotipt-105.3.2-encroachment_checklist - SIGNED.pdf REDLINES- SURVEY- Gulaid.pdf Title Commitment.pdf Updated_Tier III Encroachment Exhibits - 40th and Fox.pdf | ||||
| 2025-ENCROACHMENT-0000019 2nd Submittal Tier III AHRT 5375 W 10th Ave Private Storm Line | ENCROACHMENT | 24 | Denial · 3 | |
| Survey Review Denied Survey comments copied to Project REDLINES folder. ERA Transportation Review Denied 1. The 13-foot ROW dedication needs to be approved and recorded prior to approval of this encroachment permit . Encroachments may only be permitted within existing (already dedicated) public ROW. Add dedication number to site plan and survey exhibit(s). 2. Pro… Xcel Referral Denied PWPRS Project Number: 2025-ENCROACHMENT-0000019_2nd Submittal Tier III AHRT 5375 W 10th Ave Private Storm Line Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewer… All documents in this project (14) 1st sub storm pipe plan 22038_Creekside_Encroachment Storm PandP (1).pdf 1st sub storm pipe plan 22038_Creekside_Encroachment Storm PandP (2).pdf 2025 NEW Encroachment Review Distribution List.xlsx 2025-ENCROACHMENT-0000019 Comment Report 10-15-2025.pdf ★ 2025-ENCROACHMENT-0000019 Revised Comment Report 10-23-2025.pdf 22038_Creekside Flats_Wall Encroachment.pdf Encroachment Permit - Legal and Exhibit_Exhibit A_R2.pdf Encroachment Permit - Legal and Exhibit_Exhibit B.pdf Encroachment Permit - Legal Description_Exhibit A_R2.docx Encroachment Permit - Legal Description_Exhibit B.docx Encroachment Permit Exhibit A - Closure Report_R2.pdf Encroachment Permit Exhibit B - Closure Report.pdf REDLINES- Metro WW- Boch.pdf REDLINES- Survey- Lee.docx | ||||
| 2025-ENCROACHMENT-0000019 Tier III AHRT 5375 W 10th Ave Private Storm Line | ENCROACHMENT | 21 | Denial · 3 | |
| Survey Review Denied See Survey Comments in REDLINES folder. CenturyLink Referral Denied Denied on behalf of this critical reviewer. We received the following email with contact information for the reviewer assigned to this project. Please contact the reviewer to work towards their approval. "Your project number is P865011 and it should be referen… Xcel Referral Denied PWPRS Project Number: 2025-ENCROACHMENT-0000019 Tier III AHRT 5375 W 10th Ave Private Storm Line Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Donna… All documents in this project (10) ★ 2025-ENCROACHMENT-0000019 Comment Report 03-18-2025.pdf 70815473_Commitment_revision_2 1.pdf Creekside 5375 W 10th Ave_encroachment_application.pdf Creekside_Storm Plan and Profile.pdf Denver - 5375 W 10th Avenue_ALTA.pdf dotipt-105.3.2-encroachment_checklist.pdf Encroachment Permit - Legal Description.docx Encroachment Permit - Legal Exhibit.pdf Encroachment Permit Parcel - Closure Report.pdf Revised 22038_Creekside_Encroachment Storm PP.pdf | ||||
| 2025-ENCROACHMENT-0000009 Tier III - 201 S. Milwaukee St Fence | ENCROACHMENT | 26 | Denial · 6 | |
| DS Transportation Review Denied 1. See DOTI ER/Paul Weller comments and accompanying markup 2. Depict adjacent 2900 E Cedar Ave neighbors driveway to the west. 3. Depict edge of pavement on south and north side along E Cedar Ave 4. Show AASHTO roadway sight triangles at neighbor's driveway t… DS Project Coordinator Review Denied PWPRS Project Number: 2025-ENCROACHMENT-0000009 - Tier III - 201 S. Milwaukee St Fence Reviewing Agency/Company: Project Coordination Reviewers Name: Tiffany Holcomb Reviewers Phone: 720-865-3018 Reviewers Email: Tiffany.Holcomb@denvergov.org Approval Status:… Survey Review Denied Uploaded survey comments in E-Review. Review Status: Approved CenturyLink Referral Denied Denied on behalf of this critical reviewer. We received the following email with contact information for the reviewer assigned to this project. Please contact the reviewer to work towards their approval. "We have received your request for an encroachment and h… Construction Engineering Review Denied Submittal is incomplete see comments from other reviewers. City Forester Review Denied | ||||
| 2024-VACA-0000007 830 Federal Blvd Alley Vacation | VACA | 26 | Denial · 4 | |
| Asset Management Review Denied My understanding is a portion of the alley is needed for maintaining Weir Gulch. ERA Transportation Review Denied 1. There is an additional adjacent property owner with City and County of Denver owning parcels on either side of alley. This is not considered public right-of-way, and you will need to work with City Real Estate for approval to proceed. 2. Please also note, i… ERA Wastewater Review Denied See ER-Wastewater Redlines Survey Review Denied see survey redlines in folder and uploaded in e-review All documents in this project (8) 1005311-Federal Blvd Vacation Site Plan-VACATION EXHIBIT-FINAL.pdf ★ 2024-VACA-0000007 Comment Report 09.20.2024.pdf Alleyway Vacation Legal Description.docx Application and Checklist.pdf FEDERAL ALLEY VACATION DESCPT-FINAL.pdf REDLINES - ER WASTEWATER - SASARAK.pdf surve redlines FEDERAL ALLEY VACATION DESCPT-FINAL.pdf survey redlines 1005311-Federal Blvd Vacation Site Plan-VACATION EXHIBIT-FINAL.pdf | ||||
| 2024-VACA-0000006 2625 W 24th Ave Vacation | VACA | 29 | Denial · 2 | |
| ERA Transportation Review Denied 1. Please note that a vacation would be split between adjacent property owners. Does the owner to the North agree with this request? 2. Please show on survey that utility pole would not fall within the vacated area. It appears to be very close to the line and… Survey Review Denied | ||||
| 2024-VACA-0000004 901 Navajo Street - Mercy Housing | VACA | 20 | Denial · 1 | |
| Survey Review Denied Resubmittal Required. Survey Redlines are in the project REDLINES folder. REDLINES are uploaded to the E-Review webpage. | ||||
| 2024-UTIL-0000017 Xcel - SITEWISE - 1679 BELLAIRE ST | UTIL | 6 | Denial · 1 | |
| Parks and Recreation Review Denied DPR Comments provided in documents Review Status: Denied All documents in this project (4) | ||||
| 2024-RELINQ-0000014 2777 Zuni St Covenant Relinquishment | RELINQ | 16 | Denial · 1 | |
| DES Wastewater Review Denied Per the terms of the Covenant, this agreement will remain until demo permits are issued and the sanitary service lines are properly capped and inspected for the 21 units. When demo permits and cutoffs completed, contact Brenden Marron for removal of this denia… | ||||
| 2024-RELINQ-0000008 1055 19th Street Relinquishment | RELINQ | 15 | Denial · 2 | |
| CenturyLink Referral Denied PWPRS Project Number: 2024-RELINQ-0000008 - 1055 19th Street Relinquishment Reviewing Agency/Company: Lumen/ CenturyLink Reviewers Name: VeShon Sheridan Reviewers Phone: 804-234-6825 Reviewers Email: veshon.sheridan@lumen.com Approval Status: Denied Comments:… Xcel Referral Denied PWPRS Project Number: 2024-RELINQ-0000008 - 1055 19th Street Relinquishment Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy | ||||
| 2024-ENCROACHMENT-0000198 Tier III 3439 Lowell Blvd Retaining Wall and Fence | ENCROACHMENT | 26 | Denial · 1 | |
| ERA Transportation Review Denied 1. Show 10 ft x 10 ft pedestrian sight triangle at alley. Fence must be moved out of the triangle. 2. Show dimension from toe of retaining to face of lower wall on structural section. | ||||
| 2024-ENCROACHMENT-0000179 Tier II 96 W Hoye Pl - Broadway Station Soil Cells | ENCROACHMENT | 21 | Denial · 1 | |
| Survey Review Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. All documents in this project (17) ★ 2024-ENCROACHMENT-0000179 Revised Comment Report 12-20-24.pdf Broadway Sta EF - Exhibit A.docx Broadway Sta EF - Exhibit A.pdf Broadway Sta EF - Exhibit B.docx Broadway Sta EF - Exhibit B.pdf Broadway Sta EF - Exhibit C.docx Broadway Sta EF - Exhibit C.pdf Broadway Sta EF - Exhibit D.docx Broadway Sta EF - Exhibit D.pdf Broadway Sta EF - Exhibit E.docx Broadway Sta EF - Exhibit E.pdf Broadway Sta EF - Lot Exhibit.docx Broadway Sta EF - Lot Exhibit.pdf Broadway Sta EF - Title Commitment.pdf Broadway Station - Encroachment Application.pdf Broadway Station - Permit Submittal Checklist.pdf BroadwayEF_EncroachmentApp_SitePlan.pdf | ||||
| 2024-ENCROACHMENT-0000167 Tier III 740 Lafayette St - Wall | ENCROACHMENT | 24 | Denial · 3 | |
| DS Project Coordinator Review Denied PWPRS Project Number: 2024-ENCROACHMENT-0000167 Tier III 740 Lafayette St - Wall Reviewing Agency/Company: Project Coordination Reviewers Name: Tiffany Holcomb Reviewers Phone: 720-865-3018 Reviewers Email: Tiffany.Holcomb@denvergov.org Approval Status: Denied… Survey Review Denied Survey comments are uploaded in E-Review. Review Status: Approved Xcel Referral Denied PWPRS Project Number: 2024-ENCROACHMENT-0000167 Tier III 740 Lafayette St - Wall Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Donna.L.George@xcelen… All documents in this project (13) 07.16.2024_740NorthLafayetteStreet_StampedDrawings.pdf ★ 2024-ENCROACHMENT-0000167 Revised Comment Report 12-20-2024.pdf dotipt-105.3.2-encroachment_checklist.pdf REDLINES - Forestry - Huetig - OCF Comments 11-15-24.pdf REDLINES - Forestry - Huetig - OCF Tree Protection Detail - 11x17 - 4-1-22.pdf REDLINES - Survey - Breitnauer.docx REDLINES- ER Transportation- Weller- WoolstonREVWallDetail.pdf REDLINES- ER Transportation- Weller.pdf REDLINES- Forestry- Huetig- Approved.pdf signed dotipt-105-encroachment_application copy.pdf signeddoti.pt.2023.105_tier_determination_checklist.pdf StampedSurvey_740Lafayette.pdf Tier Review 740 N Lafayette.pdf | ||||
| 2024-ENCROACHMENT-0000133 Tier II - 1520 California St - Canopies and Planters | ENCROACHMENT | 21 | Denial · 4 | |
| DS Transportation Review Denied 1. Sheet EP-01. California St frontage. The 6'10" PAR is utilizing the amenity zone/pavers at the tree/tree grates. Demonstrate or the PAR will meet CCD and ADA cross-slope requirements and remove PAR from alternate material pavers/tree grate as may be require… Survey Review Denied Survey comments/reds are in the REDLINES folder (REDLINES- Survey- Savich.pdf) REDLINES are uploaded to the E-Review webpage. ERA Transportation Review Denied 1. Plans show right-of-way (ROW) width as greater than 21 ft. Per Transportation Standards and Details, encroachments shall maintain a PAR of 8 ft for ROW streetscape greater than 21 ft. Therefore, a min 8 ft PAR is required. 2. Plans showing PAR as measured f… Xcel Referral Denied PWPRS Project Number: 2024-ENCROACHMENT-0000133 - Tier II - 1520 California St - Canopies and Planters Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email:… All documents in this project (14) ★ 2024-ENCROACHMENT-0000133 Comment Report 10-28-24.pdf a_2024Encroach133-SitePlan-001.pdf b_2024Encroach133-VestingDeed-001.pdf c_2024Encroach133-TitleCommitment-001.pdf d_2024Encroach133-DeedDesc-001.docx Encroachment Application.pdf Encroachment Checklist_1520California_10-3-2024.pdf Flowline Measurements.pdf Lease - Leven Deli.pdf LOI.pdf Parcel Land Description.docx Plans.pdf REDLINES- ER Transportation- Kijowski.pdf Revised Encroachment Application and Plans_1520California__10-10-25 Land Owner Executed.pdf | ||||
| 2024-ENCROACHMENT-0000128 Tier III 10 Galapago Stairs Landing and Railing | ENCROACHMENT | 23 | Denial · 1 | |
| CenturyLink Referral Denied Denied on behalf of this critical reviewer. We received the following email with contact information for the reviewer assigned to this project. Please contact the reviewer to work towards their approval. "Your project number is P863578 and it should be referen… All documents in this project (11) 1613100LX-AE-2024-07-03.pdf 2024.07.18_10 Galapago - 60pct Construction Documents.pdf 2024_08_27 - 10 Galapago - A101.pdf 2024_08_27 - 10 Galapago - S100.pdf 20240827-10 Galapago-Encroachment Plan.pdf ★ 2024-ENCROACHMENT-0000128 Comment Report 10-16-2024.pdf doti.pt.2023.105_tier_determination_checklist - 10 Galapago_Signed.pdf dotipt-105.3.2-encroachment_checklist_10 Galapago_Signed.pdf dotipt-105-encroachment_application_10 Galapago_Signed.pdf REDLINES- CenturyLink- Canary.pdf Warranty Deed 2017028546.pdf | ||||
| 2024-ENCROACHMENT-0000113 Tier II - E Colfax BRT Grant-Josephine – Steele-Colorado – Elm-Monaco | ENCROACHMENT | 27 | Denial · 1 | |
| DS Transportation Review Denied Denied on behalf of Critical Reviewer, This is still under review. Please contact the reviewer to resolve. All documents in this project (6) ★ 2024-ENCROACHMENT-0000113 Comment Report 09-11-2024.pdf dotipt-105.3.2-encroachment_checklist - E Colfax BRT - signed.pdf dotipt-105-encroachment_application - E Colfax BRT - signed.pdf E Colfax BRT - Landscape Layout Plans and Details - 8-15-24.pdf REDLINES - Special Projects - Pulkinen.pdf REDLINES - Survey - Breitnauer.docx | ||||
| 2024-ENCROACHMENT-0000091 Tier III 1550 Market St STK Patio | ENCROACHMENT | 24 | Denial · 5 | |
| DS Transportation Review Denied 1. Dimension PAR clearance at each of the two (2) light pole bases in front of property, nearest patio rail to nearest concrete pole base element. 2. Provide grades and cross-slope of PAR around patio at regular intervals to verify it meets CCD/ADA standards a… Survey Review Denied Survey comments are in the REDLINES folder (REDLINES- Survey- Savich) ERA Wastewater Review Denied See Denial Comments from 6/27/2024 Denver Office of Disability Rights Referral Denied PWPRS Project Number: 2024-ENCROACHMENT-0000091 Tier III 1550 Market St STK Patio Reviewing Agency/Company: DODR Reviewers Name: Juan Pasillas Reviewers Phone: 720-913-3309 Reviewers Email: Juan.pasillas@denvergov.org Approval Status: Denied Comments: Please s… Landmark Review Denied This project will require Landmark design review by the Lower Downtown Design Review Commission. The project will need to comply with the Design Guidelines for Lower Downtown Historic District and the Design Guidelines for Lower Downtown Streetscape. As design… All documents in this project (14) 2024_05-17 - STK Market Street Denver CO_01 ARCH.pdf 2024_05-17 - STK Market Street Denver CO_02 STRC.pdf 2024_05-17 - STK Market Street Denver CO_03 STRC CALCS.pdf 2024_05-17 - STK Market Street Denver CO_04 LAND SURVEY.pdf 2024-ENCROACHMENT-0000091 Comment Report 7-2-2024.pdf ★ 2024-ENCROACHMENT-0000091 Revised Comment Report 06-13-2025 .2.pdf Deed of Trust Security Agreement Fixture Filing and Assignment of Leases and Rents.pdf FINAL - doti.pt.2023.105_tier_determination_checklist.pdf FINAL - dotipt-105-encroachment_app-signed.pdf PARCEL DESCRIPTION 1550 market 5-17-24.docx REDLINES - CenturyLink - Hackler.pdf REDLINES - DODR - Pasillas.pdf REDLINES- Survey- Savich.docx Tab 40 - Survey.pdf | ||||
| 2024-ENCROACHMENT-0000071 Tier III 1501 S Pearl St. - Ototo Patio | ENCROACHMENT | 28 | Denial · 1 | |
| ERA Transportation Review Denied 1. It is unclear what has been revised since previous submittal. This submittal did not provide comment responses showing previous comments by reviewers as well as how the comment was addressed. Please include. 2. Encroachments shall be a max of 40 ft in lengt… All documents in this project (9) | ||||
| 2024-ENCROACHMENT-0000037 Tier III 1509 17th St Canopies and Strata Vaults | ENCROACHMENT | 23 | Denial · 5 | |
| DS Transportation Review Denied There are no exceptions to the proposed encroachments from DES Transportation; however, limits need to match TEP/SDP submittals. 1. The Tier III Encroachments (i.e. Canopies and Strata Vaults) are to be identified on TEP/SDP and identified by name and type mat… Survey Review Denied Survey comments are in the REDLINES folder (REDLINES- Survey- Savich.docx) DES Wastewater Review REDLINES uploaded to E-review webpage Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. Xcel Referral Denied PWPRS Project Number: 2024-ENCROACHMENT-0000037 - Tier III 1509 17th St Canopies and Strata Vaults Reviewing Agency/Company: Public Service Company of Colorado (PSCo) dba Xcel Energy Reviewers Name: Donna George Reviewers Phone: 3035713306 Reviewers Email: Don… City Forester Review Denied 2024-ENCROACHMENT-0000037 - 17th & Blake Cells & Canopies OCF Comments 4-15-24 1. NOTE: Planting area configuration on Blake has changed from what was originally approved by OCF (see attachment, uploaded via ERA site). A. Our office needs to re-review the SDP… All documents in this project (8) 20240320_RH_EncrApplication.pdf 20240320_RH_EncrChecklist.pdf 20240320_RH_EncrExhibits.pdf ★ 2024-ENCROACHMENT-0000037 Comment Report 4-18-2024.pdf 2024-ENCROACHMENT-0000037 Revised Comment Report 2-26-2025.pdf REDLINES- CenturyLink- Letter of No Objection with Reservations.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Survey- Savich.docx | ||||
| 2023-VACA-0000011 3330 W 24th Ave Vacation | VACA | 28 | Denial · 4 | |
| City Councilperson and Aides Referral Denied PWPRS Project Number: 2023-VACA-0000011 - 3330 W 24th Ave Vacation Reviewing Agency/Company: City Council Reviewers Name: Amanda Sandoval ERA Transportation Review Denied 1. Properties at 3324 W. 24th Ave. and 3326 W. 24th Ave. - have these owners accepted the vacation request, as they may receive a portion of this vacation? Please provide written acceptance from these owners. Survey Review Denied survey redlines can be found in REDLINES folder ROW - Supplemental Review Denied PWPRS Project Number: 2023-VACA-0000011 - 3330 W 24th Ave Vacation Reviewing Agency/Company: CPD - Zoning Administration Reviewers Name: Tina Axelrad Reviewers Phone: 7208652937 Reviewers Email: tina.axelrad@denvergov.org Approval Status: Denied Comments: Appr… | ||||
| 2023-UTIL-0000189 Xcel Energy - E Harvard Ave and S Downing St, Denver | UTIL | 7 | Denial · 1 | |
| ERA Transportation Review Denied 1. Provide dimensions perpendicular from the EOP to conduit, instead of from the ROW line. 2. Minimum depth of boring shall be 4' under structures and 5' under channel thalweg when located within a | ||||
| 2023-UTIL-0000184 Denver Water - TBD - Evans Avenue from Josephine to Milwaukee Street | UTIL | 15 | Denial · 2 | |
| City Forester Review Denied 2023-UTIL-0000184: Evans - Josephine to Milwaukee OCF Comments 8-21-23 1. Address OCF comments on attached redlined plans (uploaded via ERA site). If redlined plans were not received, email Eric.Huetig@denvergov.org to request a set of redlines (reference proj… ERA Transportation Review Denied 1. Please protect all sanitary sewer and storm drain pipes and appurtenances during construction. 2. Provide legend for line types and symbols (define EOC as lip of pan or back of curb). All documents in this project (10) ★ 2023-UTIL-0000184 Comment Report 08-23-2023.pdf 2023-UTIL-0000184 Revised Comment Report 12-4-2025.pdf 2023-UTIL-0000184 Revised Comment Report 12-8-2025.pdf 21941 dotipt-121.2- UPR - application.pdf DW Evans Ave UPR-checklist.pdf Plans - 21941 - DSGN - SSM - 60.pdf REDLINES- ER Transportation- Leyva.pdf REDLINES Forestry Huetig - OCF Tree Protection Detail - 2-14-20.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES Forestry Huetig.pdf | ||||
| 2023-RELINQ-0000017 1975 S. Colorado Blvd | RELINQ | 22 | Denial · 2 | |
| Survey Review Denied Survey RedLines in REDLINES folder DES Wastewater Review Denied Denver Wastewater will not relinquish this portion of the easement until design plans to re-route the existing public sanitary sewer main have been approved. Approval of the sewer main re-route design plans will also include bonding/surety to ensure that the e… All documents in this project (7) 1- 1975 S. Colorado Blvd - easement - relinquishment - application submit.pdf 2- 1975 S. Colorado Blvd - Easement Relinquishment Letter.pdf ★ 2023-RELINQ-0000017 Comment Report 07-14-2023.pdf 3- 1975 S. Colorado Blvd Sewer Easement Relinquishment Site Plan.pdf 4- 1975 S. Colorado Blvd - Proposed Relinquishment-Survey.pdf 5- 1975 S. Colorado Blvd - Original Ordinance.pdf REDLINES Survey Clarke.pdf | ||||
| 2023-RELINQ-0000005 263 Josephine St | RELINQ | 20 | Denial · 3 | |
| CenturyLink Referral Denied PWPRS Project Number: 2023-RELINQ-0000005 - 263 Josephine St Reviewing Agency/Company: CenturyLink/Lumen Reviewers Name: Rebekah Anthony Reviewers Phone: 307-717-0420 Reviewers Email: rebekah.anthony@lumen.com Approval Status: Denied Comments: CenturyLink has… DES Wastewater Review Denied PWPRS Project Number: 2023-RELINQ-0000005 - 263 Josephine St Reviewing Agency/Company: DOTI ERA Transportation Review Denied 1. Please work with the DES Wastewater reviewer for requirements relating to the private storm and public sanitary mains located within the easement reserved by ordinance 728, series 1978. The easement may not be relinquished until the public main has been aba… All documents in this project (13) 2023-RELINQ-0000005 Comment Report 3-21-2023.pdf 2023-RELINQ-0000005 Comment Report.pdf ★ 2023-RELINQ-0000005 Revised Comment Report 1-4-2024.pdf 2023-RELINQ-0000005 Revised Comment Report 3-28-2023.pdf 20240104_2023-RELINQ-0000005_SitePlan.pdf 263 Josephine St Easement Relinquishment Letter.pdf 302_easement_relinquishment_application ss.pdf Pages from 302_easement_relinquishment_application page 2.pdf REDLINES- Centurylink- Anthony.pdf REDLINES- ER Transportation- Kijowski.pdf REDLINES- Survey- Pfohl.pdf Response to REDLINES- Survey- Pfohl.pdf Site Plan-r1.pdf | ||||
| 2023-ENCROACHMENT-0000175 Tier II - 301 High St - Security Wall | ENCROACHMENT | 25 | Denial · 5 | |
| DS Transportation Review Denied comments emailed to applicant DS Project Coordinator Review Denied PWPRS Project Number: 2023-ENCROACHMENT-0000175 - Tier II - 301 High St - Security Wall Reviewing Agency/Company: Development Services / Project Coordination Reviewers Name: Tiffany Holcomb Reviewers Phone: 720-865-3018 Reviewers Email: Tiffany.Holcomb@denverg… Survey Review Denied Comments in project folder Review Status: Approved Building Department Review Denied No uploaded drawings for the wall were found under the documents tab for this project. Assuming the proposed wall height increase doubles the height of the wall, the flexural stress at the bottom of the wall due to wind load will increase by a factor of 4. App… Denver Fire Department Review Denied No drawings or information to review for this project | ||||
| 2023-ENCROACHMENT-0000168 2nd -Tier II Crown Castle 2023 Group 16 | ENCROACHMENT | 26 | Denial · 3 | |
| Survey Review Denied ERA Transportation Review Denied 1. Site DN0540 - per Small Cell Design Guidelines Section 2.2 for General Placement, free standing poles are not to be placed within a designated park or parkway. This location falls within Hale Parkway. Co-locations may be options nearby - but also require Pa… Parks and Recreation Review Denied DPR Comments provided in documents Review Status: Approved - No Response All documents in this project (7) 2023 Group 16 ADDRESS_CARD_REV_1895_Wynkoop_St- DN0689.pdf 2023 Group 16 DN0689 EME Report REV.pdf 2023 Group 16 DN0689_1A_ACCURACY_CERTIFICATION_SIGNED REV.pdf 2023 Group 16 DN0689_FCD_1.4.24_SIGNED.pdf ★ 2023-ENCROACHMENT-0000168 Comment Report 10-18-2023 (2).pdf Crown Castle Fiber LLC - 2023 - Group #16 - SMALL GROUP TRACKER.xlsx REDLINES- ER Transportation- McMurtrie- Comment Letter.pdf | ||||
| 2023-ENCROACHMENT-0000158 2nd - Tier III 50-80 S Bellaire Retaining Wall | ENCROACHMENT | 27 | Denial · 8 | |
| DS Transportation Review Denied 1. Show and label the curb/gutter and sidewalk on the Site Plan. Include dimensions for sidewalk width and distance from curb flowline (face-of-curb) to closest edge of retaining wall (for example, column edge, columnar cap edge). 2. Walls, including their foo… Survey Review Denied PWPRS Project Number: 2023-ENCROACHMENT-0000158_2nd - Tier III 50-80 S Bellaire Retaining Wall Reviewing Agency/Company: DOTI-ROWS Survey Reviewers Name: Brian Pfohl Reviewers Phone: 630.202.6564 Reviewers Email: brian.pfohl@denvergov.org Approval Status: Deni… DES Wastewater Review REDLINES uploaded to E-review webpage Denied City Council Referral Denied PWPRS Project Number: 2023-ENCROACHMENT-0000158_2nd - Tier III 50-80 S Bellaire Retaining Wall Reviewing Agency/Company: Denver City Council, District 5 Reviewers Name: Amanda Sawyer Reviewers Phone: 7203375555 Reviewers Email: DenverCouncil5@denvergov.org App… ERA Transportation Review Denied PWPRS Project Number: 2023-ENCROACHMENT-0000158_2nd - Tier III 50-80 S Bellaire Retaining Wall Reviewing Agency/Company: DOTI ROWS ER Transportation Reviewers Name: Paul Weller Reviewers Phone: 720-913-0514 Reviewers Email: Paul.Weller@Denvergov.org Approval S… TES Sign and Stripe Review Denied PWPRS Project Number: 2023-ENCROACHMENT-0000158 - Tier III - 50 S Bellaire - Retaining Wall Reviewing Agency/Company: DOTI Implementation Reviewers Name: Brittany Price Reviewers Phone: 7208653154 Reviewers Email: brittany.price@denvergov.org Approval Status:… ERA Review Denied Better dimensioned plans are needed showing height of wall and fence, property line, right-of-way line, sidewalk dimensions and how far into the right-of-way the wall is. Call outs must be on plans including flowline, face of curb, curb cuts fully dimensioned… ROW - Supplemental Review Denied PWPRS Project Number: 2023-ENCROACHMENT-0000158 - Tier III - 50 S Bellaire - Retaining Wall Reviewing Agency/Company: Hilltop Neighborhood Association Reviewers Name: Thomas Hart AIA - Zoning Committee Chair - Hilltop Neighborhood Association Reviewers Phone:… All documents in this project (7) ★ 2023-ENCROACHMENT-0000158 Comment Report 5-3-2024.pdf 2nd Sub Encroachment Application_50 S Bellaire_04-05-2024.pdf 2nd Sub Encroachment Application_80 S Bellaire_04-05-2024.pdf 2nd Sub Site Plan_50-80 S Bellaire_04-05-2024.pdf REDLINES- ER Transportation- Weller.pdf REDLINES- Hilltop Neighborhood Letter.pdf REDLINES- Survey- Pfohl.pdf | ||||
| 2023-ENCROACHMENT-0000135 Tier II - 805 W 38th Ave - Planters | ENCROACHMENT | 25 | Denial · 2 | |
| DS Transportation Review Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. Survey Review Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. All documents in this project (9) 2020-PM-0000591_38th and Huron_Encroachment Checklist.pdf 2020-PM-0000591_38th and Huron_Legal Description- Comments.pdf 2020-PM-0000591_38th and Huron_Legal Description.docx 2020-PM-0000591_38th and Huron_Legal Exhibit.pdf 2020-PM-0000591_38th and Huron_Signed Encroachment Application.pdf 2020-PM-0000591_38th and Huron_Tier II Encroachment Plans.pdf 2020-PM-0000591_38th and Huron_Title Commitment.pdf ★ 2023-ENCROACHMENT-0000135 Comment Report 8-25-2023.pdf REDLINES- SURVEY- Ali.pdf | ||||
| 2023-ENCROACHMENT-0000126 Tier II - 200 E Colfax - Bollards - Capitol Bldg | ENCROACHMENT | 21 | Denial · 1 | |
| City Forester Review Denied DENIED - please coordinate with OCF on Tree Protection Requirements. All trees to remain and be protected. Significant impact shown to historic, large stature, shade trees. Nick.Evers@denvergov.org. All documents in this project (14) 01-CB Encroachment Permit Transmittal.pdf 02-CB COD Encroachment Permit App. 2023.07.18.pdf 03-CB Encroachment Narrative.pdf 04-CB Encroachment SITE PLAN.pdf 05-CB Bollard Cover and Rated BollardEUA reviewed.pdf 06-CB Encroachment Location.docx 07-CB Additional Materials - Property Ownership.pdf 08-CB Site Survey - signed.pdf 09-CB encroachment_checklist.pdf 10-CB ID78915 2-14-23 State Capitol Bollards.pdf ★ 2023-ENCROACHMENT-0000126 Comment Report 8-11-2023.pdf REDLINES- Survey- Pfohl 8-11-2023.docx REDLINES- Survey- Pfohl-Approved.pdf REDLINES- Survey -Prohl.docx | ||||
| 2023-ENCROACHMENT-0000063 Tier II - 1906 Pearl St - Awning | ENCROACHMENT | 28 | Denial · 5 | |
| DS Transportation Review Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. DS Project Coordinator Review Denied PWPRS Project Number: 2023-ENCROACHMENT-0000063 - Tier II - 1906 Pearl St - Awning Reviewing Agency/Company: Development Services / Project Coordination Reviewers Name: Tiffany Holcomb Reviewers Phone: 720-865-3018 Reviewers Email: Tiffany.Holcomb@denvergov.or… Survey Review Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. DES Wastewater Review Denied Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. ERA Transportation Review Denied 1. Remove "Encroachment A" from the Encroachment Exhibit. Based on other submittal documents, it does not appear to be included with this application. If Encroachment A is to be included in this permit, please provide all required information per the Submittal… All documents in this project (11) ★ 2023-ENCROACHMENT-0000063 Comment Report 07-12-2023.pdf Encroachment Checklist.pdf EncroachmentApplication - 1906-N-Pearl-St - 05-31-2023.pdf EncroachmentCOI - 1906-N-Pearl-St - 05-31-2023.pdf EncroachmentExhibit - 1906-N-Pearl-St - 05-31-2023.pdf EncroachmentLegalDesc - 1906-N-Pearl-St - 05-31-2023.docx PropertyLegalDesc - 1906-N-Pearl-St - 05-31-2023.docx REDLINES Xcel George.pdf SitePlan - 1906-N-Pearl-St - 05-31-2023.pdf Title Report - 1906-N-Pearl-St - 05-31-2023.pdf Warranty Deed - 1906-N-Pearl-St - 05-31-2023.pdf | ||||
| 2026-CIP-0000067 2023 Intersection Improvement Design 🚲 bike lane | CIP | 30 | Flagged · 3 | |
| 🚲 Bike lane mentioned [file name] "53rd Ave Bikeway Plans 2026.5.29 reduced.pdf" ERA Wastewater Review Review Complete - Objection ERA Floodplain Review Review Complete - Objection All floodplain comments made on previous CIP review still apply. Below are general comments from the previous review that did not appear to be addressed with this submittal. FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplai… PW WW Maintenance Review Review Complete - Objection PWPRS Project Number: 2026-CIP-0000067 - 2023 Intersection Improvement Design Reviewing Agency/Company: WW Construction Reviewers Name: Mark Gehrke Reviewers Phone: 303-446-3427 Reviewers Email: mark.gehrke@denvergov.org Approval Status: Approved with conditio… All documents in this project (8) 100PRNT 2023 Intersection Improvements Specs.pdf 2023 Group 1 100pct 2026-06-10.pdf 2023 Intersection Improvements Final Drainage Report 20260604.pdf ★ 2026-CIP-0000067 Comment Report 06.26.2026.pdf 23080 2023 Intersections Group 1 Comments Matrix 2026-06-10.pdf 53rd Ave Bikeway Plans 2026.5.29 reduced.pdf Perry and Lakewood Gulch - No Impact Letter_20260605.pdf REDLINES WW CONST Gehrke.pdf | ||||
| 2026-CIP-0000055 Downtown Bus Priority 🚲 bike lane | CIP | 23 | Flagged · 2 | |
| 🚲 Bike lane mentioned [comment report text] "ys park, they park. See the "loading zone" on market between 15th and 16th located in the bike lane. It says it is a loading zone 5pm to 2am. Cars are parked in it 24/7 making it unusable." [comment report text] "The lane still needs to function. Allowing cars to park in the bike lane so that bikes/scooters zip in and out of the bus lane is UNSAFE for everyone." [comment report text] "-16th and blake needs to install the physical armadillos to protect the bike lanes all the way up to the crosswalk at blake and 16th. Constantly" [comment report text] "the crosswalk at blake and 16th. Constantly cars parked in the bike lane before and after the intersection. There are no turning moveme" [comment report text] "s on or off 16th, design does not need to accommodate this and could instead provide more bike lane protection. 18th and blake and 17th and blake are protected al" Forestry Review Review Complete - Objection Forestry Comments: 1) Sheet 18 - Show TPZ fencing perimeter. External Referral 1 Review Complete - Objection PWPRS Project Number: 2026-CIP-0000055 - Downtown Bus Priority Reviewing Agency/Company: RTD | ||||
| 2026-CIP-0000035 Ogden Bikeway Extension 🚲 bike lane | CIP | 28 | Flagged · 1 | |
| 🚲 Bike lane mentioned [project title] "2026-CIP-0000035 - Ogden Bikeway Extension" [comment report text] "www.denvergov.org/pwera Ogden Bikeway Extension 04/28/2026" [comment report text] "Comment Report Ogden Bikeway Extension 04/28/2026" [comment report text] "Comment Report Ogden Bikeway Extension 04/28/2026" [comment report text] "Comment Report Ogden Bikeway Extension 04/28/2026" [comment report text] "omplete - No Objection Comments: PWPRS Project Number: 2026-CIP-0000035 - Ogden Bikeway Extension Reviewing Agency/Company: Transportation Mobility Engineeri" ERA Erosion Control Review Review Complete - Objection 1. Add missing note 5I to CIP Erosion Control Notes - CASDP Not Required "THE DIRECT OR INDIRECT DISCHARGE OF WATER CONTAINING WASTE CEMENT TO THE STORM SEWER SYSTEM IS PROHIBITED All documents in this project (7) ★ 2026-CIP-0000035- Comment Report - 04.28.2026.pdf OBE 60Pct Cost Estimate 20260410.pdf OBE 60Pct DesignPlans 20260410.pdf REDLINE- DOTI - CLONG - 2026-CIP-035 CL REDLINES - DOTI - CLONG - 2026-CIP-035 CL.pdf REDLINES- TME- EStein-2026-4-23_OBE 60Pct DesignPlans 20260410_EES_AT.pdf REDLINES- WW Constructions - OBE 60Pct DesignPlans 20260410-mwg.pdf | ||||
| 2026-CIP-0000014 GES Safer Streets 🚲 bike lane | CIP | 29 | Flagged · 4 | |
| 🚲 Bike lane mentioned [comment report text] "he project is now designating Clayton Street as a designated (shared) bikeway with passenger vehicles which deviates from the original Colorado Public Utilities Commis" ERA Wastewater Review Review Complete - Objection Sheet 157: The low point at 20+40.84 needs an inlet. PW Survey Review Review Complete - Objection Plan set indicates survey sheets will be added with next submittal. DOTI Survey comments are in the project folder. REDLINES uploaded to E-review webpage Forestry Review Review Complete - Objection Forestry Comments: 1) What is protocol for new signage installs adjacent to ROW trees (within canopy dripline)? Recommend including Additional Internal Review 8 Review Complete - Objection PWPRS Project Number: 2026-CIP-0000014 - GES Safer Streets Reviewing Agency/Company: Forestry Reviewers Name: Darren Potucek Reviewers Phone: 3163042366 Reviewers Email: darren.potucek@denvergov.org Approval Status: Denied Comments: Need to discuss work being… All documents in this project (8) ★ 2026-CIP-0000014 Comment Report 3-6-2026.pdf 26087-GES SS-FIR-Cost Estimate-2026-02-06.pdf 26087-GES SS-FIR-Plans-2026-02-06.pdf 26087-GES SS-FIR-Preliminary Drainage Memo-2026-02-06-Consor.pdf 26087-GES SS-FIR-Preliminary Drainage Memo-2026-02-06-KH.pdf 26087-GES SS-FIR-Turning Movements-2026-02-06.pdf REDLINES- Survey- Castaneda.docx REDLINES- WW Maintenance- Gehrek.pdf | ||||
| 2026-CIP-0000012 2023 Intersection Improvement Design - Early Package 🚲 bike lane | CIP | 25 | Flagged · 2 | |
| 🚲 Bike lane mentioned [file name] "53rd Ave Bikeway Plans 2026.02.04 reduced.pdf" [file name] "REDLINES- Project Manager- 53rd Ave Bikeway Plans.pdf" PW Survey Review Review Complete - Objection Comments and redlines in project folder Review Status: Review Complete - Objection ERA Floodplain Review Review Complete - Objection Review Complete - Objection All documents in this project (14) 2023 90PCT COMBINED.pdf ★ 2026-CIP-0000012 Comment Report 2-24-2026.pdf 23080 2023 Intersections Group 1 60pct Comments Matrix.xlsx 53rd Ave Bikeway Plans 2026.02.04 reduced.pdf 90_ 2023 Intersection Improvements Estimate G1.xlsx 90pct 2023 Intersection Improvements Final Drainage Report.pdf 90pct 2023 Intersection Improvements Specs.pdf REDLINES- Craig Long.pdf REDLINES- Floodplain- Silva.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Project Manager- 2023 90PCT COMBINED.pdf REDLINES- Project Manager- 53rd Ave Bikeway Plans.pdf REDLINES- Survey- Pfohl.pdf REDLINES- WW Maintenance- Gehrke.pdf | ||||
| 2026-CIP-0000005 South Central CTN - 12th Ave 🚲 bike lane | CIP | 26 | Flagged · 3 | |
| 🚲 Bike lane mentioned [file name] "REDLINES -2026-CIP-0005 South Centrial CTN Bikeway - CL.pdf" [comment report text] "comm Reviewing Agency: Attachment: 2026-CIP-0005 South Centrial CTN Bikeway CL.pdf REDLINES uploaded to Ereview page Reviewers Name: Additional Internal Review" PW Trans and Mobility Review Review Complete - Objection PWPRS Project Number: 2026-CIP-0000005 - South Central CTN - 12th Ave Reviewing Agency/Company: DOTI Transportation & Mobility Engineering Reviewers Name: Allison Thienpont Reviewers Phone: 720-865-3197 Reviewers Email: almithienpont@gmail.com Approval Status:… Fire Prevention Review Review Complete - Objection The drawings for this project are approved, however, the DFD does not endorse nor approve any traffic circles at this time. RTD Review Complete - Objection PWPRS Project Number: 2026-CIP-0000005 - South Central CTN - 12th Ave Reviewing Agency/Company: RTD Reviewers Name: clayton woodruff Reviewers Phone: 3032992943 Reviewers Email: Clayton.Woodruff@RTD-Denver.com Approval Status: Denied Comments: Project Name: 20… | ||||
| 2025-CIP-0000219 Ultra-Urban Green Infrastructure Guidelines 2nd Edition 🚲 bike lane | CIP | 31 | Flagged · 1 | |
| 🚲 Bike lane mentioned [comment report text] "eir operations and vehicles. 3. For Green Gutter locations showing a bike lane or access between the planter and sidewalk, please revise images and" Reviewers Name: ERA Transportation Review Review Complete - Objection The City of Denver Engineering and Regulatory Office has completed its Strategic review of the submitted All documents in this project (16) ★ 2025-CIP-0000219 Comment Report 12.26.25.pdf Appendix A Typical Details.pdf Appendix B Supplemental Fact Sheet Details.pdf Appendix C Plant List.pdf Appendix D Critical Elevations Table.pdf Appendix E Plan Set Guidance.pdf Appendix F Construction Checkpoint List.docx Appendix G Drainage Report Checklist.docx Appendix H Green Infrastructure Monitoring.pdf Appendix I O and M Plan Template.docx Appendix I O and M Plan Templates MATRIX.xlsx Cover Letter.pdf RECOMMENDATIONS - 2025-CIP-0000219 - One Water Stevens.pdf REDLINES- Forestry- Evers.pdf UUGIG 2ndEdition 95pct.pdf UUGIG 60Pct CommentResponses.pdf | ||||
| 2025-CIP-0000197 Lipan Pond Water Quality Facility 🚲 bike lane | CIP | 25 | Flagged · 2 | |
| 🚲 Bike lane mentioned [comment report text] "to be the west ROW of Lipan, South ROW of Alameda, and east limits of existing bike path along SPR at/near river bank. Effective perimeter controls are essent" ERA Erosion Control Review Review Complete - Objection 11/18/2025 Review Complete - Objection This CIP objection will be removed once CASDP application has been submitted. Final technical review of CASDP elements will be performed during formal CASDP application process. ER-Erosion Control has reviewed the SWMP pl… ERA Floodplain Review Review Complete - Objection This project was permitted under a No-Rise for the floodplain permit (2023-SUDP-0003121). Please submit a signed and sealed letter from the hydraulic engineer verifying that the final grading and design of the Lipan Pond will not All documents in this project (9) 2025-10-20 SPR - Lipan Pond 90pct.pdf 2025-10-20SPR - Lipan Pond90 pct SUDP.pdf ★ 2025-CIP-0000197 Comment Report 11-19-2025.pdf 21-029.01 SPR OandM.pdf Narrative Report Information Worksheet Lipan Pond.pdf REDLINES- WW Maintenance- Gehrke- Lipan Pond 90pct.pdf REDLINES- WW Maintenance- Gehrke- OandM.pdf SPR - Lipan Pond SWMP.pdf SPR Lipan Pond - Drainage Memo 90pct.pdf | ||||
| 2026-CIP-0000082 Parks Maintenance Facility - Green Valley Ranch | CIP | 8 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection See Survey comments inf Project Redlines folder. All documents in this project (3) | ||||
| 2026-CIP-0000080 Irving Street Traffic Calming | CIP | 28 | Flagged · 4 | |
| ERA Wastewater Review Review Complete - Objection We have recently updated our Urban Flood Risk modeling to include 1 foot contours, basin boundaries, and flow depth information. It is suggested speed cushions be placed outside of areas where stormwater flows are already spilling, or may spill, into private p… ERA Erosion Control Review Review Complete - Objection 1. Please add CASDP not required notes to plans. DS Wastewater Review Review Complete - Objection Please see Brendan's comment. ERA Floodplain Review Review Complete - Objection PLANS: Show and label the floodplain boundaries and Flood Zone(s). Add the following Floodplain Note to identify the effective FIRM information: FLOODPLAIN NOTE: THIS PROJECT PROPOSES WORK IN THE ZONE AE FLOODPLAIN AND FLOODWAY OF SANDERSON GULCH AS SHOWN ON F… | ||||
| 2026-CIP-0000076 Encroachment Rules and Regulations | CIP | 49 | Flagged · 2 | |
| ERA Floodplain Review Review Complete - Objection See comments in shared document. External Referral 12 Review Complete - Objection PWPRS Project Number: 2026-CIP-0000076 - Encroachment Rules and Regulations Reviewing Agency/Company: Denver Office of Climate Action, Sustainability and Resiliency Reviewers Name: Khai Hoan Nguyen Reviewers Phone: (720) 384 4855 Reviewers Email: khaihoan.nguy… | ||||
| 2026-CIP-0000075 CDOT - Proj. 26358 - SH35 R1 RESURFACING-BRIDGE | CIP | 21 | Flagged · 3 | |
| ERA Erosion Control Review Review Complete - Objection DS Transportation Review Review Complete - Objection See redlines. Review Status: Review Complete - No Objec 2026 07 01 cm transportation redlines CIP CDOT ERA Floodplain Review Review Complete - Objection A floodplain permit is required for this project and review comments have been sent via the General Floodplain Permit review, 2026-FLOOD-0000081. This objection will be cleared once there are no outstanding floodplain comments that | ||||
| 2026-CIP-0000074 S. Platte River Trail - Mississippi to Dartmouth | CIP | 34 | Flagged · 3 | |
| ERA Erosion Control Review Review Complete - Objection 1. Due to the project's limit of disturbance (greater than one acre) a Construction Activities Stormwater Discharge Permit (CASDP) is required. 2. Please prepare CASDP package in accordance with the City guidelines found here: https://denvergov.org/Government/… DS Wastewater Review Review Complete - Objection EC is needed since the site disturbing area more than 1 acre and adjacent to floodplain. Floodplain permit is required for working within floodplain. Reviewers Name: PW Survey Review Review Complete - Objection Redlines in project folder All documents in this project (17) 20260715_2026-CIP-0000074_SurveyComments.docx 20260715_2026-CIP-0000074_SurveyRedlines.pdf ★ 2026-CIP-0000074 - Comment Report - 07.16.26.pdf 25420 SPRT ProjectSpecificationsList 30.pdf 25420_SPRT_ConstructionPlans-Part1of2_30 MH.pdf 25420_SPRT_ConstructionPlans-Part1of2_30.pdf 25420_SPRT_ConstructionPlans-Part2of2_30 MH.pdf 25420_SPRT_ConstructionPlans-Part2of2_30.pdf 25420_SPRT_DraftWallStructureSelectionReport_30.pdf 25420_SPRT_PreliminaryDrainageMemo_30.pdf 25420_SPRT_PreliminaryFloodplainMemo_30.pdf 25420_SPRT_PreliminaryGeotechnicalReport_30.pdf 25420_SPRT_ProjectSpecificationsList_30 MH.pdf cpep-suggested-notes MH.pdf REDLINES - WW Construction - MGehrke 25420_SPRT_ConstructionPlans-Part1of2_30-mwg.pdf REDLINES- Survey- Pfohl.pdf REDLINES_Floodplain.pdf | ||||
| 2026-CIP-0000073 CDOT HSIP FY25 11TH AVE and QUEBEC ST | CIP | 24 | Flagged · 2 | |
| ERA Wastewater Review Review Complete - Objection 1) Plans identify a disturbance area less than 1 acre. Therefore, it is understood that regulatory WQ treatment per the terms of the City's MS4 permit will not apply. Please confirm this understanding with a statement in the drainage memo. 2)See attached storm… Reviewers Name: PW Survey Review Review Complete - Objection Uploaded survey redline comments in E-Review. Review Status: Review Complete - Objection All documents in this project (12) ★ 2026-CIP-0000073 - Comment Report -07.16.2026.pdf 25530 11 Quebec 30p Drng Memo.pdf 25530 11th and Quebec - FIR SUE Report.pdf 25530 11th-Quebec FIR Submittal Memo.pdf 25530 11th-quebec-plans-260619.pdf REDLINES - EPR - DHarris - 25530 11th-quebec-plans-260619 EPR WW redlines.pdf REDLINES - Forestry - NEvers - Comments 7-15-26.pdf REDLINES - SURVEY - 20260702-26CIP073-30PRNCT Plans-Survey RedlineComments - FULL SET.pdf REDLINES - SURVEY - 20260702-26CIP073-3030PRNCTPlans-Survey RedlineComments.pdf REDLINES - SURVEY - 20260702-26CIP073-30PRCT Plans-Survey RedlineComments.pdf REDLINES - TME - ERodgriguez - Pages from 25530 11th-quebec-plans-260619 - TME Reviewed.pdf REDLINES - WWConstruction MGehke - 25530 11th-quebec-plans-260619-mwg.pdf | ||||
| 2026-CIP-0000072 Rapid Diverter Deployment | CIP | 29 | Flagged · 1 | |
| PW Trans Safety Review Review Complete - Objection PWPRS Project Number: 2026-CIP-0000072 - Rapid Diverter Deployment Reviewing Agency/Company: DOTI Transportation & Mobility Engineering Reviewers Name: Allison Thienpont Reviewers Phone: 720-865-3197 Reviewers Email: allison.thienpont@denvergov.org Approval St… All documents in this project (10) ★ 2026-CIP-0000072 - Comment Report - 7.15.26.pdf 90PRCT Rapid-Deployment Comment-Response.xlsx 90PRCT Rapid-Deployment Construction-Plans.pdf 90PRCT Rapid-Deployment Cost-Estimate.pdf 90PRCT Rapid-Deployment Truck-Turns.pdf REDLINES - DOTIIMPLE - JCanada - 90PRCT Rapid-Deployment Construction-Plans - JEC Review.pdf REDLINES - DOTIIMPLE - JCanada - 90PRCT - Rapid-Deployment Cost-Estimate - JEC.pdf REDLINES - DOTIIMPLEM - JCandana 90PRCT Rapid-Deployment Truck-Turns - JEC Review.pdf REDLINES - TOPS - Arredondo.pdf REDLINES-DPR Cmnts PRNCT Rapid-Deployment_Construction-Plans.pdf | ||||
| 2026-CIP-0000070 GES Safer Streets | CIP | 26 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection Review Complete - Objection All documents in this project (8) ★ 2026-CIP-0000070 - Comment Report - 07-13-2026.pdf 2026-CIP-0000070 GES Safer Streets Survey Comments 2026.07.10.docx 26087-GES SS-FOR-Cost Estimate-2026-05-18.pdf 26087-GES SS-FOR-Drainage Memo-2026-05-15-Consor.pdf 26087-GES SS-FOR-Specs-2026-05-15.pdf 26087-North Central Community Improvements - FIR CRF.xlsx GES SS-FOR-Plans-2026-06-24.pdf REDLINES - WWConstruction - Mgehrke - GES SS-FOR-Plans-2026-06-24 mwg.pdf | ||||
| 2026-CIP-0000069 GO Bond Sidewalk Project - RISE - Vanderbilt Park and 6th and Federal Connections | CIP | 25 | Flagged · 5 | |
| ERA Wastewater Review Review Complete - Objection 1)Water quality is required at 1 acre of land disturbance and required treatment of 95% of the disturbed area. The proposed work around Vanderbilt Park adjacent ROW's is understood to exceed 1 acre of disturbance. Please submit a drainage letter and design dem… ERA Erosion Control Review Review Complete - Objection Review Complete - Objection 1. Due to the project's limit of disturbance (greater than one acre) a Construction Activities Stormwater Discharge Permit (CASDP) is required for the construction areas by Vanderbilt Park and Tower Road. You may choose to submit a… DS Transportation Review Review Complete - Objection 1. Recommend detached sidewalks to comply with CCD Std Dwg 2.1 2. All concrete driveway should be constructed per CCD Std Dwg 6.1 with 5' approach widenings and 6' flares Forestry Review Review Complete - Objection PWPRS Project Number: 2026-CIP-0000069 - GO Bond Sidewalk Project - RISE - Vanderbilt Park and 6th and Federal Connections ERA Floodplain Review Review Complete - Objection PLANS: Please see attached floodplain redlines and address accordingly for your next CIP submittal. | ||||
| 2026-CIP-0000068 Parks Maintenance Facility - Green Valley Ranch | CIP | 23 | Flagged · 1 | |
| DPR Parks QA Review Complete - Objection All DPR comments have not been addressed at this time. | ||||
| 2026-CIP-0000066 GO Bond Sidewalks - CD 237 - Group 2 | CIP | 24 | Flagged · 2 | |
| ERA Erosion Control Review Review Complete - Objection Please add the required erosion control notes for projects not requiring a CASDP. Required notes are uploaded as redlines. REDLINES uploaded to E-review webpage Forestry Review Review Complete - Objection Forestry Comments: Review Status: No Response 1) Include OCF Tree Protection Detail - see OCF website. All documents in this project (10) ★ 2026-CIP-0000066 Comment Report 6-24-2026.pdf CCD 2 3 7 - Sidewalks Initial Drainage Memo.pdf FOR 30 ER Comment Matrix-Package 2 and 3.pdf FOR ConstPlans-Package 2 and 3.pdf FOR-Specs Package 2 and 3.pdf REDLINES - ER Erosion Control- Sasarak.pdf REDLINES- Forestry- Evers- Mitigation Form.pdf REDLINES- Forestry- Evers- OCF Tree Protection Notes.docx REDLINES- Trans Safety- De Vos Tidd.pdf REDLINES- WW Maintenance- Gehrke.pdf | ||||
| 2026-CIP-0000065 Bear Creek Trail (Bear Creek Park) | CIP | 28 | Flagged · 4 | |
| ERA Wastewater Review Review Complete - Objection Provide documentation Metro Wastewater has reviewed and accepted the improvements within their easements. ERA Transportation Review Review Complete - Objection The City of Denver Engineering and Regulatory Office has completed its Strategic review of the submitted ERA Erosion Control Review Review Complete - Objection 1). Due to the project's limit of disturbance (greater than one acre) a Construction Activities Stormwater Discharge Permit (CASDP) is required. PW Survey Review Review Complete - Objection Review Complete - Objection sheets. Can you provide clarification on the "Revisions of Sections 625 and 629" comment, additional context would be helpful. Survey Redlines uploaded in Accela and copied into the Project Redlines folder REDLINES are uploaded to t… All documents in this project (15) ★ 2024-CIP-0000150 Comment Report 10-17-2024-RESPONSES.pdf 2026-06-05 23-007 Bear Creek 90PRNT-compiled.pdf 2026-06-05 Bear Creek Trail 0PRNTCost Estimate.pdf 2026-CIP-0000065 - Comment Report - 06-29-2026.pdf Bear Creek Trail - 90PRNT Spec book.pdf Bear Creek Trail - Bear Creek Crossing SSR - PBB Review with responses.pdf Bear Creek Trail - Bear Creek Crossing Structure Selection Report90PRNCT.pdf Bear Creek Trail - Marston Crossing SSR - PBB Review with responses.pdf Bear Creek Trail - Marston Crossing Structure Selection Report 90PRNCT.pdf Bear Creek Trail CASDP 90 Percent 06.05.2026.pdf Bear Creek Trail CASDP Narrative Report 90PRNT Submittal 2023-PROJMSTR-0000251.pdf DPR comment doc BCT - 60pct Review Doc-RESPONSES.pdf REDLINE Floodplain Review Comments.docx REDLINES - Floodplain 60pcntPlans.pdf REDLINES- Survey- Pfohl.pdf | ||||
| 2026-CIP-0000063 Encroachment Rules and Regulations | CIP | 35 | Flagged · 3 | |
| DS Transportation Review Review Complete - Objection Forestry Review Review Complete - Objection ERA Wastewater Review Complete - Objection All documents in this project (6) ★ 2026-CIP-0000063 - Comment Report - 06-16-2026.pdf EPR Transportation_Chris Mueller - workshop photo 1.jpeg EPR Transportation_Chris Mueller - workshop photo 2.jpeg EPR Transportation_Chris Mueller - workshop photo 3.jpeg EPR Transportation_Chris Mueller - workshop photo 4.jpeg Reviewer Instructions - Encroachment RR.pdf | ||||
| 2026-CIP-0000061 2023 New Traffic Signals - Central Denver 100Pcnt | CIP | 23 | Flagged · 2 | |
| Forestry Review Review Complete - Objection PWPRS Project Number: 2026-CIP-0000061 - 2023 New Traffic Signals - Central Denver 100Pcnt Reviewing Agency/Company: Office of the City Forester Reviewers Name: Eric Huetig Reviewers Phone: 7209130752 Reviewers Email: eric.huetig@denvergov.org Approval Status:… REDLINES ARE UPLOADED TO THE E-REVIEW WEBPAGE Review Complete - Objection I am behind on reviews and will need to submit comments on 6/12 All documents in this project (13) 2026-04-30 Central Signals 100Pcnt Drainage Report.pdf 2026-04-30 Central Signals 100Pcnt Estimate.pdf 2026-04-30 Central Signals 100Pcnt Plans.pdf 2026-04-30 Central Signals 100Pcnt Specs.pdf 2026-04-30 Central Signals 90Pcnt Comment Resolution Matrix.pdf ★ 2026-CIP-0000061 Comment Report 6.10.2026.pdf 4015CENT- SUE Report_Stamped_REDUCED.pdf 4015CENT_SUE_Stamped.pdf EXTERNAL Central Signals - Geotech Requirements.msg Geotechnical Investigation Report_RockSol.pdf REDLINES Forestry_Huetig - OCF Comments 6-8-26__ 2025PM0000173_2026-CIP-61 - 100pct.pdf REDLINES Trans Mobility_Stein - 2026-5-29_Central Signals 100Pcnt Plans_EES.pdf REDLINES_Jessica Stevens_Turf Alternatives.png | ||||
| 2026-CIP-0000059 RRA - SW Trail | CIP | 26 | Flagged · 1 | |
| ERA Wastewater Review Review Complete - Objection Please remove the 2nd to last paragraph from the Drainage Memo. This project is not within the City's MS4 jurisdictional limits. Project should be reviewed by Jefferson County for applicable MS4 requirements such as | ||||
| 2026-CIP-0000057 GVR Activation Zones | CIP | 25 | Flagged · 1 | |
| Obtain a CASDP from ER Review Complete - Objection Survey comments copied to Project REDLINES folder. Review Status: No Response | ||||
| 2026-CIP-0000056 Montbello Landscape Transformation | CIP | 28 | Flagged · 3 | |
| ERA Erosion Control Review Review Complete - Objection 1. Due to the project's limit of disturbance (greater than one acre) a Construction Activities Stormwater Discharge Permit (CASDP) is required. Please prepare CASDP package in accordance with the City guidelines found here: https://www.denvergov.org/content/de… Follow the prompts to enter application data and upload files Review Complete - Objection PDF IS 90 MB. THIS CITY LAPTOP LOCKS UP. PLEASE RESEND AS 20MB MAX. PDF. PW Construction Engineering Review Review Complete - Objection The traffic control spec needs to reference dotipt 116.1 Traffic Control Procedures and dotirr 022.3 Issuance of Permits by the CTE so the contractor understands that E 56th is an arterial - Permit applications need to be submitted All documents in this project (2) | ||||
| 2026-CIP-0000054 Santa Fe Streetscape and Multimodal Improvements | CIP | 28 | Flagged · 3 | |
| ERA Materials Review Review Complete - Objection See uploaded Specs with kdb comments. Review Status: Review Complete - No Objec Forestry Review Review Complete - Objection Please refer to attached OCF Comment PDF: 1) Show accurate TPZ fencing (as would be installed during construction - perimeter around canopy/rooting area) Additional Internal Review 4 Review Complete - Objection Review Complete - Objection All documents in this project (16) 20241016 Santa Fe Streetscape Design Intersection Analysis Turn Ln Removal.pdf 20260508 Santa Fe Street scape Design Final Drainage Report 90pct Bid.pdf 20260508 Santa Fe Streetscape Design 30pct Comment Response Form.pdf 20260508 Santa Fe Streetscape Design Cost Estimate 90pct Bid.pdf 20260508 Santa Fe Streetscape Design Final Geotech Report 03-24-25.pdf 20260508 Santa Fe Streetscape Design Memo 90pct Bid.pdf 20260508 SANTA FE STREETSCAPE DESIGN PLANS 90pct Bid.pdf 20260508 Santa Fe Streetscape Design Technical Specifications 90pct Bid.pdf ★ 2026-CIP-0000054 Comment Report 5-28-2026.pdf ErosionControlPlans SantaFe PRJ10004604.pdf REDLINES- DPR- Cervera.pdf REDLINES- ERA Materials- Blair.pdf REDLINES- Forestry- Evers.pdf REDLINES- Trans Safety- Stein.pdf REDLINES- WW Maintenance- Gehrke.pdf Santa Fe CASDP Narrative ReportSantaFe PRJ10004604.pdf | ||||
| 2026-CIP-0000052 5280 Trail - Acoma Shared Street | CIP | 33 | Flagged · 1 | |
| DS Transportation Review Review Complete - Objection This project reviewed by ROWS-DES Transportation only for coordination with other nearby private developments. Please contact DES transportation review engineer Matt Steder (matt.steder@denvergov.org) if you have any All documents in this project (11) ★ 2026-CIP-0000052 - Comment Report - 05-26-26.pdf 5280 Trail - Acoma Segment 90PCNT - CASDP Narrative.pdf 5280 Trail - Acoma Segment 90PCNT - Final Drainage Report.pdf 5280 Trail - Acoma Segment 90PCNT- Construction Plans.pdf 5280 Trail - Acoma Segment 90PCNT- OandM Plan.pdf 5280 Trail - Acoma Segment 90PCNT- Updated Irrigation Plan.pdf CCD 5280 Trail – Acoma Street 12th to 10th Avenue Memorandum.pdf REDLINES - EPR Transportation - MSteder - Approved_Signed - TEP Plan Set REV. 5_4-SITE_TRANSPORTATION_2022PM0000109.pdf REDLINES - WWConstruction - MGehrke 5280 Trail - Acoma Segment 90PCNT- Construction Plans-mwg_Optimized.pdf REDLINES - WWConstruction - MGehrke 5280 Trail - Acoma Segment 90PCNT- OandM Plan-mwg.pdf REDLINES -OFC- NEvers ER 90 prcnt Forestry - comments 5-26-26.docx-26-05-26-13-44.docx | ||||
| 2026-CIP-0000051 City Park - 21st and York St Bus Stop - Accessibility Improvement | CIP | 29 | Flagged · 5 | |
| ERA Transportation Review Review Complete - Objection The City of Denver Engineering and Regulatory Office has completed its Strategic review of the submitted PW Survey Review Review Complete - Objection Control Diagram is not required for this project. REDLINES are uploaded to the E-Review webpage. PW Construction Engineering Review Review Complete - Objection See kdb red lines. Review Status: No Response Additional Internal Review 4 Review Complete - Objection PWPRS Project Number: 2025-CIP-0000061 - City Park 21st and York St Bus Stop Accessibility Improvement Reviewing Agency/Company: Transportation & Mobility Engineering External Referral 1 Review Complete - Objection PWPRS Project Number: 2025-CIP-0000061 - City Park 21st and York St Bus Stop Accessibility Improvement Reviewing Agency/Company: RTD Reviewers Name: clayton s woodruff Reviewers Phone: 303-299-2943 Reviewers Email: Clayton.woodruff@rtd-denver.com Approval Stat… All documents in this project (6) 2026-CIP-0000051 Comment Report 05-26-2026.pdf CityPark 21st York 95PRCTFLAT.pdf REDLINES- TME-ERodriguez- Pages from CityPark 21st York 95PRCTFLAT - TME Reviewed.pdf ★ Response 2025-CIP-0000061 Comment Report 04-15-25.pdf Response kdb red lines PB Fund CityPark 21st York 60PRNCT.pdf Response REDLINES - Transportation and Mobility Engineering - Krook.pdf | ||||
| 2026-CIP-0000050 Southmoor Park Tributary | CIP | 32 | Flagged · 3 | |
| ERA Erosion Control Review Review Complete - Objection 1. Due to the project's proximity to a drainageway or water body (enter name of drainageway/water body), a Construction Activities Stormwater Discharge Permit (CASDP) is required. Please prepare CASDP package in accordance with the City guidelines found here:… Reviewers Name: PW Survey Review Review Complete - Objection Comments and redlines in project folder ERA Floodplain Review Review Complete - Objection The no-rise analysis for the floodplain permit is currently under review. Additional floodplain comments will be provided with the no-rise analysis review. The object for the CIP will be cleared once the no-rise analysis has been reviewed and there are no outs… All documents in this project (7) ★ 2026-CIP-0000050 - Comment Report - 05 - 26 - 26.pdf REDLINES - WW Constuction- MGehkre Southmoor Park Tributary Improvements - 60pct Plans-mwg.pdf REDLINES- DPR - JCervera - Comments Southmoor Park Tributary Improvements - 60pct Plans.pdf REDLINES- Flood District- Clark.pdf REDLINES- Survey- Pfohl.pdf Southmoor Park Trib Existing Assessment and Concept Memo.pdf Southmoor Park Tributary Improvements - 60pct Plans.pdf | ||||
| 2026-CIP-0000048 Lincoln Street Bridge and 6th Avenue Bridge over Cherry Creek | CIP | 39 | Flagged · 4 | |
| ERA Wastewater Review Review Complete - Objection Verify the pipe sizes shown are correct. Sheet 19 shows an 24-inch elliptical pipe with new FES outfall to cherry creek but the pipe upstream of the inlet at 306+51.50 is a 60-inch RCP. MapIT shows the existing main in 6th Ave as ERA Erosion Control Review Review Complete - Objection 1. Due to the project's proximity to a waterway, a Construction Activities Stormwater Discharge Permit (CASDP) is required. 2. Please prepare CASDP package in accordance with the City guidelines found here: https://denvergov.org/Government/Agencies-Departments… Forestry Review Review Complete - Objection PWPRS Project Number: 2026-CIP-0000048 - Lincoln Street Bridge and 6th Avenue Bridge over Cherry Creek Reviewing Agency/Company: Forestry RTD Review Complete - Objection PWPRS Project Number: 2026-CIP-0000048 - Lincoln Street Bridge and 6th Avenue Bridge over Cherry Creek Reviewing Agency/Company: RTD Reviewers Name: clayton woodruff Reviewers Phone: 3032992943 Reviewers Email: Clayton.Woodruff@RTD-Denver.com Approval Status:… All documents in this project (13) ★ 2026-CIP-0000048 Comment Report 05.15.2026.pdf 2026-CIP-0000048 Revised Comment Report 05.22.26.pdf L6CC 30PRNT FIR Submittal 04-24-26.pdf L6CC 30PRNT FIR Cost Estimate 4-24-26.pdf L6CC Draft Drainage Design Report FIR 4-24-26.pdf L6CC Draft Geotech Report FIR 4-24-26.pdf L6CC Draft Pavement Design Report FIR 4-24-26.pdf L6CC Draft Structure Selection Report FIR 4-24-26.pdf L6CC Draft Utility Report FIR.pdf REDLINES - DPR Comments L6CC 30PRNT FIR Submittal 04-24-26.pdf REDLINES - Floodpain - DBoyles 2026-CIP-0000048_Floodplain-review.pdf REDLINES - SURVEY - DSperling COMMENTS SPERLING L6CC 30PRNT FIR Submittal 04-24-26.pdf REDLINES - TME- ETidd - L6CC 30PRNT FIR Submittal 04-24-26_EDT.pdf | ||||
| 2026-CIP-0000046 Clearance and Release - 1241 W Bayaud Ave | CIP | 21 | Flagged · 3 | |
| DS Transportation Review Review Complete - Objection Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. DS Wastewater Review Review Complete - Objection Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. PW Survey Review Review Complete - Objection stamp date and sign the exhibit Review Status: Review Complete - No Objection description approved All documents in this project (6) 2026-04-24 Clearance and Release Intake Form-Appx 1241 W Bayaud-CASR EV Charger.xlsm 2026-04-24 Clearance and Release Memo-All Agencies-1271 W Bayaud Xcel Permit.pdf 2026-04-24 Legal Description-1271 Bayaud.pdf ★ 2026-CIP-0000046 - Comment Report - 05.11.2026.pdf 2026-CIP-0000046 Comment Report 05.21.2026.pdf REDLINES - SURVEY COMMENTS Legal Description-1271 Bayaud.pdf | ||||
| 2026-CIP-0000044 Mill 18 - 15th and Umatilla | CIP | 29 | Flagged · 4 | |
| ERA Wastewater Review Review Complete - Objection Sheet 25: Consider adding a slope to the ADA crossing in the proposed minimum. Shown as zero percent on plans. Sheet 38: verify the existing and propose storm manhole rims will not be located in the proposed curb and gutter section. Especially the existing man… ERA Materials Review Review Complete - Objection See kdb 630 spec. . Please verify that the HMA spec meets the MGPEC Item 20 and make the note in the specification. PW Survey Review Review Complete - Objection Minor survey comments are in the project REDLINES folder (REDLINES- Survey- Savich.pdf) External Referral 1 Review Complete - Objection PWPRS Project Number: 2026-CIP-0000044 - Mill 18 - 15th and Umatilla Reviewing Agency/Company: RTD All documents in this project (13) 10859-AT-003.pdf 10859-Mill18 SAQ.xlsx 2026.04.17-Mill 18 15th and Umatilla Street-Plans-90PRNCT TML.pdf ★ 2026-CIP-0000044- Comment Report - 05.11.2026.pdf 60pMill18-Comment Resolution Matrix.xlsx B202090 01-Mill 18-SS-3-6-2026.pdf Mill Levy 18 Specs 90p.pdf REDLINES - OFC-EHuetig- 5-5-26 2018PM0000539 - 2026-CIP-0000044.pdf REDLINES- Materials- KDB-630 Mill Levy18 Specs 90p.pdf REDLINES- Survey- Savich.pdf REDLINES-Implementation-JCanada -2026.04.17-Mill_18 15th and Umatilla Street-Plans-90PRCT Canada Stein Thienpont.pdf REDLINES-WaterServices-JStevens- Turf Alternatives.png REDLINES-WWConstruction-MGehrke-2026.04.17-Mill 18 15th and Umatilla Street-Plans-90PRNCT TML-mwg.pdf | ||||
| 2026-CIP-0000043 High Line Canal Trail Quebec to Parker | CIP | 26 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection Comments in project folder Review Status: No Response All documents in this project (6) | ||||
| 2026-CIP-0000040 5283 Underground Relocation Project Phase 2, Segment 3, 95 PRCT Engineering Submittal | CIP | 30 | Flagged · 3 | |
| PW Survey Review Review Complete - Objection Comments and redlines in project folder PW Trans Safety Review Review Complete - Objection PWPRS Project Number: 2026-CIP-0000040 - 5283 Underground Relocation Project Phase 2, Segment 3, 95 PRCT Engineering Submittal Reviewing Agency/Company: Transportation Mobility Engineering Reviewers Name: Eric Stein Reviewers Phone: (720) 865-3270 Reviewers Em… Additional Internal Review Review Complete - Objection The Survey Control Diagram has been completed but not included with the plan set. The Survey Control Diagram should incorporate CCD Local Projection Coordinate System with the following parameters: All documents in this project (6) ★ 2026-CIP-0000040 - Comment Report - 05-01-2026.pdf Att. 0 - Xcel Energy 5283 Phase 2 Sgmt 3 95PRCT Engineering Cover Memo 2026-04-07.pdf Att. 1 - 5283 ELAT-MONR 230 kV UG Rplc Phase 2 - Section 3 - Drawing Package.pdf Att. 2 - 2025-CIP-0000010 Comment Report 02-05-2025 Comment Response - Section 3 and 4.xls Att. 3 - Monroe to Elati Control Diagram CO83-CF MOD .dwg REDLINES- Survey- Pfohl.pdf | ||||
| 2026-CIP-0000039 RISE New Signals Project - South Package | CIP | 29 | Flagged · 1 | |
| Forestry Review Review Complete - Objection Add current tree protection detail from forestry website. Forestry has received mitigation funds. Need removal permit prior to construction. Tree protection must be approved prior to mobilization for remaining trees to protect. All documents in this project (8) 2026-04-13 RISE South Plans-Last Call Review - RV Comments.pdf 2026-04-13 RISE South Plans-Last Call Review.pdf 2026-04-13 RISE South Specs-Last Call Review.pdf 2026-04-14 RISE South Estimate-Last Call Review.pdf 2026-04-15 RISE Signals South 90 ER Comment Resolution Response.pdf ★ 2026-CIP-0000039 - Comment Report - 04-30-2026.pdf REDLINES - DPR Comments 2026-04-13 RISE South Plans-Last Call Review.pdf REDLINES - DPR Comments 2026-04-13 RISE South Specs-Last Call Review.pdf | ||||
| 2026-CIP-0000038 GOGO Bond Sidewalks - RISE - East Colfax Gaps | CIP | 23 | Flagged · 4 | |
| DS Transportation Review Review Complete - Objection SEE REDLINES: Review Status: Review Complete - No Objection 2026 04 16 CM TRANSPORTATION REDLINES SIDEWALKS PW Survey Review Review Complete - Objection Forestry Review Review Complete - Objection Review Complete - Objection PW Construction Engineering Review Review Complete - Objection See kdb red lines. All documents in this project (13) 2025-CIP-0000134 30 Comment Matrix Responses.pdf ★ 2026-CIP-0000038 - Comment Report - 04-30-2026..pdf REDLINES - DPR - Comments RISE East Colfax Sidewalk Gaps Plan Set 90.pdf REDLINES - Forestry - NEvers - East Colfax Grouping Sidewalk Improvments; Mitigation Form.pdf REDLINES - MATERIAL REVIEW - KDB RISE E Colfax SW - PSPs 90.pdf REDLINES - MATERIAL REVIEW - KDB RISE E Colfax SW Gap 90.pdf REDLINES - Survey- TB - CIP 90%_Comments.doc REDLINES - TME -ERodriguez Pages from RISE East Colfax Sidewalk Gaps Plan Set 90 - TME Reviewed.pdf REDLINES - WW Construction- MGehrke - RISE East Colfax Sidewalk Gaps Plan Set 90-mwg.pdf REDLINES - WWConstruction - MGehkre 20250507_103130.jpg RISE East Colfax Sidewalk Gaps Drainage Letter 90.pdf RISE East Colfax Sidewalk Gaps Plan Set 90.pdf RISE East Colfax Sidewalks - Project Special Provisions 90.pdf | ||||
| 2026-CIP-0000037 Sanderson Gulch Upstream of Clay Street | CIP | 26 | Flagged · 1 | |
| ERA Floodplain Review Review Complete - Objection REDLINES uploaded to E-review webpage All documents in this project (6) | ||||
| 2026-CIP-0000034 Metro Water Recovery - Cherry Creek Interceptor Rehabilitation | CIP | 39 | Flagged · 2 | |
| ERA Materials Review Review Complete - Objection See kdb red lines - the Transportation Notes need to be updated. Review Status: Review Complete - Objection ERA Floodplain Review Review Complete - Objection FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplain are required to obtain a Floodplain Permit. As currently proposed this project can permitted under a General Floodplain Permit, https://denvergov.org/files/assets/public/v/… All documents in this project (6) ★ 2026-CIP-0000034 - Comment Reports - 04.27.2026.pdf PAR 1478 - CHERRY CREEK INTERCEPTOR REHABILITATION 2026 - 30 EDITS.pdf REDLINES - WW Construction - Gehrke - PAR 1478 - CHERRY CREEK INTERCEPTOR REHABILITATION 2026 - 30 EDITS-mwg.pdf-26-04-23-15-34.pdf REDLINES -Material Reivew kdbPAR 1478 - CHERRY CK INTERCEPTOR REHAb 2026.pdf REDLINES- Survey- Lee.docx REDLINES_Floodplain.pdf | ||||
| 2026-CIP-0000033 RTD Downtown Rail Replacement - Areas B and C 80pct Design | CIP | 29 | Flagged · 3 | |
| ERA Wastewater Review Review Complete - Objection Add the 7 Drainage Notes for outside agency projects to the plan set. Drainage Notes can be found on Page 8 of the attached Suggested CPEP Notes Combined PDF. PW Survey Review Review Complete - Objection Review Complete - Objection Additional Internal Review 1 Review Complete - Objection refer to survey comments and redlines per Thomas Savich All documents in this project (8) ★ 2026-CIP-0000033 Comment Report 4.27.26.pdf DOTI Comment Resolution Form - Area BandC 30pct.pdf EPR WR REDLINES_Suggested_CPEP_Notes_Combined_6-28-23.pdf REDLINES - Transportation Mobility Engineering - 2026-4-14_RTD DRRP Area BandC 80pct Plans_EES.pdf REDLINES - WW CONSTRUCTION - RTD DRRP Area BandC 80pct Plans-mwg.pdf-26-04-23-15-00.pdf REDLINES- Survey- Savich.docx RTD DRRP Area BandC 80pct Drainage Report.pdf RTD DRRP Area BandC 80pct Plans.pdf | ||||
| 2026-CIP-0000032 RTD Downtown Rail Replacement - Area A 30pct Design | CIP | 33 | Flagged · 3 | |
| ERA Wastewater Review Review Complete - Objection ERA Erosion Control Review Review Complete - Objection PW Survey Review Review Complete - Objection All documents in this project (7) ★ 2026-CIP-0000032 - Comment Report - 04.24.2026.pdf EPR WR REDLINES_Suggested_CPEP_Notes_Combined_6-28-23.pdf REDLINES - TransportationMobilityEngineering - Approved wconditions.pdf REDLINES - WWConstruction- RTD DRRP Area A 30pct Plans-mwg.pdf REDLINES- Survey- Savich.docx RTD DRRP Area A 30pct Drainage Report.pdf RTD DRRP Area A 30pct Plans.pdf | ||||
| 2026-CIP-0000031 GES Safer Streets - Non-Federal Package | CIP | 20 | Flagged · 5 | |
| ERA Materials Review Review Complete - Objection When the Specification are submitted: ERA Erosion Control Review Review Complete - Objection Please prepare CASDP package in accordance with the City guidelines found here: https://denvergov.org/Government/Agencies-Departments-Offices/Agencies-Departments-Offices-Directory/Depart ment-of-Transportation-and-Infrastructure/Programs-Services/Wastewater-M… PW Survey Review Review Complete - Objection ERA Floodplain Review Review Complete - Objection FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplain are required to obtain a Floodplain Permit. Portions of this project are in the regulatory floodplain. Additional Internal Review 1 Review Complete - Objection PWPRS Project Number: 2026-CIP-0000031 - GES Safer Streets - Non-Federal Package Reviewing Agency/Company: RTD Reviewers Name: clayton woodruff Reviewers Phone: 3032992943 Reviewers Email: Clayton.Woodruff@RTD-Denver.com Approval Status: Denied Comments: Proje… All documents in this project (11) ★ 2026-CIP-0000031 Comment Report 4-22-2026.pdf GES SS - Non-Federal Package - Design Critieria Memorandum.pdf GES SS-P2NonFed-60-Plans-2026-04-03.pdf GES SS-P2NonFed-60PRCT-DrainageReport-2026-04-03.pdf GES SS-P2NonFed-60PRCT-Turning Movements-2026-04-03.pdf REDLINES- Craig Long.pdf REDLINES- DPR- Cervera.pdf REDLINES- ER WW- Sasarak.pdf REDLINES- Forestry- Huetig.pdf REDLINES- RTD- Woodruff.pdf REDLINES- Survey- Castaneda.docx | ||||
| 2026-CIP-0000030 Willis Case - Cart Path Replacement | CIP | 25 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection Date: 2026.04.21 Project Name: 2026-PROJMSTR-0000133 Willis Case - Cart Path Replacement All documents in this project (3) | ||||
| 2026-CIP-0000029 60pct - First Creek Trail and Stream Improvements - 42nd to 38th | CIP | 30 | Flagged · 6 | |
| ERA Wastewater Review Review Complete - Objection REPEAT COMMENT: Prepare a Water Quality Memo stating compliance with the City's MS4 permit for construction and post-construction water quality regulations. The City's MS4 permit is available online at: https://www.denvergov.org/Government/Agencies-Departments… ERA Materials Review Review Complete - Objection For traffic control specifications, Add dotipt 116.1 dotirr 22.3 to the list of Stds. FOR ASPHALT AND CC USED IN THE ROW: Please Verify and state in the HMA Spec that it meets MGPEC Item 20 Review Complete - Objection 1. SWMP plans and CASDP narrative were both received with this CIP submittal. However, CASDP reviews require a separate application. 2. Please prepare CASDP package in accordance with the City guidelines found here: https://denvergov.org/Government/Agencies-De… 4. This objection will be removed once a CASDP application has been received. Review Complete - Objection 04/01/2026 Review Complete - Objection SEE REDLINES. 2026 04 01 CM TRANSPORTATION REDLINES TRAIL PLEASE REQUEST A TEAMS CALL MEETING SHOULD THERE BE QUESTIONS. REDLINES uploaded to E-review webpage Reviewers Name: PW Survey Review Review Complete - Objection Survey redlines uploaded to Accela. Review Status: No Response PW Construction Engineering Review Review Complete - Objection If there are new cub cuts and curb ramps in the ROW - corresponding details need to be provided. All documents in this project (10) 20260330 - First Creek Trail - CASDP Report.pdf 20260331 - First Creek Trail 38th to 42nd 60pct CDs.pdf ★ 2026-CIP-0000029 Comment Report 4-16-2026.pdf 25035 Tree Survey.pdf Appendix G2 - First Creek Trail 38th to 42nd - SWMP Plans.pdf DPR CDSubmittalChecklist 2025.xlsx REDLINES- DS Transportation- Mueller.pdf REDLINES- Floodplain- Boles.docx REDLINES- Survey- Lee.docx REDLINES- WW Maintenance- Gehrke.pdf | ||||
| 2026-CIP-0000027 S University Blvd Sidewalk CD10-G1 | CIP | 30 | Flagged · 2 | |
| ERA Materials Review Review Complete - Objection It is better to reference standards instead of include them in the plans. Please ensure that the concrete specs meet MGPEC Item 30. Then state in the spec that MGPEC Item 30 requirements are met. PW Survey Review Review Complete - Objection redlines in project folder All documents in this project (6) ★ 2026-CIP-0000027 Comment Report 04.15.2026.pdf REDLINES - Impementation Design - LEdington - SouthUniversityBoulevard 100 Construction Plans March26 - LME comments.pdf REDLINES- Survey- Pfohl.pdf South University Boulevard 100 Specifications March26.pdf South University Boulevard 60 Comment Resolution Matrix March26.pdf SouthUniversityBoulevard 100 Construction Plans March26.pdf | ||||
| 2026-CIP-0000026 2025 - Wastewater Facility Improvements | CIP | 25 | Flagged · 1 | |
| ERA Wastewater Review Review Complete - Objection The Existing Condition and Demo plan does not distinguish between full depth removal of asphalt and mill and overlay. The overall grading plan correctly shows full-depth removal vs. mill and overlay. Note: the variation on the plan sheets may cause a critical… All documents in this project (3) | ||||
| 2026-CIP-0000025 Welton Streetscape - 24th ST to 30th ST | CIP | 28 | Flagged · 5 | |
| ERA Wastewater Review Review Complete - Objection Welton Street is in an Urban Flood Risk Area (UFRA) identified with significant street flows during major storm events. The project should perform an analysis and identify potential adverse impacts to adjacent properties resulting from increased flow depths in… ERA Materials Review Review Complete - Objection Please reference dotipt 116.1 Traffic Control Procedures and 630 sepc and ensure there aren't conflicts. ERA Erosion Control Review Review Complete - Objection Project will require a CASDP. Project manager to determine the appropriate time to submit for a a CASDP. This objection can be removed once a CASDP application has been received. To submit a new application online, - Go to the E-permits website and sign into y… Comments: Review Complete - Objection 04/08/2026 Review Complete - Objection CIP has been reviewed for coordination with private development. There are several approved and ongoing site developments adjacent to the area of work. EPR-Wastewater will notify adjacent proposed developments that may be… PW Survey Review Review Complete - Objection See Survey comments. Review Status: Review Complete - Objection All documents in this project (5) ★ 2026-CIP-0000025 - Comment Report 04.09.2026.pdf REDLINES Construction - KBrekke - Welton Streetscapes 3PRCT Roll Plot - redlines.pdf REDLINES- Forestry- Evers.pdf SURVEY - SURVEY - 2026-CIP-0000025 Welton Streetscape - 24th ST to 30th ST Survey Comments 2026.04.08.docx Welton Streetscapes 3PRCT Roll Plot.pdf | ||||
| 2026-CIP-0000023 Parks Maintenance Facility - GVR 60pct Submittal | CIP | 26 | Flagged · 4 | |
| ERA Erosion Control Review Review Complete - Objection Objection will be removed once CASDP application has been received. DS Transportation Review Review Complete - Objection Review Complete - Objection REDLINES uploaded to E-review webpage SEE REDLINES: PW Survey Review Review Complete - Objection survey comments uploaded to e review add survey diagram and general survey notes PW Construction Engineering Review Review Complete - Objection Review Complete - Objection All documents in this project (7) 2026.03.13 Comment Response Document.pdf 2026.03.15 GVR Parks Maintenance Facility - ER Set.pdf ★ 2026-CIP-0000023 Comment Report 4-2-2026.pdf CCD NE Maintenance Facility Drainage Memo FULL.pdf REDLINES- Construction Engineer- Blair.pdf REDLINES- DS Transportation- Mueller.pdf REDLINES- Survey- Sperling.docx | ||||
| 2026-CIP-0000020 2026 WMD Pipe and Manhole Rehabilitation - Phase 2 | CIP | 36 | Flagged · 1 | |
| ERA Floodplain Review Review Complete - Objection FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplain are required to obtain a Floodplain Permit. The following locations are in the floodplain and will require a floodplain permit: - Base Area 5 - Base Area 6 - Add Alt 4 - Ar… All documents in this project (3) | ||||
| 2026-CIP-0000019 Bannock St. and 8th Ave. Bridges over Cherry Creek Rehabilitation | CIP | 27 | Flagged · 3 | |
| ERA Erosion Control Review Review Complete - Objection Erosion control review will be completed with CASDP, 2025-EC-0000142, currently under review. Once there are no significant erosion control comment with the CASDP review the objection will be cleared on the CIP. ERA Floodplain Review Review Complete - Objection Erosion control review will be completed with floodplain permit, 2025-FLOOD-0000179, currently under review. Once there are no significant floodplain comments with the floodplain permit review the objection will be cleared on the Additional Internal Review 1 Review Complete - Objection PWPRS Project Number: 2026-CIP-0000019 - Bannock St. and 8th Ave. Bridges over Cherry Creek Rehabilitation Reviewing Agency/Company: DOTI IPM - Bridge Reviewers Name: Lisa Hilt Reviewers Phone: 303-446-3579 Reviewers Email: lisa.hilt@denvergov.org Approval Sta… All documents in this project (13) 2026-02-13 8th and BannockSpecs.docx 2026-02-13 8th BannockSpecs.pdf 2026-02-13 HPBSpecs (2).docx 2026-02-13 HPBSpecs.docx 2026-02-13 HPBSpecs.pdf 2026-02-13_HPBSpecs.pdf ★ 2026-CIP-0000019 Comment Report 3-18-2026.pdf 8th and Bannock 100 PRNCT Plans.pdf CCD MaterialsManagementPlan 20191113.pdf CCOD RACS SOP 20190502 Final.pdf HighlandsPedBridge 100 PRNCT Plans.pdf REDLINES- DPR- Cervera.pdf REDLINES- Trans Safety- Stein.pdf | ||||
| 2026-CIP-0000018 Quebec over Airlawn | CIP | 23 | Flagged · 2 | |
| Reviewers Name: PW Survey Review Review Complete - Objection 1. Previous comment unaddressed: Add Survey Control Points, with both symbols and point numbers, to Roadway Removal & Reset Plans, Roadway Plans, Sidewalk Plan and Profile sheets. PW Construction Engineering Review Review Complete - Objection See kdb red lines. Review Status: Review Complete - No Objec All documents in this project (14) 2023-CIP-0000225 60 Comment Matrix Responses.pdf ★ 2026-CIP-0000018 Comment Report 3-18-2026.pdf Quebec over Airlawn - Project Special Provisions95.pdf Quebec over Airlawn CASDP Narrative 95.pdf Quebec over Airlawn Drainage Report 95.pdf Quebec over Airlawn Environmental LSI Final.pdf Quebec over Airlawn Geotetch Pavement Report Final.pdf Quebec over Airlawn Plans 95.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- Materials- Blair- CC Specs.pdf REDLINES- Materials- Blair- Project Special Provisions.pdf REDLINES- Survey- Castaneda.docx REDLINES- Trans Safety- Rodriguez.pdf REDLINES- WW Maintenance- Gehrke.pdf | ||||
| 2026-CIP-0000017 S Sheridan Blvd and W Louisiana Ave Intersection Improvements | CIP | 31 | Flagged · 3 | |
| ERA Materials Review Review Complete - Objection See kdb red lines. Review Status: Review Complete - Objection Forestry Review Review Complete - Objection Review Complete - Objection Comments: Review Complete - Objection PWPRS Project Number: 2026-CIP-0000017 - S Sheridan Blvd and W Louisiana Ave Intersection Improvements Reviewing Agency/Company: Denver Department of Transportation and Infrastructure - Construction Engineering Reviewers Name: KIM BLAIR, P.E. Reviewers Phone:… All documents in this project (9) 2026-0218 Sheridan and Louisiana 90 PRNCT -OPCC.pdf 2026-0218 Sheridan and Louisiana 90 PRNCT Drainage Memo.pdf 2026-0218 Sheridan and Louisiana 90PRNCT Specs.pdf 2026-0218 Sheridan and Louisiana 90PRNCT-CommentResolution.pdf 2026-0218 SheridanandLouisiana 90PRNCT-ConstPlans.pdf ★ 2026-CIP-0000017 Comment Report 3-12-2026.pdf REDLINES- ERA Materials- Blair.pdf REDLINES- Erosion Control - CASDP Not Required.pdf REDLINES- Forestry- Huetig.pdf | ||||
| 2026-CIP-0000016 5280 Trail - Acoma Shared Street | CIP | 32 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection survey comments are uploaded Review Status: Review Complete - No Objec All documents in this project (3) | ||||
| 2026-CIP-0000015 RTD Downtown Rail Replacement Project DRRP | CIP | 25 | Flagged · 4 | |
| Reviewers Name: ERA Wastewater Review Review Complete - Objection New storm infrastructure requires inspection and as-builts. Please indicated in the Drainage Report if this project is re-developing under RTD's MS4 permit. Reviewers Name: ERA Erosion Control Review Review Complete - Objection Please indicate if this project is redeveloping under RTD's MS4 permit for construction stormwater management or if the project intends to obtain an erosion control (CASDP) from the City and County of Denver. PW Survey Review Review Complete - Objection survey comments have been uploaded Review Status: Review Complete - Objection ERA Floodplain Review Review Complete - Objection Show FEMA 100-year floodplain/floodway boundary for Cherry Creek on the plans. the 100-year floodplain and floodway coincide at this location. The project proposed work in the regulatory floodplain and floodway of Cherry Creek. As such, a Floodplain Permit is… All documents in this project (4) | ||||
| 2026-CIP-0000013 2025 - Wastewater Facility Improvements | CIP | 25 | Flagged · 3 | |
| ERA Wastewater Review Review Complete - Objection The decorative paving on the north and east side of building is also full-depth pavement replacement. The total full-depth pavement replacement is 1.11 AC, see EPR-Wastewater Redlines. Please reduce the full-depth pavement to be below 1.00 AC or provide water… Forestry Review Review Complete - Objection No existing trees shown on the demo plans. Need to show trees called out for protection due to equipment, materials stored in parking lot and access routes to the facility. Trees get damaged in the parking lot medians due to this ERA Floodplain Review Review Complete - Objection Floodplain review will be completed through floodplain permit, currently in for review, 2026-FLOOD-0000008. Floodplain objection will be cleared from CIP once review is complete and there are no outstanding floodplain All documents in this project (6) ★ 2026-CIP-0000013 Comment Report 3.5.26.pdf 90 PRCT SurveyRedlineResponses 2000W3rdAve 02-17-2026.pdf 90 PRCT DesignDrawings 2000W3rdAve 02-17-2026.pdf 90 PRCT ERResponseLetter 2000W3rdAve 02-17-2026.pdf 90 PRCT WWRedlineResponses 2000W3rdAve 02-17-2026.pdf REDLINES - WASTERWATER- MSasarak - EPR - WASTEWATER REDLINES.pdf | ||||
| 2026-CIP-0000011 Participatory Budget Athmar Park Sidewalks | CIP | 22 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection Comments and redlines in project folder. Review Status: Review Complete - No Objec | ||||
| 2026-CIP-0000010 LIPAN POND IMPROVEMENTS - W. ALAMEDA AVE. TO BAYAUD AVE | CIP | 26 | Flagged · 1 | |
| ERA Floodplain Review Review Complete - Objection Repeat Comment: This project was permitted under a No-Rise for the floodplain permit (2023-SUDP-0003121). Please submit a signed and sealed letter from the hydraulic engineer verifying that the final grading and design of the Lipan All documents in this project (8) ★ 2026-CIP-0000010 Comment Report 2-19-2026.pdf 21-029.01 SPR O and M.pdf 21-029.1 SPR Lipan Pond - Drainage Memo 100PRNT.pdf Narrative Report Information Worksheet Lipan Pond.pdf REDLINES- WW Maintenance- Gehrke- SPR Corridor Improvements.pdf REDLINES- WW Maintenance- Gehrke.pdf SPR Corridor Improvements - Lipan Pond 100 PRNTCASDP Plans.pdf SPR Corridor Improvements - Lipan Pond 100PRNT Plans.pdf | ||||
| 2026-CIP-0000006 DPR Pre-Fabricated Restrooms | CIP | 29 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection Missing survey control diagram for each City Park projects in this submittal. Refer to PDF for Survey Control Guidelines. REDLINES uploaded to E-review webpage All documents in this project (11) 2026 0116 DOTI - DPR Restroom Improvements 60PRNCT ER Comment Report RESPONSES.pdf 20260116 DOTI-DPR RR Improvements 95 PRNCT ER Civil MONTBELLO.pdf 20260116 DOTI-DPR RR Improvements 95PRNCT ER Civil COMMONS.pdf 20260116 DOTI-DPR RR Improvements 95PRNCT ER Civil HUSTON.pdf 20260116 DOTI-DPR RR Improvements 95PRNCT ER Civil KENNEDY.pdf 20260116 DOTI-DPR RR Improvements 95PRNCT ER Elec.pdf 20260116 DOTI-DPR RR Improvements 95PRNCT ER Plbg.pdf 20260116 DOTI-DPR RR Improvements 95PRNCTER Civil RGO.pdf 20260116 DOTI-DPR RR Improvements95PRNCT ER Civil RUDE.pdf ★ 2026-CIP-0000006 Comment Report 2-11-2026.pdf REDLINES- Survey- Breitnauer.pdf | ||||
| 2026-CIP-0000004 Parks Maintenance Facility - Green Valley Ranch | CIP | 24 | Flagged · 3 | |
| ERA Wastewater Review Review Complete - Objection The project is tributary to a regional offsite detention and water quality pond, Silverado Pond I. I have uploaded the Master Drainage Report for the project area to Accela, please contact me directly if you can not access the document. ERA Erosion Control Review Review Complete - Objection Project requires a CASDP. This objection will be removed once the CASDP application has been received. To submit a new application online, - Go to the E-permits website and sign into your account: denvergov.org/epermits - Click Apply for a Permit under the Dev… PW Construction Engineering Review Review Complete - Objection See kdb red lines. I have included a plan sheet from the project that constructed the sidewalk. It appears that there's a descrepancy. All documents in this project (8) 2025.12.18 CCD DPR Parks Maintenance Facility Construction GVR Drawings.pdf ★ 2026-CIP-0000004 Comment Report 2-5-2026.pdf REDLINES - ER Wastewater- Sasarak.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- DS Transportation- Mueller- Gateway overall south.pdf REDLINES- DS Transportation- Mueller.png REDLINES- ER Wastewater- Sasarak- Master Drainage Report.pdf REDLINES- Survey- Pfohl.pdf | ||||
| 2026-CIP-0000002 Sun Valley Riverfront Park | CIP | 29 | Flagged · 1 | |
| ERA Floodplain Review Review Complete - Objection Floodplain Design Requirement 1 - FLOODPLAIN PERMIT: Floodplain permit 2023-SUDP-0003998 is currently under All documents in this project (6) | ||||
| 2026-CIP-0000001 Sloans Lake North Tennis and Basketball Court Replacement and ADA Access | CIP | 26 | Flagged · 1 | |
| ERA Erosion Control Review Review Complete - Objection This objection will be removed once a CASDP has been submitted. | ||||
| 2025-CIP-0000226 Holden Place and Decatur Street Intersection Improvements | CIP | 32 | Flagged · 1 | |
| External Referral 4 Review Complete - Objection PWPRS Project Number: 2025-CIP-0000226 - Holden Place and Decatur Street Intersection Improvements Reviewing Agency/Company: RTD Reviewers Name: clayton woodruff Reviewers Phone: 3032992943 Reviewers Email: Clayton.Woodruff@RTD-Denver.com Approval Status: Deni… All documents in this project (3) | ||||
| 2025-CIP-0000224 2025 - Wastewater Facility Improvements | CIP | 24 | Flagged · 3 | |
| ERA Wastewater Review Review Complete - Objection Per discussions with the project team, a decision needs to be make between full-depth pavement replacement and mill-overlay. Mill and overlay with portions of the project, not exceeding one acre, being full-depth can be performed PW Survey Review Review Complete - Objection survey comments are in the project folder Review Status: No Response add general survey notes ERA Floodplain Review Review Complete - Objection Comments to be addressed on plans submitted for CIP review prior to floodplain objection being cleared . Please note that if additional comments arise during the floodplain permit review that result in plan changes those must also be | ||||
| 2025-CIP-0000221 E. Yale Ave Multimodal Improvements | CIP | 28 | Flagged · 1 | |
| ERA Materials Review Review Complete - Objection There is confusion about the ROW lines. Please see my comments R1. Review Status: Review Complete - Objection All documents in this project (10) ★ 2025-CIP-0000221 Comment Reports 12.30.25.pdf C14-027-PSPs-Yale Improvements 2025-12-09.pdf REDLINES - DOTI- CLONG 2025-CIP-221 Yale Ave Improvr - CL.pdf REDLINES - ERA Materials - kdb Red Lines Yale Holly 95 Design 2025-12-09 (2).pdf REDLINES - ERA Materials - kdb Red Lines Yale Holly 95 Design 2025-12-09.pdf REDLINES- Design Plans- Kevan OConnell.pdf REDLINES- Yale Improvements- Kevan OConnell.pdf REDLINES-Transmobile-EDevosTidd.pdf Yale Holly 95pct Design Plans Roadway Project.pdf Yale Holly 95pct Drainage Report Roadway Project.pdf | ||||
| 2025-CIP-0000220 RTD Downtown Rail Replacement Project DRRP | CIP | 22 | Flagged · 3 | |
| Reviewers Name: ERA Wastewater Review Review Complete - Objection Indicate the ownership responsibility of all the inlets labeled to be "reset". Label as either "private" or "City and County of Denver " - use "CCD" as an abbreviation if desired. Modifications to CCD inlets will require city ERA Erosion Control Review Review Complete - Objection Please indicate if this project is redeveloping under RTD's MS4 permit for construction stormwater management or if the project intends to obtain an erosion control (CASDP) from the City and County of Denver. ERA Floodplain Review Review Complete - Objection It is not clear whether there is work proposed on the bridge over Cherry Creek. Sheet CS-003 says no work between STA 219+70 & 247+70, and construction limits shown on other sheets contradict this statement, but sheets K-001 & K-007 seem to indicate there may… | ||||
| 2025-CIP-0000218 Participatory Budget Athmar Park Sidewalks | CIP | 22 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection Comments and redlines in project folder All documents in this project (7) | ||||
| 2025-CIP-0000217 Cheesman Playground Picnic and Walk Replacement | CIP | 24 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection survey comments in the project folder All documents in this project (6) ★ 2025-CIP-0000217 Comment Report 12-22-2025.pdf Cheesman Park Improvements 60PRCNT CD Plan Set.pdf DPR Cheesman Park Improvements 60PRCNT CASDP 2025 1120.pdf REDLINES- ER WW- Sasarak- 51st and Zuni Drainage Memo.pdf REDLINES- ER WW- Sasarak- Parks MS4 - Exclusions.pdf REDLINES- Survey- Sperling.pdf | ||||
| 2025-CIP-0000216 Morrison Road Project | CIP | 35 | Flagged · 4 | |
| ERA Materials Review Review Complete - Objection Please reference dotipt 116.1 Traffic Control Procedures and dotirr 022.3 Issuance of Permits by the CTE in the 630 sepc and ensure there aren'tconflicts. . Insure that the project 401 Spec meets MGPEC Item 20, and the project concrete spec meets MGPEC Item 30… ERA Erosion Control Review Review Complete - Objection This objection will be removed once a CASDP application has been submitted. Forestry Review Review Complete - Objection Review Complete - Objection External Referral 2 Review Complete - Objection PWPRS Project Number: 2025-CIP-0000216 - Morrison Road Project Reviewing Agency/Company: RTD All documents in this project (22) 2025-1_1.PDF 2025-1_2.PDF 2025-1_3.PDF 2025-12-01_Morrison Rd 60pct and 95pct BofD Memo.pdf 2025-12-01_Morrison Rd NORTH 60pct Plans_SUBMITTED.pdf 2025-12-01_Morrison Rd SOUTH 95pct Plans_SUBMITTED.pdf 2025-12-01_Morrison Rd_SOUTH_95pct Specs.pdf ★ 2025-CIP-0000216 Comment Report 12-22-2025.pdf 4070MORR - Utility Report 2025 DRAFT.pdf 60pct NORTH and 90pct SOUTH Submission Cover Letter.pdf ER Review Request Memo 20251202.docx REDLINES- Craig Long.pdf REDLINES- ERA Materials- Blair - Traffic Control Procedures.pdf REDLINES- ERA Materials- Blair- Asphalt Pavement Materials.pdf REDLINES- ERA Materials- Blair- issuance of permits.pdf REDLINES- ERA Materials- Blair- Portland Cement Concrete.pdf REDLINES- Forestry- Evers.pdf REDLINES- Mobility- Thienpont- 60pct Plans.pdf REDLINES- Mobility- Thienpont- 95pct Plans- EES Comments.pdf REDLINES- Mobility- Thienpont- 95pct Plans.pdf REDLINES- Mobility- Thienpont- BDS 4-3 3ft gap.pdf REDLINES- WW Maintenance- Gehrke.pdf | ||||
| 2025-CIP-0000213 Sanderson Gulch Zuni to Clay Bid Set | CIP | 27 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection Comments in project folder Review Status: No Response All documents in this project (9) 2025-CIP-0000137 Comment Response.xlsx ★ 2025-CIP-0000213 Comment Report 12-18-2025.pdf CASDP Plans Sanderson Gulch Trail 100PRCNT.pdf CASDP Report 100PRCNT.pdf CDs Sanderson Gulch Trail 100PRCNT.pdf Floodplain Impact Memo Sanderson Gulch Trail 100 PRCNT.pdf HEC RAS Model Sanderson Gulch Trail100PRCNTSubmittal.zip REDLINES- Floodplain- Boles.docx REDLINES- Survey- Pfohl.docx | ||||
| 2025-CIP-0000212 New Traffic Signals Northeast Denver - MLK and Kearney | CIP | 23 | Flagged · 4 | |
| ERA Materials Review Review Complete - Objection see kdb red lines 630 spec Review Status: Review Complete - No Objec Reviewers Name: DS Transportation Review Review Complete - Objection SEE REDLINES: 2025 12 04 CM TRANSPORTATION REDLINES - MLK KEARNEY DPR Parks QA Review Complete - Objection See DPR Comments REDLINES. Review Status: No Response Fire Prevention Review Review Complete - Objection By approving this project it will take away the ability for DFD to have navigation from the west to the north and from the east to the south on Kearney. All documents in this project (9) ★ 2025-CIP-0000212 Comment Report 12-18-2025.pdf NTS NE - 100pct CASDP Narrative 2025-11-19.pdf NTS NE - 90pct Comment Resolution Form 2025-11-19.pdf NTS NE - CP2 - 100pct Plans 2025-11-19.pdf NTS NE - CP2 - 100pct Specifications 2025-11-19.pdf REDLINES- DPR- Cervera.pdf REDLINES- DS Transportation- Mueller.pdf REDLINES- Materials- Blair.pdf REDLINES- Trans Safety- Rodriguez.pdf | ||||
| 2025-CIP-0000211 New Traffic Signals Northeast Denver - Bond | CIP | 26 | Flagged · 3 | |
| ERA Materials Review Review Complete - Objection Please cite and ensure that the HMA Spec meets MGPEC Item 20 and that the CC Spec meets MGPEC Item 30 (both uploaded here). RE: comment resolution, where is page 2, Standard construction details? REDLINES uploaded to E-review webpage . PW Survey Review Review Complete - Objection redlines in project folder Review Status: Review Complete - No Objec DPR Parks QA Review Complete - Objection See DPR Comments REDLINES_DPR_ pdf Review Status: Review Complete - No Objec All documents in this project (11) ★ 2025-CIP-0000211 Comment Report 12-17-2025.pdf NTS NE 100PRCNT CASDP Narrative.pdf NTS NE CP1 100PRCNT Plans.pdf NTS NE 90PRCNT Comment Resolution Form.pdf NTS NE CP1 100PRCNT Specifications.pdf REDLINES- DPR- Cervera- 100pct Plans.pdf REDLINES- DPR- Cervera- 100pct Specifications.pdf REDLINES- DPR- Cervera- Approved.pdf REDLINES- Materials- Blair 1.pdf REDLINES- Materials- Blair 2.pdf REDLINES- Survey- Pfohl.pdf | ||||
| 2025-CIP-0000210 SIGI Five Points Group D - Coordination | CIP | 25 | Flagged · 1 | |
| Forestry Review Review Complete - Objection Please see attached pdf (in e-review) for comments: 1) See pdfs for species substitutions. All documents in this project (9) 2025.11.26 29th and Curtis Drainage Memo.pdf 2025.11.26 31st and Cali Drainage Memo.pdf 2025.11.26 SIGI 3091 CALIFORNIA ST BAWM60CD.pdf 2025.11.26 SIGI CURTIS ST 2900 60CD.pdf ★ 2025-CIP-0000210 Comment Report 12-16-2025.pdf CL SIGI5Points GrpD 60per.pdf REDLINES- Forestry- Evers- California.pdf REDLINES- Forestry- Evers- Curtis.pdf SPECS SIGI5POINTS GrpC D forER.pdf | ||||
| 2025-CIP-0000208 Skyline Park Block 2 | CIP | 25 | Flagged · 1 | |
| PW Trans Safety Review Review Complete - Objection PWPRS Project Number: 2025-CIP-0000208 - Skyline Park Block 2 Reviewing Agency/Company: DOTI Transportation & Mobility Engineering Reviewers Name: Allison Thienpont Reviewers Phone: 720-865-3197 Reviewers Email: allison.thienpont@denvergov.org Approval Status:… All documents in this project (25) 01 Skyline-B2 PRCNT Design G General RIOS.pdf 04 Skyline-B2 100PRCNT Design V Survey105 West.pdf 06 Skyline-B2 100PRCNT Design C Civil Kimley Horn.pdf 07 Skyline-B2 100PRCNT Design L Landscape RIOS.pdf 08 Skyline-B2 100PRCNT Design HP HistoricPreservation ModernRuins.pdf 10 Skyline-B2 100PRCNT Design A Architecture RIOS.pdf 14 Skyline-B2 100PRCNT Design QF Food Service Ricca.pdf 15 Skyline-B2 100PRCNT Design S Structure HCL.pdf 16 Skyline-B2 100PRCNT Design M Mechanical RJA.pdf 17 Skyline-B2 100PRCNT Design E Electrical RJA.pdf 18 Skyline-B2 100PRCNT Design P Plumbing RJA.pdf 19 Skyline-B2 100PRCNT Design EL Lighting Clanton.pdf ★ 2025-CIP-0000208 Comment Report 12-5-2025.pdf 21 Skyline-B2100PRCNT Design AV Audio-Visual King Systems.pdf 22 Skyline-B2 100PRCNT Design SG Signage RIOS.pdf 23 Skyline-B2 100PRCNT Design R Ice Rink Stantec.pdf 24 Skyline-B2 100PRCNT Design W Water Features Fluidity Arch.pdf 24 Skyline-B2 100PRCNT Design W Water Features Fluidity MEP.pdf 250919 Skyline-B2 ER 90PRCNT Comment Responses ef.pdf MEMO - C - Skyline-B2 100PRCNT Design Civil Final Drainage Report.pdf MEMO - S - Skyline-B2 100PRCNT Design Structural Calculations.pdf REDLINES- CE- Brekke.pdf REDLINES- Trans Safety- Thienpont.pdf REDLINES- WW Maintenance- Gehrke.pdf Skyline Project Manual Permit Set 2025-09-19.pdf | ||||
| 2025-CIP-0000207 RSA Pkg 2 Projects - Park 20th and 22nd | CIP | 30 | Flagged · 1 | |
| Forestry Review Review Complete - Objection Please refer to attached comments: 1) Sheet 24 - trees appear to be in fair condition. Coordinate with OCF before or at construction to determine plan of All documents in this project (13) ★ 2025-CIP-0000207 Comment Report 12-1-2025.pdf ER Submittal Overview.dotx REDLINES- ERA Materials- Bair 1.pdf REDLINES- ERA Materials- Blair 2.pdf REDLINES- WW Maintenance- Gehrke.pdf RSA PKG 2 - 30pct Comment Resolution Form 2025-11-12.pdf RSA PKG 2 - 90pct Drainage Memo.pdf RSA PKG 2 - 90pct Plans 2025-11-12.pdf RSA PKG 2 - 90pct Specifications 2025-11-12.pdf RSA PKG 2 - Historic Tech Memo.pdf RSA PKG 2 90pct - X24-122.01 RD TRN - Fire Truck.dwg RSA PKG 2 90pct - X24-122.01 RD TRN - SU-30.dwg RSA PKG 2 90pct -X24-122.01 RD TRN - Fire Truck.bak | ||||
| 2025-CIP-0000206 Go Bond Sidewalks - CD 8 and 9 Colorado Blvd | CIP | 31 | Flagged · 2 | |
| ERA Erosion Control Review Review Complete - Objection The limits of construction are 1.47 acres. Project requires a CASDP. Please remove the Erosion Control Notes from Sheet 64 and submit for a CASDP. CASDP/SWMP plans may remain in the CIP plan set, but should be extracted for PW Construction Engineering Review Review Complete - Objection Ensure that the curb ramps are detailed with 2' radii where possible per CCD Std Dwg 7.1. All documents in this project (6) | ||||
| 2025-CIP-0000205 High Line Canal Trail Activation Zones | CIP | 23 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection Resubmittal Required Review Status: No Response | ||||
| 2025-CIP-0000204 17th and 18th Ave Transit Improvements | CIP | 28 | Flagged · 3 | |
| ERA Transportation Review Review Complete - Objection The City of Denver Department of Transportation & Infrastructure Engineering & Regulatory Office (ER) has completed its Transportation review of the submitted 2025-CIP-0000204 - 17th and 18th Ave Transit Improvements Forestry Review Review Complete - Objection Review Complete - Objection PW Trans Safety Review Review Complete - Objection PWPRS Project Number: 2025-CIP-0000204 - 17th and 18th Ave Transit Improvements Reviewing Agency/Company: DOTI Transportation & Mobility Engineering Reviewers Name: Allison Thienpont Reviewers Phone: 720-865-3197 Reviewers Email: allison.thienpont@denvergov.or… All documents in this project (7) | ||||
| 2025-CIP-0000203 Mayfair Town Center Streetscape Improvements | CIP | 26 | Flagged · 1 | |
| Forestry Review Review Complete - Objection OCF Comments 11-17-25 1. Address OCF comments on attached redlined plans, uploaded via ERA site. If redlined plans were not received, All documents in this project (7) | ||||
| 2025-CIP-0000201 DPR NW Maint. Facility | CIP | 27 | Flagged · 4 | |
| ERA Wastewater Review Review Complete - Objection Please provide a drainage report with calculations for the bio-retention pond. Pond size should be sized to provide water quality for the ultimate build-out condition including the future building expansion and pavement of the gravel parking lot. Note: the sanitary sewer service and SOI require an SUDP permit. Review Complete - Objection See KDB Red Lines Review Status: Review Complete - Objection ERA Floodplain Review Review Complete - Objection FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplain are required to obtain a Floodplain Permit through the Sewer Use and Drainage Permit (SUDP) application process. Send a project location map to the Denver Floodplain Manage… Additional Internal Review 3 Review Complete - Objection As identified during review of 2025-CIP-0000142, please refer to the Sloan's Lake Major Drainageway Plan January 2018. The recommended plan proposes a forebay in conflict with the gravel/future phase parking area. Please include All documents in this project (6) 2025-11-04 SLGC Equipment Building 60 PRNCT CD Drawings.pdf 2025-11-04 SLGC Office and Equipment Bldg 60 PRNCT CD Project Manual.pdf 2025-11-04 SLGC Office Building 60 PRNCT CD - Drawings.pdf ★ 2025-CIP-0000201 Comment Report 11-24-2025.pdf REDLINES - ERWastewater - MSasarak - DENVF 180017_SloansLake_DRAINAGE REPORT_IFP Rev1_20260331.pdf REDLINES- Kim Blair.pdf | ||||
| 2025-CIP-0000200 48th Avenue Greenway | CIP | 30 | Flagged · 5 | |
| ERA Transportation Review Review Complete - Objection The City of Denver Department of Transportation & Infrastructure Engineering & Regulatory Office (ER) has completed its Transportation review of the submitted 2025-CIP-0000200 - 48th Avenue Greenway Project documents, DS Wastewater Review Review Complete - Objection Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. DPR Parks QA Review Complete - Objection See DPR Comments in pdfs starting with 'DPR Cmnts_'. ERA Floodplain Review Review Complete - Objection PW Trans Safety Review Review Complete - Objection PWPRS Project Number: 2025-CIP-0000200 - 48th Avenue Greenway Reviewing Agency/Company: Transportation Mobility Engineering Reviewers Name: Eric Stein Reviewers Phone: 7208653270 Reviewers Email: eric.stein@denvergov.org Approval Status: Denied Comments: I'm s… All documents in this project (11) ★ 2025-CIP-0000200 Comment Report 11.21.25.pdf 48th Greenway-100PRCNT Submittal-Comment Resolution.xlsx 48th Greenway-100PRCNT Submittal-Plan Set.pdf DPR Cmnt 48th Greenway-100PRCNT Submittal Comment Resolution.pdf DPR Cmnt 48th Greenway-100PRCNT Submittal-Plan Set.pdf REDLINES - WWConstruction-MGehrke.pdf REDLINES- 2025-CIP-0000200 Floodplain-comments.docx REDLINES- DOTIDivGreen Infrastructure-CBell.pdf REDLINES- DPR- Kijowski.pdf REDLINES- ER Transportation- Kijowski.pdf REDLINES-TransMobility-EStein.pdf | ||||
| 2025-CIP-0000199 SIGI Five Points Group C | CIP | 22 | Flagged · 1 | |
| Forestry Review Review Complete - Objection Forestry Comments - pdfs submitted via E-Review: 1) See Species recommendations - Tremont All documents in this project (11) 2025.10.31 N. Downing Drainage Memo.pdf 2025.10.31 Park Ave and Tremont Drainage Memo.pdf 2025-10-31 Group C - Tremont 60CD.pdf 2025-10-31 Group C- Downing 60CD.pdf ★ 2025-CIP-0000199 Comment Report 11-20-2025.pdf CL SIGI5Points GrpC 60per.pdf REDLINES- Forestry- Evers- Downing.pdf REDLINES- Forestry- Evers- Tremont.pdf REDLINES- WW Maintenance- Gehrek 1.pdf REDLINES- WW Maintenance- Gehrek 2.pdf SPECS SIGI5POINTS GrpC-D.pdf | ||||
| 2025-CIP-0000198 Skyline Block 3 Electrical Design | CIP | 26 | Flagged · 1 | |
| ERA Transportation Review Review Complete - Objection Where is this work being done? There wasn't a Site Plan or Cover Sheet included with the submittal, so it's unclear whether this vault is on park property or in the ROW. All documents in this project (2) | ||||
| 2025-CIP-0000195 2024 Pedestrian Intersection Improvement Project | CIP | 25 | Flagged · 1 | |
| Reviewers Name: ERA Materials Review Review Complete - Objection Review Complete - Objection All documents in this project (22) ★ 2025-CIP-0000195 Comment Report 11-18-2025.pdf 30 PRNT 2024 Intersections Drainge Report.pdf 30 PRNT 2024 Intersections Turning Templates.pdf 30 PRNT 2024 IntersectionsTechnicalSpecificationsList.pdf 30PRNT 2024 Intersections Construction Plans.pdf 30PRNT 2024 Intersections Cost Estimate.pdf REDLINES- Craig Long.pdf REDLINES- ER Materials- Blair 1.pdf REDLINES- ER Materials- Blair 2.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Mobility- Thienpont- Construction Plans.pdf REDLINES- Mobility- Thienpont- Turning Templates.pdf REDLINES- Survey- Sperling.pdf UPCG-Traffic Memo 23rd Ave and Decatur.pdf UPCG-Traffic Memo 50th and Julian.pdf UPCG-Traffic Memo 6th and Irving.pdf UPCG-Traffic Memo Evans and Hazel.pdf UPCG-Traffic Memo Florida and Hazel.pdf UPCG-Traffic Memo Iliff and Hazel.pdf UPCG-Traffic Memo Jewell and Yates.pdf UPCG-Traffic Memo Syracuse and 22nd.pdf UPCG-Traffic Memo Walden St.pdf | ||||
| 2025-CIP-0000194 Washington Park Improvements Project - Track 2 (Central Tennis Courts) | CIP | 26 | Flagged · 1 | |
| PW Survey Review Review Complete - Objection Comments and redlines in project folder | ||||
| 2025-CIP-0000192 GO Bond Sidewalks - GES 2021 Project A | CIP | 23 | Flagged · 3 | |
| ERA Wastewater Review Review Complete - Objection See ER-Wastewater Redlines Review Status: Review Complete - No Objec ERA Erosion Control Review Review Complete - Objection This objection will be removed once a CASDP application has been received. Note. the SWMP plans may remain in the complete CIP set, but the the SWMP plans and details sheets should be extracted and submittal along with the External Referral 1 Review Complete - Objection PWPRS Project Number: 2025-CIP-0000192 - GO Bond Sidewalks - GES 2021 Project A Reviewing Agency/Company: RTD Reviewers Name: clayton woodruff Reviewers Phone: 3032992943 Reviewers Email: Clayton.Woodruff@RTD-Denver.com Approval Status: Denied All documents in this project (8) ★ 2025-CIP-0000192 Comment Report 11-13-2025.pdf CCD GES Sidewalks_ER Review Comments.xlsx CCD GES Sidewalks_Narrative Report Information Worksheet.pdf CCD GES Sidewalks_Plans.pdf CCD GES Sidewalks_TechnicalSpecifications.pdf REDLINES - ER WASTEWATER - SASARAK.pdf REDLINES- Craig Long.pdf REDLINES- RTD- Woodruff.pdf | ||||
| 2025-CIP-0000191 University Hills - Bethesda Park | CIP | 27 | Flagged · 2 | |
| ERA Transportation Review Review Complete - Objection The City of Denver Department of Transportation & Infrastructure Engineering & Regulatory Office (ER) has completed its Strategic review of the submitted 2025-CIP-0000191 - University Hills - Bethesda Park 100% Project PW Survey Review Review Complete - Objection Comments and redlines in project folder Review Status: No Response | ||||
| 2025-CIP-0000190 2025 - Wastewater Facility Improvements | CIP | 28 | Flagged · 4 | |
| ERA Wastewater Review Review Complete - Objection Please clarify if the asphalt repaving is "full depth" replacement or "mill and overlay". See the Materials drop-down at the bottom of the page. Review Complete - Objection Due to the land disturbance activity adjacent to South Platte River, the repaving improvements require a CASDP. This objection will be removed once a CASDP application has bee received. PW Survey Review Review Complete - Objection survey comments are in the project folder Review Status: No Response survey notes ERA Floodplain Review Review Complete - Objection FLOODPLAIN PERMIT APPLICATION: All projects proposing work in the regulatory floodplain are required to obtain a Floodplain Permit. As this project progresses if the improvements change that are in the regulatory floodplain the umbrella permit may not be an op… All documents in this project (7) | ||||
| 2025-CIP-0000189 5280 Trail - Acoma Shared Street | CIP | 34 | Flagged · 5 | |
| ERA Wastewater Review Review Complete - Objection Please indicate which city department will be responsible for the long term maintenance of the soil cells and street side planters. The proposed trench drain is non-standard infrastructure. Please indicate which city department will be responsible for its main… ERA Erosion Control Review Review Complete - Objection PW Survey Review Review Complete - Objection comments in the folder Review Status: Review Complete - Objection Fire Prevention Review Review Complete - Objection Additional Internal Review 4 Review Complete - Objection My concern is that where vehicle curb cuts remain, that there is no flare. I think the landscape area next to these will be damaged. All documents in this project (12) ★ 2025-CIP-0000189 Comment Report 11-5-2025.pdf 5280 Trail - Acoma Segment Green Infrastructure Memo 251017.pdf 5280 Trail - Acoma Segment Preliminary Design Plans - Submittal 251017.pdf 5280 Trail - Acoma Segment Preliminary Drainage Report 251017.pdf CCD 5280 Trail – Acoma Street 12th to 10th Avenue Memorandum - 251017.pdf REDLINES- Craig Long.pdf REDLINES- Forestry- Evers 1.pdf REDLINES- Forestry- Evers 2.pdf REDLINES- Mobility- Stein- Preliminary Design Plans.pdf REDLINES- Mobility- Stein.pdf REDLINES- Survey- Sperling.pdf REDLINES- WW Maintenance- Gehrke.pdf | ||||
| 2025-CIP-0000185 Bannock St. and 8th Ave. Bridges over Cherry Creek Rehabilitation | CIP | 26 | Flagged · 1 | |
| ERA Floodplain Review Review Complete - Objection All documents in this project (17) ★ 2025-CIP-0000185 Comment Report 10-28-2025.pdf 208_specification_2020.pdf 8th and Bannock 90PRCNT Plans.pdf 8th and Bannock_613 Electrical Specifications.pdf 8th and Bannock_ELEC_Cost Estimate.xlsx 8th and Bannock_UTIL Cost Estimate.xlsx 8th and Bannock_Utility Specifications.pdf 8thandBannock_Structural_Spec.pdf 8thAveOverCherryCreek_Rev_20250922.kmz Bannock and 8th St Bridges BRTM Final 2025-10-06.pdf CASMP_90pct.pdf D-01-CC-168 Final Rehabilitation Report.pdf D-01-CC-170A Final Rehabilitation Report.pdf D-01-CC-172 Final Rehabilitation Report (1).pdf EL_StatementNoImpact_20250926.pdf REDLINES- Trans Safety- De Vos Tidd.pdf SUDP_Application_Signed.pdf | ||||
| 2025-CIP-0000167 Federal and Amherst HAWK Signal | CIP | 27 | Flagged · 1 | |
| Forestry Review Review Complete - Objection 2023PM0000031 - Federal & Amherst HAWK 100% OCF Comments 9-24-25 All documents in this project (8) | ||||
| 2025-CIP-0000160 Sanderson Gulch Florida to Arkansas | CIP | 38 | Flagged · 3 | |
| ERA Wastewater Review Review Complete - Objection The storm outfalls passing through walls 4 and 16 conflict with the soldier pile footings. Provide a detail showing how the storm drain will pass through the wall - likely needs to be centered between pile footings. DS Transportation Review Review Complete - Objection Denied on behalf of this critical reviewer. This is still under review. Please contact the reviewer to resolve. PW Survey Review Review Complete - Objection Comments in project folder Review Status: Review Complete - No Objection All documents in this project (24) ★ 2025-CIP-0000160 Comment Report 9-8-2025.pdf 2025-CIP-0000160 Revised Comment Report 12-2-2025.pdf Checklist_DPR (2).pdf Letter_Transmittal.pdf Plans_Civil.pdf Plans_Reveg.pdf REDLINES- Floodplain- Hamer_Comments.pdf REDLINES- Floodplain- Hamer_Plans_Civil.pdf REDLINES- Floodplain- Hamer_Report_Design.pdf REDLINES- Floodplain- Hamer_Specifications_Civil.pdf REDLINES- Survey- Pfohl.docx REDLINES- Tran Safety- De Vos Tidd.pdf REDLINES- Wastewater- Gehrke.pdf Report_CASDP_Narrative.pdf Report_Design.pdf Report_ErosionControl.pdf Report_Geotech_Walls_Draft.pdf Report_StructureSelection (1).pdf Report_StructureSelection.pdf Responses_DPR.pdf Responses_MHFD.pdf Responses_Table.xlsm Specifications_Civil.pdf Specifications_Reveg.pdf | ||||
| 2025-CIP-0000106 RISE New Signals Project | CIP | 26 | Flagged · 1 | |
| DPR Parks QA Review Complete - Objection DPR Comments provided in documents Review Status: No Response All documents in this project (13) 2025-06-13_RISE Signals North 100pcnt Cost Estimate.pdf 2025-06-13_RISE Signals North 100pcnt Plans.pdf 2025-06-13_RISE Signals North 100pcnt Specs.pdf 2025-06-13_RISE Signals North 90pcnt CRF.pdf 2025-11-21_RISE Signals NORTH Estimate.pdf 2025-11-21_RISE Signals NORTH Plans.pdf 2025-11-21_RISE Signals NORTH Specs.pdf ★ 2025-CIP-0000106 Updated Comment Report 1-7-2026.pdf REDLINES - CCD - Long.pdf REDLINES - CCD - Vigil - RV Comments.pdf REDLINES - CCD - Vigil.msg REDLINES - Parks - Cervera.pdf REDLINES- Craig Long.pdf | ||||
| 2025-CIP-0000010 Xcel Energy 5283 Transmission Line-Phase 2 | CIP | 25 | Flagged · 3 | |
| City Project Manager Review Review Complete - Objection This plan has been submitted as an External Agency Transportation or Utility review. The City and County of Denver does not formally approve these plans rather a Statement of No Objection (SONO) is issued. The SONO constitutes an authorization to proceed with… Reviewers Name: ERA Transportation Review Review Complete - Objection Review Complete - Objection The City of Denver Engineering and Regulatory Office has completed its Strategic review of the submitted PW Survey Review Review Complete - Objection Comments in project folder All documents in this project (8) 2024-CIP-0000048 Comment Report 04-04-2024_PEI Response.xls ★ 2025-CIP-0000010 Comment Report 02-05-2025.pdf 2025-CIP-0000010 Comment Report 02-05-2025.xls 5283 ELAT-MONR 230 kV UG Rplc Phase 2 - Final Civil Bid Drawing Package.pdf 5283 Leets Elati Cover Letter-Memo for Denver_Phase 1 and 2_60pcnt Resubmittal_1-17-25.pdf REDLINES - Forestry - Huetig.pdf REDLINES- Survey- Pfohl.docx Xcel Energy - 5283 Underground - Phase 2, Section 3 - 95% CIP.zip | ||||
| 2024-CIP-0000200 Upper Sanderson Gulch Storm Improvements | CIP | 30 | Flagged · 5 | |
| ERA Transportation Review Review Complete - Objection See ER Transportation Redlines for comments Review Status: Review Complete - No Objection ERA Erosion Control Review Review Complete - Objection 1). Due to the project's proximity to a waterway, a Construction Activities Stormwater Discharge Permit (CASDP) is required. 2). Please prepare CASDP package in accordance with the City guidelines found here: https://www.denvergov.org/content/denvergov/en/wast… PW Survey Review Review Complete - Objection Survey redlines have been uploaded to Accela and copied to the Project REDLINES folder. DPR Parks QA Review Complete - Objection DPR Comments provided in documents Review Status: No Response ERA Floodplain Review Review Complete - Objection Please see comments provided with the review of 2024-SUDP-0004218. All documents in this project (16) 2024_11_20_MHFD MEP Design Approval Letter_Upper Sanderson.pdf ★ 2024-CIP-0000200 Comment Report 12-26-2024.pdf 2024-CIP-0000200 Upper Sanderson Gulch Storm Improvements - CASDP Plan.msg BID_UPPER SANDERSON GULCH_07272022.pdf Geocal - Upper Sanderson Gulch Storm Project Report rev. 5-11-2022.pdf REDLINES- DPR- Cervera- Approved.pdf REDLINES- DPR- Cervera- concrete_walks_curbs_and_miscellaneous_flatwork.docx REDLINES- DPR- Cervera- Executed DOTI Storm Sewer Utility Permit in Sanderson Gulch.pdf REDLINES- DPR- Cervera- native_seeding.docx REDLINES- DPR- Cervera.pdf REDLINES- ER Transportation- Weller.pdf REDLINES- Survey- Lee.docx Sanderson Drainage Memo_Bid.pdf Upper Sanderson_Comment Response Log_Bid_ER.xlsx Upper Sanderson_MMP_Final.pdf Upper Sanderson_Statement Of No Impact_Bid.pdf | ||||
| 2026-ENCROACHMENT-0000123 Tier II - 1110 17th St Skynet 🚲 bike lane | ENCROACHMENT | 24 | Clear | |
| 🚲 Bike lane mentioned [comment report text] "tus Date: Comments: Status: Maintain minimum 9'8" vertical clearance from bike lane surface to cable. No permanent infrastructure may be Comments: installed in the" [comment report text] "surface to cable. No permanent infrastructure may be Comments: installed in the bike lane. 07/09/2026 Denied PWPRS Proje" All documents in this project (10) 2026-ENCROACHMENT-0000123 Comment Report 7-9-2026.pdf ★ 2026-ENCROACHMENT-0000123 Revised Comment Report 7-9-2026.pdf 260609 Skynet - Skyline Preliminary Art Engineering.pdf DDS SKY 2_ SKYLINE_ Art Plan View.pdf DDS SKY 2_ SKYLINE_ Elevation View.pdf REDLINES- Survey- Savich- Approved.pdf REDLINES- Survey- Savich.pdf SKYLINE ENGINEERING PACKET Plan w ROW lines.pdf Skyline Park Encroachment Application DOTI v2.pdf SKYLINE Preliminary Truss Engineering.pdf | ||||
| 2026-CIP-0000028 Jackson Street Storm System Phase 3 🚲 bike lane | CIP | 27 | Clear | |
| 🚲 Bike lane mentioned [comment report text] "r future projects. This would help to account for opportunities such as the Albion Street bike path improvement. Alternative 1 seems" All documents in this project (3) | ||||
| 2026-VACA-0000008 Womens Soccer Stadium Parcel 1B Vacation | VACA | 28 | Clear | |
| All documents in this project (9) 2025-SDP-0000222 BWS Filing 5 SDP.pdf 2026-04-13_Title Commitment_Parcel 1B.pdf ★ 2026-VACA-0000008 Comment Report 4-29-2026.pdf Application and checklist.pdf BWS F5-PARCEL 1B-ADJ-20251120 SURV-APP.pdf BWS-FILING 5-ALTA-DRAFT-20260324 sheet 5_Parcel 1B.pdf Parcel 1B Legal Description.docx QCD from CDOT to City.pdf SDP Plans_Denver Summit FC-2025-PROJMSTER-0000120 - 2nd Review Submittal.pdf | ||||
| 2026-UTIL-0000140 Xcel - HKS Utility Services - 4819 Irving St | UTIL | 5 | Clear | |
| All documents in this project (4) | ||||
| 2026-UTIL-0000139 Xcel - HKS Utility Services - 20th St. and Lawrence St | UTIL | 6 | Clear | |
| 2026-UTIL-0000136 Denver Water - 17th Ave and Detroit Street - West Elk Place and Tejon Street | UTIL | 6 | Clear | |
| 2026-UTIL-0000127 CenturyLink - Pauley Construction - 4765 Green Valley Ranch Blvd | UTIL | 7 | Clear | |
| 2026-UTIL-0000124 Xcel - HKS Utility Services - E 59th Ave and Tower Rd | UTIL | 7 | Clear | |
| 2026-UTIL-0000120 Xcel - HKS Utility Services, LLC - 3494 W Alameda Ave | UTIL | 7 | Clear | |
| All documents in this project (8) 2026-UTIL-0000020 Comment Report 7-8-2026.pdf 2026-UTIL-0000120 - Final Approval Plan Set.pdf ★ 2026-UTIL-0000120 Revised Comment Report 7-24-2026.pdf 3494 W. Alameda Ave. - Electric Installation (2026-06-05).pdf 3494 W. Alameda Ave. - UPR Application 6.9.26.pdf 3494 W. Alameda Ave. - UPR Checklist (2026-06-05).pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES Forestry Huetig.pdf | ||||
| 2026-UTIL-0000118 CenturyLink - Pauley Construction - 5292 Argonne St | UTIL | 15 | Clear | |
| 2026-UTIL-0000117 Xcel - HKS Utility Services - 4000 Lipan St | UTIL | 15 | Clear | |
| 2026-UTIL-0000116 Comcast - ITG Communications - 6923 E Montview Blvd | UTIL | 7 | Clear | |
| All documents in this project (8) 2026-UTIL-0000116 Comment Report 6-25-2026.pdf 2026-UTIL-0000116 Final Approved Plan Set.pdf ★ 2026-UTIL-0000116 Revised Comment Report 7-15-2026.pdf Application.pdf Checklist.pdf JB2405622-Montview Blvd and Olive St.pdf REDLINES- Construction Engineering- Blair.pdf TCP-JB0002405622 Montview Blvd and Olive St.pdf | ||||
| 2026-UTIL-0000110 Denver Water - S Locust St and S Leyden St between E Virginia Ave and E Alameda Ave | UTIL | 7 | Clear | |
| 2026-UTIL-0000109 Xcel - HKS Utility Services - 1565 Colorado Blvd | UTIL | 9 | Clear | |
| All documents in this project (9) 1565 Colorado Blvd. - Electric Installation.pdf 1565 Colorado Blvd. - UPR Application.pdf 1565 Colorado Blvd. - UPR Checklist.pdf 2026-UTIL-0000109 - Final Approval Plan Set.pdf 2026-UTIL-0000109 Comment Report 6-17-2026.pdf 2026-UTIL-0000109 Revised Comment Report 6-23-2026.pdf ★ 2026-UTIL-0000109 Revised Comment Report 6-24-2026.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- ER Transportation- Leyva- Approved.pdf | ||||
| 2026-UTIL-0000108 Xcel - NACC Construction - Atchison Way | UTIL | 8 | Clear | |
| All documents in this project (8) 2026-UTIL-0000108 - Comment Report 06.15.2026.pdf 2026-UTIL-0000108 Revised Comment Report 6-16-2026.pdf 2026-UTIL-0000108 Revised Comment Report 6-23-2026.pdf ★ 2026-UTIL-0000108 Revised Comment Report 7-28-2026.pdf Atchison Phase 1 UPR application.pdf Atchison phase one-utility-plan-review-checklist.pdf Atchison-PH1_Denver_114946964_27May26.pdf REDLINES - Construction Engineering - KBlair - Atchison - PH1Denver 114946964 27May26 kdb.pdf | ||||
| 2026-UTIL-0000105 Xcel - HKS Utility Services - E. 56th Ave. and Valentia St | UTIL | 7 | Clear | |
| 2026-UTIL-0000101 Xcel - HKS Utility Services LLC - E 56th Ave and Picadilly Rd | UTIL | 7 | Clear | |
| 2026-UTIL-0000099 Xcel - HKS Utility Services LLC - 1460 W. 38th Ave | UTIL | 7 | Clear | |
| 2026-UTIL-0000097 Xcel - HKS Utility Services - 1055 Auraria Pkwy | UTIL | 7 | Clear | |
| 2026-UTIL-0000092 Sturgeon - 1000 Chopper Circle - N Speer Blvd Chopper Circle and Auraria Pkwy | UTIL | 7 | Clear | |
| 2026-UTIL-0000091 Xcel - HKS Utility Services - Central Park Blvd and E 40th Ave | UTIL | 6 | Clear | |
| All documents in this project (5) | ||||
| 2026-UTIL-0000090 Xcel - HKS Utility Services - 1001 N. Lincoln St | UTIL | 7 | Clear | |
| All documents in this project (7) 1001 N. Lincoln St. - Electric Installation.pdf 1001 N. Lincoln St. - UPR Application.pdf 1001 N. Lincoln St. - UPR Checklist.pdf 2026-UTIL-0000090 - Comment Report - 05.07.2026.pdf 2026-UTIL-0000090 Final Approval Plan Set.pdf ★ 2026-UTIL-0000090 Revised Comment Report 5-12-2026.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2026-UTIL-0000086 Xcel - HKS Utility Services - S Monaco St Pkwy and E Center Ave | UTIL | 7 | Clear | |
| All documents in this project (5) | ||||
| 2026-UTIL-0000079 Xcel - HKS Utility Services, LLC - 250 Clayton St Denver, CO | UTIL | 9 | Clear | |
| 2026-UTIL-0000078 Xcel - HKS Utility Services - 900 W. Ellsworth Ave | UTIL | 10 | Clear | |
| All documents in this project (12) 2026-UTIL-0000078 - Comment Report - 04.16.2026.pdf 2026-UTIL-0000078 - Final Approval Plan Set.pdf 2026-UTIL-0000078 - Revised Comment Report 4-21-2026.pdf 2026-UTIL-0000078 - Revised Comment Report 6-11-2026.pdf ★ 2026-UTIL-0000078 - Revised Comment Report 6-24-2026.pdf 900 S. Ellsworth Ave. - UPR Application.pdf 900 S. Ellsworth Ave. - UPR Checklist.pdf 900 S. Ellsworth Ave. - Utility Pole Installation.pdf REDLINES - OCF- E Huetig 2020PM0000419 - Approved Utility Plan.pdf REDLINES - OCF- EHuetig - 2026-UTIL-0000078 - OCF Comments 4-15-26.pdf REDLINES- ER Transportation- Leyva- Approved.pdf REDLINES- Forestry- Approved.pdf | ||||
| 2026-UTIL-0000077 Xcel - HKS Utility Services - 49th Ave and Yampa St | UTIL | 6 | Clear | |
| 2026-UTIL-0000076 3225 and 3227 W 21st Ave | UTIL | 5 | Clear | |
| All documents in this project (5) | ||||
| 2026-UTIL-0000075 Xcel - HKS - 1001 N Lincoln St | UTIL | 9 | Clear | |
| All documents in this project (6) | ||||
| 2026-UTIL-0000071 Xcel - HKS Utility Services, LLC - 953 Decatur St Denver, CO | UTIL | 7 | Clear | |
| 2026-UTIL-0000070 Xcel - HKS Utility Services - 1055 S Fox St | UTIL | 7 | Clear | |
| 2026-UTIL-0000069 Zayo Fiber Solutions - TBD - 1400 Market St | UTIL | 7 | Clear | |
| 2026-UTIL-0000068 Denver Water - PT 22980 - South Park Hill Main Replacement - N Glencoe St | UTIL | 7 | Clear | |
| All documents in this project (5) | ||||
| 2026-UTIL-0000067 Denver Water - PT 23044 - Cory-Merrill Project 1 - S Filmore St and S Clayton St | UTIL | 6 | Clear | |
| All documents in this project (4) | ||||
| 2026-UTIL-0000066 Xcel - HKS Utility Services - 8892 E. Lowry Blvd | UTIL | 7 | Clear | |
| 2026-UTIL-0000063 Hyper Fiber - ITG - E 45TH AVE AND ARGONNE ST | UTIL | 7 | Clear | |
| All documents in this project (7) 2026-UTIL-0000063 Comment Report 4-6-2026.pdf 2026-UTIL-0000063 Final Approved Plan Set.pdf ★ 2026-UTIL-0000063 Revised Comment Report 4-23-2026.pdf OLT2 FDA00 - CCD Application - 031226.pdf OLT2 FDA00 - UPR Checklist 2.00 - 031226.pdf REDLINES- Construction Engineering- Blair.pdf RFUSA CO GREEN VALLEY RANCH OLT-02-ECA-031826-R3-OLT PERMIT.pdf | ||||
| 2026-UTIL-0000060 Hyperfiber - ITG - MAXWELL PL and IRELAND ST | UTIL | 8 | Clear | |
| All documents in this project (9) 2026-UTIL-0000060 Comment Report 3-31-2026.pdf 2026-UTIL-0000060 Final Approved Plan Set.pdf ★ 2026-UTIL-0000060 Revised Comment Report 6-16-2026.pdf 2026-UTIL-0000060 Revised Comment Report 6-9-2026.pdf OLT2 FDA9 - CCD Application - 031226.pdf OLT2 FDA9 - UPR Checklist 2.9 - 031226.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- ER Transportation -Leyva- Approved.pdf RFUSA CO GREEN VALLEY RANCH A2-09 ECA 031026 R2.pdf | ||||
| 2026-UTIL-0000057 HyperFiber - ITG - E 54th Pl and Dunkirk St | UTIL | 8 | Clear | |
| All documents in this project (10) 2026-UTIL-0000057 Comment Report 3-27-2026.pdf 2026-UTIL-0000057 Revised Comment Report 6-10-2026.pdf 2026-UTIL-0000057 Revised Comment Report 6-16-2026.pdf ★ 2026-UTIL-0000057 Revised Comment Report 6-23-2026.pdf 2026-UTIL-0000057 Revised Comment Report 6-5-2026.pdf OLT2 FDA5 - CCD Application - 031126.pdf OLT2 FDA5 - UPR Checklist 2.5 - 031126.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- ER Transportation- Leyva- Approved.pdf RFUSA CO GREEN VALLEY RANCH A2-05 ECA 031026 R2.pdf | ||||
| 2026-UTIL-0000050 CenturyLink - PAULEY CONSTRUCTION - 6400 E 6th Ave Pkwy | UTIL | 7 | Clear | |
| 2026-UTIL-0000049 Xcel - HKS Utility Services, LLC - E 20th Ave and N Grant St | UTIL | 7 | Clear | |
| 2026-UTIL-0000048 Comcast - ITG Communications - 4665 N Beeler Ct | UTIL | 7 | Clear | |
| 2026-UTIL-0000042 Xcel - HKS Utility Services - 855 N Broadway | UTIL | 9 | Clear | |
| All documents in this project (7) 2026-UTIL-0000042 Comment Report 03.04.2026..pdf 2026-UTIL-0000042 Final Approved Plan Set.pdf ★ 2026-UTIL-0000042 Revised Comment Report 4-8-2026.pdf 855 N. Broadway - Electric Installation.pdf 855 N. Broadway - UPR Application.pdf 855 N. Broadway - UPR Checklist.pdf REDLINES- ER Transportation- Leyva- Approved.pdf | ||||
| 2026-UTIL-0000039 Comcast - Mastec - 3503 CENTRAL PARK BLVD | UTIL | 8 | Clear | |
| All documents in this project (11) 2026-UTIL-0000039 Comment Report 3-3-2026.pdf 2026-UTIL-0000039 Final Approval Plan Set.pdf 2026-UTIL-0000039 Revised Comment Report 3-26-2026.pdf 2026-UTIL-0000039 Revised Comment Report 3-9-2026.pdf ★ 2026-UTIL-0000039 Revised Comment Report 5-5-2026.pdf Application.pdf Checklist 1.pdf JB 2244285.pdf JB#2244285_FINAL_051326.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- Forestry- Evers.pdf | ||||
| 2026-UTIL-0000037 Xcel - HKS Utility Services - 1625 N Marion St | UTIL | 9 | Clear | |
| All documents in this project (7) 1625 N. Marion St. - UPR Application.pdf 1625 N. Marion St. - UPR Checklist.pdf 1625 N. Marion St. - Utility Pole Installation.pdf 2026-UTIL-00000037 Comment Report 02.27.26.pdf ★ 2026-UTIL-00000037 Revised Comment Report 3-10-2026.pdf 2026-UTIL-0000037 Final Approved Plan Set.pdf REDLINES- ER Transportation- Approved.pdf | ||||
| 2026-UTIL-0000035 Xcel - HKS Utility Services - 18th and Humboldt-Franklin | UTIL | 8 | Clear | |
| 2026-UTIL-0000033 Denver Water - PT 22977 - Harvey Park Project 4 - S Quitman St and S Perry St | UTIL | 8 | Clear | |
| All documents in this project (9) 2026-UTIL-00000033 Final Approval Plan Set.pdf ★ 2026-UTIL-0000033 Comment Report 2-23-2026.pdf 2026-UTIL-0000033 Revised Comment Report 2-23-2026.pdf 2026-UTIL-0000033 Revised Comment Report 4-14-2026.pdf 22977 CCD 1ST SUBMITTAL PE Signed.pdf 22977 UPRAPP 1ST SUB.pdf 22977 UPRCHECKLIST 1ST SUB.pdf REDLINES- ER Transportation- Denied.pdf REDLINES- ER Transportation- Leyva- Approved.pdf | ||||
| 2026-UTIL-0000032 Xcel - HKS Utility Services - 995 S Clarkson St | UTIL | 7 | Clear | |
| 2026-UTIL-0000027 Xcel - HKS Utility Services - 8892 E Lowry Blvd | UTIL | 6 | Clear | |
| 2026-UTIL-0000025 Xcel - HKS Utility Services - 650 W. Colfax Ave | UTIL | 7 | Clear | |
| 2026-UTIL-0000024 Xcel - HKS Utility Services - 2483 S. Broadway | UTIL | 8 | Clear | |
| All documents in this project (7) 2026-UTIL-0000024 Comment Report 02.10.2026.pdf 2026-UTIL-0000024 Final Approved Plan Set.pdf ★ 2026-UTIL-0000024 Revised Comment Report 3-2-2026.pdf 2483 S. Broadway - UPR Application.pdf 2483 S. Broadway - UPR Checklist.pdf 2483 S. Broadway - Utility Pole Installation.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2026-UTIL-0000021 Xcel - HKS Utility Services - 2315 S. Monroe St | UTIL | 7 | Clear | |
| 2026-UTIL-0000017 Xcel - HKS Utility Services - 1338 Forest St | UTIL | 6 | Clear | |
| 2026-UTIL-0000015 Xcel - HKS Utility Services - 2950 W 10th Ave | UTIL | 8 | Clear | |
| 2026-UTIL-0000014 Xcel - HKS Utility Services - 1700 S Julian St | UTIL | 9 | Clear | |
| All documents in this project (9) 1700 S. Julian St. - Electric Installation.pdf 1700 S. Julian St. - UPR Application.pdf 1700 S. Julian St. - UPR Checklist.pdf 2026-UTIL-0000014 Comment Report 02.03.2026 - Copy (2).pdf 2026-UTIL-0000014 Final Approval Plan Set.pdf ★ 2026-UTIL-0000014 Revised Comment Report 2-18-2026.pdf 2026-UTIL-0000014 Revised Comment Report 2-19-2026.pdf REDLINES- ER Transportation- Leyva.pdf REDLINES- Forestry- Huetig- Approved.pdf | ||||
| 2026-UTIL-0000013 Xcel - HKS Utility Services - 1373 Dexter St | UTIL | 9 | Clear | |
| 2026-UTIL-0000012 Xcel - HKS Utility Services - Colfax and Oneida | UTIL | 9 | Clear | |
| 2026-UTIL-0000009 Xcel - HKS Utility Services - TOWER1412 Feeder | UTIL | 7 | Clear | |
| 2026-UTIL-0000007 Xcel - HKS Utility Services - E. 6th Ave. and N. Washington St | UTIL | 10 | Clear | |
| All documents in this project (5) | ||||
| 2026-UTIL-0000006 2nd - Xcel - HKS Utility Services - E. 2nd Ave. and Fillmore St | UTIL | 9 | Clear | |
| 2026-UTIL-0000003 Xcel - HKS Utility Services - 1928 W. 41st Ave | UTIL | 8 | Clear | |
| 2026-ENCROACHMENT-0000126 Tier II - 215 Detroit Soil Cells | ENCROACHMENT | 20 | Clear | |
| All documents in this project (11) ★ 2026-ENCROACHMENT-0000126 Comment Report 7-30-2026.pdf 215 Detroit_Encroachment_Application JH Sig.pdf 215 Detroit_Encroachment_Checklist JH Sig.pdf 215 Detroit_Encroachment_Detail SilvaCell-tech-sheet-3D-US.pdf 215 Detroit_Encroachment_Landscape For Reference.pdf 215 Detroit_Encroachment_Legal and Exhibit.pdf 215 Detroit_Encroachment_Soil Cell Exhibit.pdf REDLINES- Centurylink- Letter of No Objection.pdf REDLINES- Survey- Breitnauer- Requirements.docx REDLINES- Survey- Breitnauer- SitePlan.pdf REDLINES- Survey- Breitnauer.pdf | ||||
| 2026-ENCROACHMENT-0000027 Tier III - 1066 N Grant St- Bollards.Chains.Wall | ENCROACHMENT | 21 | Clear | |
| All documents in this project (8) ★ 2026-ENCROACHMENT-0000027 Comment Report 4-10-2026.pdf 260316 1066 Grant Property Description.docx 260316 1066 Grant QC Deed.pdf 260316 1066 Grant Tier III Encroachment Application.pdf 260316 1066 Grant Tier III Encroachment Checklist.pdf 260316 1066 Grant Tier III Encroachment Drawing Exhibit.pdf REDLINES- CenturyLink- Medrano- No Objection.pdf REDLINES- Survey- Sperling.docx | ||||
| 2026-ENCROACHMENT-0000011 Tier III- 419 S Broadway - Multiple Items | ENCROACHMENT | 20 | Clear | |
| All documents in this project (9) ★ 2026-ENCROACHMENT-0000011 Comment Report 2-19-2026.pdf BP AMLI Arthaus Encroachment Submittal Checklist.pdf BP AMLI Arthaus Encroachment_Application.pdf BP AMLI Arthaus Encroachment_Supporting Documents.pdf BP AMLI Arthaus Encroachment_Title Committment.pdf Parcel 0515205048000 - Legal Description.docx Parcel 0515205049000 - Legal Description.docx Parcel 0515205050000 - Legal Description.docx REDLINES- Survey- Sperling.docx | ||||
| 2026-CIP-0000081 Mestizo-Curtis Park Pool renovation redesign | CIP | 31 | Clear | |
| All documents in this project (16) 015713 Erosion and Sedimentation Control.pdf 10405062-Mestizo-Electrical Site Plan.pdf 2026.07.13 CCD-Mestizo Irrigation-CPEP-60.pdf 2026.07.13 CCD-Mestizo Landscape-CPEP-60.pdf 2026.07.13 Mestizo Civil Plans.pdf 2026.07.13 Mestizo Drainage Report.pdf 2026.07.13 Mestizo Rain Garden O and M.pdf ★ 2026-CIP-0000081 - Comment Report - 07.29.26.pdf 311100 Clearing and Grubbing.pdf 312000 Earth Moving.pdf 312316 Excavating and Backfilling of Trenches.pdf 321216 Asphalt Pavement.pdf 321313 Concrete Walks Curbs and Miscellaneous Flatwork.pdf 331100 Water Utility Distribution Piping.pdf 333100 Sanitary Utility Sewerage Piping.pdf 334400 Storm Sewerage.pdf | ||||
| 2026-CIP-0000079 DPR Pre-Fabricated Restrooms | CIP | 32 | Clear | |
| All documents in this project (8) ★ 2026-CIP-0000079. Comment Report. 07.27.2026.pdf 95PRNCT COMMENT RESPONSES TO 2026-CIP-0000006 Comment Report 2-11-2026.pdf ARGO PARK - DOTI-DPR RR IMPROVEMENTS - 95PRNCT ER Resubmittal.pdf COMMONS PARK - DOTI-DPR RR IMPROVEMENTS - 95PRNCT ER Resubmittal.pdf HUSTON LAKE PARK - DOTI-DPR RR IMPROVEMENTS - 95PRNCT ER Resubmittal.pdf MONTBELLO CENTRAL PARK - DOTI-DPR RR IMPROVEMENTS - 95PRNCT ER Resubmittal.pdf PROJECT MANUAL - DOTI-DPR RR IMPROVEMENTS 95PRNCT ER Resubmittal.pdf RUDE PARK - DOTI-DPR RR IMPROVEMENTS - 95PRNCT ER Resubmittal.pdf | ||||
| 2026-CIP-0000062 Evergreen Golf Course - Cart Path Replacement | CIP | 28 | Clear | |
| All documents in this project (2) | ||||
| 2026-CIP-0000053 Clearance and Release - Ball Arena Bridge Landing | CIP | 20 | Clear | |
| 2026-CIP-0000049 Willis Case - Cart Path Replacement - 90Pcnt | CIP | 23 | Clear | |
| All documents in this project (2) | ||||
| 2026-CIP-0000045 Smith Rd Bridge and Sandown Rd Bridge over Quebec | CIP | 42 | Clear | |
| All documents in this project (18) 1_SSQ Plans 100PRT 2026-04-20.pdf 10A SSQ CASDP Narrative 2026-04-17.pdf 10B SSQ CASDP Plans 2026-04-17.pdf 11 SSQ Comment Resolution Form_90PNCT 2026-04-20.pdf 12 SSQ Construction Phasing Memo Final 2026-04-21.pdf 2 SSQ Special Provisions 100PRCT 2026-04-20.pdf ★ 2026-CIP-0000045 - Comment Report - 05.15.2026.pdf 2026-CIP-0000045_Comments Compiled_Smith Rd Bridge and Sandown Rd Bridge over Quebec.msg 3_SSQ Cost Estimate 100 PRCT 2026-04-20.pdf 4SSQConstructionSchedule1002026-04-20.pdf 5SSQgeotechnicalReportFinal2026-03-30.pdf 6SSQDrainage ReportFinal2026-04-20.pdf 7ASSQSmithD-04-BOST-30A RATING Package2026-04-17.pdf 7BSSQD-04-BOST-40A RATING Package2026-04-17.pdf 8A SSQ Smith_Bridge Calculation Package 2026-04-17.pdf 8B SSQ_Smith Bridge IDC Calc Package Stamped 2026-04-17.pdf 9A SSQ Sandown CalculationPackage 2026-04-17.pdf 9B SSQ Sandown Bridge IDC Calc Package Stamped 2026-04-17.pdf | ||||
| 2026-CIP-0000042 Sun Valley Riverfront Park 125pcnt CD Submittal | CIP | 21 | Clear | |
| 2026-CIP-0000041 5283 underground projectPhase 2, Segment 2, 95PRCT | CIP | 25 | Clear | |
| All documents in this project (6) 0. Xcel Energy5283 Phase 2Sgmt 2 95PRCT Engineering Cover Memo 2026-04-14.pdf 1. 5283 ELAT-MONR 230 kV UG Rplc Phase 2 - Section 2 - Drawing Package.pdf 2. 2025-CIP-0000010 Comment Report 02-05-2025 Comment Response - Section 2, 3 & 4.xls ★ 2026-CIP-0000041 - Comment Report - 05.01.2026.pdf 3. 6531943791 5283 Control Diagram Monroe to Elati CCD SIGNED.pdf 4. Monroe to Elati Control DiagramCO83-CF MOD.dwg | ||||
| 2026-CIP-0000036 Denver Resilient Landscape DRL - Rules and Regulations | CIP | 53 | Clear | |
| All documents in this project (2) | ||||
| 2026-CIP-0000022 Clearance and Release -1800 W 39th Ave | CIP | 15 | Clear | |
| All documents in this project (7) 1965-02-23 Vesting deed-1800 W 39th Ave.PDF 2025-11-13 Assessor Info-1800 W 39th Ave.pdf 2025-11-20 OE Report-1800 W 39th Ave.pdf 2026-03-12 Clearance and Release Intake Form-1800 W 39th Ave.xlsm 2026-03-12 Clearance and Release Memo-All Agencies-1800 W 39th Ave.docx ★ 2026-CIP-0000022 Comment Report 3-31-2026.pdf Legal Description-1800 W 39th Ave-SurvApp.docx | ||||
| 2026-CIP-0000009 Alma-Lincoln Park Improvements | CIP | 27 | Clear | |
| 2026-CIP-0000008 Denver Resilient Landscape DRL Rules and Regulations | CIP | 54 | Clear | |
| All documents in this project (2) | ||||
| 2026-CIP-0000007 1240 W Bayaud Renovation | CIP | 26 | Clear | |
| 2026-CIP-0000003 2026 WMD Pipe Rehabilitation Phase 1 | CIP | 27 | Clear | |
| All documents in this project (2) | ||||
| 2025-UTIL-0000285 Xcel - HKS Utility Services - E. 52nd Ave. Washington to Emerson | UTIL | 9 | Clear | |
| All documents in this project (9) 2025-UTIL-0000285 Comment Report 1-9-2026.pdf 2025-UTIL-0000285 Final Approved Plan Set.pdf 2025-UTIL-0000285 Revised Comment Report 1-9-2026.pdf ★ 2025-UTIL-0000285 Revised Comment Report 2-19-2026.pdf E 52nd Ave - Washington to Emerson Streetlight.pdf E. 52nd Ave. - Washington to Emerson Streetlight - UPR Application.pdf E. 52nd Ave. - Washington to Emerson Streetlight - UPR Checklist.pdf REDLINES- ER Transportation- Leyva - Clear Zone Request.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2025-UTIL-0000284 Xcel - HKS Utility Services - 1625 N. Marion St | UTIL | 7 | Clear | |
| 2025-UTIL-0000282 Denver Water - W Ohio Ave - S Raleigh St - S Perry St - S Meade St | UTIL | 9 | Clear | |
| All documents in this project (7) | ||||
| 2025-UTIL-0000278 Xcel - HKS Utility Services - 325 King St | UTIL | 6 | Clear | |
| 2025-UTIL-0000277 Xcel - HKS Utility Services - 2029 Lawrence St | UTIL | 9 | Clear | |
| 2025-UTIL-0000274 CenturyLink - Pauley Construction - 978 32nd St | UTIL | 8 | Clear | |
| All documents in this project (6) | ||||
| 2025-UTIL-0000273 Xcel - HKS Utility Services - 3060 Leyden St | UTIL | 9 | Clear | |
| All documents in this project (8) 2025-UTIL-0000273 Comment Report 12.24.2025.pdf 2025-UTIL-0000273 Final Approval Plan Set.pdf 2025-UTIL-0000273 Revised Comment Report 12-29-2025.pdf ★ 2025-UTIL-0000273 Revised Comment Report 1-5-2026.pdf 3060 Leyden St. - Electric Installation.pdf 3060 Leyden St. - UPR Application.pdf 3060 Leyden St. - UPR Checklist.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2025-UTIL-0000272 Xcel - HKS Utility Services - Founders Green | UTIL | 7 | Clear | |
| All documents in this project (5) 2025-UTIL-0000272 - Final Approval Plan Set.pdf ★ 2025-UTIL-0000272 Comment Report 12-29-2025.pdf Founders Green - Electric Installation Martin Luther King and Trenton.pdf Founders Green - UPR Application Martin Luther King and Trenton.pdf Founders Green - UPR Checklist Martin Luther King and Trenton.pdf | ||||
| 2025-UTIL-0000271 Xcel - HKS Utility Services - 6th Ave. and Corona St | UTIL | 8 | Clear | |
| All documents in this project (7) ★ 2025-UTIL-0000271 Comment Report 12.24.2025.pdf 2025-UTIL-0000271- Final Approval Plan Set.pdf 2025-UTIL-0000271 Revised Comment Report 12-29-2025.pdf 2025-UTIL-0000271 Revised Comment Report 12-30-2025.pdf 6th and Corona - Electric Installation.pdf 6th and Corona - UPR Application.pdf 6th and Corona - UPR Checklist.pdf | ||||
| 2025-UTIL-0000267 Xcel - HKS Utility Services - 2280 S. Albion St | UTIL | 8 | Clear | |
| All documents in this project (7) 2025-UTIL-0000267 Comment Report 1-7-2026.pdf 2025-UTIL-0000267 Final Approved Plan Set.pdf ★ 2025-UTIL-0000267 Revised Comment Report 1-13-2026.pdf 2280 S. Albion St. - Electric.pdf 2280 S. Albion St. - UPR Application.pdf 2280 S. Albion St. - UPR Checklist.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2025-UTIL-0000266 Xcel - HKS Utility Services - Telluride St and 45th Ave | UTIL | 7 | Clear | |
| 2025-UTIL-0000265 Xcel - HKS Utility Services - E. 56th Ave. and Dunkirk St | UTIL | 9 | Clear | |
| All documents in this project (7) 2025-UTIL-0000265 Comment Report 12-16-2025.pdf 2025-UTIL-0000265 Final Approval Plans.pdf ★ 2025-UTIL-0000265 New Revised Comment Report 12-17-2025.pdf 2025-UTIL-0000265 Revised Comment Report 12-17-2025.pdf E. 59th Ave. and Dunkirk St. - Electric Installation.pdf E. 59th Ave. and Dunkirk St. - UPR Application.pdf E. 59th Ave. and Dunkirk St. - UPR Checklist.pdf | ||||
| 2025-UTIL-0000263 Xcel - HKS Utility Services - 2828 W. 44th Ave | UTIL | 8 | Clear | |
| 2025-UTIL-0000262 Xcel - HKS Utility Services - 3800 W. Colfax Ave | UTIL | 8 | Clear | |
| 2025-UTIL-0000260 2nd - Xcel - HKS Utility Services - 3850 Blake St | UTIL | 10 | Clear | |
| 2025-UTIL-0000259 Xcel - HKS Utility Services - 1660 Federal Blvd., | UTIL | 8 | Clear | |
| 2025-UTIL-0000257 Xcel - HKS Utility Services - E Evans Ave and Pearl St | UTIL | 9 | Clear | |
| All documents in this project (6) 2025-UTIL-0000257 - Comment Report - 12.02.2025.pdf 2025-UTIL-0000257 Final Approved Plan Set.pdf ★ 2025-UTIL-0000257 Revised Comment Report 12-15-2025.pdf 2509009 E. Evans and Pearl St. - Electric Installation.pdf 2509009 E. Evans and Pearl St. - UPR Application.pdf 2509009 E. Evans and Pearl St. - UPR Checklist.pdf | ||||
| 2025-UTIL-0000255 Crown Castle - UCI2 Construction Services - Gateway Ave East of Enid Way | UTIL | 9 | Clear | |
| All documents in this project (7) 2025-UTIL-0000255 Comment Report 12.01.2025.pdf 2025-UTIL-0000255 Final Approved Plan Set.pdf ★ 2025-UTIL-0000255 Revised Comment Report 12-11-2025.pdf Application 14922 E Gateway Ave 11072025.pdf Checklist 14922 E Gateway Ave 11072025.pdf Construction Drawings 14922 E Gateway Ave 11072025.pdf REDLINES-DPR Forestry-NEvers 11-26-25.pdf | ||||
| 2025-UTIL-0000253 Xcel - HKS Utility Services - 4503 Tennyson St | UTIL | 9 | Clear | |
| 2025-UTIL-0000251 Centurylink - Pauley Construction - 1445 Market St | UTIL | 10 | Clear | |
| All documents in this project (7) 2025-UTIL-0000251 - Comment Report - 11.12.2025.pdf 2025-UTIL-0000251 Final Approved Plan Set.pdf 2025-UTIL-0000251 Revised Comment Report 11-14-2025.pdf ★ 2025-UTIL-0000251 Revised Comment Report 11-17-2025.pdf P.340473 Denver Utility Plan Application.pdf P.340473- Site Plans.pdf P.340473 UPR Checklist.pdf | ||||
| 2025-UTIL-0000248 Xcel - HKS Utility Services - E. 56th Ave. and Boston Ct | UTIL | 7 | Clear | |
| 2025-UTIL-0000246 Xcel - HKS Utility Services - 471 S. Vine St | UTIL | 6 | Clear | |
| 2025-UTIL-0000242 Xcel - HKS Utility Services - 399 N High St | UTIL | 5 | Clear | |
| 2025-UTIL-0000241 Xcel - HKS Utility Svcs - Bark 17th Feeder Market St to Lawrence S | UTIL | 8 | Clear | |
| All documents in this project (7) 2025-UTIL-0000241 Comment Report 10.30.25.pdf 2025-UTIL-0000241 Final Approved Plan Set.pdf ★ 2025-UTIL-0000241 Revised Comment Report 12-2-2025.pdf Bark 17th Feeder - Electric Installation.pdf Bark 17th Feeder - UPR Application.pdf Bark 17th Feeder - UPR Checklist.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2025-UTIL-0000238 Xcel - HKS Utility Services - 2798 S. Federal Blvd | UTIL | 8 | Clear | |
| All documents in this project (6) | ||||
| 2025-UTIL-0000237 Xcel - HKS Utility Services - E. 56th Ave. and Tower Rd | UTIL | 8 | Clear | |
| All documents in this project (7) 2025-UTIL-0000237 Comment Report 10-28-2025.pdf 2025-UTIL-0000237 Final Approved Plan Set.pdf 2025-UTIL-0000237 Revised Comment Report 12-1-2025.pdf ★ 2025-UTIL-0000237 Revised Comment Report 12-4-2025.pdf E. 56th Ave. and Tower Rd. - Electric Installation.pdf E. 56th Ave. and Tower Rd. - UPR Application.pdf E. 56th Ave. and Tower Rd. - UPR Checklist.pdf | ||||
| 2025-UTIL-0000235 Xcel - HKS Utility Services - 4305 W. 46th Ave | UTIL | 9 | Clear | |
| All documents in this project (10) 2025-UTIL-0000235 Comment Report 10-27-2025.pdf 2025-UTIL-0000235 Final Approved Plan Set.pdf 2025-UTIL-0000235 Revised Comment Report 12-4-2025.pdf ★ 2025-UTIL-0000235 Revised Comment Report 12-8-2025.pdf 4305 W. 46th Ave. - UPR Application.pdf 4305 W. 46th Ave. - UPR Checklist.pdf 4305 W. 46th Ave. - Utility Pole Installation.pdf REDLINES- ER Transportation- Leyva.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig.pdf | ||||
| 2025-UTIL-0000229 Xcel - Mears Group - 5503-5539 Dearborn St | UTIL | 7 | Clear | |
| All documents in this project (9) 2025-UTIL-0000229 Comment Report 10-22-2025.pdf 2025-UTIL-0000229 Final Approval Plan Set.pdf 2025-UTIL-0000229 Revised Comment Report 12-15-2025.pdf ★ 2025-UTIL-0000229 Revised Comment Report 12-22-2025.pdf 5503-5539 Dearborn St QLB Seal.pdf Checklist.pdf Denver UPR Application.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- ER Transportation- Leyva.pdf | ||||
| 2025-UTIL-0000174 Xcel - HKS Utility Services - 47th to 52nd on Washington - Phase 2 Electric | UTIL | 8 | Clear | |
| All documents in this project (14) 2025-UTIL-0000174 Comment Report 8-22-2025.pdf 2025-UTIL-0000174 Final Approved Plans.pdf 2025-UTIL-0000174 Revised Comment Report 10-10-2025.pdf 2025-UTIL-0000174 Revised Comment Report 12-29-2025.pdf ★ 2025-UTIL-0000174 Revised Comment Report 1-5-2026.pdf 47th to 52nd on Washington (Phase 2 Electric) - Electric Install (2025-08-06).pdf 47th to 52nd on Washington (Phase 2 Electric) - UPR Application (2025-08-06).pdf 47th to 52nd on Washington (Phase 2 Electric) - UPR Checklist (2025-08-06).pdf REDLINES- ER Transportation- Leyva- Approved Plans.pdf REDLINES- ER Transportation- Leyva.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig- OCF Comments.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Traffic Signals- Barela.pdf | ||||
| 2025-UTIL-0000152 Xcel - HKS Utility Services - 805 W. 38th Ave | UTIL | 8 | Clear | |
| All documents in this project (8) ★ 2025-UTIL-0000152 Comment Report 07.28.2025.pdf 2025-UTIL-0000152 Final Approval Plan Set.pdf 2025-UTIL-0000152 Revised Comment Report 9-12-2025.pdf 805 W. 38th Ave. - Electric Installation.pdf 805 W. 38th Ave. - UPR Application.pdf 805 W. 38th Ave. - UPR Checklist.pdf REDLINES- DPR- Cervera- Approved.pdf REDLINES-DPR.pdf | ||||
| 2025-CIP-0000227 Denver Water Cathodic Protection Conduits No. 76 and 154 | CIP | 30 | Clear | |
| All documents in this project (2) | ||||
| 2025-CIP-0000223 Evergreen Golf Course - Cart Path Replacement | CIP | 24 | Clear | |
| All documents in this project (2) | ||||
| 2025-CIP-0000222 5283 Underground Relocation Project - Phase 2-Segment 4 | CIP | 23 | Clear | |
| All documents in this project (6) 2025-CIP-0000010 Comment Report 02-05-2025.xls ★ 2025-CIP-0000222 Comment Report 01.02.2026.pdf 5283 ELAT-MONR 230 kV UG Rplc Phase 2 - Section 4 - Drawing Package.pdf 6531943791 5283 Control Diagram Monroe to Elati CCD SIGNED.pdf Monroe to Elati Control Diagram CO83-CF.dwg Xcel Energy 5283 Phase 2 Sgmt 4 95pct Engineering Cover Memo 2025-12-12.pdf | ||||
| 2025-CIP-0000215 Clearance and Release CUP North Conveyance | CIP | 16 | Clear | |
| All documents in this project (8) 2016-09-02_Vesting Deed_CUP North.pdf 2017-01-27_Vesting Deed_CUP North.pdf 2025-10-28_Title Commitment_CUP North.pdf 2025-10-30_Legal Description_CUP North.pdf 2025-11-06_Survey Exhibit_CUP North.pdf 2025-12-03_Clearance and Release Memo_CUP North.pdf ★ 2025-CIP-0000215 Comment Report 12-19-2025.pdf Clearance and Release - CUP North.xlsm | ||||
| 2025-CIP-0000214 Denver Water 2026 ALSLR Program | CIP | 29 | Clear | |
| All documents in this project (7) ★ 2025-CIP-0000214 Comment Report 12-19-2025.pdf LRP_2026_CCD_ALSLRPlan_CIPPermit_Letter of Intent.pdf LRP_D-4_CIP_Attachment 1_2026 Work Package Maps_1 of 2.pdf LRP_D-4_CIP_Attachment 1_2026 Work Package Maps_2 of 2.pdf LRP_D-4_CIP_Attachment 2_2026 Contract Documents.pdf LRP_D-4_CIP_Attachment 3_S1 2025 LSLR List.pdf LRP_D-4_CIP_Attachment 4_2026_Potential_Tree_Conflicts.pdf | ||||
| 2025-CIP-0000209 Evergreen Golf Course - Cart Path Replacement | CIP | 25 | Clear | |
| All documents in this project (2) | ||||
| 2025-CIP-0000202 RISE New Signals Project | CIP | 24 | Clear | |
| All documents in this project (10) 2025-11-05 RISE Signals South 60pct ER Comment Response Form.pdf 2025-11-05 RISE Signals South 90pct Estimate.pdf 2025-11-05 RISE Signals South 90pct Plans.pdf 2025-11-05 RISE Signals South 90pct Specs.pdf ★ 2025-CIP-0000202 Comment Report 11-24-2025.pdf REDLINES- Craig Long.pdf REDLINES- Kim Blair 1.pdf REDLINES- Kim Blair 2.pdf REDLINES- Trans Safety- De Vos Tidd.pdf REDLINES- WW Maintenance- Gehrke.pdf | ||||
| 2025-CIP-0000193 Clearance and Release - Cherry Creek Glendale | CIP | 14 | Clear | |
| All documents in this project (7) 1935-08-21 Quitclaim Deed Cherry Creek Canal Property.pdf 20250210 Agreement no2 SURVAPP approved.pdf 2025-10-24 70835517 Property Information Binder.pdf 2025-10-27 Clearance and Release - Cherry Creek Glendale water stub license.xlsm 2025-10-27 Clearance and Release Memo Cherry Creek Glendale Parcel Water Line.docx ★ 2025-CIP-0000193 Comment Report 11-13-2025.pdf CCD Parcel in Glendale - Water Line.pdf | ||||
| 2026-VACA-0000003 1430 14th St Vacation | VACA | — | No report yet | |
| 2026-UTIL-0000175 Xcel - HKS Utility Services - 2777 Zuni St | UTIL | — | No report yet | |
| 2026-UTIL-0000174 Xcel - Centerline Energy Construction - 995 S Zuni St | UTIL | — | No report yet | |
| 2026-UTIL-0000173 Xcel - HKS Utility Services - 525 S. Corona St | UTIL | — | No report yet | |
| 2026-UTIL-0000172 Xcel - HKS Utility Services - 1456 N. Corona St | UTIL | — | No report yet | |
| 2026-UTIL-0000171 CenturyLink - Pauley Construction - 917 Auraria Pkwy | UTIL | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-UTIL-0000170 Xcel - HKS Utility Services - 3701 W. 16th Ave | UTIL | — | No report yet | |
| 2026-UTIL-0000169 Xcel - HKS Utility Services -1310 N Jackson St | UTIL | — | No report yet | |
| 2026-UTIL-0000168 CenturyLink - PAULEY CONSTRUCTION - 18715 53rd Ave | UTIL | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-UTIL-0000167 Comcast - ITG Communications - 5353 E Yale Ave | UTIL | — | No report yet | |
| 2026-UTIL-0000166 Xcel - HKS Utility Services - E 14th Ave and N Pennsylvania St | UTIL | — | No report yet | |
| 2026-UTIL-0000165 Comcast - ITG Communications - 1100 Federal Blvd | UTIL | — | No report yet | |
| 2026-UTIL-0000164 Xcel - HKS Utility Services - W 38th Ave and Huron St | UTIL | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-UTIL-0000163 Xcel - HKS Utility Services - E 60th Ave and Tower Rd | UTIL | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-UTIL-0000162 CenturyLink - E.1600.0029596 - 10203 E. 56th Ave (N. Galena St and E. 56th Ave) | UTIL | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-UTIL-0000160 Xcel - NACC Construction - St Paul and E 41st Ave | UTIL | — | No report yet | |
| 2026-UTIL-0000159 Verizon - ADB Companies - Maxwell Pl from Picadilly Rd to N O | UTIL | — | No report yet | |
| 2026-UTIL-0000158 Xcel - NACC Construction - W 42nd Ave and Fox St | UTIL | — | No report yet | |
| 2026-UTIL-0000157 Denver Water - W Jewell Ave between S Stuart St and S Patton Ct | UTIL | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-UTIL-0000154 Xcel - HKS Utility Services - 9111 E 40th Ave | UTIL | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-UTIL-0000151 Xcel - HKS Utility Services - Central Park Blvd. and E. 40th Ave | UTIL | — | No report yet | |
| 2026-UTIL-0000148 Xcel - HKS Utility Services - 1674 Albion St | UTIL | — | No report yet | |
| All documents in this project (4) | ||||
| 2026-UTIL-0000146 CenturyLink - Pauley Construction - 212480 E 48th Ave | UTIL | — | No report yet | |
| All documents in this project (5) | ||||
| 2026-UTIL-0000134 Denver Water - Denver Water - W 50th Ave and W Dixie Pl | UTIL | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-UTIL-0000130 Hyperfiber - ITG - Orleans St and E 55th Ave | UTIL | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-UTIL-0000129 Hyperfiber - ITG - Malaya St And E 55th Pl | UTIL | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-UTIL-0000125 Xcel - HKS Utility Services, LLC - Leetsdale Dr and Dahlia St Denver, CO | UTIL | — | No report yet | |
| 2026-UTIL-0000104 Denver Water - PT 23308 - Santa Fe Streetscape Improvement | UTIL | — | No report yet | |
| All documents in this project (4) | ||||
| 2026-UTIL-0000061 HyperFiber - ITG - DUNKIRK ST AND E 59TH AVE | UTIL | — | No report yet | |
| All documents in this project (5) | ||||
| 2026-RELINQ-0000014 Broadway Station Soccer Stadium 708 S. Delaware St | RELINQ | — | No report yet | |
| 2026-RELINQ-0000013 Broadway Station Soccer Stadium I25 and W. Kentucky Ave | RELINQ | — | No report yet | |
| 2026-RELINQ-0000012 Broadway Station Soccer Stadium 809 S Delaware Way Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (2) | ||||
| 2026-RELINQ-0000008 Storm Sewer Elmendorf and Telluride Entirety Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (4) | ||||
| 2026-RELINQ-0000007 PNEE WW Elmendorf Dr and Telluride St Partial Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-RELINQ-0000006 3800 Blake St Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (7) | ||||
| 2026-RELINQ-0000001 3875 Walnut St Relinquishment | RELINQ | — | No report yet | |
| 2026-ENCROACHMENT-0000134 Tier II 1437 Bannock St City and County Building Landscaping | ENCROACHMENT | — | No report yet | |
| 2026-ENCROACHMENT-0000125 Tier II - 44th Ave and Broadway - Mural Project | ENCROACHMENT | — | No report yet | |
| All documents in this project (8) 100_ Design Plans (44th and Broadway).pdf 44th and Broadway Site Plan.pdf doti.pt.2026.105-encroachment-application_ff.pdf Encroachment_Application_44th_Broadway.pdf encroachment-permit-submittal-checklist.pdf Mural Rendering - Wall 1, 2, 3.pdf Mural Rendering - Wall 5, 11, 12.pdf Mural Rendering - Wall 7, 12.pdf | ||||
| 2026-ENCROACHMENT-0000118 Tier II - 500 16th St Mall - Skynet Art Series | ENCROACHMENT | — | No report yet | |
| All documents in this project (11) 2026 Glenarm Plaza Special Event Agreement Skynets.pdf 260608 Glenarm Structural PC00.pdf 260608 Skynet - Glenarm Final Engineering Report.pdf CCD Special Event Permit Application Glenarm.pdf DDS SKY GLENARM artwork overlay 260602.pdf DDS SKY GLENARM breakaway and quick release detail 260601.pdf DDS SKY Glenarm Elevation 260601.pdf DOTI Encroachment Application Glenarm.pdf Glenarm Skynets - Community Notification.pdf Skynet Example.png SkyNet Glenarm Art Installation - Observation Letter.pdf | ||||
| 2026-ENCROACHMENT-0000105 Tier II 1645 E Evans Ave Monitoring Well | ENCROACHMENT | — | No report yet | |
| 2026-ENCROACHMENT-0000100 Tier III 2400 S Monroe St. Fence | ENCROACHMENT | — | No report yet | |
| All documents in this project (8) 2400 S Monroe Fencing Site Plan REV3 Trans 05.26.26 dig sign.pdf 2400 S Monroe St. ILC 2-4-26.pdf encroachment application 2400 S Monroe St 5-20-26- signed.pdf Encroachment Checklist 2400 S Monroe St. 5-22-26.pdf Land Description 2400 S Monroe 5-22-26.docx Proof of Ownership Recorded Warranty Deed 2400 S Monroe St 5-20-26.PDF SGA Response to Denver Transportation Review 2400 S Monroe St 05.26.26 dig sign.pdf Tier determination checklist 2400 S Monroe St 5-20-26.pdf | ||||
| 2026-ENCROACHMENT-0000098 2nd - 1550 Wewatta St Bike Hub | ENCROACHMENT | — | No report yet | |
| All documents in this project (10) 2026-ENCROACHMENT-0000098 Resolution Fee Invoice.pdf 2nd Sub - 20260609_Architecture Bike Building Encroachment.pdf 2nd Sub - 20260609_Bike Building Exhibit.pdf 2nd Sub - 20260610_Bike Building Plaza ROW Encroachment_signed.pdf 2nd Sub - 20260610_Electrical.pdf 2nd Sub - 20260610_Structural Construction Set.pdf 2nd Sub - 2026-PROJMSTR-0000171_arch response.pdf 2nd Sub - Arch plans_1550 Wewatta St_5-28-2026_Arch Response 1.pdf 2nd Sub - RC_GFRC_product info sheet.pdf REDLINES- CenturyLink- Letter of No Objection.pdf | ||||
| 2026-ENCROACHMENT-0000087 Tier II - 1633 S Alcott St Retaining Wall | ENCROACHMENT | — | No report yet | |
| All documents in this project (12) CeuryLink Letter of No Objection P870523.pdf Encroachment Tier Determination Application.pdf Encroachment tier determination site plan.pdf Example Plans.jpg Property Photo - Post Retaining Wall.jpg Property Photo Pre-Retaining Wall.JPG REDLINES- Survey- Pfohl.pdf Retaining Wall - Distance from flowline-curb to wall 2.jpg Retaining Wall - Distance from flowline-curb to wall.jpg Retaining Wall Photo.jpg Retaining Wall Section Detail.pdf Tier Determination Submittal Checklist.pdf | ||||
| 2026-ENCROACHMENT-0000045 Tier II - Urban Forest Initiative - 1900 Block Chestnut Pl Tree Beds | ENCROACHMENT | — | No report yet | |
| All documents in this project (6) | ||||
| 2026-ENCROACHMENT-0000040 Tier III - 1380 16th St - Patio - Benihana Express | ENCROACHMENT | — | No report yet | |
| 2026-ENCROACHMENT-0000037 Tier II - 201 and 203 Garfield St Steps and Walkways | ENCROACHMENT | — | No report yet | |
| All documents in this project (9) 201 and 203 Garfield Application.pdf Benefitting Property Parcel Land Description.docx encroachment-permit-submittal-checklist.pdf REDLINES - CenturyLink - Letter of No Objection P869803.pdf ROW Encroachment Plans - 201 and 203 Garfield - 2026-04-09.pdf Site Image 1.jpg Site Image 2.jpg Title for 201 Garfield.pdf Title for 203 Garfield.pdf | ||||
| 2026-ENCROACHMENT-0000032 4975 W 44th Avenue - Yates Theater Awning | ENCROACHMENT | — | No report yet | |
| All documents in this project (7) EncroachAppl_4979 W 44th_2026.03.23.pdf EncroachDWG_4979 W 44th_2026.03.23.pdf EncroachmentChecklist_4979_2026.03.23.pdf LandDescription_4979 W. 44th_2026.03.24 1.docx REDLINES- CenturyLink- Medrano- Letter of No Objection.pdf REDLINES- Survey- Castaneda.docx WarrantyDeed_4949 W. 44th_2026.03.23.pdf | ||||
| 2026-ENCROACHMENT-0000013 Tier III 1520 Trenton St Fence | ENCROACHMENT | — | No report yet | |
| All documents in this project (8) | ||||
| 2026-CIP-0000090 Bear Creek Ped Bridge - Submittal 1 | CIP | — | No report yet | |
| All documents in this project (2) | ||||
| 2026-CIP-0000089 Xcel Energy - Leetsdale to Elati Substations - underground transmission line relocation | CIP | — | No report yet | |
| All documents in this project (4) Att. 0 - Xcel Energy_5283 Phase 2_Sgmt 1_ 60% Engineering_Cover Memo_2026-06-15.pdf Att. 1 - 5283 ELAT-MONR 230 kV UG Rplc Phase 2 - Section 1 - Drawing Package.pdf Att. 2 - 2025-CIP-0000010 Comment Report 02-05-2025_Comment Response - Section 1, 2, 3 & 4 (1).xls Att. 3 - 5283 PHASE 2 PORTION 1 SURVEY CONTROL PLAN.pdf | ||||
| 2026-CIP-0000088 Santa Fe Streetscape 100pcnt | CIP | — | No report yet | |
| All documents in this project (3) | ||||
| 2026-CIP-0000087 Rapid Diverter Deployment - Permanent | CIP | — | No report yet | |
| 2026-CIP-0000086 17th and 18th Ave Bus Priority | CIP | — | No report yet | |
| All documents in this project (9) 17th and 18th Specs 2026-06-09.pdf 17th_18th_Recommendations Report_March 2025R1.pdf 17th-18th 100pcnt - CRF.pdf 2026-06-09 17th and 18th Avenue Estimate.pdf 2026-06-09 17th and 18th Avenue Plans.pdf 2026-06-09 17th and 18th Avenue Turning Movement (1).pdf Appendix A. 17th_18th and Pearl Alternatives.pdf Appendix B. 18th Avenue Chicanes.pdf Appendix C. Uptown Care Center Alternatives.pdf | ||||
| 2026-CIP-0000085 Denver Resilient Landscape DRL - Rules and Regulations | CIP | — | No report yet | |
| All documents in this project (1) | ||||
| 2026-CIP-0000083 GES Safer Streets - Non-Federal 90pct Package | CIP | — | No report yet | |
| 2026-CIP-0000071 Montbello Channel Improvements - Phase 3 | CIP | — | No report yet | |
| All documents in this project (24) 00_GENERAL SHEETS 1-8.pdf 01_SURVEY SHEETS 9-12.pdf 02_LIMITS OF CONSTRUCTION SHEETS 17-19.pdf 03_STORMWATER MANAGEMENT SHEETS 20-34.pdf 04_EXISTING CONDITIONS SHEETS 35-37.pdf 05_DEMOLITION AND REMOVALS SHEETS 38-40.pdf 06_CIVIL SHEETS 41-43.pdf 07_TRAFFIC CONTROL SHEETS 44-48.pdf 08_DRAINAGEWAY IMPROVEMENTS SHEETS 49-57.pdf 09_ENGINEERING GEOLOGY SHEETS 58-60.pdf 10_BOX CULVERT IMPROVEMENT SHEETS 61-72.pdf 11_WALL IMPROVEMENT SHEETS 73-78.pdf 12_STORM SEWER IMPROVEMENT SHEETS 79-86.pdf 13_ROADWAY IMPROVEMENT SHEETS 87-130.pdf 14_LANDSCAPE SHEETS 131-142.pdf REDLINES - -DPR Cmnts_Montbello Channel Improvements P3 60PRCNT.pdf REDLINES - DS Transportation - CMueller - 2026 06 26 cm transportation redlines CIVIL SHEETS.pdf REDLINES - DS Wasterwater- DHarris CIP WW Standard Notes (1).pdf REDLINES - TME _ATheinpont Pages from 13_ROADWAY IMPROVEMENT SHEETS 87-130_AT Comments.pdf REDLINES - WWConstruction-MGehrke - Attachment 3 12_STORM SEWER IMPROVEMENT SHEETS 79-86 mwg.pdf REDLINES - WWConstruction-MGehrke - Attachment 1 GENERAL SHEETS.pdf REDLINES - WWConstruction-MGehrke - Attachment 2 - 05_DEMOLITION AND REMOVALS SHEETS 38-40 mwg.pdf REDLINES - WWConstruction-MGehrke - Attachment 4 - 13_ROADWAY IMPROVEMENT SHEETS 87-130 mwg.pdf REDLINES- Survey- Lee.pdf | ||||
| 2026-CIP-0000060 CDOT Sheridan Blvd 17th Ave to 26th Ave - FOR 100PCNT REVIEW | CIP | — | No report yet | |
| All documents in this project (13) 2026-CIP-0000060 - DPR Comments - JCevera - 25506-Sheridan-Design-FOR-COMBINED.pdf 25506 SH-95 - 100PCNT FOR Drainage Report.pdf 25506 SH-95 Edgewater Conditional Use Floodplain Permit.pdf 25506 Sheridan Blvd ISA Rev1 01092025.pdf 25506ROW AuthPkg REVISION.pdf 25506-Sheridan CDOT Form 463.pdf 25506-Sheridan-Design-FOR 2-SPECS.pdf 25506-Sheridan-Design-FOR-COMBINED.pdf REDLINES - TME - EStein2026-5-29_25506-Sheridan-Design-FOR-COMBINED_EES.docx REDLINES - TME - EStein2026-5-29_25506-Sheridan-Design-FOR-COMBINED_EES.pdf REDLINES - WWConstruction - MGehrke - 25506-Sheridan-Design-FOR-COMBINED-mwg 6-8-26.pdf REDLINES- Survey- Savich.docx Sheridan Dewatering Memo 20251017.pdf | ||||
| 2026-CIP-0000024 Morrison Road Project | CIP | — | No report yet | |
| All documents in this project (13) 2025-12-01 Morrison Road 60pct NORTH Comment Response.pdf 2026-03-20 Morrison Rd 90pct NORTH Drainage Report.pdf 2026-03-20 Morrison Rd NORTH 90pct Plans SUBMITTED.pdf 2026-03-20 Morrison Rd NORTH 90pct Specs.pdf 2026-03-20 SAQ 90pct North-Plazas.pdf 2026-03-20 SAQ 90pct North.pdf 4070MORR - Utility Report 2025 DRAFT.pdf 4070MORR SUE Plan PH2-3 - 2023 STAMPED.pdf ER Review Request Memo 20260326.docx REDLINES - GInfrastructure - CBell - 2026-03-20 Morrison Rd 90pct NORTH Drainage Report.pdf-26-04-08-16-51.pdf REDLINES - Materials - KBlai - dotipt-116.1_traffic_control_procedures (1).pdf REDLINES - Materials - KBlair dotirr-022.3_issuance_of_permits_by_the_city_traffic_engineer (1).pdf REDLINES - WWConstruction - MGehrke - 2026-03-20 Morrison Rd NORTH 90pct Plans SUBMITTED-mwg_Optimized.pdf | ||||
| 2025-VACA-0000014 2535 W 35th Ave Vacation | VACA | — | No report yet | |
| 2025-VACA-0000013 510 E 51st Avenue Vacation | VACA | — | No report yet | |
| 2025-VACA-0000011 2860 N Speer Blvd | VACA | — | No report yet | |
| All documents in this project (6) | ||||
| 2025-VACA-0000010 Ball Arena Redevelopment 1000 Chopper Cir | VACA | — | No report yet | |
| All documents in this project (11) Application and Checklist - Updated and Signed.pdf Area 2 Site Plan.pdf Kroenke Arena Company - Title Commtment 70861584 - Revision_4.pdf Kroenke Parking CURRENT TITLE Commitment_revision_3.pdf KSE Ball Arena_Site Investigation Work Plan_12-1-2023.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Survey- Breitnauer.doc ROW Vacation 2 2025-09-04_Legal and Exhibit.pdf ROW Vacation 2 Parcel 2 - APPROVED.pdf Title Commitment -LTGC 1450 5th Street 74179.1.pdf Title Commitment- LTGC Arena and Surrounding Parcels 74180.1.pdf | ||||
| 2025-VACA-0000008 3800 W Colfax Ave Alley Vacation | VACA | — | No report yet | |
| All documents in this project (7) 12 Alley Vacation Lot 45 Block 7 Colfax Ave Sub. 1464 Sq Ft.pdf 1473 Newton Street Agreement - Signed and Notarized.pdf 1473 Newton Street Alley Vacation - Signed and Notarized.pdf 3800 W. Colfax_2024PM0000409 - Alley ROW Vacation Site Plan.pdf 3800 W. Colfax_2024PM0000409 - ROW Vacation App.pdf Osceola Easement - all signed.pdf REDLINES- CenturyLink- Hoopes.pdf | ||||
| 2025-VACA-0000003 Broadway Station Soccer Stadium | VACA | — | No report yet | |
| All documents in this project (5) | ||||
| 2025-VACA-0000001 910 Galapago St Alley Vacation | VACA | — | No report yet | |
| 2025-RELINQ-0000019 Cherry Lane Sidewalk Easement Along 1st Avenue | RELINQ | — | No report yet | |
| All documents in this project (6) | ||||
| 2025-RELINQ-0000014 Morning Star Observatory Park 2100 S Josephine St | RELINQ | — | No report yet | |
| All documents in this project (5) | ||||
| 2025-RELINQ-0000013 Westside Clinic 1100 Federal Blvd Relinquishment | RELINQ | — | No report yet | |
| 2025-RELINQ-0000012 Broadway Station Soccer Stadium S Cherokee and W Ohio | RELINQ | — | No report yet | |
| All documents in this project (4) | ||||
| 2025-RELINQ-0000008 26th and Larimer Block A Relinquishment | RELINQ | — | No report yet | |
| 2025-RELINQ-0000007 Colfax and Elm 4905 E Colfax Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (5) | ||||
| 2025-RELINQ-0000002 Denver Rock Drill Garage 3955 High Street | RELINQ | — | No report yet | |
| All documents in this project (2) | ||||
| 2025-RELINQ-0000001 Stok 2833 Welton Street Relinquishment | RELINQ | — | No report yet | |
| 2025-ENCROACHMENT-0000155 Tier II - 3015 E Colfax Ave - Monument Sign | ENCROACHMENT | — | No report yet | |
| All documents in this project (4) | ||||
| 2025-ENCROACHMENT-0000147 ATT SL CoLocate Group 1 | ENCROACHMENT | — | No report yet | |
| All documents in this project (9) ATT SL 2025 GROUP 1 SONO Address Card.pdf ATT SL 2025 GROUP 1 SONO Application Form_R01.pdf ATT SL 2025 GROUP 1 SONO Construction Plans.pdf ATT SL 2025 GROUP 1 SONO Master Tracker.xlsx ATT SL 2025 GROUP 1 SONO RF Certification Reports 40 Micro.pdf ATT SL 2025 GROUP 1 SONO SS Structural Analysis.pdf ATT SL 2025 GROUP 1 SONO Statement of Maintenance.pdf REDLINES - ER WASTEWATER - SASARAK.pdf REDLINES- Survey- Castaneda.doc | ||||
| 2025-ENCROACHMENT-0000147 2nd Submittal ATT SL CoLocate Group 1 | ENCROACHMENT | — | No report yet | |
| All documents in this project (12) ATT SMARTLINK 2025 GROUP 1 CITY BARK Address Card.pdf ATT SMARTLINK 2025 GROUP 1 CITY BARK Application.pdf ATT SMARTLINK 2025 Group 1 CITY BARK CCD No Objection RF Letter.docx ATT SMARTLINK 2025 GROUP 1 CITY BARK Construction Plans.pdf ATT SMARTLINK 2025 GROUP 1 CITY BARK Master Tracker.xlsx ATT SMARTLINK 2025 Group 1 CITY BARK Pole Location Description.docx ATT SMARTLINK 2025 GROUP 1 CITY BARK Signed Checklist.pdf ATT SMARTLINK 2025 GROUP 1 CITY BARK SS Structural Analysis.pdf ATT SMARTLINK 2025 GROUP 1 CITY BARK Statement of Maintenance.pdf REDLINES - ER WASTEWATER - SASARAK.pdf REDLINES- CenturyLink- Letter of No Objection.pdf REDLINES- Survey- Castaneda.doc | ||||
| 2025-ENCROACHMENT-0000127 Tier III - 1640 N Logan - Planter Boxes | ENCROACHMENT | — | No report yet | |
| All documents in this project (20) 1638 and 1640 Deed of Trust.pdf 2025 09 05 STATUS OF ENCROACHMENT.pdf 2025-09-29 - Encroachment Submittal Checklist.pdf 2025-09-29 - Encrochment Applicaiton (Tier III).pdf dotipt-105-encroachment_application (Tier III Applicaiton) (1).pdf IMG_9398.jpeg IMG_9399.jpeg IMG_9400.jpeg IMG_9401.jpeg IMG_9402.jpeg IMG_9403.jpeg IMG_9404.jpeg Quick Claim Deed.pdf REDLINES- CenturyLink- Medrano- Letter of No Objection.pdf REDLINES- ER Transportation- Kijowski 2-4-2026.pdf REDLINES- ER Transportation- Kijowski- Tier III Applicaiton.pdf REDLINES- ER Transportation- Kijowski.pdf Site Plan.pdf Site Plan.xlsx Updated Site Plans 11-17-2025.pdf | ||||
| 2025-ENCROACHMENT-0000110 Tier II - 621 Kalamath St Lighting Under Viaduct | ENCROACHMENT | — | No report yet | |
| All documents in this project (14) 2025_5_12_Encroachment Application.pdf 621 Kalamath St Denver CO 80204 - Owners, Taxes, Deeds, Records, Permits.pdf 621 LLC dotipt-105-encroachment_application.pdf 621 LLC_621 Kalamath St Property Record.pdf ACORD Form 20231212-164148.pdf Battery 621 Certificate of Insurance.pdf Battery 621 Deed 2746289-57674-2010.pdf Battery621 LED Viaduct Parking Lighting Encroachment Application.pdf Battery621 LED Viaduct Parking Lighting Encroachment Eng Drawing.pdf DOTI Bridge Letter to The Public Works.pdf Invoice 2024-PARK-000003.pdf PDFsam_merge.pdf REDLINES- CenturyLink- Medrano- Letter of No Objection.pdf REDLINES Survey ENCROACHReqmts 2025ENCROACHMENT110.docx | ||||
| 2025-ENCROACHMENT-0000088 Tier III 3801 W 32nd Ave Raised Deck and Pergola | ENCROACHMENT | — | No report yet | |
| All documents in this project (16) 25-ENCR-88_REDLINES- SURVEY- Gulaid - 11-03-2025.pdf 25-ENCR-88_REDLINES- SURVEY- Gulaid - 7-30-2025.pdf 98e80b1e-05c0-4756-9c65-d8879eef89c61.jpg ArchPlans_3801 32ND AVE_06102025s.pdf CivilPlans_3801 32ND AVE_06102025s.pdf CO Denver Print Page.pdf Copy of 2007 survey.pdf Image 1.png Image 2.png Image 3.png Image 4.png REDLINES- ER Transportation- Kijowski- Approved.pdf REDLINES- SURVEY- Gulaid - 11-04 Denial.pdf StrucPlans_3801 32ND AVE_06102025s.pdf Tier 3 encroachment submittal application.pdf Written Narrative_3801 W 32nd Ave.docx | ||||
| 2025-ENCROACHMENT-0000061 Tier III - Colorado 150 Pedestrian Walkway | ENCROACHMENT | — | No report yet | |
| All documents in this project (14) 1884 Capitol Grounds Plat Description.pdf App Reason_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdf App_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdf Checklist_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdf Elevations Architectural_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdf Elevations Structural_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdf Prop Desc_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.docx REDLINES - Forestry - Evers.pdf REDLINES - Lumen - Bolden - Exhibit A.pdf REDLINES - Lumen - Bolden - P866360 Encroachment Response - No Objections.pdf REDLINES - Survey - Breitnauer.docx SHPO Assessment_ID86303 6-9-25 Colorado 150 Walkway.pdf Site Plan_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdf Tree Protection Details_Encroachment_CO 150 Pedestrian Walkway_2025.05.28.pdf | ||||
| 2025-ENCROACHMENT-0000044 Tier III - 395 N Clermont Street - Existing Fence | ENCROACHMENT | — | No report yet | |
| All documents in this project (8) 395 N CLERMONT - dotipt-105.3.2-encroachment_checklist SIGNED.pdf 395_CLERMONT_ST - A0.1 SITE PLAN 4-11-25-DSIGN.pdf 395-N-CLERMONT-N-SIDE-FENCE-PIC.jpg DADIOMOV A0.1 2-20-25.pdf ENCROACHMENT_APPLICATION_395_N_CLERMONT_ST_4-11-25_dotipt-105-encroachment...cation_SIGNED.pdf IMG_7517.jpg IMG_7836.jpg ISP_SURVEY_395_Clermont_St_Pkwy_12-6-24.pdf | ||||
| 2025-ENCROACHMENT-0000042 2ND SUBMITTAL - Tier III - Ball Arena Pedestrian Bridge | ENCROACHMENT | — | No report yet | |
| All documents in this project (20) 1507 11th St_Adjacent Property Land Description.docx 2025-ENCROACHMENT-0000042 REDLINES - DPR - Cervera_Comment Response.pdf 2025-ENCROACHMENT-0000042 REDLINES - Floodplain - Boles.pdf_Comment Response.pdf 2025-ENCROACHMENT-0000042 REDLINES - Survey-Savich_Comment Response.pdf 2025-ENCROACHMENT-0000042 REDLINES - WW Construction - Gehrke_Comment Response.pdf 2025-ENCROACHMENT-0000042_Ball Area Bridge Encroachment Legal Description.docx Ball Arena - Title Commitment - Kroenke Parking (70860861) - REV 8 - Dtd 02.17.26, Eff 02.11.26.pdf Cherry Creek Trail Detour Plans.pdf REDLINES - DPR - JCervera - RE_ Wynkoop Crossing Tier III Encroachment - DPR Denial.pdf REDLINES- Bridges- Bergman- Tier III Inspection Requirements.docx REDLINES- Bridges- Bergman.docx REDLINES ER TRANS BACA 2025-ENCROACHMENT-0000042.pdf REDLINES Floodplain_Boles - 2025-ENCROACHMENT-0000042_Floodplain-comments_2026-06-09_drb.pdf REDLINES Gehrke WW Const Wynkoop Crossing Tier III Encroachment_2025-ENCROACHMENT-0000042_2nd Submittal-mwg.pdf REDLINES- Survey- Savich.pdf Wynkoop Crossing Tier III Encroachment Application_2025-ENCROACHMENT-0000042_2nd Submittal.pdf Wynkoop Crossing Tier III Encroachment Checklist_2025-ENCROACHMENT-0000042_2nd Submittal.pdf Wynkoop Crossing Tier III Encroachment_2025-ENCROACHMENT-0000042_1st Submittal Comment Response Letter.docx Wynkoop Crossing Tier III Encroachment_2025-ENCROACHMENT-0000042_1st Submittal Comment Response Letter.pdf Wynkoop Crossing Tier III Encroachment_2025-ENCROACHMENT-0000042_2nd Submittal.pdf | ||||
| 2025-ENCROACHMENT-0000042 Tier III - Ball Arena Pedestrian Bridge | ENCROACHMENT | — | No report yet | |
| All documents in this project (16) 2025.04.28 Wynkoop Crossing - Conceptual Design Summary.pdf Ball Area Bridge Encroachment 1 2025-03-21.docx Ball Area Bridge Encroachment 2 2025-03-21.docx Ball Arena - Title Commitment - Kroenke Parking Parcels 70860861.pdf Ball Arena Adjacent Property Land Description.docx REDLINE - Floodplain - Boles.pdf REDLINES - Denver Land Preservation - Bryant.docx REDLINES - DPR - Cervera.pdf REDLINES - Wastewater - Marron.pdf REDLINES - WW Construction - Gehrke.pdf REDLINES- Bridges- Bergman- Tier III Inspection Requirements.docx REDLINES- Bridges- Bergman.docx REDLINES- Survey- Savich.pdf Wynkoop Crossing Tier III Encroachment Application.pdf Wynkoop Crossing Tier III Encroachment Checklist.pdf Wynkoop Crossing Tier III Encroachment_1st Submittal.pdf | ||||
| 2025-ENCROACHMENT-0000034 Tier II - 250 Clayton Street Soil Cells | ENCROACHMENT | — | No report yet | |
| All documents in this project (14) 2022PM0000693_250 Clayton TIER II ENCROACHMENT APPLICATION_signed.pdf 2022PM0000693_250 Clayton TIER II ENCROACHMENT CLOSURE REPORT.pdf 2022PM0000693_250 Clayton TIER II ENCROACHMENT DETAILS.pdf 2022PM0000693_250 Clayton TIER II ENCROACHMENT Legal Description.pdf 2022PM0000693_250 Clayton TIER II ENCROACHMENT LEGL_ENCR.docx 2022PM0000693_250 Clayton TIER II ENCROACHMENT SITE PLAN.pdf 2022PM0000693_250 Clayton TIER II ENCROACHMENT ZONE LOT.docx 2022-PM0000693_252-CLayton_Title-Commitment.pdf Citygreen_Stratavault_Structural Soil_Cell_Details.pdf citygreen_Stratavault-Brochure_US_Jul2024-WEB-Letter.pdf Citygreen-Stratavault-TechSheet-July-2024.pdf REDLINES - Survey - Breitnauer - 20250409-25ENCROCH034-Site Plan.pdf REDLINES - Survey - Breitnauer - 20250409-25ENCROCH034-Survey Reqmts.docx REDLINES- CenturyLink- Canary.pdf | ||||
| 2025-ENCROACHMENT-0000031 Tier III 3901 Wynkoop St Ramp and Stairs | ENCROACHMENT | — | No report yet | |
| All documents in this project (9) 2025-03-18 Wynkoop Street Tier III Encroachment Exhibit.pdf 3901 Wynkoop - Adjacent Parcel Land Description.docx 3901 Wynkoop - dotipt-105.3.2-encroachment_checklist (CP Signed).pdf 3901 Wynkoop - dotipt-105-encroachment_application - Tier III vFinal (CP Signed).pdf 77237-ENCROACHMENT-EXHIBIT-3-17.pdf REDLINES - Survey - Castaneda Exibit A.pdf REDLINES - Survey - Castaneda.docx The Forge-CO Linked Commitment.pdf WYNKOOP-FORGE-ENCROACHMENT-DESCRIPTION.docx | ||||
| 2025-ENCROACHMENT-0000008 Tier III - 3720 Delgany St Retaining Wall | ENCROACHMENT | — | No report yet | |
| All documents in this project (9) | ||||
| 2025-CIP-0000196 Evergreen Golf Course - Cart Path Replacement | CIP | — | No report yet | |
| All documents in this project (1) | ||||
| 2025-CIP-0000182 Tower Road Sanitary Interceptor Phase 1 | CIP | — | No report yet | |
| All documents in this project (11) 2025-0919 - Tower Road Interceptor PH1 Design Report 100pct FULL.pdf 2025-0922 - Tower Road Interceptor - Project Special Provisions.pdf 2025-0922 - Tower Road Interceptor PH1 CDs 100pct.pdf REDLINES- Mueller- 56-65.png REDLINES- Mueller- 56th and Tower PMs repaired.pdf REDLINES- Mueller- 65-68.png REDLINES- Mueller- Gateway.pdf REDLINES- Mueller- High Point projects.pdf REDLINES- Mueller- Pena Station.pdf REDLINES- Mueller- Tower Road Interceptor PH1 Design Report.pdf Tower Road San 90prcnt Design MASTER COMMENT with RESPONSES.xlsx | ||||
| 2025-CIP-0000177 Bettie Cram Drive Bridge | CIP | — | No report yet | |
| All documents in this project (10) 2019-0805-NWC 3.13 BCD Bridge-Report-Geotechnical BCD Pavement.pdf 2020-0115-NWC 3.13 BCD Bridge-Report-Geotechnical BCD & 51st Bridges.pdf 2020-1218-NWC 3.13 BCD Bridge-Plan-NWC_3.07B_SSPR_Plans (SUE Plans).pdf 2024-0429-NWC 3.13 BCD Bridge-Report-Geotechnical 48th Ave over Levee Pavement Memo.pdf 2024-1014-South Platte River Hydrology and Hydraulics Report_CLOMR Support (signed).pdf 2025-0530-NWC 3.13 BCD Bridge-Memo_Drainage.pdf 2025-0919 NWC_BCD Bridge Hydraulic Summary Memo.pdf 2025-0919-NWC 3.13 BCD Bridge-Comment Response Matrix.xlsx 2025-0919-NWC 3.13 BCD Bridge-Plan-CD.pdf 2025-0919-NWC 3.13 BCD Bridge-Specs.pdf | ||||
| 2025-CIP-0000166 NTSPI Intersection Bundle 100PRNT | CIP | — | No report yet | |
| All documents in this project (15) 202500807_NTSPI Intersection Design_FINAL OPC.pdf 20250807_NTSPI Intersection Design_Final Plans.pdf 20250807_Turn Templates.pdf 20250808 NTSPI Intersection Design and Data Collection Technical Specifications Final.pdf DOTI NTSIP 90pct Comment-Resolution-Form.pdf REDLINES- Craig Long.pdf REDLINES- DPR- Cervera.pdf REDLINES- DPR- Kijowski- Approved.pdf REDLINES- ER Transportation- Kijowski.pdf REDLINES- Forestry- Huetig- Approved.pdf REDLINES- Forestry- Huetig.pdf REDLINES- PM- Canada- Intersection Design.pdf REDLINES- PM- Canada- Technical Specifications 25-09-23-12-36.pdf REDLINES- PM- Canada- Technical Specifications.pdf REDLINES- PM- Canada- Turn Templates.pdf | ||||
| 2025-CIP-0000141 2025 Green Infrastructure Improvements | CIP | — | No report yet | |
| All documents in this project (9) 2025 GI IMP_100pct PLANS.pdf 2025 GI IMP_SPECS.pdf 51st-Steele_Lowell-Evans_ERA COMMENT-RESPONSE.pdf REDLINES - Office of the City of Forestry.pdf REDLINES - Survey Red Lines 2025.08.13.pdf REDLINES - Transportation Mobility Engineering - 2025-08-5_2025 GI_IMP100PCT Plans_EES.pdf REDLINES - WW Construction Pages from 2025 GI IMP_100pct-Plans-mvg.pdf REDLINES- DPR Comments 2025 GI IMP_100pct PLANS.pdf REDLINES- Survey- Approved.pdf | ||||
| 2025-CIP-0000112 Buchtel Complete Streets and Evans Intersection Improvements Project 100pcnt Plans | CIP | — | No report yet | |
| All documents in this project (8) REDLINES - DPR - Cervera.pdf REDLINES - Forestry - Huetig.pdf REDLINES - Halpin - 25418_Buchtel_Project Specifications_100_DGI.pdf REDLINES - Halpin - Pages from 25418_Buchtel_Construction Plans_100_DGI_reduced.pdf REDLINES - TME - De Vos Tidd.pdf REDLINES - WW Construction - Gehrke.pdf REDLINES - WW-DES - Armfield.pdf REDLINES- Survey- Pfohl.pdf | ||||
| 2025-CIP-0000101 Passenger Amenity Program - Bus Stop Package 2 | CIP | — | No report yet | |
| All documents in this project (8) 2025.05.29_BSIP P2 SPECS - 100pcnt.pdf 22029_Bus Stops 100pcnt_2025-05-30.pdf REDLINES - Blair - TC fm 2025.05.29_BSIP P2 SPECS - 100pcnt.pdf REDLINES - Blair - dotipt-116.1_traffic_control_procedures.pdf REDLINES - Blair - dotirr-022.3_issuance_of_permits_by_the_city_traffic_engineer.pdf REDLINES - Forestry - Huetig.pdf REDLINES - WW - Klosowski.pdf REDLINES- Forestry- Huetig- Approved.pdf | ||||
| 2025-CIP-0000093 Mestizo-Curtis Park Pool renovation | CIP | — | No report yet | |
| All documents in this project (12) 015713_Erosion_and_Sedimentation_Control.docx 2025.05.12 MESTIZO - CIVIL 60_ CPEP DRAINAGE REPORT.pdf 2025.05.12 MESTIZO - CIVIL 60_ CPEP PLANS.pdf 2025.05.12 MESTIZO - LANDSCAPE 60_ CPEP PLANS.pdf 311100_Clearing_and_Grubbing.docx 312000_Earth_Moving.docx 312316_Excavating_and_Backfilling_of_Trenches.docx 321216_Asphalt_Pavement.docx 321313_Concrete_Walks_Curbs_and_Miscellaneous_Flatwork.docx 331100_Water_Utility_Distribution_Piping.docx 333100_Sanitary_Utility_Sewerage_Piping.docx 334400_Storm_Sewerage.docx | ||||
| 2025-CIP-0000046 Overland Park Golf Course - No.10 and No.16 Cart Path Replacement | CIP | — | No report yet | |
| 2025-CIP-0000004 Mill 20 Traffic Signal Upgrade - Monaco Pkwy | CIP | — | No report yet | |
| All documents in this project (15) 250106_2024-CIP-0000035 Comment Response_ACL.pdf 250106_Mill 20 Estimate_100pcnt.pdf 250106_Mill 20 Specs_100pcnt.pdf 250106_Mill 20_Drainage H and H Memo.pdf 250106_Mill 20_Floodplain No Rise Letter.pdf 250106_monaco-mill_20-100pcnt-plans.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- Craig Long.xlsx REDLINES- DPR- Cervera- Comment Resolution.pdf REDLINES- DPR- Cervera- Mill 20 spec.pdf REDLINES- DPR- Cervera- Plans.pdf REDLINES- DPR- Cervera.pdf REDLINES- Forestry- Huetig.pdf REDLINES- Trans Safety- De Vos Tidd.pdf REDLINES- WW Maintenance- Gehrke.pdf | ||||
| 2024-VACA-0000010 Sharp Lane North Telluride Way | VACA | — | No report yet | |
| 2024-VACA-0000009 2nd and Steele Alley Vacation | VACA | — | No report yet | |
| 2024-VACA-0000005 DFD1 745 W Colfax - 1150 Welton | VACA | — | No report yet | |
| 2024-VACA-0000002 Niagara St and Union Ave Intersection | VACA | — | No report yet | |
| 2024-RELINQ-0000018 3800 N Xanthia St Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (7) REDLINES- Survey- Svechovsky.pdf Xanthia_SSWR Esmt Relinq - Application_Signed.pdf Xanthia_SSWR Esmt Relinq - Checklist_Signed.pdf Xanthia_SSWR Esmt Relinq - Original Document.pdf Xanthia_SSWR Esmt Relinq - Sanitary Plat Map.pdf Xanthia_SSWR Esmt Relinq - Site Plan.pdf Xanthia_SSWR Esmt Relinq - Stapleton Filing No. 18 Sanitary Plans.pdf | ||||
| 2024-RELINQ-0000017 Westside Clinic 1100 Federal Blvd Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (8) DH-WSC - Easement Relinquishment Application.pdf DH-WSC - Easement Relinquishment Legal and Exhibit.docx DH-WSC - Easement Relinquishment Legal and Exhibit_signed.pdf DH-WSC - Easement Relinquishment Site Plan.pdf O-1941-0031.pdf REDLINES- CenturyLink- NDS Conflict- Canary.pdf REDLINES- Centurylink- No Objection Letter- Canary.pdf REDLINES- CenturyLink- Vacation Denial Letter- Canary.pdf | ||||
| 2024-RELINQ-0000015 4498 and 4496 N Rifle St Turnaround Easement Relinquishment | RELINQ | — | No report yet | |
| 2024-RELINQ-0000013 2777 Zuni St. Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (6) 2026-UTIL-0000139 - Final Approval Plan Set.pdf 2777 N. Zuni St. - ALTA Survey.pdf 2777 N. Zuni St. - Easement Document - Bk 2407 Pg 241.pdf 2777 N. Zuni St. - Previously Relinquished - Bk 2621 Pg 329.pdf 2777 N. Zuni St.- Easement Relinquishment Application_signed.pdf 2777 N. Zuni St.- Easement Relinquishment Exhibit.pdf | ||||
| 2024-RELINQ-0000012 SOL at Sun Valley 2622 W 11th Ave | RELINQ | — | No report yet | |
| All documents in this project (3) | ||||
| 2024-RELINQ-0000011 4602 S. Syracuse St Wastewater Easement | RELINQ | — | No report yet | |
| All documents in this project (5) | ||||
| 2024-RELINQ-0000010 123 Speer Alley Relinquishment | RELINQ | — | No report yet | |
| 2024-RELINQ-0000009 Evans and Bannock Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (3) | ||||
| 2024-RELINQ-0000006 4600 S Syracuse St Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (7) Miller - 4600 S. Syracuse Legal Description and Illustration - Zone Lot 1.pdf Miller Global - Application - Easement Relinquishment App.pdf Miller Global - Easement and Indemnity Agreement - Easement Relinquishment App.pdf Miller Global - Legal Description - 4600 S Syracuse - Commercial - Zone Lot 1 - 27735719.1.docx Miller Global - Legal Description - Easement Relinquishment App.pdf Miller Global - PNEE - Easement Relinquishment App.pdf Miller Global - Site Plan - Easement Relinquishment App.pdf | ||||
| 2024-RELINQ-0000005 4201 E Arkansas Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (8) 2023-SDPSUB-0000005_5thPlatDoc.pdf KS150_EasementRelinquish1_LegalWest.docx KS150_EasementRelinquish1_LegalWestCombined.pdf KS150_EasementRelinquish2_LegalEast.docx KS150_EasementRelinquish2_LegalEastCombined.pdf KS150_EasementRelinquishmentChecklistApplication.pdf Plat - Kibler Addition Updated.pdf REDLINES- Survey- Pfohl.pdf | ||||
| 2024-RELINQ-0000004 Relinquishment 4602 South Syracuse Street | RELINQ | — | No report yet | |
| All documents in this project (7) Application - Easement Relinquishment Application - Revised.pdf Easement and Indemnity Agreement - Easement Relinquishment Application - Revised.pdf Legal Description - 4602 S. Syracuse Zone Lot 2 - Easement Application - 26976953.1.docx Legal Description - Easement Relinquishment Application - Revised.pdf PNEE - Easement Relinquishment Application - Revised.pdf REDLINES- Survey- Pfohl.docx Site Plan - Easement Relinquishment Application - Revised.pdf | ||||
| 2024-RELINQ-0000003 SGI-USA Denver Buddhist Center - 1450 N. Speer Blvd | RELINQ | — | No report yet | |
| All documents in this project (6) 1. Easement Relinquishment Application_2021PM0000378 - Signed.pdf 2. Original Holding Document_2021PM0000378.pdf 3. Legal Description and Exhibit_2021PM0000378.pdf 3a. Legal Description in Word_2021PM0000378.docx 4. Site Plan_2021PM0000378.pdf REDLINES- Survey- Sperling- Legal Description and Exhibit.pdf | ||||
| 2024-ENCROACHMENT-0000158 Tier III 660 N Corona St Fence | ENCROACHMENT | — | No report yet | |
| All documents in this project (8) Comment Resolution Sheet_660 N Corona St_10-29-24.pdf Encroachment Application_660 N Corona St_10-29-24.pdf Encroachment Area Land Description_660 N Corona St_10-29-24.docx Encroachment Submittal Checklist_660 N Corona St_10-29-24.pdf Parcel Land Description_660 N Corona St_10-29-24.docx REDLINES- Survey- Breitnauer.docx Tier III Encroachment SitePlan.CrossSection.Photos_660 N Corona St_10-29-24.pdf Warranty Deed_660 N Corona St_10-29-24.pdf | ||||
| 2024-ENCROACHMENT-0000152 Tier II 2883 Welton St Ramp | ENCROACHMENT | — | No report yet | |
| All documents in this project (7) Address Assignment Card_2883 Welton St_.pdf Colorado SOS Document Service - trade name fliling.pdf Encroachment Permit Submittal Application_2883 Welton 1017OwnerSignature.pdf Encroachment Permit Submittal Checklist _101724 Owner Signature.pdf REDLINES- CenturyLink- Canary- Letter of No Objection.pdf ROW Set 2883 Welton St Cafe_Arch_CA_24_0805pdf-Signed82024.pdf Warranty Deed Document 2018088468.pdf | ||||
| 2024-ENCROACHMENT-0000120 Tier III 550 N Harrison St Fence | ENCROACHMENT | — | No report yet | |
| All documents in this project (8) Encroachment Permit Checklist-2024-07-03.pdf Harrison_St_Encroachment and Encumberance In Right Of Way.pdf HarrisonEncroachmentApplication_Signed_08.01.24.pdf KDB Red Lines Harrison_St_Encroachment.pdf Legal Exhibit-Encroachment area signed.pdf REDLINES - Survey - Breitnauer - 20240925 - ISP.pdf REDLINES - Survey - Breitnauer - 20240927 - Description.pdf Title Commitment for Harrison Street Development.pdf | ||||
| 2024-ENCROACHMENT-0000119 Tier III 3039 Walnut St Ramp and Stairs | ENCROACHMENT | — | No report yet | |
| All documents in this project (8) | ||||
| 2024-ENCROACHMENT-0000091 2ND SUB_Tier III 1550 Market St STK Patio | ENCROACHMENT | — | No report yet | |
| All documents in this project (16) 16M - Title Commitment 03.25.26.pdf 2026.01.16_1550_Market_Street_LandmarkApprovedApplication.pdf 2026.01.16_1550MarketStreet_AmendedCOA.pdf 2026.07.21_1550_Market_St_Approved_Application.pdf 2026.07.21_1550_Market_St_COA.pdf 2ND SUB - APPROVED PLANS-8.pdf 2ND SUB 260301-STK Denver Patio - ELEC.pdf 2ND SUB APPLICATION.pdf 2ND SUB CHECKLIST.pdf 2ND SUB JVA STK Denver Patio Awning Canopy STRUC.pdf 2ND SUB STK Denver Awning Support Frames - Calculations Updated 05142026.pdf 2ND SUB STK Market Street Denver CO V20 ARCH.pdf 2ND SUB STK Market Street Denver CO V20 PL Sheets.pdf Denver_ZONE1_CCDZoningPermit_v1_20260721_104202.pdf PARCEL DESCRIPTION 1550 market 5-17-24.docx STK Denver ESMT Legal description.pdf | ||||
| 2024-ENCROACHMENT-0000080 Tier III 2465 S. Downing Street Porter Ortho Specialty Center | ENCROACHMENT | — | No report yet | |
| All documents in this project (6) Checklist_2460 S Corona St_05-09-2024_Tier Request.pdf Exhibit_2460 S Corona St_05-09-2024_Tier Request.pdf PorterOrtho-dotipt-105-encroachment_application.pdf REDLINES- CenturyLink- Hackler- Letter Of No Objection.pdf REDLINES- Survey- Pfohl.pdf SitePlan_2490 S Corona St_03-27-2024_Zoning Permit Resubmit.pdf | ||||
| 2024-ENCROACHMENT-0000077 Tier II Washington St Improvement - Wayfinding Signs | ENCROACHMENT | — | No report yet | |
| 2024-ENCROACHMENT-0000071 2nd Tier III 1501 S Pearl St. - Ototo Patio | ENCROACHMENT | — | No report yet | |
| All documents in this project (1) | ||||
| 2024-ENCROACHMENT-0000069 Tier II 1010 Colfax Art District Sign | ENCROACHMENT | — | No report yet | |
| All documents in this project (11) 230472-04 - Opus Group - Kalaco - Denver Arts District Pylon.pdf ALTA Commit for Title Ins 7-1-21-CO.PDF dotipt-105-encroachment_application SIGNED.pdf Plans from 2019PM0000672 Colfax and Kalamath SDP 1_e.pdf Pylon dotipt-105.3.2-encroachment_checklist.pdf Pylon Permission.pdf REDLINES- Huetig- Forestry- Approved.pdf REDLINES- Huetig- Forestry.pdf REDLINES- Survey- Sperling.docx Special Warranty Deed 3.7.22.pdf Title Committment - 2.2.24_e.pdf | ||||
| 2024-ENCROACHMENT-0000067 Tier III 16th St Mall Design Build Reconstruction Project | ENCROACHMENT | — | No report yet | |
| All documents in this project (13) 16th St Mall dotipt-105.3.2-encroachment_checklist.pdf 16th St Mall dotipt-105-encroachment_application.pdf Exhibit 1 Trout and Pebbles.pdf Exhibit 2 Hexagon Shade Structures.pdf Exhibit 3 Hive Climber and Hexagon Platforms.pdf Exhibit 4 Block 4 Square Shade Structures.pdf Exhibit 5 Scattered Leaves.pdf Exhibit 6 Grasslands.pdf Exhibit 7 Block 12 Square Shade Structures.pdf Landscape Site Plans.pdf REDLINES- Parks- Cervera.pdf REDLINES- Survey- Savich- Approved.pdf REDLINES- Survey- Savich.docx | ||||
| 2024-ENCROACHMENT-0000035 Tier III 7993 E 36th Ave. Storm Sewer | ENCROACHMENT | — | No report yet | |
| 2024-ENCROACHMENT-0000011 Tier II 1140 N Bannock St Soil Cells | ENCROACHMENT | — | No report yet | |
| All documents in this project (12) 1100 Bannock - Special Warranty Deed.pdf 2024-01-30 ESW Soil Cell Encroachment Site Plan.pdf 25 - LANDSCAPE PLAN.pdf 34 - LANDSCAPE DETAILS.pdf Application Evans School West_DOTI Encroachment.pdf Checklist dotipt-105.3.2-encroachment.pdf ESMT_190212_ENCR_20240201.pdf GreenBlue Urban ArborSystem Tree Pit Package 600 24.pdf Legal Description_190212.docx LEGL_190212_ENCR.docx REDLINES- Survey- Pfohl.pdf Soil Cell Encroachment Letter 2024_01_30.pdf | ||||
| 2024-ENCROACHMENT-0000002 Tier III 1618 E 38th Ave Roof Overhang and Steps | ENCROACHMENT | — | No report yet | |
| 2024-CIP-0000102 Mill Levy 26 | CIP | — | No report yet | |
| All documents in this project (12) CIP_Review_May2022.pdf ML26 - Drainage Memo 100pct.pdf ML26 - Estimate 100pct.pdf ML26 - Plans 100pct.pdf ML26 - Specs 90pct Comments.pdf ML26 - SWMP Narrative.pdf ML26_Comment Resolution Matrix 90pct Comments.pdf REDLINES - Forestry - Evers.pdf REDLINES - Parks - Cervera.pdf REDLINES - Survey - Castaneda.docx REDLINES - Transportation Mobility Engineering - Stein.pdf REDLINES - WW Construction - Gehrke.pdf | ||||
| 2024-CIP-0000076 CD9 Sidewalk Package 8 Group B | CIP | — | No report yet | |
| All documents in this project (8) CIP_Review_May2022.pdf Denver Sidewalk Gap District 9 Package 8 Group B Final Plans.pdf Denver Sidewalk Gap District 9 Package 8 Group B Specs_REV041224.pdf REDLINES - Blair - 630 fm SW Gap D9 Pkg 8 Group B Specs_REV041224.pdf REDLINES - Blair - SW Gap D9 Pkg 8 Group B Final.pdf REDLINES - Transportation and Mobility - Stein.pdf REDLINES- ER Transportation- Kijowski- 100pct Plans.pdf REDLINES- ER Transportation- Kijowski- REV10312025.pdf | ||||
| 2024-CIP-0000021 HSIP 23 Peoria Improvements VisionZero | CIP | — | No report yet | |
| All documents in this project (9) 2024-01-19_24322_Peoria HSIP_ER CRF_100pcnt.pdf 2024-01-19_24322_Peoria HSIP_Estimate_100pcnt.pdf 2024-01-19_24322_Peoria HSIP_Plans_100pcnt.pdf 2024-01-19_24322_Peoria HSIP_Specifications_100pcnt.pdf 2026 06 16 CM Transportation Redlines 47th.pdf REDLINES- Construction Engineering- Blair- Specs.pdf REDLINES- Construction Engineering- Blair.pdf REDLINES- DS Transportation- Mueller.pdf REDLINES- Survey- Svechovsky.pdf | ||||
| 2023-VACA-0000010 Bonnie Brae Block 24 Alley | VACA | — | No report yet | |
| 2023-VACA-0000003 Broadway Station, S Cherokee St Rename | VACA | — | No report yet | |
| All documents in this project (2) | ||||
| 2023-VACA-0000002 2nd Submittal 29th and Speer | VACA | — | No report yet | |
| All documents in this project (6) 2023-VACA-0000002_29th and Speer_Response Letter.pdf 2nd Submittal 29th and Speer_Checklist and Application - Signed.pdf 2nd Submittal 29th and Speer_Concept Plan - Loading.pdf REDLINES- Baca- 20250490res.pdf REDLINES- Survey- Gulaid- LAND DESCRIPTION - 11-25.docx REDLINES- Survey- Gulaid- LAND DESCRIPTION.docx | ||||
| 2023-RELINQ-0000012 4050 N Brighton Blvd | RELINQ | — | No report yet | |
| All documents in this project (2) | ||||
| 2023-PROJMSTR-0000468 Santa Fe Streetscape Design | PROJMSTR | — | No report yet | |
| 2023-ENCROACHMENT-0000172 Tier II - 3615 Delgany - Pedestrian Lights | ENCROACHMENT | — | No report yet | |
| All documents in this project (8) 3615 Delgany - Tier II Encroachment - Application.pdf 3615 Delgany - Tier II Encroachment - Checklist.pdf 3615 Delgany - Tier II Encroachment - EG1 Fixture Specs.pdf 3615 Delgany - Tier II Encroachment - Encroachment Area Land Description.docx 3615 Delgany - Tier II Encroachment - Encroachment Area Site Plan -stamped.pdf 3615 Delgany - Tier II Encroachment - Parcel Land Description.docx 3615 Delgany - Tier II Encroachment - Survey Exhibit.pdf 3615 Delgany - Tier II Encroachment - Title.pdf | ||||
| 2023-ENCROACHMENT-0000159 Tier III - Regulator Station 54 - W 29th and Fox St | ENCROACHMENT | — | No report yet | |
| 2023-ENCROACHMENT-0000158 3rd - Tier III - 50 S Bellaire Retaining Wall | ENCROACHMENT | — | No report yet | |
| All documents in this project (20) 3rd Sub - ALTA Commitment_50 S Bellaire St_09-20-2024.pdf 3rd Sub - Architectural Site Plan_50 S Bellarie_09-20-2024.pdf 3rd Sub - Encroachment Application_50 S Bellaire_09-20-2024.pdf 3rd Sub - Encroachment Checklist_50 S Bellaire_09-20-2024.pdf 3rd Sub - Encroachment Land Description and Illustration_50 S Bellaire.pdf 3rd Sub - Encroachment Narrative_50 S Bellaire_09-20-2024.pdf 3rd Sub - ISP_5080 S Bellaire_11-02-2023.pdf 3rd Sub - Legal Description-Exhibit A_50 S Bellaire St_09-20-2024.docx APPROVAL- Survey- Pfohl.docx REDLINES- City Council- Sawyer- Approved.pdf REDLINES- ER Trans- Weller- Comments.pdf REDLINES- ER Trans- Weller- StrucRetWall.pdf REDLINES- ER Trans- Weller- Traffic Analysis Comments.pdf REDLINES- ER Trans- Weller- Traffic Engineering Memo report draft.pdf REDLINES- ER Trans- Weller.pdf REDLINES- ER Transportation- Weller- Architectural Site Plan.pdf REDLINES- ER Transportation- Weller- Comment Response Letter.pdf REDLINES- ER Transportation- Weller- Structural Detail.pdf REDLINES- Hilltop Neighborhood- Approved Plans.pdf REDLINES- Hilltop Neighborhood Letter.pdf | ||||
| 2023-ENCROACHMENT-0000158 Tier III - 50 S Bellaire - Retaining Wall | ENCROACHMENT | — | No report yet | |
| All documents in this project (14) Checklist_Signed_50 S Bellaire_09-06-2023.pdf Encroachment Application Complete Signed_50 S Bellaire_07-10-2023.pdf Encroachment Checklist_50 S Bellaire_08-29-2023.pdf Encroachment Narrative_50 S Bellaire_07-10-2023.pdf Image 1.jpeg Image 2.jpeg Image 3.jpeg Parcel Land Description_50 S Bellaire_09-06-2023.docx Quite Claim Deed Receipt Title Commitment_07-12-2023.pdf REDLINES- ER Transportation- Kijowski.pdf REDLINES- Hilltop Neighborhood Letter.pdf REDLINES- Survey- Pfohl.docx SITE PLAN_50 S BELLAIRE_09-06-2023.pdf SURVEY SIGNED_50 AND 80 S BELLAIRE_09-06-2023.pdf | ||||
| 2023-ENCROACHMENT-0000155 Tier II - CPV 17th St Gardens | ENCROACHMENT | — | No report yet | |
| All documents in this project (8) | ||||
| 2023-ENCROACHMENT-0000124 Tier II Crown Castle 2023 Group 15 | ENCROACHMENT | — | No report yet | |
| All documents in this project (11) Crown Castle 2023 Group 15 SUBMITTAL CHECKLIST.pdf Crown Castle 2023 Group 15 ADDRESS CARDS.pdf Crown Castle 2023 Group 15 APPLICATION FORM.pdf Crown Castle 2023 Group 15 CONSTRUCTION DRAWINGS.pdf Crown Castle 2023 Group 15 FOUNDATION CALCULATIONS.pdf Crown Castle 2023 Group 15 POLE DISCRIPTIONS.docx Crown Castle 2023 Group 15 RF REPORTS.pdf Crown Castle 2023 Group 15 SHOT CLOCK COVER LETTER.pdf Crown Castle 2023 Group 15 SMALL GROUP TRACKER.xlsx Crown Castle 2023 Group 15 STRUCTURAL CALCULATIONS.pdf REDLINES- Survey- Sperling.pdf | ||||
| 2023-ENCROACHMENT-0000120 Tier II Crown Castle 2023 Group 14 | ENCROACHMENT | — | No report yet | |
| All documents in this project (12) Crown Castle Fiber LLC - 2023 - Group 14 - ADDRESS CARD.pdf Crown Castle Fiber LLC - 2023 - Group 14 - APPLICATION FORM.pdf Crown Castle Fiber LLC - 2023 - Group 14 - CONSTRUCTION DRAWING.pdf Crown Castle Fiber LLC - 2023 - Group 14 - FOUNDATION CALCULATIONS.pdf Crown Castle Fiber LLC - 2023 - Group 14 - POLE DISCRIPTION.docx Crown Castle Fiber LLC - 2023 - Group 14 - RF REPORT.pdf Crown Castle Fiber LLC - 2023 - Group 14 - SHOT CLOCK COVER LETTER.pdf Crown Castle Fiber LLC - 2023 - Group 14 - SMALL GROUP TRACKER.xlsx Crown Castle Fiber LLC - 2023 - Group 14 - STRUCTURAL CALCULATIONS.pdf Crown Castle Fiber LLC - 2023 - Group 14 - SUBMITTAL CHECKLIST.pdf REDLINES - Survey - Svechovsky.pdf REDLINES ROWS Inspector Blair.pdf | ||||
| 2023-ENCROACHMENT-0000118 Tier II Crown Castle 2023 Group 13 | ENCROACHMENT | — | No report yet | |
| All documents in this project (10) Crown Castle Fiber LLC - 2023 - Group 13 - ADDRESS CARD.pdf Crown Castle Fiber LLC - 2023 - Group 13 - APPLICATION FORM.pdf Crown Castle Fiber LLC - 2023 - Group 13 - CONSTRUCTION DRAWING.pdf Crown Castle Fiber LLC - 2023 - Group 13 - FOUNDATION CALCULATIONS.pdf Crown Castle Fiber LLC - 2023 - Group 13 - POLE DISCRIPTION.docx Crown Castle Fiber LLC - 2023 - Group 13 - RF REPORT.pdf Crown Castle Fiber LLC - 2023 - Group 13 - SHOT CLOCK COVER LETTER.pdf Crown Castle Fiber LLC - 2023 - Group 13 - SMALL GROUP TRACKER.xlsx Crown Castle Fiber LLC - 2023 - Group 13 - STRUCTURAL CALCULATIONS.pdf Crown Castle Fiber LLC - 2023 - Group 13 - SUBMITTAL CHECKLIST.pdf | ||||
| 2023-ENCROACHMENT-0000117 Tier II Crown Castle FIber 2023 Group 11 | ENCROACHMENT | — | No report yet | |
| All documents in this project (10) Crown Castle Fiber LLC - 2023 - Group 11 - ADDRESS CARD.pdf Crown Castle Fiber LLC - 2023 - Group 11 - APPLICATION FORM.pdf Crown Castle Fiber LLC - 2023 - Group 11 - CONSTRUCTION DRAWINGS.pdf Crown Castle Fiber LLC - 2023 - Group 11 - FOUNDATION CALCULATIONS.pdf Crown Castle Fiber LLC - 2023 - Group 11 - POLE DISCRIPTION.docx Crown Castle Fiber LLC - 2023 - Group 11 - RF REPORT.pdf Crown Castle Fiber LLC - 2023 - Group 11 - SHOT CLOCK COVER LETTER.pdf Crown Castle Fiber LLC - 2023 - Group 11 - SMALL GROUP TRACKER.xlsx Crown Castle Fiber LLC - 2023 - Group 11 - STRUCTURAL CALCULATIONS.pdf Crown Castle Fiber LLC - 2023 - Group 11 - SUBMITTAL CHECKLIST.pdf | ||||
| 2023-ENCROACHMENT-0000116 Tier II Crown Castle Fiber 2023 Group 10 | ENCROACHMENT | — | No report yet | |
| All documents in this project (10) Crown Castle 2023 Group 10 ADDRESS CARD.pdf Crown Castle 2023 Group 10 APPLICATION FORM.pdf Crown Castle 2023 Group 10 CONSTRUCTION DRAWING.pdf Crown Castle 2023 Group 10 FOUNDATION CALCULATIONS.pdf Crown Castle 2023 Group 10 POLE DISCRIPTION.docx Crown Castle 2023 Group 10 RF REPORT.pdf Crown Castle 2023 Group 10 SHOT CLOCK COVER LETTER.pdf Crown Castle 2023 Group 10 SMALL GROUP TRACKER.xlsx Crown Castle 2023 Group 10 STRUCTURAL CALCULATIONS.pdf Crown Castle 2023 Group 10 SUBMITTAL CHECKLIST.pdf | ||||
| 2023-ENCROACHMENT-0000043 Tier III - 1000 N Broadway - Light Well | ENCROACHMENT | — | No report yet | |
| All documents in this project (10) Current Title Work-Warranty Deed.pdf Encroachment Application for Light Well.pdf Legal Description.docx Plans.pdf REDLINES- DS WW- Harris- Flo2D.pdf REDLINES- DS WW- Harris- Preliminary sump routing.pdf REDLINES- Survey- Sperling.docx Sportscastle_Light Well Encroachment-Arch Details.pdf StrucPlan_1000BroadwaySt_05-02-2023.pdf Submittal Checklist.pdf | ||||
| 2023-ENCROACHMENT-0000017 Tier II Crown Castle 2023 Group 6 | ENCROACHMENT | — | No report yet | |
| All documents in this project (10) Crown Castle Fiber LLC - 2023 - Group 6 - APPLICATION FORM.pdf Crown Castle Fiber LLC - 2023 - Group 6 - ADDRESS CARD.pdf Crown Castle Fiber LLC - 2023 - Group 6 - CONSTRUCTION DRAWING.pdf Crown Castle Fiber LLC - 2023 - Group 6 - FOUNDATION CALCULATIONS.pdf Crown Castle Fiber LLC - 2023 - Group 6 - POLE LOCATION DECSRIPTION.docx Crown Castle Fiber LLC - 2023 - Group 6 - RF REPORT.pdf Crown Castle Fiber LLC - 2023 - Group 6 - SMALL GROUP TRACKER.xlsx Crown Castle Fiber LLC - 2023 - Group 6 - STRUCTURAL CALCULATIONS.pdf Crown Castle Fiber LLC - 2023 - Group 6 - SUBMITTAL CHECKLIST.pdf Crown Castle Fiber LLC - 2023 - Group 6- SHOT CLOCK COVER LETTER.pdf | ||||
| 2023-ENCROACHMENT-0000015 2ND SUBMITTAL - Tier III - 3575 Chestnut Pl - Plaza | ENCROACHMENT | — | No report yet | |
| 2023-ENCROACHMENT-0000015 Tier III - 3575 Chestnut Pl - Plaza | ENCROACHMENT | — | No report yet | |
| All documents in this project (8) 23.0307 Tier III encroashment permit.pdf 3575 Chestnut Pl - 1st Submittal TEP - 2023-02-24.pdf 3575 Chestnut Pl - Coffee_C01 Site Plan and Details.pdf dotipt-105.3.2-encroachment_checklist.pdf Email with encroachment image.pdf REDLINES- Building- Peetz.pdf REDLINES- Survey- Castaneda- Denial- Exhibit.pdf REDLINES- Survey- Castaneda.docx | ||||
| 2022-VACA-0000015 2nd Submittal - 32nd and Tejon Assemblage 3222 Tejon St Vacation | VACA | — | No report yet | |
| All documents in this project (11) 1939 W. 32ND EGRESS DIAGRAM.pdf 2022-VACA-0000015 - 3222 Tejon St - Response Comments 1 - 12.09.2024.pdf 22VAC15-Survey-Redline- Gulaid.pdf Acceptance Letter - 1925 W 32nd Ave_secured.pdf Acceptance Letter - 3216 Tejon - 07.28.2023_signed.pdf Acceptance Letter - 3222 Tejon - 07.28.2023_signed.pdf Acceptance Letter_ 1939 W 32nd Ave - Steve Trese.pdf LSP Survey 3216 3222 3232 N Tejon St 052523.pdf REDLINES- CenturyLink- Letter of No Objection.pdf Turning Exhibits Option 1 - 12.09.2024.pdf Utilites - ESI Land Surveying - Tejon 05.25.23.pdf | ||||
| 2022-RELINQ-0000021 38th and Huron North Partial Relinquishment | RELINQ | — | No report yet | |
| All documents in this project (5) _EXTERNAL_ FW_ 2022-RELINQ-0000021 Updates .msg 2020PM591_North Easement_Original Holding Document - 9200095493.pdf 38th Huron - 2022-RELINQ-0000021 - Lot 1 Block 1 Easement Exhibit - 2026-02-12.pdf doti.pt.2024-302.3-easement-relinquishment-checklist-application -REF 2022-RELINQ-000021.pdf Legal Description - 2022-RELINQ-0000021.pdf | ||||
| 2021-RELINQ-0000013 1235 N Yates Street Sewer Easement | RELINQ | — | No report yet | |
| All documents in this project (8) 1235 N. YATES-ESMNT RELINQ EXHIBIT-R1-230403.pdf 1235 North Yates Street - PROPOSED SITE PLAN.pdf EXHIBIT A-LEGAL DESCRIPTION-R1.docx REDLINES- Centurylink- Key.pdf REDLINES- Survey- Sperling.pdf SUBMITTAL 3_1235 North Yates Street - EASEMENT RELINQUISHMENT APPLICATION.pdf SUBMITTAL 3_1235 North Yates Street - EASEMENT RELINQUISHMENT LETTER and EXHIBIT A.pdf SUBMITTAL 3_1235 North Yates Street - ORIGINAL DEED OF EASEMENT.pdf | ||||
No projects matching your filters.
Source: Denver's public e-Review. "Denial" reflects at least one reviewing agency's
status reading "Denied" as of that report's last update — many are resolved in a later
resubmittal. The 🚲 bike lane flag is a keyword match against project titles, filenames,